CN204993299U - Controller - Google Patents
Controller Download PDFInfo
- Publication number
- CN204993299U CN204993299U CN201520459322.2U CN201520459322U CN204993299U CN 204993299 U CN204993299 U CN 204993299U CN 201520459322 U CN201520459322 U CN 201520459322U CN 204993299 U CN204993299 U CN 204993299U
- Authority
- CN
- China
- Prior art keywords
- unit
- controller
- time
- control unit
- instruction
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Active
Links
Abstract
The embodiment of the utility model discloses the instruction that two micro -gap switch come boot device is opened through receiving the user simultaneously to boot device's method and device, acquires time interval between two micro -gap switch boot device's the instruction, if time interval in the time threshold value that sets up in advance, then to equipment sends the enabled instruction, according to start the actuation of command control relay and start equipment only could start controller when the switch is pressed in the time at preset simultaneously to both hands, press two switches if two micro -gap switch start time interval above preset's time, and this controller is boot device not to realize to guarantee the safe mesh that operating personnel can not press by equipment at the in -process hand of operating equipment.
Description
Technical field
The utility model embodiment relates to the technical field of mobile terminal, particularly relates to a kind of controller.
Background technology
At present, normal conditions get off to realize series connection two-hand controlling switch, in this process, use at least 1 time relay is arranged tandem tap, then at least 1 electromagnetic relay is needed to carry out starting device, the last time of being carried out control machine action again by least one time relay, if need counter also to need to increase counter again; Package unit needs larger one-tenth originally to realize, and time breaker and electromagnetic relay are consumable accessory.And one hand turn increases the potential safety hazard of operative employee by switch; Now develop a circuit module being carried out control appliance by integrated chip, control by chip the demand for control that solid state relays realizes equipment, not only saved cost, and machine reliability has and significantly increases.
Utility model content
The object of the utility model embodiment is to propose a kind of controller, is intended to the problem solving the reliability and safety how improving device start.
For reaching this object, the utility model embodiment by the following technical solutions:
A kind of controller, it is characterized in that, described controller comprises opens for receiving user the instruction that at least two sensitive switches carry out starting device simultaneously, the switch input unit (101) in the time interval between the instruction of at least two sensitive switch starting devices described in acquisition, if for the described time interval in the time threshold pre-set, then to described equipment send enabled instruction control unit (102) and for starting the relay output unit (103) of described equipment according to the adhesive of described enabled instruction control relay, described switch input unit (101) is connected with described control unit (102), described control unit (102) is connected with described relay output unit (103).
Preferably, described controller also comprises:
For the time set unit (104) of time worked after arranging described device start, described time set unit (104) is connected with described control unit (102).
Preferably, described controller also comprises:
For the display unit (104) of time worked after showing the described device start of setting, described display unit (104) is connected with described control unit (102).
Preferably, described controller also comprises:
Power module unit 106, described power module unit 106 is connected 102 with described switch input unit 101 and described control unit.
Preferably, described controller also comprises:
Closing unit 107, described closing unit 107 is connected with described control unit 102.
The utility model provides a kind of controller, described controller comprises switch input unit, control unit and relay output unit, described switch input unit is connected with described control unit, described control unit is connected with described relay output unit, only could start-up connector when both hands press switch simultaneously, under out of step conditions, press two switches, this controller not starting device, thus realize the security purpose ensureing operating personnel.
Accompanying drawing explanation
Fig. 1 is the high-level schematic functional block diagram of the utility model embodiment controller;
Fig. 2 is the high-level schematic functional block diagram of the utility model embodiment controller;
Fig. 3 is the high-level schematic functional block diagram of the utility model embodiment controller;
Fig. 4 is the high-level schematic functional block diagram of the utility model embodiment controller;
Fig. 5 is the high-level schematic functional block diagram of the utility model embodiment controller;
Fig. 6 is the high-level schematic functional block diagram of the utility model embodiment controller.
Embodiment
Below in conjunction with drawings and Examples, the utility model embodiment is described in further detail.Be understandable that, specific embodiment described herein is only for explaining the utility model embodiment, but not the restriction to the utility model embodiment.It also should be noted that, for convenience of description, illustrate only the part relevant to the utility model embodiment in accompanying drawing but not entire infrastructure.
Embodiment one
With reference to the high-level schematic functional block diagram that figure 1, Fig. 1 is the utility model embodiment controller.
