CN205019904U - Aluminium casting shop's dust pelletizing system - Google Patents

Aluminium casting shop's dust pelletizing system Download PDF

Info

Publication number
CN205019904U
CN205019904U CN201520764114.3U CN201520764114U CN205019904U CN 205019904 U CN205019904 U CN 205019904U CN 201520764114 U CN201520764114 U CN 201520764114U CN 205019904 U CN205019904 U CN 205019904U
Authority
CN
China
Prior art keywords
dust
sweep
pipes
pipe
house steward
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201520764114.3U
Other languages
Chinese (zh)
Inventor
江钦坚
王传明
徐成钢
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Zhanyi Ruifeng Aluminum Co Ltd
Original Assignee
Zhanyi Ruifeng Aluminum Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Zhanyi Ruifeng Aluminum Co Ltd filed Critical Zhanyi Ruifeng Aluminum Co Ltd
Priority to CN201520764114.3U priority Critical patent/CN205019904U/en
Application granted granted Critical
Publication of CN205019904U publication Critical patent/CN205019904U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Casting Support Devices, Ladles, And Melt Control Thereby (AREA)

Abstract

The utility model discloses an aluminium casting shop's dust pelletizing system, including casting shop and dust removal workshop, casting shop and dust removal workshop are through the total union coupling of dust absorption, be provided with a plurality of holding furnaces in the casting shop, no. Three dust absorption pipes at the top of holding furnace, no. Three dust absorptions pipe exit linkage dust absorption house steward, be equipped with charge door and discharge gate on the holding furnace lateral wall, the top of charge door is equipped with a suction hood and a dust absorption pipe, the top of discharge gate is equipped with no. Two suction hoods and no. Two dust absorption pipes, a dust absorption pipe, no. Two dust absorption pipes, after collecting the dust, no. Three dust absorptions pipe assembles in the dust absorption house steward, the dust removal workshop is connected gradually through the dust exhaust pipe by water cooler, cyclone, centrifugal fan, bag collector and forms. The utility model relates to a rationally, gather dust thoroughly comprehensively, do not keep the dead angle, can reduce the temperature that gets into the sack cleaner smoke and dust effectively, reduce the frequency that the sack burnt out, reduction in production cost.

