CN205015696U - Urgent shutting -off system redundancy apparatus of platform - Google Patents

Urgent shutting -off system redundancy apparatus of platform Download PDF

Info

Publication number
CN205015696U
CN205015696U CN201520791224.9U CN201520791224U CN205015696U CN 205015696 U CN205015696 U CN 205015696U CN 201520791224 U CN201520791224 U CN 201520791224U CN 205015696 U CN205015696 U CN 205015696U
Authority
CN
China
Prior art keywords
plc
et200m
output module
input module
signal acquiring
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201520791224.9U
Other languages
Chinese (zh)
Inventor
鲍顺义
王双喜
陈明飞
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Zhenjiang SaierNico Automation Co., Ltd.
Original Assignee
Zhenjiang Saiernico Electric & Automation Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Zhenjiang Saiernico Electric & Automation Co Ltd filed Critical Zhenjiang Saiernico Electric & Automation Co Ltd
Priority to CN201520791224.9U priority Critical patent/CN205015696U/en
Application granted granted Critical
Publication of CN205015696U publication Critical patent/CN205015696U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Small-Scale Networks (AREA)

Abstract

The utility model discloses an urgent shutting -off system redundancy apparatus of platform, including a PLC, the 2nd PLC, a ET200M signal acquisition system, the 2nd ET200M signal acquisition system, PROFIBUS field bus, a digital input module, a digital output module, the 2nd digital input module, the 2nd digital output module, a PLC, a ET200M signal acquisition system, a digital input module, a digital output module are the main system, the 2nd PLC, the 2nd ET200M signal acquisition system, the 2nd digital input module, the 2nd digital output module are standby system. The utility model discloses a soft redundant system reliability that increases, the redundant system can be managed because of CPU trouble and the communication cable fault that hardware fault or software error lead to, has increased emergent shutting -off system's security, reliability.

