CN104989319A - Cementing method based on continuous cementing mode in petroleum exploration - Google Patents

Cementing method based on continuous cementing mode in petroleum exploration Download PDF

Info

Publication number
CN104989319A
CN104989319A CN201510273572.1A CN201510273572A CN104989319A CN 104989319 A CN104989319 A CN 104989319A CN 201510273572 A CN201510273572 A CN 201510273572A CN 104989319 A CN104989319 A CN 104989319A
Authority
CN
China
Prior art keywords
cementing
plug
continuous
mode
sizing collar
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201510273572.1A
Other languages
Chinese (zh)
Inventor
周斌
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Chengdu Gaopu Petroleum Engineering Technology Co Ltd
Original Assignee
Chengdu Gaopu Petroleum Engineering Technology Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Chengdu Gaopu Petroleum Engineering Technology Co Ltd filed Critical Chengdu Gaopu Petroleum Engineering Technology Co Ltd
Priority to CN201510273572.1A priority Critical patent/CN104989319A/en
Publication of CN104989319A publication Critical patent/CN104989319A/en
Pending legal-status Critical Current

Links

Landscapes

  • Consolidation Of Soil By Introduction Of Solidifying Substances Into Soil (AREA)

Abstract

The invention discloses a cementing method based on a continuous cementing mode in petroleum exploration. The cementing method is characterized by comprising steps of installing a flexible plug and a replacing opening plug in a cement head, and implementing first grade cementing operation through a grading hoop after circulation; pressing the flexible plug, and quantitatively replacing slurry, wherein replaced slurry capacity is less than the capacity from a grading hoop body to a replacing pipe at a bump pressure seat by 0 to 2m2; pressing the replacing opening plug, continuing to replacing slurry until the replacing opening plug opens a plug seat to a lower sliding sleeve of the grading hoop, and pressuring to open a circulating hole of the grading hoop; implementing second grade cementing operation through the grading hoop; pressing a closing plug, replacing the slurry, and bumping; and stopping a pump to release pressure from a well head. The cementing method based on the continuous cementing mode in petroleum exploration is high in safety, and stable in the whole well sealing performance.

Description

The cementing method of continuous cementing mode is adopted in a kind of oil exploration
Technical field
The present invention relates to exploration activity construction field, particularly, relate in a kind of oil exploration the cementing method adopting continuous cementing mode.
Background technology
current, most of oil field shallow-layer is explored exploitation, in order to obtain more oil gas energy storage and exploitation production capacity, can only dispose the exploration and development of middle-deep well, deep-well and ultradeep well.In middle-deep well, deep-well and ultradeep well, due to oil-gas Layer between the upper and lower every large, gas and formation water to reasons such as casing corrosions, need to the real-time sealing technique of full well.In order to satisfied well cementation needs, the development plan of Oilfield Company all requires must use fraclional well cementing technique for the Oil/gas Well vertically more than 2500 meters.
In well cementing operation, can use and need to adopt sizing collar, sizing collar is also called stage cementing device or bipolar hoop.Existing well cementation mode is a lot, how to realize the safety of full well sealing, stability is very important.
Summary of the invention
Technical problem to be solved by this invention is to provide in a kind of oil exploration the cementing method adopting continuous cementing mode, and not only safety is high for it, and the sealing stability of full well is high.
The present invention's adopted technical scheme that solves the problem is:
Adopt a cementing method for continuous cementing mode in oil exploration, it is characterized in that, comprise the following steps:
A) flexibility plug and replacement type being opened plug is contained in cementing head, utilizes sizing collar to carry out first order cementing job after circulation is good;
B) the flexible plug of pressure, quantitatively for mud, is less than sizing collar body to impacting seat place for pipe internal volume 0-2m for slurry amount 2;
C) bear down on one and open plug for type, continue for mud, until replacement type opens obturating plug on sizing collar low sleeve, pressurization, opens sizing collar circulation port;
D) sizing collar is utilized to carry out second level cementing job;
E) shut-off plug is pressed, for mud, bruising;
F) termination of pumping, from well head release pressure.
As preferably, in step e, the pressure of exerting pressure should be more than or equal to the closing presure of sizing collar.
As preferably, when first order cementing job and second level cementing job, often a mud filled by lower 10 sleeve pipes.
As preferably, when first order cementing job and second level cementing job, upper and lower 4 sleeve pipes of sizing collar add elastic centralizer continuously.
Further, in steps A and step e, after complete under sleeve pipe, connect cementing head and well cementation pipeline, the ascending circulation of discharge capacity.
As preferably, in stepb, be less than sizing collar body to impacting seat place for pipe internal volume 1m for slurry amount 2.
To sum up, the invention has the beneficial effects as follows:
1, the requirement of well cementation mode of the present invention to technique is low, and method is simple, and safety is high.
2, adopt well cementation mode of the present invention, it is high to the sealing stability of full well.
Detailed description of the invention
Below in conjunction with embodiment, be clearly and completely described the technical scheme in the embodiment of the present invention, obviously, described embodiment is only the present invention's part embodiment, instead of whole embodiments.Based on the embodiment in the present invention, those of ordinary skill in the art, not making the every other embodiment obtained under creative work prerequisite, belong to the scope of protection of the invention.
Embodiment 1:
Adopt a cementing method for continuous cementing mode in oil exploration, it is characterized in that, comprise the following steps:
A, flexibility plug and replacement type are opened plug be contained in cementing head, after circulation is good, utilize sizing collar to carry out first order cementing job;
The flexible plug of b, pressure, quantitatively for mud, is less than sizing collar body to impacting seat place for pipe internal volume 0-2m for slurry amount 2;
C, bear down on one and open plug for type, continue for mud, until replacement type opens obturating plug on sizing collar low sleeve, pressurization, opens sizing collar circulation port;
D, sizing collar is utilized to carry out second level cementing job;
E, pressure shut-off plug, for mud, bruising;
F, termination of pumping, from well head release pressure.
This cementing method adopts fraclional well cementing mode, and the requirement of whole cementing method to technique is low, and method is simple, and safety is high, and it is high to the sealing stability of full well.
Embodiment 2:
The present embodiment cementing method on the basis of above-described embodiment is optimized, and namely in step e, the pressure of exerting pressure should be more than or equal to the closing presure of sizing collar.
When first order cementing job and second level cementing job, often a mud filled by lower 10 sleeve pipes.
When first order cementing job and second level cementing job, upper and lower 4 sleeve pipes of sizing collar add elastic centralizer continuously.
In steps A and step e, after complete under sleeve pipe, connect cementing head and well cementation pipeline, the ascending circulation of discharge capacity.
In stepb, sizing collar body is less than to impacting seat place for pipe internal volume 1m for slurry amount 2.
As mentioned above, the present invention can be realized preferably.