Description

A kind of dust pelletizing system of aluminum casting workshop
Technical field
The utility model relates to electrolytic aluminium process equipment, particularly a kind of dust pelletizing system of aluminum casting workshop.
Background technology
In the casting process of aluminium, need to carry out melting in the process of casting aluminium ingot, in the process of melting, a lot of flue dust can be produced in foundry.These flue dust mainly come from three parts, and one is that holding furnace is at the high-temperature dust carrying out producing in the process of slag making, refining to aluminum melt and flue gas; Two be holding furnace open fire door carry out feeding in raw material, skim operation time, overflow the flue gas that comes and dust from fire door, three is the flue dust opening generation when discharging opening carries out discharging after holding furnace refining.Reclaim if this three parts flue dust does not add and directly discharge, not only can cause serious environmental pollution, the health of harm workman, and being also a kind of waste greatly to resource.Therefore need the dust pelletizing system developing a kind of aluminum ingot casting workshop to meet the needs of environmental protection.At present, most of aluminum ingot casting factory, in order to save cost, only collects the flue dust in holding furnace, and does not collect the flue dust that charge door and discharging opening are discharged, the volume of smoke of charge door and discharging opening discharge spreads in workshop for a long time, very unfavorable to the health of workman.Also the flue dust collected in stove is directly entered dedusting in sack cleaner by some Foundry Works, because the flue dust temperature of discharging in stove is very high, is easy to cloth bag to burn out, not only affects the normal work of dust pelletizing system, also need frequently to change cloth bag, increases the cost of casting.The utility model proposes a kind of dust pelletizing system of aluminum casting workshop for the problems referred to above, and this system can collect the flue dust produced in aluminum casting process in all directions, does not stay dead angle; And can effectively reduce the temperature entering bag-type dust room flue dust, reduce the frequency that cloth bag burns out, reduce the production cost of aluminum casting.Native system is a kind of reasonable in design, dedusting thoroughly comprehensive, good dedusting effect, can effectively reduce cleaner operation and maintenance cost, the aluminum casting dust removal system for workshop of increasing economic efficiency.
Utility model content
The purpose of this utility model is to provide a kind of reasonable in design, dedusting thoroughly comprehensive, good dedusting effect, can effectively reduce cleaner operation and maintenance cost, the aluminum casting dust removal system for workshop of increasing economic efficiency.
The purpose of this utility model realizes like this, comprise between foundry and dedusting car, be connected by dust suction house steward between foundry with dedusting car, some holding furnaces are provided with in foundry, holding furnace sidewall is provided with charge door and discharging opening, it is characterized in that: the top of described holding furnace is arranged with two No. three sweep-up pipes, No. three sweep-up pipe outlets connect dust suction house steward, the top of charge door is provided with a dust shield, the top of a dust shield connects a sweep-up pipe, the top of discharging opening is provided with No. two dust shields, the top of No. two dust shields connects No. two sweep-up pipes, a sweep-up pipe, the outlet of No. two sweep-up pipes is connected on No. three sweep-up pipes corresponding with its position, dust suction house steward is converged at after No. three sweep-up pipes collect dust, the water cooler, cyclone dust collectors, centrifugal blower, the sack cleaner that are linked in sequence successively by dust flue is provided with between described dedusting car, dust suction house steward is closed by blind plate one end, and the other end is connected with the import of water cooler, and the front end of dust flue is connected with the outlet of water cooler, and rear end is connected with sack cleaner after cyclone dust collectors, centrifugal blower.
The utility model is by by arranging No. three sweep-up pipes at the furnace roof of holding furnace, holding furnace can be collected at the flue dust carrying out producing in the process of slag making, refining, again by arranging dust excluding hood and sweep-up pipe above charge door, discharging opening, the flue dust produced when can be collected in reinforced and discharging.And the utility model increases water cooler and cyclone dust collectors in sack cleaner front end, and the temperature of flue dust can reduce by water cooler, and cyclone dust removal can remove oarse-grained dust before flue dust carries out sack cleaner.Meet the temperature entering flue dust needed for sack cleaner on the one hand, ensure the effect of sack cleaner on the other hand.The utility model is reasonable in design, gather dust thoroughly comprehensively, do not stay dead angle; And can effectively reduce the temperature entering sack cleaner flue dust, reduce the frequency that cloth bag burns out, reduce the production cost of aluminum casting.
Accompanying drawing explanation
Fig. 1 is overall structure schematic diagram of the present utility model;
In figure: 1-holding furnace, 2-charge door, 3-dust shield, 4-sweep-up pipe, 5-No. tri-sweep-up pipes, 6-dust suction house steward, 7-water cooler, 8-cyclone dust collectors, 9-dust flue, 10-is flexible coupling, 11-centrifugal blower, 12-bearing housing, 13-motor, 14-sack cleaner, 1401-dust collecting box, 1402-ash discharging hole, 15-blind plate, 16-No. bis-sweep-up pipes, 17-No. bis-dust shields, 18-discharging opening.
Detailed description of the invention
Be further described the utility model below in conjunction with accompanying drawing, but limited the utility model never in any form, any change done based on the utility model training centre or improvement, all belong to protection domain of the present utility model.
As shown in Figure 1, the utility model comprises between foundry and dedusting car, be connected by dust suction house steward 6 between foundry with dedusting car, some holding furnaces 1 are provided with in foundry, holding furnace 1 sidewall is provided with charge door 2 and discharging opening 18, it is characterized in that: the top of described holding furnace 1 is arranged with two No. three sweep-up pipes 5, No. three sweep-up pipes 5 export and connect dust suction house steward 6, the top of charge door 2 is provided with a dust shield 3, the top of a dust shield 3 connects a sweep-up pipe 4, the top of discharging opening 18 is provided with No. two dust shields 17, the top of No. two dust shields 17 connects No. two sweep-up pipes 16, a sweep-up pipe 4, the outlet of No. two sweep-up pipes 16 is connected on No. three sweep-up pipes 5 corresponding with its position, dust suction house steward 6 is converged at after No. three sweep-up pipes 5 collect dust, the water cooler 7, cyclone dust collectors 8, centrifugal blower 11, the sack cleaner 14 that are linked in sequence successively by dust flue 9 is provided with between described dedusting car, dust suction house steward 6 one end is closed by blind plate 15, and the other end is connected with the import of water cooler 7, and the front end of dust flue 9 is connected with the outlet of water cooler 7, and rear end is connected with sack cleaner 14 after cyclone dust collectors 8, centrifugal blower 11.
Further, the bottom of cyclone dust collectors 8 is provided with star-shaped dust-discharging valve.For the ease of discharging the dust produced through cyclone dust collectors 8 sedimentation.
Further, in order to collect and discharge sack cleaner 14 produce dust, the bottom of sack cleaner 14 is provided with dust collecting box 1401, and the side bottom dust collecting box 1401 is provided with ash discharging hole 1402.
Further, the import and export of centrifugal blower 11 and dust flue 9 connecting portion are provided with elasticity and are flexible coupling 10.Cushioning effect is played to the connection of centrifugal blower 11 and dust flue 9, the tightness that the vibration effect dust flue 9 reducing centrifugal blower 11 operation generation is connected with centrifugal blower 11.
Further, in order to meet process requirements, simplifying process facility, the turning cylinder of centrifugal blower 11 being connected with bearing housing 12, the front end of bearing housing 12 is connected with motor 13, and centrifugal blower 11 drives running by motor 13.
Operation principle of the present utility model is such, first the fire door opening charge door 2 feeds in raw material, charge door 2 can be emerged a large amount of dense smoke immediately, at this moment collected by the dust shield 3 be arranged on above charge door 2, be transported in No. three sweep-up pipes 5 through a sweep-up pipe 4, and finally converge in dust suction house steward 6; When adding material, close fire door, holding furnace starts slag making, refining, also volume of smoke can be produced in this process, collected by No. three sweep-up pipes 5 being arranged on furnace roof and import in dust suction house steward 6, after refining, opening discharging opening 18 when casting, a large amount of flue dust can be produced equally, collect by No. two dust shields 17 be arranged on above discharging opening 18 and be pooled in dust suction house steward 6.These flue dust are sent between dedusting car by dust suction house steward 6, first cool through water cooler 7, then enter cyclone dust collectors 8 except the large dust of degranulation, finally under the graviational interaction of centrifugal blower 11, enter sack cleaner 14, dust detention is shown in bag, and pure qi (oxygen) is discharged in air through filter bag micropore.After sedimentation after a while, cyclone dust collectors 8 and the collected dust of sack cleaner 14 are discharged respectively by the star-shaped dust-discharging valve of bottom and ash discharging hole 1402.