In embodiment one, described controller comprises:
Described controller comprises switch input unit 101, control unit 102 and relay output unit 103, and described switch input unit 101 is connected with described control unit, and described control unit is connected with described relay output unit.
Wherein, described switch input unit 101 opens for receiving user the instruction that two sensitive switches carry out starting device simultaneously, the time interval between the instruction obtaining described two sensitive switch starting devices; If described control unit 102 in the time threshold pre-set, then sends enabled instruction to described equipment for the described time interval; Described relay output unit 103 is for starting described equipment according to the adhesive of described enabled instruction control relay.
Concrete, the switching programme of two or more start-up connector is set in the program of controller, receives user simultaneously or in the switch command of the time internal trigger pre-set, and the time interval between the instruction obtaining the switch activated equipment of both hands.If receive user when triggering the instruction of the switch activated equipment of both hands, obtain the time interval between this pressing two switch commands, if this time interval is in the time threshold pre-set, then send enabled instruction to this controller.Controller receives the adhesive of operation control relay after this instruction, and starts described controller.
The utility model embodiment, by receiving the instruction of the both hands push switch starting device of user's triggering, obtains the time interval between pressing two switch commands; If the described time interval is in the time threshold pre-set, then send enabled instruction to described equipment; Described equipment is started according to the adhesive of described enabled instruction control relay, only could start-up connector when both hands press switch simultaneously, two switches are pressed, this controller not starting device under out of step conditions, thus the handling safety object reaching guarantee personnel.
Embodiment two
With reference to the high-level schematic functional block diagram that figure 2, Fig. 2 is the utility model embodiment controller.
On the basis of embodiment one, described controller also comprises:
Time set unit 104, described time set unit 104 is connected with described control unit 102.
Wherein, described time set unit 104 first arranges instruction for what receive that user triggers, opens and arranges interface; By described arrange that interface receives that user triggers second instruction is set, trigger and position corresponding to instruction be set with described second; Receive user's triggering the 3rd arranges instruction, setup times numerical value on described position.
Concrete, when continuing to push button Key1 after two seconds, enter the pattern of setting; Button Key2 is that displacement arranges function, after pressing Key2, arrange figure place individual, ten, hundred, thousand cyclic switchings; Button Key3 is that numerical value adds function, and after pressing Key3, numerical value adds switching in 0-9 circulation; Press after being provided with Key1 exit the pattern of setting and simultaneously preserve numerical value is set, still effective after power-off.
Embodiment three
With reference to the high-level schematic functional block diagram that figure 3, Fig. 3 is the utility model embodiment controller.
On the basis of embodiment one, described controller also comprises:
Display unit 105, described display unit 105 is connected with described control unit 102.
Wherein, the time of described display unit 105 for working after showing the described device start of setting.
Concrete, in the normal mode of operation, the time of display module display work at present number of times and every task, can be used for production capacity counting, press Key3 and can reset current count value.
Embodiment four
With reference to the high-level schematic functional block diagram that figure 4, Fig. 4 is the utility model embodiment controller.
On the basis of embodiment one, described controller also comprises:
Power module unit 106, described power module unit 106 is connected with described switch input unit 101 and described control unit 102.
Embodiment five
With reference to the high-level schematic functional block diagram that figure 5, Fig. 5 is the utility model embodiment controller.
On the basis of embodiment one, described controller also comprises:
Closing unit 107, described closing unit 107 is connected with described control unit 102.
Wherein, when described closing unit 107 reaches for the time worked after described device start the time pre-set, automatically close described equipment.
Concrete, after both hands press starting switch simultaneously, input control signal is to control unit, whether control unit meets safe initial conditions according to input signal automatic decision, when meeting safe initial conditions, control unit output signal control relay inhale and, open controlled device, equipment automatic drawing back action after relay time delay certain operating time, and equipment after only having the operating time to complete again input signal just can rework.
Embodiment six
With reference to the high-level schematic functional block diagram that figure 6, Fig. 6 is the utility model embodiment controller.
In embodiment six, described controller comprises:
Switch input unit 101, control unit 102 and relay output unit 103, described switch input unit 101 is connected with described control unit, and described control unit is connected with described relay output unit.
