CN204984265U - Particle filling pipe system - Google Patents

Particle filling pipe system Download PDF

Info

Publication number
CN204984265U
CN204984265U CN201520782336.8U CN201520782336U CN204984265U CN 204984265 U CN204984265 U CN 204984265U CN 201520782336 U CN201520782336 U CN 201520782336U CN 204984265 U CN204984265 U CN 204984265U
Authority
CN
China
Prior art keywords
particle
storage tank
line
connects
operated valve
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201520782336.8U
Other languages
Chinese (zh)
Inventor
谢从辉
马晓伟
刘林红
于成龙
田玉栋
白晓捷
段立俊
窦金勇
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Daqing Petroleum Administration Bureau
China National Petroleum Corp
Original Assignee
Daqing Petroleum Administration Bureau
China National Petroleum Corp
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Daqing Petroleum Administration Bureau, China National Petroleum Corp filed Critical Daqing Petroleum Administration Bureau
Priority to CN201520782336.8U priority Critical patent/CN204984265U/en
Application granted granted Critical
Publication of CN204984265U publication Critical patent/CN204984265U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Abstract

The utility model relates to a particle filling pipe system. The traditional particle filling pipe system who has mainly solved existence among the prior art can reach the technical requirement's of homogeneous mixing problem. Its characterized in that: well drilling ground pipeline (11) is connected in bore hole pump (1), and well drilling ground pipeline passes through pressure balance pipe line (2) and connects particle storage tank (9) abhiseca one side, particle storage tank abhiseca opposite side passes through overflow line (7) and connects overflow tank (8), particle storage tank abhiseca portion connects particle filling tube (6), hydraulic operated valve A (3), hydraulic operated valve B (4), hydraulic operated valve C (5) have been connect on pressure balance pipe line, particle filling tube, the overflow line respectively, the particle storage tank is irritated the bottom and is connected particle injector pump (10), and the particle injector pump passes through pipeline connection well drilling ground pipeline. This particle filling pipe system can be under the parameter that sets up, carries out entire system's autonomous operation, reduces the interference of human factor, realizes effective, steady, the even mixture of particle and drilling fluid.

