CN204983501U - Stone material is hung futilely in preprocessing - Google Patents

Stone material is hung futilely in preprocessing Download PDF

Info

Publication number
CN204983501U
CN204983501U CN201520486603.7U CN201520486603U CN204983501U CN 204983501 U CN204983501 U CN 204983501U CN 201520486603 U CN201520486603 U CN 201520486603U CN 204983501 U CN204983501 U CN 204983501U
Authority
CN
China
Prior art keywords
cell wall
filler
stone material
hole
storage tank
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201520486603.7U
Other languages
Chinese (zh)
Inventor
杨冬梅
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Sichuan green Mstar Technology Ltd.
Yang Jijun
Original Assignee
Individual
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Individual filed Critical Individual
Priority to CN201520486603.7U priority Critical patent/CN204983501U/en
Application granted granted Critical
Publication of CN204983501U publication Critical patent/CN204983501U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Finishing Walls (AREA)

Abstract

The utility model discloses a stone material is hung futilely in preprocessing, including stone material body, structural adhesive layer, steel sheet and screw rod, the rear end face of stone material body is equipped with the storage tank, and the storage tank has preceding cell wall, left cell wall and a right cell wall, and left cell wall is concave left to be equipped with left filler groove, and right cell wall is concave right to be equipped with right filler groove, is equipped with the filler hole and the base concave bar groove that is equipped with forward of cell wall in the front on the preceding cell wall, the steel sheet comprises horizontal plate and vertical board, and the horizontal plate is inserted and is located the bar inslot, and vertical board is installed in the storage tank, and the interval is provided with gluey hole on the vertical board, the one end of screw rod is welded in the rear end face of vertical board, and the horizontal ranging back of the other end is with in inserting the predetermined slotted hole of wall body, in the storage tank before structural adhesive layer sets up in left filler groove, right filler groove, filler hole, glue hole, bar groove reach thoroughly between cell wall and the vertical board. The utility model discloses do not receive stone material body thickness restriction, processing is convenient, joint strength is high, the scene need not secondary operation.

