CN205000898U - Leafy hosqe bit of drilling bored concrete pile list waist - Google Patents

Leafy hosqe bit of drilling bored concrete pile list waist Download PDF

Info

Publication number
CN205000898U
CN205000898U CN201520188314.9U CN201520188314U CN205000898U CN 205000898 U CN205000898 U CN 205000898U CN 201520188314 U CN201520188314 U CN 201520188314U CN 205000898 U CN205000898 U CN 205000898U
Authority
CN
China
Prior art keywords
leafy
waist
bit
drill bit
hole
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201520188314.9U
Other languages
Chinese (zh)
Inventor
刘军
凌阳
张剑
沈建成
裘炜炜
应征东
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Zhejiang Yu Jian Construction Group Co Ltd
Original Assignee
Zhejiang Yu Jian Construction Group Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Zhejiang Yu Jian Construction Group Co Ltd filed Critical Zhejiang Yu Jian Construction Group Co Ltd
Priority to CN201520188314.9U priority Critical patent/CN205000898U/en
Application granted granted Critical
Publication of CN205000898U publication Critical patent/CN205000898U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Earth Drilling (AREA)

Abstract

The utility model belongs to building construction field, concretely relates to leafy hosqe bit of drilling bored concrete pile list waist, process flow: fix a position lofting -> take one's place centering -> pore -forming -> for the first time under the clear hole -> steel reinforcement cage -> downcomer -> for the second time clear hole -> irritate the concrete, leafy hosqe bit of drilling bored concrete pile list waist, including the leafy cone drill bit of single waist, the fixed welding of the leafy cone drill bit of single waist end has a clamping orient drum, and the circumference of clamping orient drum one end distributes on along the mouth has a plurality of clamping orient drum wolfram steel heads. The utility model has the advantages of the perpendicularity of the good pore -forming of guidance quality is high, and the dado is made good use of, and it is convenient to arrange the sediment, and fast, the broken rock of pore -forming is fast.

