CN204781779U - Improvement structure of accessory is hung futilely to T type - Google Patents

Improvement structure of accessory is hung futilely to T type Download PDF

Info

Publication number
CN204781779U
CN204781779U CN201520545408.7U CN201520545408U CN204781779U CN 204781779 U CN204781779 U CN 204781779U CN 201520545408 U CN201520545408 U CN 201520545408U CN 204781779 U CN204781779 U CN 204781779U
Authority
CN
China
Prior art keywords
hole
upper plate
vertical
seep
vertical upper
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201520545408.7U
Other languages
Chinese (zh)
Inventor
陈全源
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Individual
Original Assignee
Individual
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Individual filed Critical Individual
Priority to CN201520545408.7U priority Critical patent/CN204781779U/en
Application granted granted Critical
Publication of CN204781779U publication Critical patent/CN204781779U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Abstract

The utility model discloses an improvement structure of accessory is hung futilely to T type solves current conventional T type and hangs the not enough and not high technical problem of security of joint strength between accessory and the stone panel futilely. The utility model discloses a technological solution be: an improvement structure of accessory is hung futilely to T type is in by a horizontal plate and a difference body coupling the vertical upper plate and the vertical hypoplastron of horizontal plate front end are constituteed, the rear end of horizontal plate is run through from top to bottom and is equipped with the mounting hole, correspond about vertical upper plate and vertical hypoplastron and dislocation from top to bottom, just the rear end face of vertical upper plate and the rear end face of vertical hypoplastron are wave surface respectively, run through around the vertical upper plate and be equipped with the first hole of gluing, run through around the vertical hypoplastron and be equipped with the thoroughly gluey hole of second.

