CN204953799U - Automatic forge hot device of changing - Google Patents

Automatic forge hot device of changing Download PDF

Info

Publication number
CN204953799U
CN204953799U CN201520589096.XU CN201520589096U CN204953799U CN 204953799 U CN204953799 U CN 204953799U CN 201520589096 U CN201520589096 U CN 201520589096U CN 204953799 U CN204953799 U CN 204953799U
Authority
CN
China
Prior art keywords
industrial robot
heat treatment
press
heating furnace
discharge end
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201520589096.XU
Other languages
Chinese (zh)
Inventor
李华章
王存立
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Kunshan Deke Auto Parts Co Ltd
Original Assignee
Kunshan Deke Auto Parts Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Kunshan Deke Auto Parts Co Ltd filed Critical Kunshan Deke Auto Parts Co Ltd
Priority to CN201520589096.XU priority Critical patent/CN204953799U/en
Application granted granted Critical
Publication of CN204953799U publication Critical patent/CN204953799U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Abstract

The utility model provides an automatic forges the device, including automatic control device, blanking machine, heating furnace, forging press and heat treatment furnace thorax, be equipped with industrial robot A between blanking machine and the heating furnace, be equipped with industrial robot B between heating furnace, forging press and the heat treatment furnace thorax, be equipped with the conveyer belt between forging press and the processing furnace, the feed end of heat treatment furnace thorax is connected to the conveyer belt, the heat treatment furnace thorax is equipped with the discharge end, the discharge end next door is equipped with clipping press, be equipped with industrial robot C between discharge end and the clipping press. Realize the forge hot completely and made process automation processing, made the operation personnel break away from the higher hammered work of danger coefficient, be favorable to the safety in production, effectually prevent the compounding, leak the process phenomenon, improve product quality's stability greatly, the front and back process is connected closely, effectively improves the place rate of utilization, article two, the production streamline goes on simultaneously, and production efficiency improves greatly.