Description

Ocean platform emergency cut-off system redundant apparatus
Technical field
The utility model relates to a kind of ocean platform emergency cut-off system, particularly relates to a kind of ocean platform emergency cut-off system redundant apparatus, belongs to ocean platform technical field.
Background technology
Ocean platform, away from land, adds himself narrow space, pipeline and equipment high concentration again, and its fire hazard is higher than land platform or general chemical industry manufacturing enterprise.Ocean platform emergency cut-off system, as the key equipment of ocean platform, is responsible for platform breaking out of fire or other emergency cut-off tasks in emergency circumstances, and gets rid of rear platform when dangerous situation and still should be able to normally run.Ocean platform emergency cut-off system running status whether stablize the safety and environmental protection situation directly having influence on offshore platform, more and more cause the attention of owner and classification society.
Utility model content
The purpose of this utility model is to provide a kind of ocean platform emergency cut-off system redundant apparatus, increases the security of ocean platform emergency cut-off system, reliability.
The purpose of this utility model is achieved by the following technical programs:
A kind of ocean platform emergency cut-off system redundant apparatus, comprises a PLC, 2nd PLC, one ET200M signal acquiring system, 2nd ET200M signal acquiring system, PROFIBUS fieldbus, first digital quantity input module, first digital output module, second digital quantity input module, second digital output module, a described PLC, one ET200M signal acquiring system, first digital quantity input module, first digital output module is main system, described 2nd PLC, 2nd ET200M signal acquiring system, second digital quantity input module, second digital output module is back-up system, a described PLC is communicated with an ET200M signal acquiring system by PROFIBUS fieldbus, described 2nd PLC is communicated with the 2nd ET200M signal acquiring system by PROFIBUS fieldbus, a described PLC, connected by CAT order wire between 2nd PLC, a described ET200M signal acquiring system, 2nd ET200M signal acquiring system, first digital quantity input module, first digital output module, second digital quantity input module, second digital output module is installed in frame, is communicated by core bus.
The purpose of this utility model can also be realized further by following technical measures:
Aforementioned ocean platform emergency cut-off system redundant apparatus, wherein a PLC, the 2nd PLC are S7-400.
Aforementioned ocean platform emergency cut-off system redundant apparatus, wherein the communication interface module of an ET200M signal acquiring system, the 2nd ET200M signal acquiring system is IM153-2.
Aforementioned ocean platform emergency cut-off system redundant apparatus, wherein PROFIBUS fieldbus adopts 6XV1830-0EH10 order wire.
Aforementioned ocean platform emergency cut-off system redundant apparatus, wherein the first digital quantity input module, the second digital quantity input module are SM321, and the first digital output module, the second digital output module are SM322.
Compared with prior art, the beneficial effects of the utility model are: increase system reliability by soft redundancy, continued to perform user program assembly by standby station after master station breaks down, redundant system can manage the faults such as the broken string that cpu fault because hardware fault or software error cause and communication cable occur, and adds the security of emergency switching-off system, reliability.
Accompanying drawing explanation
Fig. 1 is redundant apparatus circuit diagram of the present utility model.
Embodiment
Below in conjunction with the drawings and specific embodiments, the utility model is described in further detail.
As shown in Figure 1, ocean platform emergency cut-off system redundant apparatus, comprises a PLC, 2nd PLC, one ET200M signal acquiring system, 2nd ET200M signal acquiring system, PROFIBUS fieldbus, first digital quantity input module, first digital output module, second digital quantity input module, second digital output module, a described PLC, one ET200M signal acquiring system, first digital quantity input module, first digital output module is main system, described 2nd PLC, 2nd ET200M signal acquiring system, second digital quantity input module, second digital output module is back-up system, a described PLC is communicated with an ET200M signal acquiring system by PROFIBUS fieldbus, described 2nd PLC is communicated with the 2nd ET200M signal acquiring system by PROFIBUS fieldbus, a described PLC, connected by CAT order wire between 2nd PLC, a described ET200M signal acquiring system, 2nd ET200M signal acquiring system, first digital quantity input module, first digital output module, second digital quantity input module, second digital output module is installed in frame, is communicated by core bus.Wherein a PLC, the 2nd PLC are S7-400.Wherein the communication interface module of an ET200M signal acquiring system, the 2nd ET200M signal acquiring system is that IM153-2, PLC are by this communication interface module and the external device communication of ocean platform emergency cut-off system; PROFIBUS fieldbus adopts 6XV1830-0EH10 order wire; First digital quantity input module, the second digital quantity input module are SM321, and the first digital output module, the second digital output module are that SM322, PLC carry out the input and output of signal by digital quantity input, output module.
The utility model emergency switching-off redundant system is overlapped control system formed by a PLC, the 2nd PLC two.When any one assembly in main system is made mistakes, control task can automatically switch in the middle of back-up system and perform, and at this moment, former main system is for subsequent use, and this handoff procedure is that the entirety comprising power supply, CPU, communication cable and IM153 interface module switches.In system operation, make mistakes even without any assembly, operating personnel also can pass through setup control word, and realize manual main preparation system and switch, this manual switchover process, the software and hardware for control system adjusts, and change, dilatation is very useful.
The utility model redundancy can realize: the redundancies such as I. mainframe power supply, core bus; II.PLC processor redundancy; III.PROFIBUS fieldbus networks redundancy (comprising the redundancy of communication interface, bus contact, bus cable); The communication interface module IM153-2 redundancy at IV.ET200M station.
When redundant system carries out work, under normal circumstances, a PLC, the second PLC control system (processor, communication, I/O) independent operating, grasped the I/O control in ET200 slave station by the PLC of main system.PLC program in main system, back-up system is made up of nonredundancy (non-duplicated) user program section and redundancy (redundantbackup) user program section, main system PLC performs whole user programs, back-up system PLC only performs nonredundancy user program section, and skips redundant subscribers program segment.When main system is out of order, as cpu fault, power fail and network communication fault etc., automatically switch to emergency switching-off system redundancy function for subsequent use.
In addition to the implementation, the utility model can also have other embodiments, and all employings are equal to the technical scheme of replacement or equivalent transformation formation, all drop in the protection domain of the utility model requirement.

Claims (5)

1. an ocean platform emergency cut-off system redundant apparatus, is characterized in that, comprises a PLC, 2nd PLC, one ET200M signal acquiring system, 2nd ET200M signal acquiring system, PROFIBUS fieldbus, first digital quantity input module, first digital output module, second digital quantity input module, second digital output module, a described PLC, one ET200M signal acquiring system, first digital quantity input module, first digital output module is main system, described 2nd PLC, 2nd ET200M signal acquiring system, second digital quantity input module, second digital output module is back-up system, a described PLC is communicated with an ET200M signal acquiring system by PROFIBUS fieldbus, described 2nd PLC is communicated with the 2nd ET200M signal acquiring system by PROFIBUS fieldbus, a described PLC, connected by CAT order wire between 2nd PLC, a described ET200M signal acquiring system, 2nd ET200M signal acquiring system, first digital quantity input module, first digital output module, second digital quantity input module, second digital output module is installed in frame, is communicated by core bus.
2. ocean platform emergency cut-off system redundant apparatus as claimed in claim 1, it is characterized in that, a described PLC, the 2nd PLC are S7-400.
3. ocean platform emergency cut-off system redundant apparatus as claimed in claim 1, it is characterized in that, the communication interface module of a described ET200M signal acquiring system, the 2nd ET200M signal acquiring system is IM153-2.
4. ocean platform emergency cut-off system redundant apparatus as claimed in claim 1, is characterized in that, described PROFIBUS fieldbus adopts 6XV1830-0EH10 order wire.
5. ocean platform emergency cut-off system redundant apparatus according to claim 1, is characterized in that, described first digital quantity input module, the second digital quantity input module are SM321, and the first digital output module, the second digital output module are SM322.
CN201520791224.9U 2015-10-14 2015-10-14 Urgent shutting -off system redundancy apparatus of platform Active CN205015696U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201520791224.9U CN205015696U (en) 2015-10-14 2015-10-14 Urgent shutting -off system redundancy apparatus of platform