Wherein, described switch input unit 101 is for receiving the instruction of the both hands started by press equipment of user's triggering; The time interval between the instruction obtaining described two switch activated equipment.If described control unit 102 in the time threshold pre-set, then sends enabled instruction to described equipment for the described time interval; Described relay output unit 103 is for starting described equipment according to the adhesive of described enabled instruction control relay.
Concrete, the switching programme of two or more start-up connector is set in the program of controller, receives user simultaneously or in the switch command of the time internal trigger pre-set, and the time interval between the instruction obtaining the switch activated equipment of these both hands.If when receiving the instruction of the switch activated equipment of both hands that user triggers, obtain the time interval between this instruction, if this time interval is in the time threshold pre-set, then to this controller transmitting apparatus enabled instruction.Controller receives the adhesive of operation control relay after this instruction, and starts described controller.
Preferably, described controller also comprises:
Time set unit 104, described time set unit 104 is connected with described control unit 102.
Wherein, described time set unit 104 first arranges instruction for what receive that user triggers, opens and arranges interface; By described arrange that interface receives that user triggers second instruction is set, trigger and position corresponding to instruction be set with described second; Receive user's triggering the 3rd arranges instruction, setup times numerical value on described position.
Concrete, when continuing to push button Key1 after two seconds, enter the pattern of setting; Button Key2 is that displacement arranges function, after pressing Key2, arrange figure place individual, ten, hundred, thousand cyclic switchings; Button Key3 is that numerical value adds function, and after pressing Key3, numerical value adds switching in 0-9 circulation; Press after being provided with Key1 exit the pattern of setting and simultaneously preserve numerical value is set, still effective after power-off.
Preferably, described controller also comprises:
Display unit 105, described display unit 105 is connected with described control unit 102.
Wherein, the time of described display unit 105 for working after showing the described device start of setting.
Concrete, in the normal mode of operation, the time of display module display work at present number of times and every task, can be used for production capacity counting, press Key3 and can reset current count value.
Preferably, described controller also comprises:
Power module unit 106, described power module unit 106 is connected with described switch input unit 101 and described control unit 102.
Preferably, described controller also comprises:
Closing unit 107, described closing unit 107 is connected with described control unit 102.
Wherein, when described closing unit 107 reaches for the time worked after described device start the time pre-set, automatically close described equipment.
Concrete, after both hands press starting switch simultaneously, input control signal is to control unit, whether control unit meets safe initial conditions according to input signal automatic decision, when meeting safe initial conditions, control unit output signal control relay inhale and, open controlled device, equipment automatic drawing back action after relay time delay certain operating time, and equipment only have the operating time to complete after input signal could again start.
The utility model embodiment opens the instruction that two sensitive switches carry out starting device, the time interval between the instruction obtaining described two sensitive switch starting devices by receiving user simultaneously; If the described time interval is in the time threshold pre-set, then send enabled instruction to described equipment; Described equipment is started according to the adhesive of described enabled instruction control relay, only could start-up connector when both hands press switch within the time preset simultaneously, if two sensitive switch intervals start-up time exceed the time preset and press two switches, this controller will not starting device, thus realize ensureing operating personnel in the process of operating equipment hand can not by equipment be pressed onto security purpose.
Below the know-why of the utility model embodiment is described in conjunction with specific embodiments.These describe the principle just in order to explain the utility model embodiment, and can not be interpreted as the restriction to the utility model embodiment protection range by any way.Based on explanation herein, those skilled in the art does not need to pay other embodiment that performing creative labour can associate the utility model embodiment, these modes all by fall into the utility model embodiment protection range within.
Claims (5)
1. a controller, it is characterized in that, described controller comprises opens for receiving user the instruction that at least two sensitive switches carry out starting device simultaneously, the switch input unit (101) in the time interval between the instruction of at least two sensitive switch starting devices described in acquisition, if for the described time interval in the time threshold pre-set, then to described equipment send enabled instruction control unit (102) and for starting the relay output unit (103) of described equipment according to the adhesive of described enabled instruction control relay, described switch input unit (101) is connected with described control unit (102), described control unit (102) is connected with described relay output unit (103).
2. controller according to claim 1, is characterized in that, described controller also comprises:
For the time set unit (104) of time worked after arranging described device start, described time set unit (104) is connected with described control unit (102).
3. controller according to claim 1, is characterized in that, described controller also comprises:
For the display unit (104) of time worked after showing the described device start of setting, described display unit (104) is connected with described control unit (102).
