CN204954769U - Prevent splashing detachably matter hammer - Google Patents

Prevent splashing detachably matter hammer Download PDF

Info

Publication number
CN204954769U
CN204954769U CN201520714463.4U CN201520714463U CN204954769U CN 204954769 U CN204954769 U CN 204954769U CN 201520714463 U CN201520714463 U CN 201520714463U CN 204954769 U CN204954769 U CN 204954769U
Authority
CN
China
Prior art keywords
hammer
hammer handle
handle
hammer body
detachable
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201520714463.4U
Other languages
Chinese (zh)
Inventor
李松波
岳其中
廖展宇
杨相茂
罗高英
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Wuhan South Central Metallurgical Prospecting Resource Environment Engineering Co Ltd
Original Assignee
Wuhan South Central Metallurgical Prospecting Resource Environment Engineering Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Wuhan South Central Metallurgical Prospecting Resource Environment Engineering Co Ltd filed Critical Wuhan South Central Metallurgical Prospecting Resource Environment Engineering Co Ltd
Priority to CN201520714463.4U priority Critical patent/CN204954769U/en
Application granted granted Critical
Publication of CN204954769U publication Critical patent/CN204954769U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Percussive Tools And Related Accessories (AREA)

Abstract

The utility model provides a prevent splashing detachably matter hammer, relates to geology instrument field, including interconnect's hammer block and hammer handle, the hammer handle includes first hammer handle and second hammer handle, end screw thread connection before the first hammer handle end screw thread connection before the hammer block, first hammer handle rear end and second hammer handle, the lower part of hammer block is the tup of radius bench -type, and the upper portion of hammer block is cylindric, and the outer wall on hammer block upper portion is protruding to be equipped with two bulge loops, is equipped with the ring that the hammer block outer wall was located to a cover between two bulge loops, and the radius of bulge loop is greater than the radius of ring, the plastic cover plate of loudspeaker form is established to hammer block outer wall cover, plastic cover plate's interior border pin joint in the ring, when the hammer block contacted with the rock, plastic cover plate outwards expanded for the hammer block lateral wall. The utility model discloses a hammer block and hammer handle can be dismantled, conveniently carry, and hammer handle length can be adjusted, facilitates the use, can also prevent that the rock from splashing to do not block geologist's sight.

Description

One is anti-splashes detachable geologic hammer
Technical field
The utility model relates to geology field of tool, and being specifically that one is anti-splashes detachable geologic hammer.
Background technology
In geological prospecting work, time geological work personnel need to sample to rock, geologic hammer usually can be used to strike cutter to rock, so that obtain the sample of rock.The hammer handle of geologic hammer is longer, is inconvenient to carry, and hammer handle length can not regulate, and is not easy to different geologists and uses.
In addition, traditional geologic hammer is when striking rock drilling stone, the situation that rock debris splashes can be there is, easily splash face or even the eye of geological work personnel, make geological personnel injured, but cannot arrange gear edge at hammer body again, easily stop the sight line of geological work personnel, therefore the security of existing geologic hammer is lower.
Utility model content
For the defect existed in prior art, the purpose of this utility model is that providing a kind of prevents splashing detachable geologic hammer, and detachably, be convenient for carrying, hammer handle length can regulate, easy to use for hammer body and hammer handle; Can also prevent rock from splashing, and not stop geologist's sight line.
For reaching above object, the technical scheme that the utility model is taked is: one is anti-splashes detachable geologic hammer, comprise interconnective hammer body and hammer handle, it is characterized in that: described hammer handle comprises the first hammer handle and the second hammer handle, first hammer handle nose threads connects described hammer body, and the first hammer handle rear end is connected with the second hammer handle nose threads; The bottom of described hammer body is the tup of rounding bench-type, the top of hammer body is cylindric, the outer wall on hammer body top is convexly equipped with two bulge loops, the annulus that one is sheathed on hammer body outer wall is provided with between two bulge loops, the radius of bulge loop is greater than the radius of annulus, the sheathed trumpet-shaped plastic cement catch of described hammer body outer wall, and the inside edge of plastic cement catch is articulated in described annulus, when hammer body and rock contact, plastic cement catch outwards launches relative to hammer body sidewall.
On the basis of technique scheme, the front end of described first hammer handle and the second hammer handle is all convexly equipped with measure-alike male threaded joint, all cave in and have measure-alike internal thread groove in the sidewall on hammer body top and the rear end of the first hammer handle, the male threaded joint of the first hammer handle front end is threadedly connected to the internal thread groove on hammer body top, and the male threaded joint of the second hammer handle front end is threadedly connected to the internal thread groove of the first hammer handle rear end.
On the basis of technique scheme, described trumpet-shaped plastic cement catch inside edge is ringwise curling, and described annulus is arranged in annular.
On the basis of technique scheme, described second hammer handle rear end is inwardly provided with a containing cavities, and the second hammer handle rear end is threaded one and blocks, and is provided with a nail of carving characters in containing cavities.
On the basis of technique scheme, be provided with one in described containing cavities and support plate, support between plate and the front end of containing cavities and be provided with a spring, the tip end of described nail of carving characters is towards containing cavities front end, carve characters nail two ends be held in respectively described in support plate and blocking, now spring is in compressive state.
On the basis of technique scheme, the part that described hammer body top and tup close on is provided with a circle LED, described LED is looped around the sidewall of hammer body, and hammer body sidewall is provided with a battery case, be provided with a button cell be connected with described LED in battery case, button cell top is provided with by compressing switch.
On the basis of technique scheme, described second hammer handle outer surface is arranged with a plastic anti-skid cover.
On the basis of technique scheme, described hammer body, the first hammer handle and the second hammer handle are steel material.
On the basis of technique scheme, described plastic cement catch is 90 ° relative to the flared maximum angle of hammer body sidewall.
The beneficial effects of the utility model are:
1, hammer body, be between the first hammer handle and the second hammer handle and be threaded, can dismantle when not using, be convenient for carrying, not take up space; Geologist is according to different situations, and can select installation two sections of hammer handles or install one section of hammer handle, be applicable to the use of different situations, different geologist, applicability is extensive.
2, the annulus that is sheathed on hammer body outer wall is provided with between two bulge loops, the inside edge of plastic cement catch is articulated in described annulus, plastic cement material due to plastic cement catch has and necessarily shrinks elasticity, front plastic cement catch is used to hang by nature, when spindle descends touches rock, plastic cement catch is upwards dug due to inertia, namely outwards launch relative to hammer body sidewall, radius due to bulge loop is greater than the radius of annulus, the angle that plastic cement catch launches is 90 ° to the maximum, effectively prevent rock debris from splashing, safe and reliable.In spindle descends process, plastic cement catch also can not stop the sight line of geological work personnel.
3, the second hammer handle rear end is inwardly provided with a containing cavities, is provided with a nail of carving characters in containing cavities, and convenient taking-up is at any time portrayed rock.Further, carve characters nail after such insertion, tip end in contact supports plate, and spring is in compressive state, and after blocking is backed out, nail automatic spring of carving characters, conveniently takes, ejection be not tip end, avoid stabbing geologist's finger.
4, the part that described hammer body top and tup close on is provided with a circle LED, being provided with button cell in battery case is that LED is powered, by realizing lighting and extinguishing of LED by compressing switch, can not be subject to light restriction during geological work librarian use, the visual field is better.
5, described hammer body, the first hammer handle and the second hammer handle are steel material, durable; Second hammer handle outer surface is arranged with a plastic anti-skid cover, is convenient to geological work personnel and holds, in use reduce the impulsive force of opponent.
Accompanying drawing explanation
Fig. 1 is that the utility model embodiment prevents splashing detachable geologic hammer structural representation;
Fig. 2 is the structural representation that the utility model embodiment plastic cement catch is articulated in annulus.
Reference numeral:
Hammer body 1, tup 11, bulge loop 12, annulus 13, plastic cement catch 14, LED 15, battery case 16, button cell 17, by compressing switch 18;
Hammer handle 2, the first hammer handle 21, second hammer handle 22, containing cavities 23, supports plate 24, spring 25, blocking 26, plastic anti-skid cover 27;
Male threaded joint 3;
To carve characters nail 4.
Detailed description of the invention
Below in conjunction with accompanying drawing, embodiment of the present utility model is described in further detail.
As shown in Figure 1, the utility model is anti-splashes detachable geologic hammer, and comprise hammer body 1 and hammer handle 2, hammer handle 2 comprises again the first hammer handle 21 and the second hammer handle 22.First hammer handle 21 nose threads connects hammer body 1, first hammer handle 21 rear end and is connected with the second hammer handle 22 nose threads.Preferably, the front end of the first hammer handle 21 and the second hammer handle 22 is all convexly equipped with measure-alike male threaded joint 3, all caves in and have measure-alike internal thread groove (not shown) in the sidewall on hammer body 1 top and the rear end of the first hammer handle 21; The male threaded joint 3 of the first hammer handle 21 front end is threadedly connected to the internal thread groove on hammer body 1 top, and the male threaded joint 3 of the second hammer handle 22 front end is threadedly connected to the internal thread groove of the first hammer handle 21 rear end.The male threaded joint 3 of the second hammer handle 22 front end as required, can also be directly screwed into the internal thread groove on hammer body 1 top by geological work personnel, and then uses shorter hammer handle 2.Preferably, hammer body 1, first hammer handle 21 and the second hammer handle 22 are steel material, durable; Second hammer handle 22 outer surface is arranged with a plastic anti-skid cover 27 (conveniently represent, in Fig. 1, plastic anti-skid cover 27 is for analysing and observe), is convenient to geological work personnel and holds.
As depicted in figs. 1 and 2, the bottom of described hammer body 1 is the tup 11 of rounding bench-type, and the top of hammer body 1 is cylindric, and the outer wall on hammer body 1 top is convexly equipped with two bulge loops 12, be provided with the annulus 13 that is sheathed on hammer body 1 outer wall between two bulge loops 12, the radius of bulge loop 12 is greater than the radius of annulus 13.An outer wall also sheathed trumpet-shaped plastic cement catch 14 on hammer body 1 top, plastic cement catch 14 inside edge is ringwise curling, annulus 13 is arranged in annular, the inside edge of plastic cement catch 14 is articulated in described annulus 13, plastic cement catch 14 is outwards launched relative to hammer body 1 sidewall, and the block of top bulge loop 12 can be subject to, maximum expanded angle is 90 °.
As shown in Figure 1, preferably, described second hammer handle 22 rear end is inwardly provided with a containing cavities 23, second hammer handle 22 rear end and is threaded one and blocks 26, is provided with a nail 4 of carving characters in containing cavities 23.Further, be provided with one in containing cavities 23 and support plate 24, between the front end supporting plate 24 and containing cavities 23, be provided with a spring 25.Before putting into nail 4 of carving characters, spring 25 is the normal condition of non-stress, subsequently, the front end of the tip end of nail 4 of carving characters towards containing cavities 23 is pushed, the tip end in contact of nail 4 of carving characters supports plate 24, is communicated with to support plate 24 and continue to advance, and spring 25 gradually reduces, until carve characters, nail 4 all enters in containing cavities 23, blocking 26 of screwing on.Now, the two ends of nail 4 of carving characters are held in this respectively and support plate 24 and blocking 26, and spring 25 is in compressive state.When blocking 26 is turned on, spring 25 stretches automatically, and nail 4 of carving characters ejects containing cavities 23.
As shown in Figure 1, preferably, the part that described hammer body 1 top and tup 11 close on is provided with a circle LED 15, LED 15 is looped around the sidewall of hammer body 1, and hammer body 1 sidewall is provided with a battery case 16, a button cell 17 be connected with described LED 15 is provided with in battery case 16, button cell 17 is provided with by compressing switch 18, by by the lighting of the 18 control LED 15 that compress switch, extinguish, when button cell 17 electricity is not enough, open by compressing switch 18, namely replaceable new button cell 17, easy to use.
During use, geological work personnel select installation one section or two sections of hammer handles 2 according to different situations, for two sections of hammer handles 2, first two sections of hammer handles 2 and hammer body 1 are installed.Geological work personnel take out and to carve characters nail 4, treat to strike cutter position and portray in advance, then nail 4 of carving characters are loaded in the containing cavities 23 of the second hammer handle 22 rear end.
Subsequently, geological work personnel hold the plastic anti-skid cover 27 of the second hammer handle 22 outer surface, another hand opens LED 15, carry out striking cutter according to the position of portraying in advance, when hammer body 1 falls and tup 11 touches rock, when hammer body 1 falls to touching rock, plastic cement catch 14 is upwards dug due to inertia, namely outwards launch relative to hammer body 1 sidewall, radius due to bulge loop 12 is greater than the radius of annulus 13, and the angle that plastic cement catch 14 launches is 90 ° to the maximum, effectively prevents rock debris from splashing, simultaneously not block vision in dropping process, safe and reliable.
The utility model is not only confined to above-mentioned preferred forms; anyone can draw other various forms of products under enlightenment of the present utility model; no matter but any change is done in its shape or structure; every have identical with the utility model or akin technical scheme, all within its protection domain.

Claims (9)

1. prevent splashing detachable geologic hammer for one kind, comprise interconnective hammer body (1) and hammer handle (2), it is characterized in that: described hammer handle (2) comprises the first hammer handle (21) and the second hammer handle (22), first hammer handle (21) nose threads connects described hammer body (1), and the first hammer handle (21) rear end is connected with the second hammer handle (22) nose threads, the bottom of described hammer body (1) is the tup (11) of rounding bench-type, the top of hammer body (1) is cylindric, the outer wall on hammer body (1) top is convexly equipped with two bulge loops (12), the annulus (13) that one is sheathed on hammer body (1) outer wall is provided with between two bulge loops (12), the radius of bulge loop (12) is greater than the radius of annulus (13), the sheathed trumpet-shaped plastic cement catch (14) of described hammer body (1) outer wall, the inside edge of plastic cement catch (14) is articulated in described annulus (13), when hammer body (1) and rock contact, plastic cement catch (14) outwards launches relative to hammer body (1) sidewall.
2. prevent as claimed in claim 1 splashing detachable geologic hammer, it is characterized in that: the front end of described first hammer handle (21) and the second hammer handle (22) is all convexly equipped with measure-alike male threaded joint (3), all cave in and have measure-alike internal thread groove in the sidewall on hammer body (1) top and the rear end of the first hammer handle (21), the male threaded joint (3) of the first hammer handle (21) front end is threadedly connected to the internal thread groove on hammer body (1) top, the male threaded joint (3) of the second hammer handle (22) front end is threadedly connected to the internal thread groove of the first hammer handle (21) rear end.
3. prevent as claimed in claim 1 splashing detachable geologic hammer, it is characterized in that: described trumpet-shaped plastic cement catch (14) inside edge is ringwise curling, and described annulus (13) is arranged in annular.
4. prevent as claimed in claim 1 splashing detachable geologic hammer, it is characterized in that: described second hammer handle (22) rear end is inwardly provided with a containing cavities (23), second hammer handle (22) rear end is threaded one and blocks (26), is provided with a nail (4) of carving characters in containing cavities (23).
5. prevent as claimed in claim 4 splashing detachable geologic hammer, it is characterized in that: be provided with one in described containing cavities (23) and support plate (24), a spring (25) is provided with between the front end supporting plate (24) and containing cavities (23), the tip end of described nail (4) of carving characters is towards containing cavities (23) front end, carve characters the two ends of nail (4) be held in respectively described in support plate (24) and blocking (26), now spring (25) is in compressive state.
6. prevent as claimed in claim 1 splashing detachable geologic hammer, it is characterized in that: the part that described hammer body (1) top and tup (11) close on is provided with a circle LED (15), described LED (15) is looped around the sidewall of hammer body (1), and hammer body (1) sidewall is provided with a battery case (16), be provided with a button cell (17) be connected with described LED (15) in battery case (16), button cell (17) top is provided with by compress switch (18).
7. prevent as claimed in claim 1 splashing detachable geologic hammer, it is characterized in that: described second hammer handle (22) outer surface is arranged with a plastic anti-skid cover (27).
8. anti-as described in as arbitrary in claim 1 to 7 splashes detachable geologic hammer, it is characterized in that: described hammer body (1), the first hammer handle (21) and the second hammer handle (22) are steel material.
9. anti-as described in as arbitrary in claim 1 to 7 splashes detachable geologic hammer, it is characterized in that: described plastic cement catch (14) is 90 ° relative to the flared maximum angle of hammer body (1) sidewall.
CN201520714463.4U 2015-09-16 2015-09-16 Prevent splashing detachably matter hammer Expired - Fee Related CN204954769U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201520714463.4U CN204954769U (en) 2015-09-16 2015-09-16 Prevent splashing detachably matter hammer

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201520714463.4U CN204954769U (en) 2015-09-16 2015-09-16 Prevent splashing detachably matter hammer

Publications (1)

Publication Number Publication Date
CN204954769U true CN204954769U (en) 2016-01-13

Family

ID=55049866

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201520714463.4U Expired - Fee Related CN204954769U (en) 2015-09-16 2015-09-16 Prevent splashing detachably matter hammer

Country Status (1)

Country Link
CN (1) CN204954769U (en)

Cited By (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106881690A (en) * 2017-04-10 2017-06-23 东华理工大学 Geologic hammer
CN107782790A (en) * 2017-12-04 2018-03-09 朱元彬 Side detection hammer device is struck in down-hole mining operation
CN108356767A (en) * 2018-03-16 2018-08-03 河北工程大学 A kind of safe Multifunction geological hammer
CN108372484A (en) * 2018-02-11 2018-08-07 河北工程大学 Multifunction geological hammer
CN108381466A (en) * 2018-05-10 2018-08-10 中国科学技术大学 A kind of geologic hammer
CN108514431A (en) * 2018-04-10 2018-09-11 谢娟 A kind of diagnosis for medical diagnosis is hammered into shape

Cited By (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106881690A (en) * 2017-04-10 2017-06-23 东华理工大学 Geologic hammer
CN107782790A (en) * 2017-12-04 2018-03-09 朱元彬 Side detection hammer device is struck in down-hole mining operation
CN108372484A (en) * 2018-02-11 2018-08-07 河北工程大学 Multifunction geological hammer
CN108356767A (en) * 2018-03-16 2018-08-03 河北工程大学 A kind of safe Multifunction geological hammer
CN108514431A (en) * 2018-04-10 2018-09-11 谢娟 A kind of diagnosis for medical diagnosis is hammered into shape
CN108381466A (en) * 2018-05-10 2018-08-10 中国科学技术大学 A kind of geologic hammer

Similar Documents

Publication Publication Date Title
CN204954769U (en) Prevent splashing detachably matter hammer
AU2014393124B2 (en) Water-preserved-mining roof-contacted filling method for controlling fissure of overlying strata and surface subsidence
CN201572458U (en) Slit small-caliber vertical shaft lifesaving device
GB201101718D0 (en) Needle holder
CN205466028U (en) Geological hammer is used in field
CN203402119U (en) Mini window breaker
GB2488697A (en) Deploying an electrically-activated tool into a subsea well
CN204209645U (en) Geologic hammer is splashed for the anti-of geological prospecting
CN205380635U (en) Multifunctional geologic hammer
CN201800006U (en) Nail support capable of preventing hammering injury of hand
CN203446787U (en) Key holding buckle
CN209446789U (en) A kind of geologic prospect field work geologic hammer
CN203449271U (en) Mining extraction device for broken wire ends and broken pipe ends
CN205342946U (en) Take LED lamp and laborsaving bottle opener
CN204623395U (en) A kind of accumulating type safety hammer tup resetting structure
CN203450074U (en) Miniature window breaker
CN205009169U (en) Safe hammer and tup thereof
CN204642116U (en) Kickboard
CN204192582U (en) A kind of nerve reflex inspector
CN202215282U (en) Simple lifesaving appliance in pit
CN204182057U (en) A kind of fire extinguisher
CN203383597U (en) Novel door lock provided with guide slot
CN207402736U (en) A kind of dual-purpose type geologic hammer
CN201815022U (en) Underground rescue execution device
CN204070711U (en) A kind of safety cap for geological prospecting

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20160113

CF01 Termination of patent right due to non-payment of annual fee