Description

The forge hot device of automation
Technical field
The utility model belongs to forging apparatus field, particularly relates to the forge hot device of automation.
Background technology
Forge hot is that one utilizes heating furnace, forging press heat metal material and apply pressure, makes it produce plastic deformation to obtain the processing method with certain mechanical performance, definite shape and size forging.From down, forge hot processing expects that machined needs multiple working procedure complete independently, middle exist repeatedly all swivel links, very easily occurs the phenomenon of batch mixing or leakage operation, causes producing product defective in quality; In hot forging process, every procedure has oneself semi-finished product and finished product, needs reserved larger, more material rest area, production site can not be made to obtain maximum using; There is the dangerous link of more multipair people in forge hot region, easily has an accident.
Utility model content
In order to solve the problem, the utility model provides a kind of safety in production and the forging apparatus of the automation of production constant product quality.
According to an aspect of the present utility model, a kind of forge hot device of automation is provided, comprise automaton, blanking machine, heating furnace, forging press and heat treatment burner hearth, be provided with industrial robot A between described blanking machine and heating furnace, described heating furnace, between forging press and heat treatment burner hearth, be provided with industrial robot B.
In some embodiments, be provided with conveyer belt between described forging press and process burner hearth, described conveyer belt connects the feed end of heat treatment burner hearth.
In some embodiments, described heat treatment burner hearth is provided with discharge end, and described discharge end side is provided with clipping press, is provided with industrial robot C between described discharge end and clipping press.
In some embodiments, described clipping press is other is provided with four station turnplate special planes, is provided with industrial robot D between described clipping press and four station turnplate special planes.
In some embodiments, described four station turnplate special planes are provided with material frame.
In some embodiments, described blanking machine, heating furnace, forging press, conveyer belt, clipping press, four station turnplate special planes, industrial robot A, industrial robot B and industrial robot D respectively with described heat treatment burner hearth and industrial robot C for respectively establishing one in axial symmetry both sides.
The utility model adopts industrial robot to substitute former manual operation, and each operation is connected together, and forms a forge hot streamline.Its beneficial effect is: fully achieve the processing of warm and hot forging process automation, the hammered work that operating personnel is departed from danger coefficient is higher, be conducive to safety in production; Effectively prevent batch mixing, leak operation phenomenon, the stability of greatly improving the quality of products; Front and back operation connects closely, effectively improves place utilization rate; Article two, produce streamline to carry out, production efficiency improves greatly simultaneously.
Accompanying drawing explanation
Fig. 1 is flowage structure schematic diagram of the present utility model.
In figure: 1-blanking machine, 2-heating furnace, 3-forging press, 4-heat treatment burner hearth, 5-industrial robot A, 6-industrial robot B, 7-conveyer belt, 8-feed end, 9-discharge end, 10-clipping press, 11-industrial robot C, 12-tetra-station turnplate special plane, 13-industrial robot D, 14-material frame.
Detailed description of the invention
Be further described below in conjunction with accompanying drawing 1 pair of the utility model.Accompanying drawing 1 schematically shows the forge hot device of the utility model automation, comprise automaton, blanking machine 1, heating furnace 2, forging press 3 and heat treatment burner hearth 4, be provided with industrial robot A5 between described blanking machine 1 and heating furnace 2, described heating furnace 2, between forging press 3 and heat treatment burner hearth 4, be provided with industrial robot B6.
Preferably, be provided with conveyer belt 7 between described forging press 3 and process burner hearth 4, described conveyer belt 7 connects the feed end 8 of heat treatment burner hearth 4.
Preferably, described heat treatment burner hearth 4 is provided with discharge end 9, and described discharge end 9 side is provided with clipping press 10, is provided with industrial robot C11 between described discharge end 9 and clipping press 10.
Preferably, described clipping press 10 is other is provided with four station turnplate special planes 12, is provided with industrial robot D13 between described clipping press 10 and four station turnplate special planes 12.
Preferably, described four station turnplate special planes 12 are provided with material frame 14.
Preferably, described blanking machine 1, heating furnace 2, forging press 3, conveyer belt 7, clipping press 10, four station turnplate special plane 12, industrial robot A5, industrial robot B6 and industrial robot D13 respectively with described heat treatment burner hearth 4 and industrial robot C11 for respectively establishing one in axial symmetry both sides.
The forge hot automatic assembly line course of work is: after blanking machine 1 completes blanking, workpiece is put into heating furnace 2 by industrial robot A5, workpiece after heating is put into forging press 3 cavity forming and is placed on conveyer belt 7 by shaping workpiece by industrial robot B6, be transported on heat treatment burner hearth 4 feed end 8 through conveyer belt 7 workpiece, workpiece from heat treatment burner hearth 4 out to discharge end 9; Meanwhile, be that axisymmetric opposite side streamline works simultaneously with heat treatment burner hearth 4 and industrial robot C11, the heat treatment burner hearth 4 discharge end 9 workpiece clipping press 10 that both sides are put at interval is respectively carried out trimming work by industrial robot C11; The workpiece completing trimming in clipping press 10 takes out and puts into respectively on four corresponding station turnplate special planes 12 by two symmetrically arranged industrial robot D13, and the workpiece that four station turnplate special planes 12 process is put into material frame 14.
Above-described is only embodiments more of the present utility model; it should be pointed out that for the person of ordinary skill of the art, under the prerequisite not departing from creation design of the present utility model; can also make other distortion and improve, these all belong to protection domain of the present utility model.

Claims (6)

1. the forge hot device of automation, comprise automaton, blanking machine (1), heating furnace (2), forging press (3) and heat treatment burner hearth (4), it is characterized in that, industrial robot A(5 is provided with between described blanking machine (1) and heating furnace (2)), described heating furnace (2), between forging press (3) and heat treatment burner hearth (4), be provided with industrial robot B(6).
2. the forge hot device of automation as claimed in claim 1, is characterized in that, is provided with conveyer belt (7) between described forging press (3) and process burner hearth (4), and described conveyer belt (7) connects the feed end (8) of heat treatment burner hearth (4).
3. the forge hot device of automation as claimed in claim 1, it is characterized in that, described heat treatment burner hearth (4) is provided with discharge end (9), described discharge end (9) side is provided with clipping press (10), is provided with industrial robot C(11 between described discharge end (9) and clipping press (10)).
4. the forge hot device of automation as claimed in claim 3, it is characterized in that, described clipping press (10) is other is provided with four station turnplate special planes (12), is provided with industrial robot D(13 between described clipping press (10) and four station turnplate special planes (12)).
5. the forge hot device of automation as claimed in claim 4, it is characterized in that, described four station turnplate special planes (12) are provided with material frame (14).
6. the forge hot device of automation as claimed in claim 5, it is characterized in that, described blanking machine (1), heating furnace (2), forging press (3), conveyer belt (7), clipping press (10), four station turnplate special planes (12), industrial robot A(5), industrial robot B(6) and industrial robot D(13) respectively with described heat treatment burner hearth (4) and industrial robot C(11) for respectively establishing one in axial symmetry both sides.
CN201520589096.XU 2015-08-03 2015-08-03 Automatic forge hot device of changing Expired - Fee Related CN204953799U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201520589096.XU CN204953799U (en) 2015-08-03 2015-08-03 Automatic forge hot device of changing