Claims (5)

1. the dust pelletizing system in an aluminum casting workshop, comprise between foundry and dedusting car, be connected by dust suction house steward (6) between foundry with dedusting car, some holding furnaces (1) are provided with in foundry, holding furnace (1) sidewall is provided with charge door (2) and discharging opening (18), it is characterized in that: the top of described holding furnace (1) is arranged with two No. three sweep-up pipes (5), No. three sweep-up pipe (5) outlets connect dust suction house steward (6), the top of charge door (2) is provided with a dust shield (3), the top of a dust shield (3) connects a sweep-up pipe (4), the top of discharging opening (18) is provided with No. two dust shields (17), the top of No. two dust shields (17) connects No. two sweep-up pipes (16), a sweep-up pipe (4), the outlet of No. two sweep-up pipes (16) is connected on No. three sweep-up pipes (5) corresponding with its position, dust suction house steward (6) is converged at after No. three sweep-up pipes (5) collect dust, the water cooler (7), cyclone dust collectors (8), centrifugal blower (11), the sack cleaner (14) that are linked in sequence successively by dust flue (9) is provided with between described dedusting car, dust suction house steward (6) one end is closed by blind plate (15), the other end is connected with the import of water cooler (7), the front end of dust flue (9) is connected with the outlet of water cooler (7), and rear end is connected with sack cleaner (14) after cyclone dust collectors (8), centrifugal blower (11).
2. the dust pelletizing system in a kind of aluminum casting workshop according to claim 1, is characterized in that: the bottom of described cyclone dust collectors (8) is provided with star-shaped dust-discharging valve.
3. the dust pelletizing system in a kind of aluminum casting workshop according to claim 1, is characterized in that: the bottom of sack cleaner (14) is provided with dust collecting box (1401), and the side of dust collecting box (1401) bottom is provided with ash discharging hole (1402).
4. the dust pelletizing system in a kind of aluminum casting workshop according to claim 1, is characterized in that: the import and export of centrifugal blower and dust flue (9) connecting portion are provided with elasticity and are flexible coupling (10).
5. the dust pelletizing system in a kind of aluminum casting workshop according to claim 1, it is characterized in that: the turning cylinder of centrifugal blower (11) is connected with bearing housing (12), the front end of bearing housing (12) is connected with motor (13), and centrifugal blower (11) is driven by motor (13).
CN201520764114.3U 2015-09-30 2015-09-30 Aluminium casting shop's dust pelletizing system Expired - Fee Related CN205019904U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201520764114.3U CN205019904U (en) 2015-09-30 2015-09-30 Aluminium casting shop's dust pelletizing system