Description

The leafy hosqe bit of a kind of bored pile list waist
Technical field
The utility model belongs to the realm of building construction, is specifically related to the leafy hosqe bit of a kind of bored pile list waist.
Background technology
Emerging in large numbers in recent years along with engineerings such as large scale industry, civilian construction, highrise buildings, direct foundation can not meet load requirement, and the advantages such as bored pile is large with its strong adaptability, bearing capacity, moderate cost, easy construction become the base form that construction work often adopts.But in highrise building, adopt bored pile foundation to be bearing stratum mainly with apoplexy rock stratum greatly.
Drilling pouring pile hole embedding rock in soft clay area generally adopts taper bit, rock bit and hosqe bit.
The steering capability of taper bit is poor, and easily collapse in pore forming process hole, enters rate of penetration after rock slow, meets comparatively hard formation and have gradient rock stratum drill bit to want pogo stick.Adopt its pore-forming time of rock bit slightly long, cost is higher, and drill bit is also expensive and itself is comparatively heavy, adds labour intensity and the process cost of construction.
When adopting hosqe bit to creep into, be rely on the tooth being contained in bottom periphery to be cut off by periphery rock after entering rock, rock constantly declines with drill bit and pierces in cylinder simultaneously, gets into correct position when carrying brill, side door closes up to be embraced rock in cylinder, and lower pressing door pours out rock.Hosqe bit also exists that drill bit is expensive, drill bit is heavy, also needs to carry brill and pours out rock, add labour intensity and the process cost of construction equally.This brings certain difficulty just to bored pile in work progress.
In view of the above circumstances, for the practical difficulty that drilling pouring pile hole and embedding rock are constructed in construction, the leafy hosqe bit of a kind of bored pile list waist after improving is adopted effectively to solve the problem.
Utility model content
First object of the present utility model is to provide a kind of bored pile list waist leafy hosqe bit drilling construction method, to overcome shortcoming of the prior art.
For achieving the above object, the utility model specifically provides technical scheme to be: a kind of bored pile list waist leafy hosqe bit drilling construction method, technological process: construction layout → centering → pore-forming → first time in place clear hole → descending reinforcing cage → downcomer → second time hole → filling concrete clearly.
Further, described construction layout: surveying and locating, buries casing underground, guarantee shield-tube embedment slightly deviation time, ensure that drill bit can be correctly in place, and carry brill smoothly; The soil layer casing length low at water level is 1.2M, and the soil layer casing length that water level is higher is 2M.
Further, described centering in place: drilling rod, to after turntable leveling, adopts the verticality of the main drilling rod of transit survey in the orthogonal both direction of rig plane, guarantees the two waistband drill bit of vertical rear installation.
Further, in boring procedure, check the levelness of drilling machine platform at any time, find, adjust in time; Penetration rate according to different soil, the adjustment of stake footpath, can must slow down penetration rate, make all not bear drilling tool gravity at the bottom of hole, to reduce the resistance of single waist leafy hole formula drill bit pore-forming and middle weathered layer after entering rock; When boring reaches projected depth, should shut down in time, aperture, hole depth are checked, start to carry out once clear hole.
Further, descending reinforcing cage, install reinforcing cage, answers both sides symmetry to hang, guarantees that skeleton is vertically slowly transferred, and reinforcing cage top mark of controlling well is high, hangs muscle be fixed on correct elevation location with two, ensures that reinforcement cage skeleton does not sink to floating.
Further, put conduit, prepare corresponding conduit joint number according to hole depth, when transferring conduit, position is correct, and bayonet socket screws; With the space ensuring about 30-50CM at the bottom of hole at the bottom of conduit, prevent conduit from entering in sediment and concrete cannot be gushed out outside pipe.
Further, secondary pile hole cleaning, carries out secondary pile hole cleaning after putting conduit well, surveys sediment thickness; Perfusion concrete, concrete slump should control at 18CM-22CM; Beginning quantity should ensure to make conduit imbed more than 1M in concrete; According to pile diameter domination pipe-pulling speed, pipe laying depth is unsuitable too small or excessive, controls between 4-6M.
Another object of the present utility model is to provide a kind of bored pile list waist leafy hosqe bit, to be applied to construction method described above.
For achieving the above object, the concrete technical scheme that the utility model provides is: the leafy hosqe bit of a kind of bored pile list waist, comprise the leafy taper bit of single waist, the leafy tapered bur head end of single waist is fixedly welded with positioning and guiding cylinder, the circumferential rim mouth of positioning and guiding cylinder one end is distributed with some positioning and guiding cylinder wolfram steel heads.
Further, the leafy taper bit of described single waist comprises drilling rod, the outer peripheral face of drilling rod is fixedly welded with some horizontal leaves, and some horizontal leaves are connected by horizontal loop; Described drilling rod is connected by some oblique leaves with horizontal loop, and the oblique end of blade of described drilling rod is fixedly welded with triangle drill bit, and this triangle drill bit is positioned at positioning and guiding cylinder.