Description

A kind of modified node method of T-shaped dry-hanging fitting
Technical field
The utility model relates to building materials technology field, particularly relates to a kind of modified node method of T-shaped dry-hanging fitting.
Background technology
The stone material construction of current building outer wall is general adopts stone material dry suspending method, and general stone material dry suspending method first forms keel structure according to the first framework one of the installation requirement of stone material by multiple cross bar and multiple vertical pole square crossing at building outer wall, then utilize dry-hanging piece for stone such as T-shaped dry hanging article to connect keel structure and stone panel, the upper riser of T-shaped dry hanging article inserts in the slot of stone panel corresponding position, top setting, and in the slot that the stone panel corresponding position that lower riser inserts adjacent below is arranged, carry out support by upper riser and lower riser to neighbouring two stone panels to fix.But the bonding strength of the dry-hanging piece for stone of this structure is not enough, and safety is not high.
Utility model content
For overcoming the technological deficiency that prior art exists, the utility model provides a kind of modified node method of T-shaped dry-hanging fitting, greatly can strengthen the bonding strength between dry-hanging fitting and stone panel, improves safety.
The technical solution that the utility model adopts is:
A kind of modified node method of T-shaped dry-hanging fitting, by level board and be integrally connected to the vertical upper plate of described level board front end respectively and vertical lower plate forms, the rear end of described level board is run through up and down and is provided with installing hole, corresponding and misplace up and down about described vertical upper plate and vertical lower plate, and the rear end face of the rear end face of described vertical upper plate and vertical lower plate is respectively in wavy surface, run through before and after described vertical upper plate and be provided with the first seep through hole, before and after described vertical lower plate, run through being provided with the second seep through hole.
Preferably, the wave bearing of trend of the wavy surface on described vertical upper plate is consistent with the above-below direction of vertical upper plate.
Preferably, the wave bearing of trend of the wavy surface in described vertical lower plate is consistent with the above-below direction of vertical lower plate.
Preferably, described first seep through hole is provided with two, and two described first seep through spans arrange and are positioned on same level height.
Preferably, described second seep through hole is provided with two, and two described second seep through spans arrange and are positioned on same level height.
Preferably, the shape of cross section of described installing hole is kidney-shaped.
Preferably, run through before and after described vertical upper plate and be provided with tapped through hole, in described tapped through hole, adaptation is equiped with screw shell, and the outer wall thread rotation direction of described screw shell is consistent with the thread rotary orientation of described tapped through hole, and the opening of described screw shell backward, its inwall has internal thread.
In the utility model, described fore-and-aft direction refers to constructs after body of wall by stone material dry suspending, and be backward near body of wall side, body of wall front is forward direction.
The beneficial effects of the utility model: because the rear end face of vertical upper plate and the rear end face of vertical lower plate are respectively in wavy surface, run through before and after vertical upper plate and be provided with the first seep through hole, run through before and after vertical lower plate and be provided with the second seep through hole, in concrete dry hanging construction, structure glue is inserted respectively at vertical upper plate place and vertical lower plate place, utilize mobility and the bonding fastness of structure glue, greatly strengthen the utility model T-shaped stone material dry suspending accessory to the bonding strength of neighbouring two stone panels and support strength, ensure the safety after construction and stone structure stability.
Accompanying drawing explanation
Fig. 1 is the utility model lateral view.
Fig. 2 is the utility model rear elevation.
Description of reference numerals:
10, level board; 11, installing hole; 20, vertical upper plate; 21, the first seep through hole; 22, tapped through hole; 30, vertical lower plate; 31, the second seep through hole; 40, screw shell.
Detailed description of the invention
Below in conjunction with accompanying drawing, the utility model is described in further detail:
As shown in Figure 1-2, the present embodiment provides a kind of modified node method of T-shaped dry-hanging fitting, by level board 10 and be integrally connected to the vertical upper plate 20 of described level board 10 front end respectively and vertical lower plate 30 forms.
In the present embodiment, the rear end of described level board 10 is run through up and down and is provided with installing hole 11, the shape of cross section of described installing hole 11 is kidney-shaped, by T-shaped for the present embodiment dry-hanging fitting location and installation in the corresponding position of keel structure, and the longitudinal separation between stone panel and keel structure can suitably can be adjusted by described installing hole 11.
In the present embodiment, described vertical upper plate 20 and vertical lower plate about 30 are corresponding and misplace up and down, and the rear end face of the rear end face of described vertical upper plate 20 and vertical lower plate 30 is respectively in wavy surface, the wave bearing of trend of the wavy surface on described vertical upper plate 20 is consistent with the above-below direction of vertical upper plate 20, the wave bearing of trend of the wavy surface in described vertical lower plate 30 is consistent with the above-below direction of vertical lower plate 30, so can to improve after construction vertically upper plate 20 and vertical lower plate 30 respectively with the structural stability of stone panel.
In the present embodiment, run through before and after described vertical upper plate 20 and be provided with the first seep through hole 21, described first seep through hole 21 is provided with two, and two described first intervals, seep through hole 21 arrange and are positioned on same level height.Run through before and after described vertical lower plate 30 and be provided with the second seep through hole 31, described second seep through hole 31 is provided with two, and two described second intervals, seep through hole 31 arrange and are positioned on same level height.In concrete dry hanging construction, below stone panel with vertical lower plate 30 opposite position place and top stone panel be respectively equipped with slot with vertical upper plate 20 opposite position place, structure glue is filled with in this slot, flow into described first seep through hole 21 and described second seep through hole 31 by structure glue and form glue nail respectively, this glue nail is a coherent body with the structure glue in region, front and back in corresponding slot, remarkable enhancing bonding strength, ensure described vertical upper plate 20 to the support strength of top stone panel and bonding strength and described vertical lower plate 30 to the support strength of below stone panel and bonding strength.
The basis of technique scheme is improved further, run through before and after described vertical upper plate 20 and be provided with tapped through hole 22, in described tapped through hole 22, adaptation is equiped with screw shell 40, the outer wall thread rotation direction of described screw shell 40 is consistent with the thread rotary orientation of described tapped through hole 22, and the opening of described screw shell 40 backward, its inwall has internal thread.In concrete dry hanging construction, top stone panel be provided with through hole with screw shell 40 opposite position place, this through hole supplies the screw rod matched with screw shell 40 inwall to insert and hold and supports stone panel above this, separately can insert structure glue in through hole, thus greatly strengthen described vertical upper plate 20 to the supporting and location of top stone panel and bonding strength.
The utility model is not limited to above-mentioned preferred forms, and anyone should learn the structure change made under enlightenment of the present utility model, and every have identical or close technical scheme with the utility model, all falls within protection domain of the present utility model.

