CN204982638U - Pier cushion cap structure - Google Patents

Pier cushion cap structure Download PDF

Info

Publication number
CN204982638U
CN204982638U CN201520710664.7U CN201520710664U CN204982638U CN 204982638 U CN204982638 U CN 204982638U CN 201520710664 U CN201520710664 U CN 201520710664U CN 204982638 U CN204982638 U CN 204982638U
Authority
CN
China
Prior art keywords
pier
cushion cap
pier cap
bridge
cap
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201520710664.7U
Other languages
Chinese (zh)
Inventor
何贞俊
张金明
杨聿
王建平
余陈颖妮
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Pearl River Hydraulic Research Institute of PRWRC
Original Assignee
Pearl River Hydraulic Research Institute of PRWRC
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Pearl River Hydraulic Research Institute of PRWRC filed Critical Pearl River Hydraulic Research Institute of PRWRC
Priority to CN201520710664.7U priority Critical patent/CN204982638U/en
Application granted granted Critical
Publication of CN204982638U publication Critical patent/CN204982638U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Bridges Or Land Bridges (AREA)

Abstract

The utility model discloses a pier cushion cap structure, it includes pier, pier cushion cap and pile foundation, and the pier setting is on the pier cushion cap, and the pier cushion cap sets up in the pile foundation. The cross -section that the length direction of bridge is followed to the pier cushion cap is the ship type, and the major axis of pier cushion cap sets up along water flow direction. Implement the technical scheme of the utility model, on the facade of rivers, the lower edge of pier cushion cap is streamlined for rivers are when the cushion cap, and rivers streamline and cushion cap lower edge line smooth transition all can not form the recirculation region at cushion cap upstream face, bottom and back side on the facade, may show to reduce the intensity that flows back, thereby reduce the local head loss that the cushion cap causes, reduce head -water elevation and stop up the height, thereby reduce the influence to the flood control.