Further, described some oblique leaves are fixedly welded with some oblique leaf wolfram steel heads, the oblique leaf wolfram steel head interval on described adjacent oblique leaf is arranged; Described triangle drill bit is fixedly welded with some triangles and bores wolfram steel head.
Realize technique scheme, the utility model compared with prior art has following characteristics:
One, the verticality of the good pore-forming of guidance quality is high: when adopting the leafy taper bit of common single waist to construct, in drilling process, taper bit something or somebody to fall back on portion conical head leads and breaks rock, guiding position is point-like, when guide head encounters the layer position of soft or hard inequality, easily partially enter toward soft subgrade soil direction, and then cause hole deviation, meet comparatively hard formation and have gradient rock stratum drill bit to want bouncing of drilling tool, sliding to bore and the breaking of rod, and the formula drill guide position, single waist leafy hole after improving is steel plate material circular bucket shape bottom belt wolfram steel head.When creeping into, wolfram steel head at the bottom of positioning and guiding cylinder is first carved into circular groove in rock stratum and is fixed drill bit, and the drill bit in centre carries out brokenly rock, thus the direction overcoming point-like motion is uncertain, ensures the verticality of pore-forming.
Two, retaining wall is made good use of: the leafy taper bit of common single waist is in drilling process, and be neutral gear substantially below drill bit waistband, during drill bit rotational, the mud direction of motion is synchronous with drill bit, is formed wash away hole wall.Easily cause collapse hole and borehole enlargement, single waist leafy hole formula drill bit after improvement is because horizontal blade and oblique vane are with the inclination angle of 45 degree, mud vertically rises from drilling rod position, and there is again good retaining wall effect positioning and guiding barrel head position, can reduce washing away hole wall.
Three, deslagging is convenient: hosqe bit enters rock and rock cut off needs and carries brill and pour out rock.And single waist leafy hole formula drill bit is not owing to all closing up and down, rock disintegrating slag can be discharged by mud buoyancy from drill bit internal along drilling rod.
Four, fast, the broken rock speed of pore-forming is fast: single waist leafy hole formula drill bit is by the broken rock in multiple wolfram steel head paddle-tumble location on positioning and guiding cylinder, again by middle taper bit detritus, wolfram steel head reaming on oblique vane, therefore substantially increases pore-forming and breaks rock speed.
Accompanying drawing explanation
Fig. 1 is the leafy hosqe bit structural representation of the utility model list waist; Fig. 2 is the leafy hosqe bit sectional view of the utility model list waist.
Detailed description of the invention
As shown in Figure 1, 2, what the utility model disclosed is the leafy hosqe bit of a kind of bored pile list waist, comprise the leafy taper bit 10 of single waist, single waist leafy taper bit 10 end is fixedly welded with positioning and guiding cylinder 6, the circumferential rim mouth of positioning and guiding cylinder 6 one end is distributed with some positioning and guiding cylinder wolfram steel heads 7.
Further, the leafy taper bit 10 of described single waist comprises drilling rod 1, the outer peripheral face of drilling rod 1 is fixedly welded with some horizontal leaves 3, and some horizontal leaves 3 are connected by horizontal loop 2; Described drilling rod 1 is connected by some oblique leaves 4 with horizontal loop 2, and oblique leaf 4 end of described drilling rod 1 is fixedly welded with triangle drill bit 9, and this triangle drill bit 9 is positioned at positioning and guiding cylinder 6.
Further, described some oblique leaves 4 are fixedly welded with some oblique leaf wolfram steel heads 5, oblique leaf wolfram steel head 5 interval on described adjacent oblique leaf 4 is arranged; Described triangle drill bit 9 is fixedly welded with some triangles and bores wolfram steel head 8.
A kind of bored pile list waist leafy hosqe bit drilling construction method, concrete steps are as follows:
A. surveying and locating
B. bury casing (steel pile casting adopt 5MM steel plate make) underground, guarantee shield-tube embedment slightly deviation time, ensure that drill bit can be correctly in place, and carry brill smoothly.The soil layer casing length low at water level is 1.2M, and the soil layer casing length that water level is higher is 2M.Principle guarantee casing enters undisturbed soil 50CM, and about 30CM above ground level, to guarantee the head pressure being not less than 1M.
C. drilling rod is to after turntable leveling, adopts the verticality of the main drilling rod of transit survey in the orthogonal both direction of rig plane, guarantees the single waistband drill bit of vertical rear installation.Carefully should check the size diameter of drill bit before drill bit is installed, after installing, check whether drill bit is connected with drilling rod firm, and whether drill bit, connector and drilling rod have the hidden danger such as crack to exist.
D., in sandy soil stratum, forbid to use clear water perforate, should prepare proportion is that 1.3-1.4 mud enter in mud pit and hole.Every platform pile foundation should arrange 2 mud pits simultaneously, and the mud of hole Inner eycle is introduced into after sedimentation basin precipitates and flows into second mud pit again.