Description

A kind of preprocessing dry-hang stone
Technical field
The utility model relates to dry hanging technology field, particularly relates to a kind of preprocessing dry-hang stone.
Background technology
Current domestic wall-surface stone is installed and is all adopted dry-hanging method to construct, and the sheet metal thickness that current building supplies business provides often does not reach the requirement of GB dry-hang stone high-class product, stone material thickness of slab negative common difference is bigger than normal, adopts conventional cladding mounting means cannot meet safety requirements, even cannot install.In addition, traditional dry hanging technology is to the not too many requirement of the processing technology of stone material, and also will carry out unnecessary secondary operations after making stone material be transported to job site could install, and power consumption of taking a lot of work, extends construction period, and potential safety hazard is also large.
Utility model content
For overcoming the technological deficiency that prior art exists, the utility model provides the utility model to provide a kind of and is not subject to the restriction of stone material body thickness, easy to process, bonding strength is high, the on-the-spot preprocessing dry-hang stone without the need to secondary operations.
The technical solution that the utility model adopts is:
A kind of preprocessing dry-hang stone, comprises stone material body, structural adhesive layer, steel plate and screw rod;
It is square storage tank that the rear end face center position of described stone material body is provided with cross sectional shape, described storage tank has the front cell wall of close stone material body front end face, the left cell wall near stone material body left side and near the right cell wall of stone material body right side, described left cell wall is arranged with left filler groove left, described right cell wall is arranged with right filler groove to the right, and on described front cell wall, interval is arranged with forward multiple filler hole and is arranged with bar-shaped trough forward on the base of described front cell wall;
Described steel plate is made up of the level board integrally connected and vertical plate, and described level board is inserted in described bar-shaped trough, and described vertical plate is installed in described storage tank, and described vertical plate fore-and-aft direction is arranged at intervals with multiple seep through hole;
One end of described screw rod is welded in the rear end face of described vertical plate, and other end level extends back to insert in the default slotted eye of body of wall;
Described structural adhesive layer is arranged in described left filler groove, right filler groove, filler hole, seep through hole, bar-shaped trough and the storage tank between described front cell wall and described vertical plate.
Preferably, described filler span arranges the border circular areas that formation one is the center of circle with described storage tank center.
Preferably, the cross sectional shape in described filler hole is circular.
Preferably, correspondingly before and after described filler hole and described seep through hole arrange or shift to install.
Preferably, the rear end face of described vertical plate is mutually concordant with the rear end face of described stone material body.
Preferably, the length of described bar-shaped trough equals the base length of described front cell wall.
Preferably, also comprise barb, described barb is welded on the end of described screw rod away from described steel plate.
The beneficial effects of the utility model: owing to arranging storage tank on stone material body rear end face, the front cell wall of storage tank arranges filler hole and bar-shaped trough is set on front cell wall base, left cell wall is arranged with left filler groove left, right cell wall is arranged with right filler groove to the right, and steel plate is made up of level board and vertical plate, level board is inserted in bar-shaped trough by structural adhesive layer to provide strong support and to strengthen bonding strength, vertical plate arranged multiple seep through hole and be inserted in storage tank by structural adhesive layer, structural adhesive layer part after solidification is infiltrated in filler hole and seep through hole and is formed glue nail, part is infiltrated in bar-shaped trough and forms adhesive tape, strengthen the bonding strength of structural adhesive layer to stone material body and steel plate, ensure that steel plate is to the supporting and location effect of stone material body, and without the need to secondary operations, reduce the potential safety hazard at dry hanging construction scene.And one end of screw rod is welded in the rear end face of vertical plate, other end level extends back to be inserted in the default slotted eye of body of wall by structure glue, realize dry hanging construction of the present utility model, again because storage tank is the rear end face being opened in stone material body, without the need to considering the thickness problem of stone material body, and process more convenient.
Accompanying drawing explanation
Fig. 1 is the structural representation of stone material body in the utility model.
Fig. 2 is the sectional view along the place of A-A shown in Fig. 1.
Fig. 3 is the sectional view along the place of B-B shown in Fig. 1.
Fig. 4 is the utility model cross-sectional structure schematic diagram.
Fig. 5 is the utility model vertical section structure schematic diagram.
Description of reference numerals:
10, stone material body; 11, storage tank; 12, filler hole; 13, bar-shaped trough; 14, left filler groove; 15, right filler groove; 20, steel plate; 21, level board; 22, vertical plate; 220, seep through hole; 30, screw rod; 40, structural adhesive layer; 50, barb.
Detailed description of the invention
Below in conjunction with accompanying drawing, the utility model is described in further detail:
As Figure 1-5, the present embodiment provides a kind of preprocessing dry-hang stone, comprises stone material body 10, structural adhesive layer 40, steel plate 20 and screw rod 30.
It is square storage tank 11 that the rear end face center position of described stone material body 10 is provided with cross sectional shape, described storage tank 11 has the front cell wall of close stone material body 10 front end face, the left cell wall near stone material body 10 left side and near the right cell wall of stone material body 10 right side, described left cell wall is arranged with left filler groove 14 left, described right cell wall is arranged with right filler groove 15 to the right, and on described front cell wall, interval is arranged with forward multiple filler hole 12 and is arranged with forward bar-shaped trough 13 on the base of described front cell wall.
Described steel plate 20 is made up of the level board 21 integrally connected and vertical plate 22, described level board 21 is inserted in described bar-shaped trough 13, described vertical plate 22 is installed in described storage tank 11, the rear end face of described vertical plate 22 is mutually concordant with the rear end face of described stone material body 10, and described vertical plate 22 fore-and-aft direction is arranged at intervals with multiple seep through hole 220, correspondingly before and after described seep through hole 220 and described filler hole 12 arrange or shift to install.
One end of described screw rod 30 is welded in the rear end face of described vertical plate 22, and other end level extends back to insert in the default slotted eye of body of wall.
Described structural adhesive layer 40 is arranged in described left filler groove 14, right filler groove 15, filler hole 12, seep through hole 220, bar-shaped trough 13 and the storage tank 11 between described front cell wall and described vertical plate 22.
In this enforcement, the cross sectional shape in each described filler hole 12 is circular, and the border circular areas that formation one is the center of circle with described storage tank 11 center is arranged at interval, described filler hole 12, and the length of described bar-shaped trough 13 equals the base length of described front cell wall.
On the basis of technique scheme, the present embodiment also comprises barb 50, described barb 50 is welded on the end of described screw rod 30 away from described steel plate 20, in utilize described barb 50 to be fastened in structure glue that body of wall presets in slotted eye, thus the bonding strength strengthened between the present embodiment and body of wall and structural stability.
The utility model is not limited to above-mentioned preferred forms, and anyone should learn the structure change made under enlightenment of the present utility model, and every have identical or close technical scheme with the utility model, all falls within protection domain of the present utility model.

