CN204981923U - Blast furnace gun volume of beating mud display device - Google Patents

Blast furnace gun volume of beating mud display device Download PDF

Info

Publication number
CN204981923U
CN204981923U CN201520751179.4U CN201520751179U CN204981923U CN 204981923 U CN204981923 U CN 204981923U CN 201520751179 U CN201520751179 U CN 201520751179U CN 204981923 U CN204981923 U CN 204981923U
Authority
CN
China
Prior art keywords
signal
mud
proximity switch
blast furnace
controlling system
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Withdrawn - After Issue
Application number
CN201520751179.4U
Other languages
Chinese (zh)
Inventor
王文志
唐志宏
李明亮
张广川
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Liuzhou Iron and Steel Co Ltd
Original Assignee
Liuzhou Iron and Steel Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Liuzhou Iron and Steel Co Ltd filed Critical Liuzhou Iron and Steel Co Ltd
Priority to CN201520751179.4U priority Critical patent/CN204981923U/en
Application granted granted Critical
Publication of CN204981923U publication Critical patent/CN204981923U/en
Withdrawn - After Issue legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Manufacture Of Iron (AREA)

Abstract

The utility model discloses a blast furnace gun volume of beating mud display device belongs to metallurgical equipment technical field, the device including set up respectively in the proximity switch that changes big gun operating handle department with set up in the 2nd proximity switch who beats mud operating handle department, these two switches are connected with DCS control system's signal input part respectively, DCS control system's signal output part is connected with the signal input part of time -recorder, DCS control is passed through too the wire mould piece and is connected with host computer foundation, wherein: proximity switch output is changeed the big gun signal and is given DCS control system, DCS control system judges this commentaries on classics big gun signal and carries out data acquisition and timing to the mud signal of beating of the 2nd proximity switch output, disappear up to beating the mud signal, then the DCS control system data calculation that will gather sends for the host computer after handling, and information is measured to this dozen mud of demonstration on the host computer. The problem of the unable accurate measurement of the current blast furnace gun volume of beating mud can be solved to this kind of device.