E. in boring procedure, check the levelness of drilling machine platform at any time, find, adjust in time.Penetration rate can according to different soil, the adjustment of stake footpath.When soil property plasticity is better, stake footpath is less, when resistance is less in drilling process, suitably penetration rate should be accelerated., gravel layer, soft or hard soil layer poor in soil property plasticity join, stake footpath is comparatively large, should slow down penetration rate when resistance is larger in drilling process.Should be specifically noted that and must slow down penetration rate after entering rock, make all not bear drilling tool gravity at the bottom of hole, to reduce the resistance of single waist leafy hole formula drill bit pore-forming and middle weathered layer.Can not creep into by force when there is bit freezing, should first on carry drill bit after, then to creep into, otherwise easily cause drill rod breaking, fall the quality accidents such as brill.
F. bore operation is put into several classes and is carried out continuously, does not interrupt.When stopping for some reason in the borehole to bore, one is the mud guaranteeing to have predetermined water level and corresponding proportion, prevents collapse hole; Two is carry about 2M by drill bit, in case boring mud precipitates and buries drill bit, causes quality accident.
G. because single waist leafy hole formula drill bit pore-forming is larger than normal drill bit weight, when lifting drilling tool, should smooth operation be ensured, when drill bit promotes, prevent collision casing, hole wall and the phenomenon at the bottom of hook casing and occur.
H. when boring reaches projected depth, should shut down in time.Aperture, hole depth are checked, test oneself qualified after, report Supervision survey, starts to carry out once clear hole after agreement.
I. after reaching projected depth, start first time clear hole, after first time, clear hole completed, carry drilling rod, descending reinforcing cage, downcomer, carry out second time hole clearly, the complete survey sediment thickness in clear hole, sediment thickness reaches placing of concrete after designing requirement.
J. descending reinforcing cage.The on-the-spot merogenesis of reinforcing cage makes, and length is determined according to the stake of actual hole depth is long, ensures that joint staggers by 50%, and same reinforcing bar two joints stagger more than 35d; Fabrication of reinforcing cage can use after well reporting management acceptance(check) afterwards; Reinforcing cage connects employing single-selded lap joint, and length is 12d, takes appointment with certificate, and ensure that weld seam is full, length meets code requirement; Install reinforcing cage, answers both sides symmetry to hang, guarantees that skeleton is vertically slowly transferred, and reinforcing cage top mark of controlling well is high, hangs muscle be fixed on correct elevation location with two, ensures that reinforcement cage skeleton does not sink to floating (mainly referring to that reinforcing cage is not the stake of full cage).
K. conduit is put.Corresponding conduit joint number is prepared, one-time-reach-place when ensureing to install according to hole depth; When transferring conduit, position should be correct, and bayonet socket screws; From the space (pile diameter dominations according to different) ensuring about 30-50CM at the bottom of hole at the bottom of conduit, prevent conduit from entering in sediment and concrete cannot be gushed out outside pipe; Separately avoid at the bottom of hole too high, make the first bucket concrete perfusion cannot bury conduit mouth or depth of tremie very little, mud again pours in conduit and forms folder mud, affects pile quality.
L. secondary pile hole cleaning.Carry out secondary pile hole cleaning after putting conduit well, survey sediment thickness, meet after the management of designing requirement report is agreed to and start concrete perfusion.
M. concrete is poured into.Concrete slump should control at 18CM-22CM; Beginning quantity should ensure to make conduit imbed more than 1M in concrete; According to pile diameter domination pipe-pulling speed, pipe laying depth is unsuitable too small or excessive, controls between 4-6M.
Bored pile uses single waist leafy hole formula drill bit drilling construction, its construct with common drilling pile drill compared with benefit obvious:
Bored pile construction adopts single waist leafy hole formula drill bit drilling construction, solves stake holes deflection, enters rock drilling depth slow, the quality problems such as hole of easily collapsing, thus ensure that hole quality.Greatly reduce the probability of cleaning bottom of hole and redrilling, save the direct cost (as: charges for water and electricity, labour cost etc.) of construction.
While guarantee hole quality, accelerate the speed transferring reinforcing cage.Workload of doing over again also greatly reduces, thus accelerates construction speed.
Bored pile adopts single waist leafy hole formula drill bit pore-forming in middle weathered layer construction, plays the effect of righting, guiding, plays a significant role in control pile body verticality; Simultaneously due to single waist leafy hole formula drill bit pore-forming mud off better effects if compared with common brill.Guarantee is have also been obtained in control concrete fullness coefficient.Can not tilt because of hole wall, cause fullness coefficient excessive after collapse hole, cleaning bottom of hole, and waste a large amount of concretes.According to record, use the actual fullness coefficient of construction king-pile of normal drill bit in the area such as sandy soils, the uneven soil layer of sand soft or hard generally between 1.3-1.4.And adopt single waist leafy hole formula drill bit drilling construction fullness coefficient between 1.1-1.2.
Above-mentioned fact Example is only for explaining the design that the utility model patent is described; but not the restriction to the protection of the utility model patent right; all changes utilizing this design the utility model patent to be carried out to unsubstantiality; such as change bar cross section; plant bulk changes, and all should fall into the protection domain of the utility model patent.

