CN204949110U - Box with a net mooring system - Google Patents

Box with a net mooring system Download PDF

Info

Publication number
CN204949110U
CN204949110U CN201520547814.7U CN201520547814U CN204949110U CN 204949110 U CN204949110 U CN 204949110U CN 201520547814 U CN201520547814 U CN 201520547814U CN 204949110 U CN204949110 U CN 204949110U
Authority
CN
China
Prior art keywords
mooring
net cage
anchoring unit
square
mooring system
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201520547814.7U
Other languages
Chinese (zh)
Inventor
黄光平
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Guangdong Liansu Technology Industrial Co Ltd
Original Assignee
Guangdong Liansu Technology Industrial Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Guangdong Liansu Technology Industrial Co Ltd filed Critical Guangdong Liansu Technology Industrial Co Ltd
Priority to CN201520547814.7U priority Critical patent/CN204949110U/en
Application granted granted Critical
Publication of CN204949110U publication Critical patent/CN204949110U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y02TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
    • Y02ATECHNOLOGIES FOR ADAPTATION TO CLIMATE CHANGE
    • Y02A40/00Adaptation technologies in agriculture, forestry, livestock or agroalimentary production
    • Y02A40/80Adaptation technologies in agriculture, forestry, livestock or agroalimentary production in fisheries management
    • Y02A40/81Aquaculture, e.g. of fish

Landscapes

  • Devices Affording Protection Of Roads Or Walls For Sound Insulation (AREA)

Abstract

The utility model relates to a box with a net mooring system, including the square frame of mooring, four at least anchoring units and both ends respectively with net upset frame frame, the frame attach's that moors a plurality of mooring cable, seted up four extreme points on the square frame of mooring, four extreme points all correspond with the anchoring unit to be connected, mooring system still including the supplementary anchoring units of setting between adjacent two anchoring units, assists the anchoring unit and controls two adjacent end -to -end joints. The utility model provides a mooring system adds supplementary anchoring unit between through the anchoring unit two double -phase neighbours to make supplementary anchoring unit and control two adjacent end -to -end joints, make mooring system to provide enough big power to net upset frame frame and resist the impact that comes from front or side stormy waves, thereby avoid appearing walking the condition of anchor.