Description

Clay gun of blast furnace quantity display apparatus
Technical field
The utility model relates to technical field of metallurgical equipment, especially a kind of display unit for clay gun of blast furnace amount.
Background technology
Clay gun is the casthouse equipment of the smelting indispensability that accurately can block rapidly the iron notch after putting iron, and a kind of blast furnace gun as shown in Figure 1, includes big gun body 4 and Hydraulic Station 1, Hydraulic Station is provided with operating valve,
Operating valve includes and turns big gun operating valve and make mud operating valve, turns big gun operating valve is provided with to turn big gun operation handle arm 2, beats on mud operating valve and is provided with dozen mud operation handle arm 3; During work, first controlling clay gun rotational alignment blast furnace iron notch by turning big gun operation handle arm, then beating mud by playing the transmitting of mud operation handle arm control clay gun; Wherein, the mud amount of beating of blast furnace gun number decide blast-melted, whether slag can smoothly from the key parameter that iron notch is discharged, if it is many to beat mud amount, then the iron mouth degree of depth is excessively dark, the molten iron discharging time is long, and slag iron can not be discharged in time in blast furnace, affects the cyclic production of blast furnace, output can not reach expection, and productivity effect will decline; If it is very few to beat mud amount, then slag iron can be caused to flow out too fast from blast furnace, and molten iron flows out too fast, molten iron can overflow trough, flows to the slag iron treatment system of stokehold, and has a large amount of water in slag iron treatment system, when the molten iron of high temperature contacts with water, a large amount of steam can be produced and cause an explosion accident.Therefore the accurate-metering how realizing the clay gun of blast furnace amount under harsh environments is people's problems anxious to be resolved.
Utility model content
Technical problem to be solved in the utility model is to provide a kind of clay gun of blast furnace quantity display apparatus, and this device can solve existing clay gun of blast furnace amount cannot the problem of accurate-metering.
In order to solve the problem, the technical scheme that the utility model adopts is: this clay gun of blast furnace quantity display apparatus, include the first proximity switch being arranged at respectively and turning big gun operation handle arm place and the second proximity switch being arranged at dozen mud operation handle arm place, described first proximity switch, second proximity switch is connected respectively by the signal input part of respective rly. with DCS Controlling System, the signal output part of described DCS Controlling System is connected with the signal input part of timing register by rly., described DCS Controlling System has ethernet module, described ethernet module is connected by netting twine and upper computer,
Wherein: described first proximity switch: export and turn big gun signal to described DCS Controlling System;
Described second proximity switch: export and beat mud signal to described DCS Controlling System;
Described DCS Controlling System: first receive and turn big gun signal and according to predetermined lasting time, this turned big gun signal and is judged; Then receiving and beat mud signal and mud signal of fighting each other carries out data gathering and timing, until beat mud blackout, then is, after beating mud amount signal, send to upper computer by ethernet module by the data computing collected;
Described upper computer: receive and beat mud amount signal and show this dozen of mud amount information.
In technique scheme, technical scheme can also be more specifically: described predetermined lasting time is less than 60 seconds.
Owing to have employed technique scheme, the utility model compared with prior art has following beneficial effect:
1, the utility model achieves the quantification operation of mud spray gun plugging amount, and iron mouth remains on the rational degree of depth, and the slag iron not only making blast-furnace smelting produce is discharged uniformly, and is beneficial to Timeliness coverage and reply iron mouth hidden danger, is beneficial to stablize and beats mud amount, ensure that safety in production;
2, the utility model provides data refer more accurately to workshop, operator is operated more accurate, decreases blindly operation, reduce the stemming amount that blast furnace gun consumes; In practical application between the guarantee iron mouth degree of depth 2.60 meters ~ 2.8 meters, standard state is lower beats mud 4 second, cone drums mud consumption cost reduction 0.29 yuan per ton, and annual whole workshop saves 53.533 ten thousand yuan, achieves blast furnace and efficiently taps a blast furnace;
3., because predetermined lasting time is less than 60 seconds, accurately can distinguish and play mud Operation and maintenance operation.
Accompanying drawing explanation
Fig. 1 is the utility model embodiment blast furnace gun schematic diagram.
Fig. 2 is the functional block diagram of the utility model embodiment.
Embodiment
Below in conjunction with accompanying drawing embodiment, the utility model is described in further detail:
Embodiment one
Clay gun of blast furnace quantity display apparatus shown in Fig. 2, include and be arranged at the first proximity switch 5 turning big gun operation handle arm 2 place and the second proximity switch 6 being arranged at dozen mud operation handle arm 3 place respectively, first proximity switch 5 is connected by the signal input part that the first rly. 7 is corresponding to DCS Controlling System 9, second proximity switch 6 is connected by the signal input part that the second rly. 8 is corresponding to DCS Controlling System, the signal output part of DCS Controlling System 9 has ethernet module by the 3rd rly. 11 DCS Controlling System that to be connected with the signal input part of timing register 12, ethernet module is connected by netting twine and upper computer 10,
Wherein: when turning big gun operation handle arm 2 and forwarding working position to, namely the predetermined distance turned between big gun operation handle arm 2 and the first proximity switch 5 is reached, now the first proximity switch 5 is responded to rear output electrical signal and is driven the first rly. 7 to close, and this electrical signal is transferred in DCS Controlling System 9 by the first rly. 7; Now DCS Controlling System 9 judges this electrical signal, judge whether it is turn big gun signal, when being less than 60 seconds this signal duration, be judged as YES, now will beat mud operation handle arm 3 and forward working position to, namely reach and beat predetermined distance between mud operation handle arm 3 and the second proximity switch 6, now the second proximity switch 6 is responded to rear output and is beaten mud signal and drive the second rly. 8 to close, and beats mud signal and is transferred in DCS Controlling System 9 by the second rly. 8; The mud signal of beating that now DCS Controlling System 9 starts the second proximity switch 6 exports carries out data gathering and timing, until beat mud blackout, then DCS Controlling System carries out data computing, beat mud signal and export and beat mud duration by what collect and be scaled dozen mud amount, send to upper computer 10 by ethernet module, upper computer 10 shows this dozen of mud amount information.
Embodiment two
When the first proximity switch 5 responds to the signal duration 35 seconds of rear output, be judged as YES and turn big gun signal, all the other are all identical with embodiment one.
Embodiment three
When the first proximity switch 5 responds to the signal duration 50 seconds of rear output, be judged as YES and turn big gun signal, all the other are all identical with embodiment one.