Claims (2)

1. the leafy hosqe bit of bored pile list waist, it is characterized in that: comprise the leafy taper bit of single waist, the leafy tapered bur head end of single waist is fixedly welded with positioning and guiding cylinder, the circumferential rim mouth of positioning and guiding cylinder one end is distributed with some positioning and guiding cylinder wolfram steel heads; The leafy taper bit of described single waist comprises drilling rod, the outer peripheral face of drilling rod is fixedly welded with some horizontal leaves, and some horizontal leaves are connected by horizontal loop; Described drilling rod is connected by some oblique leaves with horizontal loop, and the oblique end of blade of described drilling rod is fixedly welded with triangle drill bit, and this triangle drill bit is positioned at positioning and guiding cylinder.
2. the leafy hosqe bit of a kind of bored pile list waist according to claim 1, is characterized in that: described some oblique leaves are fixedly welded with some oblique leaf wolfram steel heads, and the oblique leaf wolfram steel head interval on described adjacent oblique leaf is arranged; Described triangle drill bit is fixedly welded with some triangles and bores wolfram steel head.
CN201520188314.9U 2015-03-31 2015-03-31 Leafy hosqe bit of drilling bored concrete pile list waist Expired - Fee Related CN205000898U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201520188314.9U CN205000898U (en) 2015-03-31 2015-03-31 Leafy hosqe bit of drilling bored concrete pile list waist

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201520188314.9U CN205000898U (en) 2015-03-31 2015-03-31 Leafy hosqe bit of drilling bored concrete pile list waist

Publications (1)

Publication Number Publication Date
CN205000898U true CN205000898U (en) 2016-01-27

Family

ID=55157793

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201520188314.9U Expired - Fee Related CN205000898U (en) 2015-03-31 2015-03-31 Leafy hosqe bit of drilling bored concrete pile list waist

Country Status (1)

Country Link
CN (1) CN205000898U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN104747088A (en) * 2015-03-31 2015-07-01 浙江禹建建设集团有限公司 Single-waist multi-leaf hose bit for bored pile and drilling construction method thereof

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN104747088A (en) * 2015-03-31 2015-07-01 浙江禹建建设集团有限公司 Single-waist multi-leaf hose bit for bored pile and drilling construction method thereof

Similar Documents

Publication Publication Date Title
CN104747088B (en) A kind of leafy hosqe bit of cast-in-situ bored pile list waist and drilling construction method
CN103850249B (en) Long spire is squeezed into rock filling pile construction technology
CN104631470B (en) The large particle diameter sand gravel of high water level geology deep basal pit combination supporting construction method
CN107524138B (en) Construction method of ultra-deep foundation pit underground diaphragm wall
CN106988302B (en) A kind of high inclination-angle competent bed rotary digging pile driving construction engineering method
AU2021106928A4 (en) Construction method for excavation of deep pit with triaxial mixing pile waterstop curtains and rotary bored cast-in-place pile supports
CN203846485U (en) Long pile percussion drill hole forming construction device
CN103088814A (en) Rotary drilling rig coordinated with percussion drill hole-forming construction method
CN107724383B (en) Rotary digging cast-in-place pile construction method
CN102720186B (en) Underwater once pouring method for variable cross-section bored cast-in-place pile
CN109555116A (en) A kind of high density karst intense development area fully-sleeved filled pile construction method
CN105951747B (en) A kind of construction method of the pre-buried lattice column of contrary sequence method
CN104631438B (en) Long auger guncreting uplift pile construction method
CN105780763A (en) Construction method of medium-hole vibrating casing wall protection type long spiral cast-in-situ bored pile
CN108166483A (en) Bored pile construction method
CN105275381A (en) Drilling construction method for water-rich cobble stratum by utilizing impact drill
CN107448137A (en) A kind of rig that circles round enters the construction method of rock pore-forming
CN110629747A (en) Full-casing full-rotation construction process for pile foundation under complex geological conditions
CN104164881A (en) Piling wall overlapping cantilever foundation pit support construction method and structure
CN106988305A (en) A kind of pile-column pier construction method of underground integrated molding
CN110258512A (en) It constructs in a kind of basement rock the method for diaphram wall
CN107083932A (en) The installation method of steel pipe column in the clean cycle equipment that drills and pilot tunnel
CN105926592A (en) Construction method of hole drilling pile
CN206721870U (en) A kind of long auger guncreting pile steel reinforcement cage
CN107653878A (en) Cast-in-situ bored pile is reusable to be longitudinally separated formula steel pile casting construction

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20160127

Termination date: 20170331

CF01 Termination of patent right due to non-payment of annual fee