Description

A kind of net cage mooring system
Technical field
The utility model relates to cage culture field, more specifically, relates to a kind of net cage mooring system.
Background technology
Fisherman is when carrying out cage culture, and the general mooring system that uses is fixed net cage.Mooring system is the foundation of net cage in water, once mooring system goes wrong in stormy waves weather, will cause the overall unbalance stress of net cage and damage.At present, some the mooring cables that mooring system common both at home and abroad is generally connected with net cage frame, mooring framework respectively by a square mooring framework comprising four end points, connect one to one with square mooring framework four end points respectively four anchor unit and two ends form, the unit that wherein anchors generally comprises end anchor, main push-towing rope rope, and end anchor is connected by the end points of main push-towing rope rope with mooring framework.Above-mentioned mooring system, when there is stormy waves weather, provides the power of resisting stormy waves by four the anchoring unit arranged in the radial direction in difference, thus makes net cage frame can keep stress balance in stormy waves to net cage frame.Meanwhile, end points and anchoring unit, when arranging end points and the anchoring unit of square mooring framework, in order to make the overall stress balance of net cage, are generally evenly arranged on circumferentially by this mooring system.But the power that this setup makes mooring system provide to net cage frame front, side is less, when net cage frame is subject to the impact from the stormy waves of front or side, the situation that the anchoring unit of relevant position easily drags of anchor.
Utility model content
The utility model is the defect solving above prior art, provides a kind of net cage mooring system, and this mooring system can provide enough large power to resist impact from front or side stormy waves to net cage frame, thus avoids the situation that occurs dragging of anchor.
For realizing above utility model object, the technical scheme of employing is:
A kind of net cage mooring system, wherein said net cage comprises net cage frame and etting, etting is arranged on net cage frame, some the mooring cables that described mooring system comprises square mooring framework, at least four anchoring unit are connected with net cage frame, mooring framework respectively with two ends, described square mooring framework offers four end points, all unit is corresponding connects with anchoring for four end points, described mooring system also includes the auxiliary anchoring unit be arranged between adjacent two anchoring unit, and two end points that auxiliary anchoring unit is adjacent with left and right are connected.
In such scheme, by setting up auxiliary anchoring unit between anchoring unit adjacent between two, and auxiliary anchoring unit two end points adjacent with left and right are connected, make mooring system enough large power can be provided to resist impact from front or side stormy waves to net cage frame, thus avoid the situation that occurs dragging of anchor.
Preferably, described anchoring unit comprises end anchor and main push-towing rope rope, and end anchor is connected by the end points of main push-towing rope rope with square mooring framework.
Preferably, described auxiliary anchoring unit comprises anchor of the auxiliary end and the first connection cable, the second connection cable, anchor of the auxiliary end is arranged between two adjacent anchoring unit, and anchor of the auxiliary end is connected with left and right adjacent prismatic mooring framework end points respectively by the first connection cable, the second connection cable.When there is the stormy waves from front or side, the auxiliary anchoring unit of relevant position provides the power of opposing stormy waves to the end points connected by the first connection cable, the second connection cable, makes net cage frame can keep balancing under the impact of stormy waves.
Preferably, each end points of described square mooring framework is all connected with two mooring cables, and the other end of two mooring cables is connected with net cage frame.
Preferably, each end points of described square mooring framework be all connected with cursory.
Preferably, described each anchoring unit main push-towing rope rope on be all connected with sinker.Be provided with sinker, make main push-towing rope rope, the connection between the two of square mooring framework is not in exceptionally straight state, when net cage is involved by stormy waves impact main push-towing rope rope, square mooring framework, the never exceptionally straight state of main push-towing rope rope, square mooring framework also exists certain buffer time between exceptionally straight state, thus avoid main push-towing rope rope, square mooring framework is directly torn.
Preferably, the quantity being arranged on the auxiliary anchoring unit between adjacent two anchoring unit described in is 1.
Preferably, described square mooring framework is square mooring framework, and each auxiliary anchoring unit is uniformly distributed in a circumferential direction.
Compared with prior art, the beneficial effects of the utility model are:
The mooring system that the utility model provides by setting up auxiliary anchoring unit between anchoring unit adjacent between two, and auxiliary anchoring unit two end points adjacent with left and right are connected, make mooring system enough large power can be provided to resist impact from front or side stormy waves to net cage frame, thus avoid the situation that occurs dragging of anchor.
Accompanying drawing explanation
Fig. 1 is the structural representation of net cage.
Fig. 2 is the vertical view of mooring system.
Embodiment
Accompanying drawing, only for exemplary illustration, can not be interpreted as the restriction to this patent;
Below in conjunction with drawings and Examples, the utility model is further elaborated.
Embodiment 1
As shown in Figure 1, net cage comprises net cage frame 101 and etting 102, etting 102 is arranged on net cage frame 101, as shown in Figure 2, mooring system comprises square mooring framework 1, at least four anchoring unit 2 and two ends respectively with net cage frame 101, some the mooring cables 3 that square mooring framework 1 connects, described square mooring framework 1 offers four end points 11, all unit 2 is corresponding connects with anchoring for four end points 11, described mooring system also includes the one or more auxiliary anchoring unit 4 be arranged between adjacent two anchoring unit 2, two end points 11 that auxiliary anchoring unit 4 is adjacent with left and right are connected.In the present embodiment, the quantity being arranged on the auxiliary anchoring unit 4 between adjacent two anchoring unit 2 is 1.Square mooring framework 1 is square mooring framework, and each auxiliary anchoring unit 4 is uniformly distributed in a circumferential direction.
In such scheme, by setting up auxiliary anchoring unit 4 between anchoring unit 2 adjacent between two, and auxiliary anchoring unit 4 two end points 11 adjacent with left and right are connected, make mooring system enough large power can be provided to resist impact from front or side stormy waves to net cage frame 101, thus avoid the situation that occurs dragging of anchor.
The unit 2 that wherein anchors comprises end anchor 21 and main push-towing rope rope 22, and end anchor 21 is connected by the end points 11 of main push-towing rope rope 22 with square mooring framework 1.Auxiliary anchoring unit 4 comprises anchor of the auxiliary end 41 and the first connection cable 42, second connection cable 43, and anchor of the auxiliary end 41 is connected by two end points 11 of adjacent with the left and right respectively square mooring framework 1 of the first connection cable 42, second connection cable 43.When there is the stormy waves from front or side, the auxiliary anchoring unit 4 of relevant position provides the power of opposing stormy waves to the end points 11 connected by the first connection cable 42, second connection cable 43, make net cage frame 101 can keep balance under the impact of stormy waves.
In the present embodiment, the other end that each end points 11 of square mooring framework 1 is all connected with two mooring cables, 3, two mooring cables 3 is connected with net cage frame 101.It is cursory that each end points 11 of square mooring framework 1 is all connected with.
In the present embodiment, the main push-towing rope rope 22 of each anchoring unit 2 is all connected with sinker.Be provided with sinker, make main push-towing rope rope 22, the connection between the two of square mooring framework 1 is not in exceptionally straight state, when net cage is involved by stormy waves impact main push-towing rope rope 22, square mooring framework 1, the never exceptionally straight state of connection between main push-towing rope rope 22 and square mooring framework 1 also exists certain buffer time between exceptionally straight state, thus avoid main push-towing rope rope 22, square mooring framework 1 is directly torn.
The mooring system that the utility model provides by setting up auxiliary anchoring unit between anchoring unit adjacent between two, and auxiliary anchoring unit two end points adjacent with left and right are connected, make mooring system enough large power can be provided to resist impact from front or side stormy waves to net cage frame, thus avoid the situation that occurs dragging of anchor.
Obviously, above-described embodiment of the present utility model is only for the utility model example is clearly described, and is not the restriction to embodiment of the present utility model.For those of ordinary skill in the field, can also make other changes in different forms on the basis of the above description.Here exhaustive without the need to also giving all embodiments.All do within spirit of the present utility model and principle any amendment, equivalent to replace and improvement etc., within the protection domain that all should be included in the utility model claim.