Claims (2)

1. a clay gun of blast furnace quantity display apparatus, it is characterized in that: include the first proximity switch being arranged at respectively and turning big gun operation handle arm place and the second proximity switch being arranged at dozen mud operation handle arm place, described first proximity switch, the second proximity switch are connected respectively by the signal input part of respective rly. with DCS Controlling System, the signal output part of described DCS Controlling System is connected with the signal input part of timing register by rly., described DCS Controlling System has ethernet module, and described ethernet module is connected by netting twine and upper computer;
Wherein: described first proximity switch: export and turn big gun signal to described DCS Controlling System;
Described second proximity switch: export and beat mud signal to described DCS Controlling System;
Described DCS Controlling System: first, receives and turns big gun signal and according to predetermined lasting time, this turned to big gun signal and judges; Then receiving and beat mud signal and mud signal of fighting each other carries out data gathering and timing, until beat mud blackout, then is, after beating mud amount signal, send to upper computer by ethernet module by the data computing collected;
Described upper computer: receive and beat mud amount signal and show this dozen of mud amount information.
2. clay gun of blast furnace quantity display apparatus according to claim 1, is characterized in that: described predetermined lasting time is less than 60 seconds.
CN201520751179.4U 2015-09-26 2015-09-26 Blast furnace gun volume of beating mud display device Withdrawn - After Issue CN204981923U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201520751179.4U CN204981923U (en) 2015-09-26 2015-09-26 Blast furnace gun volume of beating mud display device

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201520751179.4U CN204981923U (en) 2015-09-26 2015-09-26 Blast furnace gun volume of beating mud display device

Publications (1)

Publication Number Publication Date
CN204981923U true CN204981923U (en) 2016-01-20

Family

ID=55116307

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201520751179.4U Withdrawn - After Issue CN204981923U (en) 2015-09-26 2015-09-26 Blast furnace gun volume of beating mud display device

Country Status (1)

Country Link
CN (1) CN204981923U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN105112588A (en) * 2015-09-26 2015-12-02 柳州钢铁股份有限公司 Display device for mud charging quantity of blast furnace mud gun

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN105112588A (en) * 2015-09-26 2015-12-02 柳州钢铁股份有限公司 Display device for mud charging quantity of blast furnace mud gun
CN105112588B (en) * 2015-09-26 2017-05-17 柳州钢铁股份有限公司 Display device for mud charging quantity of blast furnace mud gun

Similar Documents

Publication Publication Date Title
CN204270025U (en) There is the clock system of IRIG-B time adjustment function
CN104480248A (en) Full-automatic control system and method for converter single-slag process
CN203748358U (en) Accurate irrigation device based on internet of things
CN204789825U (en) Novel multi -functional distribution maintenance monitoring facilities
CN204981923U (en) Blast furnace gun volume of beating mud display device
CN105112588A (en) Display device for mud charging quantity of blast furnace mud gun
CN203798999U (en) System for testing power quality monitoring equipment
CN103398745A (en) Failure diagnosis system for frequency converter of coal winning machine
CN102877172B (en) High-speed stretch yarn machine length control system with yarn-cutting control function
CN202547969U (en) Automatic sampling device of blocky material for belt conveyer
CN202550495U (en) Non-contact intelligent press board system
CN206378714U (en) Location data collector
CN104406415B (en) Electric furnace electrode regulation system
CN204831572U (en) High tension switchgear's wireless temperature measurement system
CN203444034U (en) Fault diagnosis system of coal mining machine frequency converter
CN210071174U (en) Multifunctional wireless temperature measuring device for electrical contact
CN108067599B (en) Slab quality analysis method based on steel-making continuous casting overall process data
CN202916660U (en) Automatic control system for industrial silicon furnaces
CN207380487U (en) One kind is used to detect tobacco leaf multiple spot moisture content detection device
CN202531198U (en) Bracket pressure measuring device
CN2630860Y (en) DC system insulating monitoring instrument
CN204331415U (en) Two-wheel friction press process monitoring system
CN203484634U (en) Automatic prompting system for abnormal heat transfer flux of continuous casting crystallizer
CN205267990U (en) Footbath
CN203428855U (en) Liquid crystal brake clearance monitoring terminal

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
AV01 Patent right actively abandoned

Granted publication date: 20160120

Effective date of abandoning: 20170517

AV01 Patent right actively abandoned