4. controller according to claim 1, is characterized in that, described controller also comprises:
Power module unit (105), described power module unit (105) is connected with described switch input unit (101) and described control unit (102).
5. controller according to claim 1, is characterized in that, described controller also comprises:
Closing unit (106), described closing unit (106) is connected with described control unit (102).
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201520459322.2U CN204993299U (en) | 2015-06-30 | 2015-06-30 | Controller |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201520459322.2U CN204993299U (en) | 2015-06-30 | 2015-06-30 | Controller |
Publications (1)
Publication Number | Publication Date |
---|---|
CN204993299U true CN204993299U (en) | 2016-01-20 |
Family
ID=55127618
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201520459322.2U Active CN204993299U (en) | 2015-06-30 | 2015-06-30 | Controller |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN204993299U (en) |
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN112340629A (en) * | 2019-08-06 | 2021-02-09 | 本田技研工业株式会社 | Capstan device |
CN114587175A (en) * | 2022-03-09 | 2022-06-07 | 深圳贝迅科技有限公司 | Control method of intelligent toilet and intelligent toilet |
-
2015
- 2015-06-30 CN CN201520459322.2U patent/CN204993299U/en active Active
Cited By (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN112340629A (en) * | 2019-08-06 | 2021-02-09 | 本田技研工业株式会社 | Capstan device |
CN112340629B (en) * | 2019-08-06 | 2022-07-26 | 本田技研工业株式会社 | Capstan arrangement |
CN114587175A (en) * | 2022-03-09 | 2022-06-07 | 深圳贝迅科技有限公司 | Control method of intelligent toilet and intelligent toilet |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN106484061A (en) | Terminal resets control method, controller and system | |
CN104242463A (en) | GPRS (general packet radio service) based remote power monitoring system and monitoring method | |
CN104483568B (en) | A kind of device for detecting stand-by power supply automatic switching | |
CN103019596A (en) | Method for realizing operation of virtual key based on touch screen and mobile terminal | |
CN103634169A (en) | A household electrical appliance control system realized based on intelligent terminals | |
CN204993299U (en) | Controller | |
CN202231872U (en) | Handheld mobile Internet device and device for resetting the device | |
CN104105227A (en) | A WIFI module work method and device based on different application scenarios | |
CN104836869A (en) | Mobile communication terminal and mobile communication terminal power-on method | |
CN103207592B (en) | The program control rim brake device of medical x-ray machine, programmed control method and special-purpose member | |
CN104461664B (en) | MCU start-up mode selection circuits | |
CN109040751A (en) | A kind of control equipment of TV aging process | |
CN105704484B (en) | Analog subscriber operates the test device and method of TV | |
CN205862203U (en) | Intelligent switch device based on conventional mechanical switch | |
CN202649777U (en) | Medical X-ray machine, programmed control hand brake device thereof, relay of device and console of device | |
CN105491242B (en) | Mobile communication terminal and control method and device thereof | |
CN103592863A (en) | Reverse binding device based on key switches and implementation method thereof | |
CN204517795U (en) | Have the composite push-button of page up and homepage function concurrently | |
CN102036032A (en) | Energy-saving method of TV set and TV set | |
CN105099429B (en) | A kind of method and device of starting device | |
CN104577804A (en) | Intelligent distribution box and control method of intelligent distribution box | |
CN106054629A (en) | An intelligent device control method and device based on internet of things | |
CN209911970U (en) | Management system for control authority of kitchen equipment | |
CN203365564U (en) | Automatic testing system of remote controller | |
CN105261182A (en) | Interpretation method for remote control command and control equipment |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C14 | Grant of patent or utility model | ||
GR01 | Patent grant | ||
CP02 | Change in the address of a patent holder | ||
CP02 | Change in the address of a patent holder |
Address after: 518000 the third floor, 4 new material harbor, Changyuan middle 2, Central High Tech Park, Shenzhen, Guangdong, Nanshan District Patentee after: Ai Fosen (Shenzhen) Technology Co., Ltd. Address before: 518057 Room 201, building A, No. 1, Qian Wan Road, Nanhai Shenzhen cooperation zone, Shenzhen, Guangdong, China (Shenzhen Qianhai business secretary Co., Ltd.) Patentee before: Ai Fosen (Shenzhen) Technology Co., Ltd. |