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201520589096.XU CN204953799U (en) 2015-08-03 2015-08-03 Automatic forge hot device of changing

Publications (1)

Publication Number Publication Date
CN204953799U true CN204953799U (en) 2016-01-13

Family

ID=55048896

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201520589096.XU Expired - Fee Related CN204953799U (en) 2015-08-03 2015-08-03 Automatic forge hot device of changing

Country Status (1)

Country Link
CN (1) CN204953799U (en)

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106141693A (en) * 2016-08-04 2016-11-23 陕西奥邦锻造有限公司 A kind of automobile front axle production line and processing method
CN108262436A (en) * 2018-04-08 2018-07-10 河南科技大学 A kind of hot warm forging automatic production line
CN108453205A (en) * 2017-12-21 2018-08-28 江苏保捷锻压有限公司 A kind of the closed type forged equipment and its production method of axis products
WO2023173793A1 (en) * 2022-03-18 2023-09-21 中国机械总院集团北京机电研究所有限公司 Blade precision forging method and production line

Cited By (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106141693A (en) * 2016-08-04 2016-11-23 陕西奥邦锻造有限公司 A kind of automobile front axle production line and processing method
CN108453205A (en) * 2017-12-21 2018-08-28 江苏保捷锻压有限公司 A kind of the closed type forged equipment and its production method of axis products
CN108453205B (en) * 2017-12-21 2020-05-01 江苏保捷锻压有限公司 Closed forging equipment for shaft products and production method thereof
CN108262436A (en) * 2018-04-08 2018-07-10 河南科技大学 A kind of hot warm forging automatic production line
CN108262436B (en) * 2018-04-08 2023-09-29 河南科技大学 Automatic production line for hot warm forging
WO2023173793A1 (en) * 2022-03-18 2023-09-21 中国机械总院集团北京机电研究所有限公司 Blade precision forging method and production line

Similar Documents

Publication Publication Date Title
CN204953799U (en) Automatic forge hot device of changing
CN103230997A (en) Production device and production technology for non-quenched and tempered steel forge piece automatic forging
CN101342568A (en) Method for manufacturing super-flat compact type chain vertical ring
CN104476145B (en) The manufacture method of pad
CN104625627B (en) A kind of preparation method of plasma rotating electrode titanium alloy electrode rod
CN105666146A (en) Automatic production line for electric power fitting U-type ring and production process thereof
CN104708325A (en) Automatic production line for net communication products
CN104046753B (en) Steel ball reheating furnace and steel ball production line
CN102059272A (en) Method for horizontal continuous casting, Pilger rolling and continuous drawing of copper alloy condenser tube
CN105215252A (en) The forming technology of the mould of preform 45 ° of skew T jumping-up parts, method and 45 ° of skew Ts
CN105033586B (en) A kind of processing method of back-up ring
CN201613325U (en) Cogging, centering and clamping device for free forging
CN203938692U (en) Steel ball reheating furnace and steel ball production line
CN205085255U (en) Stamping die device
CN208772273U (en) Electric pressure cooking saucepan stainless steel inner container stretches automatic production line
CN203076507U (en) Universal joint one-mould three-station mould
CN207713778U (en) Titanium or titanium alloy Wide and Thick Slab vacuum infrared continuous annealing furnace
CN207547290U (en) A kind of tube and section bending line
CN107225176A (en) A kind of method for being used to shape the sagging structure of 7075 aluminium alloy extrusions
CN205701981U (en) A kind of sheet metal component quickly shaping device
CN105643202A (en) Bending process in iron tower manufacturing
CN204770414U (en) Mould structure of especially big set -square of mooring cable
CN214160876U (en) Device for manufacturing special-shaped steel by local heating and cold bending forming
CN204381287U (en) Rail draw bar roll forging device
CN204108217U (en) The red riveter of a kind of automatic high-frequency heating of whole chain bearing pin

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20160113

Termination date: 20190803