Description

Pier cap structure
Technical field
The utility model is the orientation optimization bridge construction from water conservancy, especially relates to a kind of pier cap structure.
Background technology
Pier cap be pile foundation and bridge pier contact part, several even tens piles link together, the pressure of bridge pier is passed to pile foundation.Cushion cap top is generally a little more than the water surface, and because the physical dimension of cushion cap is very large, the volume that blocks water during river course flood is large, and upper pond level is stopped up obviously high.The upstream face of current cushion cap is made chamfering in the plane or is led the form of fillet, to reduce the impact that blocks water of cushion cap.But, consult Fig. 1, on facade, the lower edge of existing pier cap 5 is right-angle structure, current form three recirculating zones at cushion cap upstream face, bottom and back side when walking around existing pier cap 5 lower edge right angle, highly be numerically equal to the local head loss of current when the existing pier cap 5 because upper pond level is stopped up, the extra head of the formation loss of three recirculating zones, thus increase upper pond level and stop up high.
Utility model content
The technical problems to be solved in the utility model is, provides a kind of novel bridge pier suspended deck structure.
The utility model solves the technical scheme that its technical problem adopts: construct a kind of pier cap structure, comprise bridge pier, pier cap and pile foundation, described bridge pier is arranged on described pier cap, and described pier cap is arranged in described pile foundation;
The long axis water (flow) direction of described pier cap is arranged, and on the facade of current, the lower edge of described pier cap is streamlined.
In pier cap structure of the present utility model, the side that meets water of described pier cap is provided with first and blocks water body, described first block water external side laterally position placed in the middle evagination form the first longitudinal ridge.
In pier cap structure of the present utility model, the land side of described pier cap is provided with second and blocks water body, described second block water external side laterally position placed in the middle evagination form the second longitudinal ridge.
In pier cap structure of the present utility model, the bottom of described bridge pier is also ship type along the cross section of the length direction of bridge.
In pier cap structure of the present utility model, described pier cap is greater than the sectional area of bottom along the length direction of bridge of described bridge pier along the sectional area of the length direction of bridge.
Implement the technical solution of the utility model, at least there is following beneficial effect: on the facade of current, the lower edge of pier cap is streamlined, make current through cushion cap, on facade, current streamline and cushion cap lower edge line seamlessly transit, and all can not form recirculating zone at cushion cap upstream face, bottom and back side, or significantly can reduce circulating flow strength, thus decrease the local head loss that cushion cap causes, reduce upper pond level and stop up high, thus reduce the impact on flood control.
Accompanying drawing explanation
Below in conjunction with drawings and Examples, the utility model is described in further detail, in accompanying drawing:
Fig. 1 is schematic diagram when current walk around the lower edge of existing pier cap on facade;
Fig. 2 is schematic diagram when current walk around the lower edge of the pier cap in the utility model on facade;
Fig. 3 be pier cap structure in an embodiment of the present utility model face structural representation;
Fig. 4 is the side-looking structural representation of the pier cap structure in an embodiment of the present utility model;
Fig. 5 is the plan structure schematic diagram of the pier cap structure in an embodiment of the present utility model;
Wherein, 2, bridge pier; 3, pier cap; 31, first to block water body; 32, the first longitudinal ridge; 33, second to block water body; 34, the second longitudinal ridge; 4, pile foundation; 5, existing pier cap; 6, the water surface; 7, face, riverbed.
Detailed description of the invention
In order to there be understanding clearly to technical characteristic of the present utility model, object and effect, now contrast accompanying drawing and describe detailed description of the invention of the present utility model in detail.
Fig. 2 to Fig. 5 shows a kind of pier cap structure of the present utility model, and this pier cap structure structure is simple, saving material, when using in crossing river channel bridge, reduces depth rise, from the adverse effect to a certain degree reduced flood control.
Fig. 1 is schematic diagram when current walk around the lower edge of existing pier cap on facade.Fig. 2 is schematic diagram when current walk around the lower edge of the pier cap in the utility model on facade.Fig. 3 be pier cap structure in an embodiment of the present utility model face structural representation.Fig. 4 is the side-looking structural representation of the pier cap structure in an embodiment of the present utility model.Fig. 5 is the plan structure schematic diagram of the pier cap structure in an embodiment of the present utility model.
Consult Fig. 2 to Fig. 5, this pier cap structure comprises girder bent cap, bridge pier 2, pier cap 3 and pile foundation 4, and girder bent cap is arranged on bridge pier 2, and bridge pier 2 is arranged on pier cap 3, and pier cap 3 is arranged in pile foundation 4.
The long axis water (flow) direction of pier cap 3 is arranged, and on the facade of current, the lower edge of pier cap 3 is streamlined.The Main Function of this pier cap 3 is to reduce depth rise, generally, when current are through pier cap 3, current form three recirculating zones at cushion cap upstream face, bottom and back side when walking around pier cap lower edge, the local head loss of current through pier cap is numerically equal to because upper pond level heap soil or fertilizer over and around the roots is high, the extra head of the formation loss of three recirculating zones, thus increase upper pond level and stop up high.When pier cap 3 width and inlet flow conditions one timing, the shape of pier cap 3 lower edge determines the size of recirculating zone width.
Further, consult Fig. 5, this cross section along the length direction of bridge is that the structure of the pier cap 3 of ship type is specially: the side that meets water of pier cap 3 is provided with first and blocks water body 31, and the first laterally position placed in the middle evagination that to block water outside body 31 forms the first longitudinal ridge 32.The land side of pier cap 3 is provided with second and blocks water body 33, and the second laterally position placed in the middle evagination that to block water outside body 33 forms the second longitudinal ridge 34.And this first body 31 that blocks water effectively can also reduce floating thing on the water surface impact to pier cap 3 and bridge pier.This second body 33 that blocks water can also produce certain guide effect by the opposing connection current of crossing bridge pier, reduces the flow-disturbing that weak current produce around bridge pier.
In certain embodiments, the bottom of the bridge pier 2 of this bridge pier also can be ship type along the cross section of the length direction of bridge.The bottom of bridge pier 2 and pier cap 3 compact siro spinning technology, make the external surface after being fixed as one still in streamlined, then the bottom of bridge pier 2 cross sectional shape and pier cap 3 be consistent and the bottom of bridge pier 2 both can be made to be connected with pier cap 3 more tight, also can play the effect reducing depth rise further.
Further, generally, pier cap 3 is greater than the sectional area of bottom along the length direction of bridge of bridge pier 2 along the sectional area of the length direction of bridge.Certainly; consider the needs that actual design is constructed; as long as pier cap 3 meets the requirement of design and actual job along the bottom of the sectional area of the length direction of bridge and bridge pier 2 along the sectional area of the length direction of bridge, arbitrary proportion relation is between the two all in protection domain of the present utility model.
To sum up, pier cap reasonable in design in the utility model, on the facade of current, the lower edge of pier cap is streamlined, makes current through cushion cap, and on facade, current streamline and cushion cap lower edge line seamlessly transit, all recirculating zone can not be formed at cushion cap upstream face, bottom and back side, or significantly can reduce circulating flow strength, thus decrease the local head loss that cushion cap causes, reduce upper pond level and stop up high.Thus whole pier cap structural stability is strong, is beneficial to flood control.
The foregoing is only preferred embodiment of the present utility model, be not limited to the utility model, for a person skilled in the art, the utility model can have various change, combination and change.All within spirit of the present utility model and principle, any amendment done, equivalent replacement, improvement etc., all should be included within right of the present utility model.