Claims (6)

1. adopt a cementing method for continuous cementing mode in oil exploration, it is characterized in that, comprise the following steps:
Flexibility plug and replacement type are opened plug to be contained in cementing head, utilizes sizing collar to carry out first order cementing job after circulation is good;
The flexible plug of pressure, quantitatively for mud, is less than sizing collar body to impacting seat place for pipe internal volume 0-2m for slurry amount 2;
Bear down on one and open plug for type, continue for mud, until replacement type opens obturating plug on sizing collar low sleeve, pressurization, opens sizing collar circulation port;
Sizing collar is utilized to carry out second level cementing job;
Pressure shut-off plug, for mud, bruising;
Termination of pumping, from well head release pressure.
2. adopt the cementing method of continuous cementing mode in a kind of oil exploration according to claim 1, it is characterized in that: in step e, the pressure of exerting pressure should be more than or equal to the closing presure of sizing collar.
3. adopt the cementing method of continuous cementing mode in a kind of oil exploration according to claim 1, it is characterized in that: when first order cementing job and second level cementing job, often a mud filled by lower 10 sleeve pipes.
4. adopt the cementing method of continuous cementing mode in a kind of oil exploration according to claim 1, it is characterized in that: when first order cementing job and second level cementing job, upper and lower 4 sleeve pipes of sizing collar add elastic centralizer continuously.
5. adopt the cementing method of continuous cementing mode in a kind of oil exploration according to claim 3 or 4, it is characterized in that: in steps A and step e, after complete under sleeve pipe, connect cementing head and well cementation pipeline, the ascending circulation of discharge capacity.
6. adopt the cementing method of continuous cementing mode in a kind of oil exploration according to claim 1, it is characterized in that: in stepb, be less than sizing collar body to impacting seat place for pipe internal volume 1m for slurry amount 2.
CN201510273572.1A 2015-05-26 2015-05-26 Cementing method based on continuous cementing mode in petroleum exploration Pending CN104989319A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201510273572.1A CN104989319A (en) 2015-05-26 2015-05-26 Cementing method based on continuous cementing mode in petroleum exploration

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201510273572.1A CN104989319A (en) 2015-05-26 2015-05-26 Cementing method based on continuous cementing mode in petroleum exploration

Publications (1)

Publication Number Publication Date
CN104989319A true CN104989319A (en) 2015-10-21

Family

ID=54301188

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201510273572.1A Pending CN104989319A (en) 2015-05-26 2015-05-26 Cementing method based on continuous cementing mode in petroleum exploration

Country Status (1)

Country Link
CN (1) CN104989319A (en)

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN105545247A (en) * 2015-12-08 2016-05-04 中国石油天然气股份有限公司 Well cementing method for oil and gas well
CN109281637A (en) * 2018-10-17 2019-01-29 中石化石油工程技术服务有限公司 A kind of cementing method suitable for leakiness ultradeep well
CN110566186A (en) * 2019-09-24 2019-12-13 中国石油集团渤海钻探工程有限公司 Method for measuring open blockage encountering and blocking position in two-stage well cementation operation
CN114109297A (en) * 2020-08-25 2022-03-01 中国石油化工股份有限公司 Stage cementing method

Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US3507325A (en) * 1968-04-16 1970-04-21 Byron Jackson Inc Well cementing apparatus
CN201292816Y (en) * 2008-11-24 2009-08-19 中国石油集团长城钻探工程有限公司 Self-pouring sliding bush closing type cementing machine
CN101864925A (en) * 2010-07-08 2010-10-20 中国石油集团川庆钻探工程有限公司长庆固井公司 Drilling-free sizing collar and process
CN104110234A (en) * 2014-07-31 2014-10-22 于世江 Method for well cementation drilling-free blind plate circulating well cementation of horizontal well
CN104121001A (en) * 2014-07-31 2014-10-29 于世江 Drilling-free cement injecting device for horizontal well
CN104514513A (en) * 2013-09-27 2015-04-15 中国石油化工集团公司 Cement-free well cementation method for horizontal section of horizontal well

Patent Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US3507325A (en) * 1968-04-16 1970-04-21 Byron Jackson Inc Well cementing apparatus
CN201292816Y (en) * 2008-11-24 2009-08-19 中国石油集团长城钻探工程有限公司 Self-pouring sliding bush closing type cementing machine
CN101864925A (en) * 2010-07-08 2010-10-20 中国石油集团川庆钻探工程有限公司长庆固井公司 Drilling-free sizing collar and process
CN104514513A (en) * 2013-09-27 2015-04-15 中国石油化工集团公司 Cement-free well cementation method for horizontal section of horizontal well
CN104110234A (en) * 2014-07-31 2014-10-22 于世江 Method for well cementation drilling-free blind plate circulating well cementation of horizontal well
CN104121001A (en) * 2014-07-31 2014-10-29 于世江 Drilling-free cement injecting device for horizontal well

Non-Patent Citations (2)

* Cited by examiner, † Cited by third party
Title
刘言理: "免钻分级固井技术在大港油田西8-8-6井的应用", 《化工管理》 *
陈武君等: "内关闭式双级注水泥器在现场的应用", 《石油钻探技术》 *

Cited By (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN105545247A (en) * 2015-12-08 2016-05-04 中国石油天然气股份有限公司 Well cementing method for oil and gas well
CN105545247B (en) * 2015-12-08 2018-08-10 中国石油天然气股份有限公司 A kind of oil gas well cementing operation method
CN109281637A (en) * 2018-10-17 2019-01-29 中石化石油工程技术服务有限公司 A kind of cementing method suitable for leakiness ultradeep well
CN110566186A (en) * 2019-09-24 2019-12-13 中国石油集团渤海钻探工程有限公司 Method for measuring open blockage encountering and blocking position in two-stage well cementation operation
CN114109297A (en) * 2020-08-25 2022-03-01 中国石油化工股份有限公司 Stage cementing method
CN114109297B (en) * 2020-08-25 2024-05-14 中国石油化工股份有限公司 Stage cementing method

Similar Documents

Publication Publication Date Title
CN109653707B (en) Method for dewatering and increasing oil by filling packing body particles in oil and gas well of fractured oil and gas reservoir
CN104989319A (en) Cementing method based on continuous cementing mode in petroleum exploration
CN204703876U (en) A kind of bridge-type concentric separated-injection tubing string
CN105735966A (en) Coal-bed gas well shaft drainage gas recovery coal dust migration simulation device and simulation method
CN103912257B (en) A kind of dragging multiple fracturing device with pressure
CN106968658A (en) A kind of efficient device for fracturing wellhead
CN105952431B (en) Fixed tubular column method for removing blockage
CN201416430Y (en) Hydraulic controlled type concentric dual-pipe separate injection pipe string
CN207686653U (en) All-metal sealing mandrel type casing hanger
CN102454381A (en) Oil-gas reservoir barefoot well cementing and completion method and device
CN106593358B (en) Device for releasing medicament in pumping well in relay manner
CN104389563A (en) Bilayer separate injection process pipe column device for nonmetal continuous oil pipe
CN204283384U (en) Sleeve pipe grug feeding jar
CN203412535U (en) Drilling fluid shunt device for starting or stopping pump through multiple steps
CN104405346A (en) Hydraulic sand jet perforation choke manifold
CN204371263U (en) The two-layer zone separate injection technical string device of a kind of non metal continuous oil pipe
CN202047782U (en) Swabbing steel wire rope spray-prevention device
CN208777972U (en) A kind of eccentric injection mandrel
CN103470233B (en) A kind of heavy crude reservoir natural gas huff and puff oil recovery process system and oil production method
CN107989764A (en) Low-lift pump
CN105298443A (en) Oil pipe float valve and blowout prevention, gas lift and fracture combined operation method for underbalance well completion oil pipe descending
CN205297464U (en) Gas injection well head device
CN110043218A (en) Gravel pack methods
CN204113210U (en) A kind of full well section is without bridging plug Semi-cementing tool
CN104929572A (en) Method for cementing wells during petroleum exploration

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
RJ01 Rejection of invention patent application after publication
RJ01 Rejection of invention patent application after publication

Application publication date: 20151021