Claims (8)

1. a net cage mooring system, wherein said net cage comprises net cage frame (101) and etting (102), etting (102) is arranged on net cage frame (101), described mooring system comprises square mooring framework (1), at least four anchoring unit (2) and two ends respectively with net cage frame (101), some the mooring cables (3) that square mooring framework (1) connects, described square mooring framework (1) offers four end points (11), four end points (11) are all corresponding with anchoring unit (2) to be connected, it is characterized in that: described mooring system also includes the auxiliary anchoring unit (4) be arranged between adjacent two anchorings unit (2), two end points (11) that the auxiliary unit (4) that anchors is adjacent with left and right are connected.
2. net cage mooring system according to claim 1, is characterized in that: described anchoring unit (2) comprises end anchor (21) and main push-towing rope rope (22), and end anchor (21) is connected by the end points (11) of main push-towing rope rope (22) with square mooring framework (1).
3. net cage mooring system according to claim 2, it is characterized in that: described auxiliary anchoring unit (4) comprises anchor of the auxiliary end (41) and the first connection cable (42), the second connection cable (43), auxiliary end anchor (41), is arranged between two adjacent anchorings unit (2), and auxiliary end anchor (41) is connected by two end points (11) of adjacent with the left and right respectively square mooring framework (1) of the first connection cable (42), the second connection cable (43).
4. net cage mooring system according to claim 3, is characterized in that: each end points (11) of described square mooring framework (1) is all connected with two mooring cables (3), and the other end of two mooring cables (3) is connected with net cage frame (101).
5. net cage mooring system according to claim 3, is characterized in that: it is cursory that each end points (11) of described square mooring framework (1) is all connected with.
6. net cage mooring system according to claim 5, is characterized in that: the main push-towing rope rope (22) of each anchoring unit (2) described is all connected with sinker.
7. the net cage mooring system according to any one of claim 1 ~ 6, is characterized in that: described in the quantity of auxiliary anchoring unit (4) that is arranged between adjacent two anchorings unit (2) be 1.
8. net cage mooring system according to claim 7, is characterized in that: described square mooring framework (1) is square mooring framework (1), and each auxiliary anchoring unit (4) is uniformly distributed in a circumferential direction.
CN201520547814.7U 2015-07-27 2015-07-27 Box with a net mooring system Active CN204949110U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201520547814.7U CN204949110U (en) 2015-07-27 2015-07-27 Box with a net mooring system

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201520547814.7U CN204949110U (en) 2015-07-27 2015-07-27 Box with a net mooring system

Publications (1)

Publication Number Publication Date
CN204949110U true CN204949110U (en) 2016-01-13

Family

ID=55044219

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201520547814.7U Active CN204949110U (en) 2015-07-27 2015-07-27 Box with a net mooring system

Country Status (1)

Country Link
CN (1) CN204949110U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN107711656A (en) * 2017-11-29 2018-02-23 唐山海之都海洋牧场有限公司 A kind of wind and wave resistance aquafarm cultivation apparatus

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN107711656A (en) * 2017-11-29 2018-02-23 唐山海之都海洋牧场有限公司 A kind of wind and wave resistance aquafarm cultivation apparatus

Similar Documents

Publication Publication Date Title
CN202627000U (en) Anchor-pulling type foundation pit supporting structure with double rows of piles
CN204949110U (en) Box with a net mooring system
CN204949111U (en) Box with a net mooring system breeds
CN204949099U (en) Centralized mooring system of box with a net breeds
CN206829461U (en) After pour teeth groove and be linked and packed formula precast slab
CN103628408B (en) The construction method of bridge cast in place concrete form Eight characters bracing frame
CN104963292B (en) Construction method of reinforced concrete continuous-span arch bridge or continuous box structure bridge
CN204949120U (en) A novel centralized mooring system for box with a net
CN203174516U (en) Suspension bridge closure segment construction beam segment traction pre-deflection device
CN103270984A (en) Net cage anchoring system
CN204949103U (en) A anti -current type mooring system for culture in net cage
CN104480959A (en) General tower crane supporting base
CN202450450U (en) Reinforcement and reconstruction structure of suspension bridge
CN204949096U (en) A novel mooring system for box with a net
CN108755966A (en) Assembled Super High core tube supported structure system
CN204949107U (en) Centralized mooring system of box with a net
CN205171343U (en) Combination beam self anchored suspension bridge
CN105220609B (en) Combined beam self-anchored suspension bridge and construction process thereof
CN204728484U (en) A kind of precast concrete primary-secondary beam syndeton
CN204949106U (en) A centralized mooring system for culture in net cage
CN204949115U (en) A centralized mooring system for box with a net
CN203654283U (en) Ground anchor
CN202718129U (en) Support structure for deep and large foundation pit base angle braces
CN204949114U (en) A mooring system for culture in net cage
CN204811518U (en) A novel mooring system for culture in net cage

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant