Whole bundle of machine that shuttles back and forth of steel strand wires Download PDFInfo
- Publication number
- CN204960344U CN204960344U CN201520756329.0U CN201520756329U CN204960344U CN 204960344 U CN204960344 U CN 204960344U CN 201520756329 U CN201520756329 U CN 201520756329U CN 204960344 U CN204960344 U CN 204960344U
- Authority
- CN
- China
- Prior art keywords
- clamping part
- steel strand
- jig arm
- chain
- return spring
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
Abstract
The utility model belongs to the technical field of the architectural equipment, specifically disclose a whole bundle of machine that shuttles back and forth of steel strand wires, including power device, sprocket and chain, be equipped with a plurality of groups layer board on the chain, the layer board meets through mounting and chain, be equipped with a pair of mechanical arm lock on the layer board, the machinery arm lock includes and is equipped with the draw -in groove on the side end face of clamping part by the clamping part that the preceding termination of clamping part has fan -shaped tooth, be equipped with the return spring in the machinery arm lock, return spring one end is connected in mechanical arm lock, and the other end is connected on the layer board, the layer board both sides all are equipped with splint, have connect the pneumatic cylinder on the splint. The utility model discloses simple structure, work efficiency height and with low costs.
Description
Technical field
The utility model belongs to building implements technical field, particularly a kind of steel strand integral bundle shuttle machine.
Background technology
In the building fields such as high ferro, bridge, water resources dam, need to carry out whole bundle to steel strand to shuttle back and forth, during according to artificial lashing, steel strand are easily caused to be wound around mutually, when steel strands wound together after, every pulling force suffered by root steel strand in stretching process can be caused different, increase the frictional force between steel strand, cause loss of prestress; It is unstable to there is clamping in current existing steel strand shuttle machine, easily occurs the problem of skidding, and then burns out steel strand, cause the wasting of resources, the situation that steel strand are wound around mutually also easily occurs simultaneously, causes loss of prestress.
Utility model content
The purpose of this utility model is to provide that a kind of structure is simple, operating efficiency is high and the steel strand integral bundle shuttle machine that cost is low.
For achieving the above object, the utility model by the following technical solutions: steel strand integral bundle shuttle machine, comprises power set, sprocket wheel and chain, and chain is provided with some groups of supporting plates, and supporting plate is connected with chain by fixture; Supporting plate is provided with a pair mechanical jig arm; Machinery jig arm comprises clamping part, and the side end face of clamping part is provided with draw-in groove, and the front end of clamping part is connected to sector; Machinery jig arm is provided with return spring, and return spring one end is connected in mechanical jig arm, and the other end is connected on supporting plate; Supporting plate both sides are equipped with clamping plate, and clamping plate are connected to hydraulic cylinder.
Further, be provided with roller in clamping part, the outer rim of roller protrudes from clamping part.
Further, clamping plate two ends are provided with guided plate.
Further, sector is provided with set bolt, and return spring walks around set bolt; Machinery jig arm is connected with supporting plate by set bolt.
Compared with prior art, the beneficial effects of the utility model are as follows: chain is provided with some groups of supporting plates, and supporting plate is connected with chain by fixture, and supporting plate is provided with a pair mechanical jig arm, the mechanical jig arm of many groups can be formed and clamping traction is carried out to steel strand simultaneously, ensure the continuity of the course of work; Machinery jig arm comprises clamping part, and the side end face of clamping part is provided with draw-in groove, and draw-in groove can carry out spacing to steel strand, avoids steel strands wound; The front end of clamping part is connected to sector, and the sector engagement in a pair mechanical jig arm, ensures that mechanical jig arm moving direction does not offset; Machinery jig arm is provided with return spring, and return spring one end is connected in mechanical jig arm, and the other end is connected on supporting plate, when hydraulic cylinder does not promote clamping plate reach, return spring pulls the clamping part of mechanical jig arm in opened condition, conveniently places steel strand, and structure is simple and easy to operate; Supporting plate both sides are equipped with clamping plate, and clamping plate are connected to hydraulic cylinder, and the reach of Hydraulic Cylinder clamping plate, with clamping mechanical jig arm, strengthens the clamping effect of clamping part; Be provided with roller in clamping part, the outer rim of roller protrudes from clamping part, and roller contacts with clamping plate, and reduce frictional force, mechanical jig arm is moved smooth and easy, moving direction is consistent; Clamping plate two ends are provided with guided plate, make the open and close process of clamping part slowly progressive, avoid the situation occurring steel strands wound; Sector is provided with set bolt, and return spring walks around set bolt, ensures that clamping part resets smooth and easy.
Accompanying drawing explanation
Fig. 1 is structural representation of the present utility model;
Fig. 2 is part-structure schematic diagram of the present utility model.
Detailed description of the invention
Steel strand integral bundle shuttle machine, as shown in Figure 1 and Figure 2, comprises power set 4, sprocket wheel 2 and chain 1, power set 4 can adopt motor, power set 4 are connected with sprocket wheel 2 by power transmission shaft 3, and chain 1 is provided with some groups of supporting plates 13, and supporting plate 13 is connected with chain 1 by fixture 14; Supporting plate 13 is provided with a pair mechanical jig arm 11; Machinery jig arm 11 comprises clamping part 15, the side end face of clamping part 15 is provided with draw-in groove 7, and the front end of clamping part 15 is connected to sector 6, and the draw-in groove 7 of a pair mechanical jig arm 11 is used in combination and is clamped by steel strand, the sector 6 of a pair mechanical jig arm 11 is meshed, to ensure the synchronous of two mechanical jig arm 11; Machinery jig arm 11 is provided with return spring 12, and return spring 12 one end is connected in mechanical jig arm 11, and the other end is connected on supporting plate 13; Supporting plate 13 both sides are equipped with clamping plate 8, clamping plate 8 are connected to hydraulic cylinder 5.Be provided with roller 10 in clamping part 15, the outer rim of roller 10 protrudes from clamping part 15.Clamping plate 8 two ends are provided with guided plate 9.Sector 6 is provided with set bolt 16, and return spring 12 walks around set bolt 16; Machinery jig arm 11 is connected with supporting plate 13 by set bolt 16.
During work, first primer fluid cylinder pressure 5, move after driving clamping plate 8, now return spring 12 acts on and moves after driving clamping part 15, now mechanical jig arm 11 is in open mode, steel strand are put into the draw-in groove 7 in mechanical jig arm 11, primer fluid cylinder pressure 5 also drives clamping plate 8 to move forward, start power set 4 and be with movable sprocket 2 to rotate by power transmission shaft 3, and then drive chain 1 to rotate, supporting plate 13 moves with chain 1, when moving to guided plate 9 place, under guided plate 9 position-limiting action, clamping part 15 slowly shrinks, when moving between two clamping plate 8, steel strand are clamped in the draw-in groove 7 in clamping part 15, when supporting plate 13 moves to clamping plate 8 other end, under guided plate 9 acts on, clamping part 15 slowly unclamps, chain 1 is arranged many group supporting plates 13, often the mechanical jig arm 11 organized on supporting plate 13 all follows the above-mentioned course of work, to keep continuously clamping steel strand and pulling.
Claims (4)
1. steel strand integral bundle shuttle machine, comprises power set, sprocket wheel and chain, it is characterized in that: described chain is provided with some groups of supporting plates, and supporting plate is connected with chain by fixture; Supporting plate is provided with a pair mechanical jig arm; Described mechanical jig arm comprises clamping part, and the side end face of clamping part is provided with draw-in groove, and the front end of clamping part is connected to sector; Described mechanical jig arm is provided with return spring, and return spring one end is connected in mechanical jig arm, and the other end is connected on supporting plate; Described supporting plate both sides are equipped with clamping plate, and clamping plate are connected to hydraulic cylinder.
2. steel strand integral bundle shuttle machine as claimed in claim 1, it is characterized in that: be provided with roller in described clamping part, the outer rim of roller protrudes from clamping part.
3. steel strand integral bundle shuttle machine as claimed in claim 1 or 2, is characterized in that: described clamping plate two ends are provided with guided plate.
4. steel strand integral bundle shuttle machine as claimed in claim 3, is characterized in that: described sector is provided with set bolt, and return spring walks around set bolt; Machinery jig arm is connected with supporting plate by set bolt.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201520756329.0U CN204960344U (en) | 2015-09-28 | 2015-09-28 | Whole bundle of machine that shuttles back and forth of steel strand wires |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201520756329.0U CN204960344U (en) | 2015-09-28 | 2015-09-28 | Whole bundle of machine that shuttles back and forth of steel strand wires |
Publications (1)
Publication Number | Publication Date |
---|---|
CN204960344U true CN204960344U (en) | 2016-01-13 |
Family
ID=55055418
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201520756329.0U Expired - Fee Related CN204960344U (en) | 2015-09-28 | 2015-09-28 | Whole bundle of machine that shuttles back and forth of steel strand wires |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN204960344U (en) |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN106976158A (en) * | 2017-05-19 | 2017-07-25 | 邓文 | For tube drawing and the device of push wire harness |
-
2015
- 2015-09-28 CN CN201520756329.0U patent/CN204960344U/en not_active Expired - Fee Related
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN106976158A (en) * | 2017-05-19 | 2017-07-25 | 邓文 | For tube drawing and the device of push wire harness |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN203428624U (en) | Cable unwinding-winding device | |
CN204960344U (en) | Whole bundle of machine that shuttles back and forth of steel strand wires | |
CN202428445U (en) | Manipulator fixture for storage battery | |
CN203021015U (en) | Brick clamping machine | |
CN202395407U (en) | Cable dragging suspension device for heading machine | |
CN110841866B (en) | Chain dip coating equipment | |
CN201921910U (en) | Leveling mechanism for steel plate production | |
CN211945978U (en) | Electric hoist gantry crane hoisting device | |
CN208843448U (en) | A kind of actinobacillus device for power matching network | |
CN201279705Y (en) | Steel drum wall treatment mechanism | |
CN210944553U (en) | Stator lifting appliance of electric automobile | |
CN203034871U (en) | Stereo garage chain-type lifting process amplification device | |
CN201753247U (en) | Stacking lifting platform of profile stacking and bundling device | |
CN205011922U (en) | Warp rebeaming machine | |
CN204711447U (en) | A kind of crane end carriage clamping tooling | |
CN204435966U (en) | A kind of Sheng Lian combined type lifting mechanism for parking apparatus | |
CN209457895U (en) | A kind of drill stem hoisting device | |
CN202450822U (en) | Lifting device for mechanical stereo garage | |
CN206737517U (en) | A kind of verticallifting stereo garage lifting system | |
CN216945683U (en) | Traction device of traction robot | |
CN203030667U (en) | Composite tube penetrating device | |
CN204980306U (en) | Assembly type structure prefabricated component is push -and -pull device for mould | |
CN204199816U (en) | A kind of Novel chain wire rope gearing lifting appliance | |
CN211393067U (en) | Honeycomb structure wall building block hacking machine | |
CN204873496U (en) | Electric block's pulley roof beam assembly |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C14 | Grant of patent or utility model | ||
GR01 | Patent grant | ||
CF01 | Termination of patent right due to non-payment of annual fee |
Granted publication date: 20160113 Termination date: 20160928 |
|
CF01 | Termination of patent right due to non-payment of annual fee |