CN205000530U CN201520693007.6U CN201520693007U CN205000530U CN 205000530 U CN205000530 U CN 205000530U CN 201520693007 U CN201520693007 U CN 201520693007U CN 205000530 U CN205000530 U CN 205000530U
Authority
CN
China
Prior art keywords
connecting portion
montant
buckling groove
low layer
utility
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201520693007.6U
Other languages
Chinese (zh)
Inventor
林杰超
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
HAIYAN MDHO ELECTRICAL APPLIANCE TECHNOLOGY Co Ltd
Original Assignee
HAIYAN MDHO ELECTRICAL APPLIANCE TECHNOLOGY Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by HAIYAN MDHO ELECTRICAL APPLIANCE TECHNOLOGY Co Ltd filed Critical HAIYAN MDHO ELECTRICAL APPLIANCE TECHNOLOGY Co Ltd
Priority to CN201520693007.6U priority Critical patent/CN205000530U/en
Application granted granted Critical
Publication of CN205000530U publication Critical patent/CN205000530U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Joining Of Building Structures In Genera (AREA)

Abstract

The utility model discloses a high low layer tie -beam, including first connecting portion, montant, joint groove, second connecting portion, first connecting portion are established on the top of montant, and first connecting portion level sets up, first connecting portion are located the montant right side, and first connecting portion high order end links to each other with the montant, establish at the montant middle part in the joint groove, joint trench in montant left side, the right side wall in joint groove links to each other with the montant, the second connecting portion are established in the montant bottom, and second connecting portion level sets up, the second connecting portion are located the montant left side, and second connecting portion low order end links to each other with the montant, there is a vertical arch in second connecting portion left side. The utility model discloses simple structure, reasonable in design, simple to operate can make furred ceiling tightness gap after the connection, connects more stably, has improved work efficiency greatly.

Description

A kind of high low layer tie-beam
[technical field]
The utility model relates to the technical field of building materials, particularly a kind of technical field of high low layer tie-beam.
[background technology]
Along with the raising of people's living standard, the finishing requirements of people to room is more and more higher, general office and family all can pay much attention to the device on roof when fitting up, common decoration adopts suspended ceiling, although existing ceiling material is different, but the structure adopted is substantially identical, first fixing anyhow staggered wheel hub on roof is needed during installation, then ceiling is arranged on wheel hub, but this decoration can not meet the requirement of people, seem more attractive in appearance to make family and office, highlight the different grades of people, devise the ceiling decoration of differing heights structure, although this high and low layered furred ceiling better appearance, also the needs of people are met, but install cumbersome, the time of finishing considerably increases, add labour intensity, efficiency comparison is low.And due to tie-beam design unreasonable, easily produce gap after installation, connect the situations such as unstable, have impact on the attractive in appearance of furred ceiling and structural stability.
[utility model content]
The purpose of this utility model solves the problems of the prior art exactly, proposes a kind of high low layer tie-beam, furred ceiling can be made in not crack gap upon connection, connect more stable, rational in infrastructure, easy for installation, substantially increase operating efficiency.
For achieving the above object, the utility model proposes a kind of high low layer tie-beam, comprise the first connecting portion, montant, buckling groove, second connecting portion, described first connecting portion is located at the top of montant, first connecting portion is horizontally disposed with, described first connecting portion is on the right side of montant, first connecting portion high order end is connected with montant, described buckling groove is located in the middle part of montant, buckling groove is positioned on the left of montant, the right side wall of described buckling groove is connected with montant, described second connecting portion is located at bottom montant, second connecting portion is horizontally disposed with, described second connecting portion is on the left of montant, second connecting portion low order end is connected with montant, a vertical projection is had on the left of described second connecting portion.
As preferably, described buckling groove is square draw-in groove, and straight up, the A/F of described buckling groove is about 1/2nd of buckling groove top width to buckling groove opening.
As preferably, the angle of described montant and the first connecting portion, the second connecting portion is 90 degree.
As preferably, described vertical projection is positioned at the high order end of the second connecting portion, and the top of described vertical projection is horizontal plane.
The beneficial effects of the utility model: the utility model, by the first connecting portion, montant, buckling groove, the second connecting portion being combined, through optimum experimental, can make furred ceiling in not crack gap upon connection, connect more stable, rational in infrastructure, easy for installation, substantially increase operating efficiency.
Feature of the present utility model and advantage will be described in detail by reference to the accompanying drawings by embodiment.
[accompanying drawing explanation]
Fig. 1 is the structural representation of a kind of high low layer tie-beam of the utility model.
In figure: 1-first connecting portion, 2-montant, 3-buckling groove, 4-second connecting portion, 5-are vertically protruding.
[detailed description of the invention]
Consult Fig. 1, a kind of high low layer tie-beam of the utility model, comprise the first connecting portion 1, montant 2, buckling groove 3, second connecting portion 4, described first connecting portion 1 is located at the top of montant 2, first connecting portion 1 is horizontally disposed with, described first connecting portion 1 is positioned on the right side of montant 2, first connecting portion 1 high order end is connected with montant 2, described buckling groove 3 is located in the middle part of montant 2, buckling groove 3 is positioned on the left of montant 2, the right side wall of described buckling groove 3 is connected with montant 2, described second connecting portion 4 is located at bottom montant 2, second connecting portion 4 is horizontally disposed with, described second connecting portion 4 is positioned on the left of montant 2, second connecting portion 4 low order end is connected with montant 2, one vertical protruding 5 is had on the left of described second connecting portion 2, described buckling groove 3 is square draw-in groove, buckling groove 3 opening straight up, the A/F of described buckling groove 3 is about 1/2nd of buckling groove 3 top width, described montant 2 and the first connecting portion 1, the angle of the second connecting portion 4 is 90 degree, described vertical protruding 5 high order ends being positioned at the second connecting portion 4, the described vertical top of protruding 5 is horizontal plane.
Utility model works process:
A kind of high low layer tie-beam of the utility model in the course of the work, suspension rod is connected to buckling groove 3, tie-beam fixedly completes, the ceiling board of high level is arranged on the first connecting portion 1, the ceiling board of low layer is arranged on the second connecting portion 4, complete the high low layer connection of ceiling board, on the second connecting portion 4 vertical protruding 5 joint gaps that can effectively prevent furred ceiling deformation from causing expose, and make furred ceiling more attractive in appearance.The utility model structure is simple, reasonable in design, easy for installation, furred ceiling can be made in not crack gap upon connection, connect more stable, substantially increase operating efficiency.
Above-described embodiment is to explanation of the present utility model, is not to restriction of the present utility model, anyly all belongs to protection domain of the present utility model to the scheme after the utility model simple transformation.