Description

A kind of particle injected system
Technical field
The utility model relates to petroleum drilling technology field, particularly a kind of particle injected system.
Background technology
In recent years, creep into demand along with deep hard formation, particle impact drilling technology, as the robust techniques realizing hard formation fast drilling, more and more receives the concern of each side.This technology is different from traditional drilling technology, its cardinal principle is in drilling fluid, be filled with a certain amount of metallic, after being accelerated by special drill bit, utilize the broken bottom rock of the impact force of metallic, treat that metal returns out ground with drilling fluid and recycles.Particle injected system is as an important ingredient, and its efficiency is directly connected to the mixing quality of particle and drilling fluid, also determines the success or failure of whole particle well system.
Current injected system mainly utilizes the deadweight of metallic, the negative pressure produced by drilling liquid flow by metallic " absorption " in drilling fluid, which structure is simple, but effectively can not control injection rate and the injection rate of metallic, the alluvial of easy generation metallic in-line, make drilling fluid smooth in pipeline flowing, even cause the blocking of bit port, bring out the situations such as down-hole complexity.Meanwhile, existing injected system automaticity is low, cannot complete Automatic Control, and procedure connection is slow, makes down-hole particle impacting be in state off and on, causes whole system efficiency to decline, had a strong impact on the effect of particle impact drilling technology.
Summary of the invention
Technical problem to be solved in the utility model overcomes the conventional particle injected system existed in background technology injection rate cannot be regulated can not to reach the problem of mixed uniformly technical requirements, and a kind of particle injected system is provided, this particle injected system, the autonomous operation of whole system can be carried out, reduce the interference of human factor, improve the operational efficiency of system greatly, realize particle and drilling fluid effective, steady, mix uniformly.
The invention for solving the technical problem reaches by following technical scheme: this particle injected system, comprises borehole pump, particle storage tank, and described borehole pump connects drilling well surface line, and drilling well surface line connects particle storage tank abhiseca side by pressure-equalizing line; Particle storage tank abhiseca opposite side connects overflow tank by overflow line; Described particle storage tank abhiseca portion connects particle charge pipe; Described pressure-equalizing line, particle charge pipe, overflow line are connected to respectively hydraulic operated valve A, hydraulic operated valve B, hydraulic operated valve C; Described particle storage tank is filled with bottom and is connected particle injection pump, and particle injection pump connects drilling well surface line by pipeline.
The utility model can have following beneficial effect compared with above-mentioned background technology: this particle injected system is owing to adopting said structure, by automatically controlling the action of whole system all devices and parts, control the injection rate of particle, and the adjustment of particle injection rate can be carried out as requested, the object of realize Homogeneous phase mixing, steadily creeping into, improve the operational efficiency of particle injected system, meet on-the-spot instructions for use.
Accompanying drawing explanation
Accompanying drawing 1 is structural representation of the present utility model.
In figure: 1-borehole pump; 2-pressure-equalizing line; 3-hydraulic operated valve A; 4-hydraulic operated valve B; 5-hydraulic operated valve C; 6-particle charge pipe; 7-overflow line; 8-overflow tank; 9-particle storage tank; 10-particle injection pump; 11-drilling well surface line.
detailed description of the invention:
Below in conjunction with accompanying drawing, the utility model is described in further detail:
As shown in Figure 1, this particle injected system, comprises borehole pump 1, particle storage tank 9, and described borehole pump 1 connects drilling well surface line 11, and drilling well surface line 11 connects particle storage tank 9 abhiseca side by pressure-equalizing line 2; Particle storage tank 9 abhiseca opposite side connects overflow tank 8 by overflow line 7; Described particle storage tank 9 abhiseca portion connects particle charge pipe 6; Described pressure-equalizing line 2, particle charge pipe 6, overflow line 7 are connected to respectively hydraulic operated valve A3, hydraulic operated valve B4, hydraulic operated valve C5; Described particle storage tank 9 is filled with bottom and is connected particle injection pump 10, and particle injection pump 10 connects drilling well surface line 11 by pipeline.
Wherein, borehole pump 1 provides pressure source for whole injected system, is particle storage tank 9 pressurising by pressure-equalizing line 2, so that follow-up particle injecting program; Particle charge line 6 is passages of conveying particle, to be particle storage tank interpolation particle, is discharged in overflow tank 8 by overflow line 7 by the drilling fluid in particle storage tank simultaneously; After starting particle injection pump, particle and drilling fluid Homogeneous phase mixing in drilling well surface line, and arrive shaft bottom with drilling fluid, carry out particle impacting break unvenile water pressure valve A hydraulic valve B, hydraulic valve C all automatically controlled by control centre, in system operation, opened and closed by middle control software, realize the operations in particle injection process
When this particle injected system is run, first open hydraulic valve B, in particle storage tank, add particle by particle charge line, open hydraulic valve C, make the drilling fluid in tank be discharged in overflow tank through overflow line, after particle storage tank is full of particle, close hydraulic valve B and hydraulic valve C.Subsequently, open borehole pump, opening hydraulic valve A, make drilling fluid be injected in particle storage tank through pressure-equalizing line, is the pressurising of particle storage tank, is that the pressure in particle storage tank is suitable with the pressure in the outside drilling well surface line be connected of particle injection pump.Now, start particle injection pump, by uniform particle, be injected in drilling fluid stably, arrive shaft bottom by drilling well surface line.
Because situ of drilling well is a continuous print process, in order to prevent due to independent] particle storage tank causes the stagnation of construction, the general alternately operating adopting 2 or 3 particle storage tanks, thus it is continuous to ensure that down-hole particle injects, and improves the efficiency that particle impacting creeps into.Meanwhile, whole process is all controlled automatically by the software of control centre, and each equipment of better start and stop, each valve of switch, realize the Effec-tive Function of particle injected system, meet the demand of onsite application.

Claims (1)

1. a particle injected system, comprise borehole pump (1), particle storage tank (9), it is characterized in that: described borehole pump (1) connects drilling well surface line (11), drilling well surface line (11) connects particle storage tank (9) abhiseca side by pressure-equalizing line (2); Particle storage tank (9) abhiseca opposite side connects overflow tank (8) by overflow line (7); Described particle storage tank (9) abhiseca portion connects particle charge pipe (6); Described pressure-equalizing line (2), particle charge pipe (6), overflow line (7) are connected to respectively hydraulic operated valve A (3), hydraulic operated valve B (4), hydraulic operated valve C (5); Described particle storage tank (9) is filled with bottom and is connected particle injection pump (10), and particle injection pump (10) connects drilling well surface line (11) by pipeline.
CN201520782336.8U 2015-10-10 2015-10-10 Particle filling pipe system Expired - Fee Related CN204984265U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201520782336.8U CN204984265U (en) 2015-10-10 2015-10-10 Particle filling pipe system