Claims (7)

1. the modified node method of a T-shaped dry-hanging fitting, it is characterized in that, by level board and be integrally connected to the vertical upper plate of described level board front end respectively and vertical lower plate forms, the rear end of described level board is run through up and down and is provided with installing hole, corresponding and misplace up and down about described vertical upper plate and vertical lower plate, and the rear end face of the rear end face of described vertical upper plate and vertical lower plate is respectively in wavy surface, run through before and after described vertical upper plate and be provided with the first seep through hole, before and after described vertical lower plate, run through being provided with the second seep through hole.
2. the modified node method of T-shaped dry-hanging fitting according to claim 1, is characterized in that, the wave bearing of trend of the wavy surface on described vertical upper plate is consistent with the above-below direction of vertical upper plate.
3. the modified node method of T-shaped dry-hanging fitting according to claim 1, is characterized in that, the wave bearing of trend of the wavy surface in described vertical lower plate is consistent with the above-below direction of vertical lower plate.
4. the modified node method of T-shaped dry-hanging fitting according to claim 1, is characterized in that, described first seep through hole is provided with two, and two described first seep through spans arrange and are positioned on same level height.
5. the modified node method of T-shaped dry-hanging fitting according to claim 1, is characterized in that, described second seep through hole is provided with two, and two described second seep through spans arrange and are positioned on same level height.
6. the modified node method of T-shaped dry-hanging fitting according to claim 1, is characterized in that, the shape of cross section of described installing hole is kidney-shaped.
7. the modified node method of the T-shaped dry-hanging fitting according to any one of claim 1 to 6, it is characterized in that, run through before and after described vertical upper plate and be provided with tapped through hole, in described tapped through hole, adaptation is equiped with screw shell, the outer wall thread rotation direction of described screw shell is consistent with the thread rotary orientation of described tapped through hole, and the opening of described screw shell backward, its inwall has internal thread.
CN201520545408.7U 2015-07-26 2015-07-26 Improvement structure of accessory is hung futilely to T type Expired - Fee Related CN204781779U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201520545408.7U CN204781779U (en) 2015-07-26 2015-07-26 Improvement structure of accessory is hung futilely to T type

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201520545408.7U CN204781779U (en) 2015-07-26 2015-07-26 Improvement structure of accessory is hung futilely to T type

Publications (1)

Publication Number Publication Date
CN204781779U true CN204781779U (en) 2015-11-18

Family

ID=54521851

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201520545408.7U Expired - Fee Related CN204781779U (en) 2015-07-26 2015-07-26 Improvement structure of accessory is hung futilely to T type

Country Status (1)

Country Link
CN (1) CN204781779U (en)

Similar Documents

Publication Publication Date Title
CN103243890B (en) Heat insulating decorative board hanging fastener component and mounting process thereof
CN204691156U (en) A kind of Combined hanger for cladding ornamental stone
CN204781779U (en) Improvement structure of accessory is hung futilely to T type
CN207003902U (en) A kind of decorative panel suspension member and Side fascia
CN204983514U (en) Cross stone cladding process accessory
CN204754060U (en) Stone cladding process spare
CN107700778A (en) A kind of dry-hanging component of groove formula porcelain plate
CN206174384U (en) Wall body of device is hung futilely in three -dimensional connection based on T type of adjusting installation
CN206256578U (en) A kind of dry hanging stone structure
CN105484466A (en) Point-supporting-type stone suspension member
CN103147530B (en) Unit body glass curtain wall suspension system
CN204754063U (en) Stone cladding process spare
CN202170583U (en) Curtain wall plate back hanging system
CN107675853A (en) A kind of installation system of groove formula porcelain plate
CN204983510U (en) Seat is hung to convenient to use's stone material
CN207032758U (en) A kind of installation system of groove formula porcelain plate
CN204662844U (en) A kind of dry-hanging piece for stone
CN203654497U (en) Stone heat preservation composite board dry hanging system
CN204738491U (en) Hang subassembly futilely
CN204691159U (en) A kind of stone structure with steel construction piece
CN207048245U (en) A kind of dry-hanging component of groove formula porcelain plate
CN204691157U (en) A kind of stone material dry suspending connector
CN204738488U (en) Hang stone material structure futilely
CN205189336U (en) T type stone cladding process spare
CN206352379U (en) Indoor wall decorating structure

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20151118

Termination date: 20160726