Claims (4)

1. one kind high low layer tie-beam, it is characterized in that: comprise the first connecting portion (1), montant (2), buckling groove (3), second connecting portion (4), described first connecting portion (1) is located at the top of montant (2), first connecting portion (1) is horizontally disposed with, described first connecting portion (1) is positioned at montant (2) right side, first connecting portion (1) high order end is connected with montant (2), described buckling groove (3) is located at montant (2) middle part, buckling groove (3) is positioned at montant (2) left side, the right side wall of described buckling groove (3) is connected with montant (2), described second connecting portion (4) is located at montant (2) bottom, second connecting portion (4) is horizontally disposed with, described second connecting portion (4) is positioned at montant (2) left side, second connecting portion (4) low order end is connected with montant (2), described second connecting portion (2) left side has one vertically protruding (5).
2. a kind of high low layer tie-beam as claimed in claim 1, it is characterized in that: described buckling groove (3) is square draw-in groove, straight up, the A/F of described buckling groove (3) is about 1/2nd of buckling groove (3) top width to buckling groove (3) opening.
3. a kind of high low layer tie-beam as claimed in claim 1, is characterized in that: the angle of described montant (2) and the first connecting portion (1), the second connecting portion (4) is 90 degree.
4. a kind of high low layer tie-beam as claimed in claim 1, is characterized in that: described vertical projection (5) is positioned at the high order end of the second connecting portion (4), and the top of described vertical projection (5) is horizontal plane.
CN201520693007.6U 2015-09-09 2015-09-09 High low layer tie -beam Expired - Fee Related CN205000530U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201520693007.6U CN205000530U (en) 2015-09-09 2015-09-09 High low layer tie -beam

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201520693007.6U CN205000530U (en) 2015-09-09 2015-09-09 High low layer tie -beam

Publications (1)

Publication Number Publication Date
CN205000530U true CN205000530U (en) 2016-01-27

Family

ID=55157426

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201520693007.6U Expired - Fee Related CN205000530U (en) 2015-09-09 2015-09-09 High low layer tie -beam

Country Status (1)

Country Link
CN (1) CN205000530U (en)

Similar Documents

Publication Publication Date Title
CN103485460A (en) Glass curtain wall allowing glass panels to be replaced conveniently
CN105113695A (en) Suspension type integrated ceiling
CN203066412U (en) Installing component of plug-in quickly-installed boards
CN205000530U (en) High low layer tie -beam
CN205035957U (en) Staggered floor roof beam
CN105275123A (en) Pitched roof type integrated ceiling
CN203361434U (en) Large-scale suspended ceiling structure with thin-wall metal plate
CN203961090U (en) A kind of ceiling structure with angle steel conversion layer
CN203640136U (en) Reinforced decorative furred ceiling
CN205000471U (en) Seam layering
CN203441043U (en) Push-pull externally hung stone
CN205000529U (en) Lower floor's joint structure is attend to furred ceiling
CN205000525U (en) Novel ceiling
CN206558976U (en) Pellet type crane span structure
CN204081370U (en) Building heat preservation decorative panel connects securing member
CN205000528U (en) Attend lower floor's tie -beam
CN205077697U (en) Reverse support system structure of block mount formula furred ceiling
CN205134673U (en) Integrated furred ceiling of oblique top formula
CN204647826U (en) A kind of aluminium section bar
CN205000527U (en) Integrated furred ceiling of suspension type
CN204059997U (en) A kind of suspension clamp structure of large glass curtain wall
CN204691009U (en) Aluminium alloys vertical partition wall
CN204174995U (en) A kind of framework being applicable to transformer station's outlet
CN204876222U (en) Large -scale deckboard is used in curtain connection
CN204054302U (en) A kind of prefabricated board mould

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20160127

Termination date: 20190909