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201520791224.9U CN205015696U (en) 2015-10-14 2015-10-14 Urgent shutting -off system redundancy apparatus of platform

Publications (1)

Publication Number Publication Date
CN205015696U true CN205015696U (en) 2016-02-03

Family

ID=55214291

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201520791224.9U Active CN205015696U (en) 2015-10-14 2015-10-14 Urgent shutting -off system redundancy apparatus of platform

Country Status (1)

Country Link
CN (1) CN205015696U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN105353698A (en) * 2015-10-14 2016-02-24 镇江赛尔尼柯电器有限公司 Redundancy device for ocean platform emergency switching-off system

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN105353698A (en) * 2015-10-14 2016-02-24 镇江赛尔尼柯电器有限公司 Redundancy device for ocean platform emergency switching-off system

Similar Documents

Publication Publication Date Title
CN104440923B (en) A kind of emergent stop signal control system for robot and robot thereof
CN102866690B (en) Redundancy switching method between Redundant process control station in scattered control system
CN103822539B (en) A kind of rocket ground test control system based on redundancy structure
CN101886530B (en) Deepwater blowout preventer set electric control system based on FPGAs (Field Programmable Gate Arrays)
CN204103598U (en) A kind of redundancy protection systems of transformer station
CN103472776A (en) Safety control method and safety control system for communication interruption of upper computer and lower computer
CN201805421U (en) Communication device between direct current (DC) protection systems and DC control systems
CN205015696U (en) Urgent shutting -off system redundancy apparatus of platform
CN103401748A (en) Shield machine hot standby control system and method
CN102819252B (en) Method for realizing multi-redundancy of process control station in distributed control system
CN204695092U (en) A kind of pcs system of boron heating system
CN105353698A (en) Redundancy device for ocean platform emergency switching-off system
CN107528725A (en) A kind of boss station warning information transmission realizing method based on service subscription mode
CN210442679U (en) Air brake control system based on PLC and data bus technology
CN203014480U (en) Redundant device of ship power station management system
CN108391015B (en) Fault detection and alarm system for dispatching soft switch IP telephone
CN211906004U (en) Profibus-DP bus redundancy control system
CN203352281U (en) Automatic measuring and controlling device for electricity distribution network
CN103595492B (en) CDT channel fault alarm system
CN206211657U (en) The double set uninterrupted power source electric power systems in power station centralized control center
CN202486229U (en) Lightning arrester on-line monitoring system
CN105445522A (en) High reliability all-fiber current transformer
CN205583650U (en) Differential protective system is opened by photovoltaic power plant transformer
CN204721205U (en) Shunt chopper redundancy control apparatus
CN204391898U (en) A kind of across structure multifunctional electrical monitoring system

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
EE01 Entry into force of recordation of patent licensing contract

Assignee: Zhenjiang SaierNico Automation Co., Ltd.

Assignor: Zhenjiang SaierNico Electric & Automation Co., Ltd.

Contract record no.: 2016320000178

Denomination of utility model: Redundancy device for ocean platform emergency switching-off system

Granted publication date: 20160203

License type: Exclusive License

Record date: 20160721

LICC Enforcement, change and cancellation of record of contracts on the licence for exploitation of a patent or utility model
TR01 Transfer of patent right

Effective date of registration: 20180118

Address after: 212009 Zhenjiang city in Jiangsu Province Economic Development Zone South Road two

Patentee after: Zhenjiang SaierNico Automation Co., Ltd.

Address before: 212009 Zhenjiang city in Jiangsu Province Economic Development Zone South Road two

Patentee before: Zhenjiang SaierNico Electric & Automation Co., Ltd.

TR01 Transfer of patent right