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201520782336.8U CN204984265U (en) 2015-10-10 2015-10-10 Particle filling pipe system

Publications (1)

Publication Number Publication Date
CN204984265U true CN204984265U (en) 2016-01-20

Family

ID=55118644

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201520782336.8U Expired - Fee Related CN204984265U (en) 2015-10-10 2015-10-10 Particle filling pipe system

Country Status (1)

Country Link
CN (1) CN204984265U (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN105781420A (en) * 2016-05-05 2016-07-20 中国石油大学(华东) Detection and control system for particle impact drilling
CN113585975A (en) * 2021-07-09 2021-11-02 四川川庆石油钻采科技有限公司 High-pressure particle conveying integrated system suitable for particle drilling

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN105781420A (en) * 2016-05-05 2016-07-20 中国石油大学(华东) Detection and control system for particle impact drilling
CN105781420B (en) * 2016-05-05 2017-12-01 中国石油大学(华东) Particle punching drilling measurement and control system
CN113585975A (en) * 2021-07-09 2021-11-02 四川川庆石油钻采科技有限公司 High-pressure particle conveying integrated system suitable for particle drilling

Similar Documents

Publication Publication Date Title
CN203257353U (en) Novel pressure control drilled well system
CN101139911B (en) Gas injection pressure-stabilizing drilling method
CN105909228B (en) High voltage pulse hydraulic slotted liner technique-fracturing device and method
CN103470242B (en) A kind of oilfield horizontal well volume fracturing method
CN205154105U (en) Stifled equipment system is separated in continuous acidizing of little discharge capacity of water injection well
CN108825125A (en) A kind of dynamic variable element kill-job process
WO2008095065A3 (en) High density slurry
CN204984265U (en) Particle filling pipe system
CN104265254A (en) Oil production technological method for multi-stage plug injection of oil-soluble viscosity reducer and liquid CO2 in deep super-heavy oil
CN103541658B (en) A kind of antipriming pipe horizontal jet grouting drill bit
CN103422842B (en) Oil well blocks up, adjusts, washes technique
CN203412535U (en) Drilling fluid shunt device for starting or stopping pump through multiple steps
CN109372488B (en) Swing type continuous proppant filling device for coal mine hydraulic fracturing and filling method
CN104989319A (en) Cementing method based on continuous cementing mode in petroleum exploration
CN105525890B (en) Method for sieve tube completion water plugging of horizontal well
CN110273702B (en) Coal seam step-by-step water injection accurate control system and water injection method
CN204984264U (en) Dedicated filling pipe system of particle percussion drilling
CN204266988U (en) A kind of pilot-controlled switch sliding sleeve
CN105298443A (en) Oil pipe float valve and blowout prevention, gas lift and fracture combined operation method for underbalance well completion oil pipe descending
CN103114601B (en) The rapid hardening high pressure jet grouting of strong absorbent formation cuts infiltration method and device thereof
CN204716213U (en) Pressure fluctuation meter drives self-balancing piston pump pumping equipment
CN104481452A (en) Method for sealing holes drilled through variable-frequency impulse grouting drilling
CN205206784U (en) Colliery water damage prevention and cure device
CN103470221A (en) Underbalance tubing, no-killing gas lifting, shaft pumping and pump detecting combined method
CN106930294A (en) A kind of bedrock fracture artesian area grouting method

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
CP01 Change in the name or title of a patent holder

Address after: 100007 Dongcheng District, Dongzhimen, China, North Street, No. 9 Oil Mansion, No.

Patentee after: CHINA NATIONAL PETROLEUM Corp.

Patentee after: DAQING PETROLEUM ADMINISTRATION Co.,Ltd.

Address before: 100007 Dongcheng District, Dongzhimen, China, North Street, No. 9 Oil Mansion, No.

Patentee before: China National Petroleum Corp.

Patentee before: DA QING PETROLEUM ADMINISTRATION BUREAU

CP01 Change in the name or title of a patent holder
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20160120

CF01 Termination of patent right due to non-payment of annual fee