Claims (5)

1. a pier cap structure, comprise bridge pier (2), pier cap (3) and pile foundation (4), described bridge pier (2) is arranged on described pier cap (3), and described pier cap (3) is arranged in described pile foundation (4); It is characterized in that, the long axis water (flow) direction of described pier cap (3) is arranged, and on the facade of current, the lower edge of described pier cap (3) is streamlined.
2. pier cap structure according to claim 1, it is characterized in that, the side that meets water of described pier cap (3) is provided with first and blocks water body (31), described first block water body (31) outside laterally position placed in the middle evagination form the first longitudinal ridge (32).
3. pier cap structure according to claim 1, it is characterized in that, the land side of described pier cap (3) is provided with second and blocks water body (33), described second block water body (33) outside laterally position placed in the middle evagination form the second longitudinal ridge (34).
4. pier cap structure according to claim 1, is characterized in that, the bottom of described bridge pier (2) is also ship type along the cross section of the length direction of bridge.
5. pier cap structure according to claim 4, is characterized in that, described pier cap (3) is greater than the sectional area of bottom along the length direction of bridge of described bridge pier (2) along the sectional area of the length direction of bridge.
CN201520710664.7U 2015-09-14 2015-09-14 Pier cushion cap structure Expired - Fee Related CN204982638U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201520710664.7U CN204982638U (en) 2015-09-14 2015-09-14 Pier cushion cap structure

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201520710664.7U CN204982638U (en) 2015-09-14 2015-09-14 Pier cushion cap structure

Publications (1)

Publication Number Publication Date
CN204982638U true CN204982638U (en) 2016-01-20

Family

ID=55117020

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201520710664.7U Expired - Fee Related CN204982638U (en) 2015-09-14 2015-09-14 Pier cushion cap structure

Country Status (1)

Country Link
CN (1) CN204982638U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN115341508A (en) * 2022-08-22 2022-11-15 国网河南省电力公司经济技术研究院 River structure and method for arranging river structure

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN115341508A (en) * 2022-08-22 2022-11-15 国网河南省电力公司经济技术研究院 River structure and method for arranging river structure
CN115341508B (en) * 2022-08-22 2024-04-26 国网河南省电力公司经济技术研究院 River structure and method for setting river structure

Similar Documents

Publication Publication Date Title
CN204959707U (en) Ecological fishway of multiple -step type
CN102747716B (en) Vertical seam type fishway structure
CN104294803A (en) Winding type fishway
CN204212122U (en) A kind of fish pass
CN203514273U (en) Large-incidence-angle diffusion-type drop sill underflow energy dissipation structure
CN103195027B (en) Stepped weir for straight river channel
CN102154999A (en) Diversion ecological spur dike
CN109778800B (en) Gradual change falls sill type stilling basin
CN204982638U (en) Pier cushion cap structure
CN206189344U (en) Existing stereoplasm shore protection ecological landscape ization transformation structure
CN204940222U (en) A kind of bilateral vertical seam type fish channel structure
CN103835273B (en) Vertical slit type fishway rest pool
CN202688968U (en) Vertical connection type fishway
CN208701768U (en) A kind of float Structure of shallow embedding open cut of subway station or Subway Tunnel
CN102286963A (en) New shape overflow dam and bottom flow energy dissipation method
CN203462439U (en) Feeding water distribution system for holothurian culture pond
CN104264626A (en) Structure for controlling and guiding river regime and stabilizing river mainstream
CN204738220U (en) Pier structure
CN105442503A (en) Fishway with energy dissipation columns
CN203904943U (en) Vertical slot fishway rest pool
CN204803845U (en) Ecological revetment block of two port combination formula
CN204385687U (en) Without aileron layout of sluice form
CN211256913U (en) Curve overflow weir structure of bank spillway
CN210459143U (en) Utilize integrated configuration of river levee and lock to realize crossing fish function
CN209555870U (en) A kind of broken line type weir reducing upstream hammed water height

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20160120

Termination date: 20160914

CF01 Termination of patent right due to non-payment of annual fee