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201520764114.3U CN205019904U (en) 2015-09-30 2015-09-30 Aluminium casting shop's dust pelletizing system

Publications (1)

Publication Number Publication Date
CN205019904U true CN205019904U (en) 2016-02-10

Family

ID=55252472

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201520764114.3U Expired - Fee Related CN205019904U (en) 2015-09-30 2015-09-30 Aluminium casting shop's dust pelletizing system

Country Status (1)

Country Link
CN (1) CN205019904U (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN105749686A (en) * 2016-04-28 2016-07-13 无锡三达环保科技有限公司 Steelmaking slag treatment dust removing system of AOD furnace
CN112077106A (en) * 2020-08-31 2020-12-15 中色科技股份有限公司 Joint debugging and operation control method for fixed centralized aluminum casting workshop negative pressure cleaning device

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN105749686A (en) * 2016-04-28 2016-07-13 无锡三达环保科技有限公司 Steelmaking slag treatment dust removing system of AOD furnace
CN112077106A (en) * 2020-08-31 2020-12-15 中色科技股份有限公司 Joint debugging and operation control method for fixed centralized aluminum casting workshop negative pressure cleaning device

Similar Documents

Publication Publication Date Title
CN205019904U (en) Aluminium casting shop's dust pelletizing system
CN208340408U (en) A kind of dedicated bag-type dust collecting equipment of Large Electric Furnace smoke gas treatment
CN205002618U (en) Novel high -efficient aluminium ingot production line residual heat from flue gas utilizes system
CN207599714U (en) A kind of waste solid incinerator
CN206843514U (en) Air-cooled metallurgical slag treatment apparatus
CN205730756U (en) Electric furnace dust filtering recovering device
CN202032902U (en) Dust removing and residual heat utilizing system for argon oxygen decarburizing furnace
CN205037778U (en) System is used multipurposely to aluminium casting shop's waste heat
CN202164318U (en) Environmental smoke-collecting device for converter blowing factory buildings
CN210425072U (en) Boiler deslagging and dedusting equipment for power plant
CN201607132U (en) Cyclone condenser used for smoke dust and acid mist
CN205042277U (en) Processing apparatus of thick copper fire refining flue gas
CN210198113U (en) Clean high-efficient aluminium stove flue gas dust collector that melts
CN210568451U (en) Waste lithium battery pyrolysis flue gas energy-saving treatment device
CN206700959U (en) A kind of dust pelletizing system in aluminum casting workshop
CN203184319U (en) Lead powder collecting and recycling device
CN208782558U (en) A kind of distribution network automated implementing device
CN202793035U (en) Corundum arc furnace closed dust removal system
CN102052856A (en) Dust collecting and waste heat utilizing system for argon oxygen decarburization furnace
CN202087435U (en) Cyclone dust collector
CN201136851Y (en) Dust removing system for coke ovens
CN207797775U (en) Ring cold machine is taken heat and dust-extraction unit by shots
CN207507183U (en) A kind of flue gas processing device for cast stone smelting furnace
CN207996876U (en) A kind of Melting of Special Steels workshop dust collector
CN211133373U (en) Dust removal and cooling device for high-temperature furnace operating room

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20160210

Termination date: 20190930