Claims (7)

1. a preprocessing dry-hang stone, is characterized in that, comprises stone material body, structural adhesive layer, steel plate and screw rod;
It is square storage tank that the rear end face center position of described stone material body is provided with cross sectional shape, described storage tank has the front cell wall of close stone material body front end face, the left cell wall near stone material body left side and near the right cell wall of stone material body right side, described left cell wall is arranged with left filler groove left, described right cell wall is arranged with right filler groove to the right, and on described front cell wall, interval is arranged with forward multiple filler hole and is arranged with bar-shaped trough forward on the base of described front cell wall;
Described steel plate is made up of the level board integrally connected and vertical plate, and described level board is inserted in described bar-shaped trough, and described vertical plate is installed in described storage tank, and described vertical plate fore-and-aft direction is arranged at intervals with multiple seep through hole;
One end of described screw rod is welded in the rear end face of described vertical plate, and other end level extends back to insert in the default slotted eye of body of wall;
Described structural adhesive layer is arranged in described left filler groove, right filler groove, filler hole, seep through hole, bar-shaped trough and the storage tank between described front cell wall and described vertical plate.
2. preprocessing dry-hang stone according to claim 1, is characterized in that, described filler span arranges the border circular areas that formation one is the center of circle with described storage tank center.
3. preprocessing dry-hang stone according to claim 1, is characterized in that, the cross sectional shape in described filler hole is circular.
4. preprocessing dry-hang stone according to claim 1, is characterized in that, correspondingly before and after described filler hole and described seep through hole arranges or shifts to install.
5. preprocessing dry-hang stone according to claim 1, is characterized in that, the rear end face of described vertical plate is mutually concordant with the rear end face of described stone material body.
6. preprocessing dry-hang stone according to claim 1, is characterized in that, the length of described bar-shaped trough equals the base length of described front cell wall.
7. the preprocessing dry-hang stone according to any one of claim 1 to 6, is characterized in that, also comprise barb, and described barb is welded on the end of described screw rod away from described steel plate.
CN201520486603.7U 2015-07-04 2015-07-04 Stone material is hung futilely in preprocessing Expired - Fee Related CN204983501U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201520486603.7U CN204983501U (en) 2015-07-04 2015-07-04 Stone material is hung futilely in preprocessing

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201520486603.7U CN204983501U (en) 2015-07-04 2015-07-04 Stone material is hung futilely in preprocessing

Publications (1)

Publication Number Publication Date
CN204983501U true CN204983501U (en) 2016-01-20

Family

ID=55117883

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201520486603.7U Expired - Fee Related CN204983501U (en) 2015-07-04 2015-07-04 Stone material is hung futilely in preprocessing

Country Status (1)

Country Link
CN (1) CN204983501U (en)

Similar Documents

Publication Publication Date Title
CN207348221U (en) A kind of steel house girder steel connector
CN204983501U (en) Stone material is hung futilely in preprocessing
CN204754058U (en) No fossil fragments drydash material structure
CN204728623U (en) A kind of stone structure with dry-hanging component
CN103835469A (en) Keel-free stone material dry-sticking structure
CN204754066U (en) Hang stone material structure futilely
CN204754060U (en) Stone cladding process spare
CN204754057U (en) Hang stone material structure futilely with steel sheet
CN204456750U (en) A kind of heat insulating decorative board installation system
CN204691159U (en) A kind of stone structure with steel construction piece
CN204551887U (en) A kind of lightweight section structure spandrel girder
CN202913548U (en) Dry hanging connection structure
CN207484753U (en) A kind of light cellular partition board reinforcement by connection structure
CN204691157U (en) A kind of stone material dry suspending connector
CN204754065U (en) I -shaped stone cladding process accessory
CN204754064U (en) H type stone cladding process accessory
CN204754021U (en) Novel stone material structure
CN204728618U (en) A kind of dry hanging stone structure
CN204343615U (en) A kind of hanging piece for stone
CN203905373U (en) Wall attaching regulating clamp slave keel mounting structure
CN208088739U (en) A kind of heat preservation plaque connector
CN203978261U (en) The ladder structure of improvement
CN210622175U (en) Leveling device for wall surface dry-hanging stone
CN204826513U (en) T type stone cladding process accessory
CN204781779U (en) Improvement structure of accessory is hung futilely to T type

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
C41 Transfer of patent application or patent right or utility model
TR01 Transfer of patent right

Effective date of registration: 20160831

Address after: 1, No. 139, No. 5, No. 610000, No. 1 DESAY street, Chengdu hi tech Zone, Sichuan, 9

Patentee after: Sichuan green Mstar Technology Ltd.

Address before: 610000 No. 2, No. 1, building 222, 2903 Tian Shun Road, Chengdu hi tech Zone, Sichuan, China

Patentee before: Yang Jijun

Effective date of registration: 20160831

Address after: 610000 No. 2, No. 1, building 222, 2903 Tian Shun Road, Chengdu hi tech Zone, Sichuan, China

Patentee after: Yang Jijun

Address before: 362272 Fujian city of Quanzhou province Jinjiang City Dong Shi Zhen pan Jing Cun Highway No. 117 North

Patentee before: Yang Dongmei

CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20160120

Termination date: 20180704

CF01 Termination of patent right due to non-payment of annual fee