CN204945452U - Cable jacket production line - Google Patents

Cable jacket production line Download PDF

Info

Publication number
CN204945452U
CN204945452U CN201520658003.4U CN201520658003U CN204945452U CN 204945452 U CN204945452 U CN 204945452U CN 201520658003 U CN201520658003 U CN 201520658003U CN 204945452 U CN204945452 U CN 204945452U
Authority
CN
China
Prior art keywords
machine
steel band
band
tension force
cable jacket
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201520658003.4U
Other languages
Chinese (zh)
Inventor
周细毛
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Guangdong Hongkai Optical Fiber Equipment Technology Co Ltd
Original Assignee
Guangdong Hongkai Optical Fiber Equipment Technology Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Guangdong Hongkai Optical Fiber Equipment Technology Co Ltd filed Critical Guangdong Hongkai Optical Fiber Equipment Technology Co Ltd
Priority to CN201520658003.4U priority Critical patent/CN204945452U/en
Application granted granted Critical
Publication of CN204945452U publication Critical patent/CN204945452U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Ropes Or Cables (AREA)

Abstract

The utility model discloses a kind of cable jacket production line, includes initiatively paying out machine, the first tension force dancing device, steel band and puts band machine, online welding machine, steel band belt machine, steel band embossing calender, gel filling device, longitudinal covering model tool platform, extrusion main unit, mobile tank, fixing tank, blow-dry device, caliper, colour band inker, caterpillar-tractor, the second tension force dancing device, admission machine and master control electronic box; Each device and mechanism is utilized by coordinating; achieve the automatic production of cable jacket overall process; instead of the mode adopting human assistance machine to complete of tradition; the machine can carry out the splicing of steel band under non-stop-machine state; automaticity is high; decrease manpower to expend, and effectively improve work efficiency, for manufacturing enterprise brings more Multi benefit.

Description

Cable jacket production line
Technical field
The utility model relates to optical cable production equipment art, refers in particular to a kind of cable jacket production line.
Background technology
Cable is the general designation of the article such as optical cable, cable, and wherein optical cable is the communications cable assembly utilizing one or more optical fiber being placed in coated sheath also can use separately or in groups as transmission medium.Cable is common and indispensable a kind of article in daily life, and the purposes of cable has a lot, mainly contains and controls installation, connection device, transmits electric power.
At present, optical cable is when producing, and need to carry out the operations such as Baogang's band, injection mo(u)lding sheath, cooling, in prior art, completing of these operations is generally completed by human assistance machine, and automaticity is low, labor intensive, inefficiency.
Summary of the invention
In view of this, the utility model is for the disappearance of prior art existence, and its fundamental purpose is to provide a kind of cable jacket production line, and it effectively can solve existing optical cable and produce the mode completed by human assistance machine and there is labor intensive, inefficient problem.
For achieving the above object, the utility model adopts following technical scheme.
A kind of cable jacket production line, includes initiatively paying out machine, the first tension force dancing device, steel band and puts band machine, online welding machine, steel band belt machine, steel band embossing calender, gel filling device, longitudinal covering model tool platform, extrusion main unit, mobile tank, fixing tank, blow-dry device, caliper, colour band inker, caterpillar-tractor, the second tension force dancing device, admission machine and master control electronic box, this is paying out machine initiatively, first tension force dancing device, steel band puts band machine, online welding machine, steel band belt machine, steel band embossing calender, gel filling device, longitudinal covering model tool platform, extrusion main unit, mobile tank, fixing tank, blow-dry device, caliper, colour band inker, caterpillar-tractor, second tension force dancing device and admission machine are laterally arranged side by side, this master control electronic box controls the plasticization temperature of extrusion main unit and the speed of production of whole production line, first tension force dancing device, steel band puts band machine, online welding machine, steel band belt machine, steel band embossing calender, gel filling device, longitudinal covering model tool platform, extrusion main unit, mobile tank, fixing tank, blow-dry device, caliper, colour band inker, caterpillar-tractor, the work of the second tension force dancing device and admission machine.
Preferably, between described active paying out machine and the first tension force dancing device, be provided with the first rolling stand, between this second tension force dancing device and admission machine, be provided with second tin roller support.
Preferably, described active paying out machine is planer-type initiatively paying out machine.
Preferably, described mobile tank is 4 meters of mobile tanks.
Preferably, described fixing tank is 12 meters of fixing tanks.
Preferably, the two ends of described fixing tank are provided with reverse wheel.
Preferably, described steel band puts band machine is two that are arranged side by side.
The utility model compared with prior art has obvious advantage and beneficial effect, specifically, as shown from the above technical solution.
Each device and mechanism is utilized by coordinating; achieve the automatic production of cable jacket overall process; instead of the mode adopting human assistance machine to complete of tradition; the machine can carry out the splicing of steel band under non-stop-machine state; automaticity is high; decrease manpower to expend, and effectively improve work efficiency, for manufacturing enterprise brings more Multi benefit.
For more clearly setting forth architectural feature of the present utility model and effect, below in conjunction with accompanying drawing and specific embodiment, the utility model is described in detail.
Accompanying drawing explanation
Fig. 1 is the structural representation of the preferred embodiment of the utility model.
Fig. 2 is the preferred embodiment close-up schematic view of the utility model.
Fig. 3 is another close-up schematic view of preferred embodiment of the utility model.
Accompanying drawing identifier declaration.
11, active paying out machine 12, first tension force dancing device
13, steel band puts band machine 14, online welding machine
15, steel band belt machine 16, steel band embossing calender
17, gel filling device 18, longitudinal covering model tool platform
19, extrusion main unit 20, mobile tank
21, fixing tank 22, blow-dry device
23, caliper 24, colour band inker
25, caterpillar-tractor 26, second tension force dancing device
27, admission machine 28, master control electronic box
29, the first rolling stand 30, second tin roller support
31, reverse wheel
Embodiment
Please refer to shown in Fig. 1 to Fig. 3, that show the concrete structure of the preferred embodiment of the utility model, include initiatively paying out machine 11, first tension force dancing device 12, steel band and put band machine 13, online welding machine 14, steel band belt machine 15, steel band embossing calender 16, gel filling device 17, longitudinal covering model tool platform 18, extrusion main unit 19, mobile tank 20, fixing tank 21, blow-dry device 22, caliper 23, colour band inker 24, caterpillar-tractor 25, second tension force dancing device 26, admission machine 27 and master control electronic box 28.
This is paying out machine 11 initiatively, first tension force dancing device 12, steel band puts band machine 13, online welding machine 14, steel band belt machine 15, steel band embossing calender 16, gel filling device 17, longitudinal covering model tool platform 18, extrusion main unit 19, mobile tank 20, fixing tank 21, blow-dry device 22, caliper 23, colour band inker 24, caterpillar-tractor 25, second tension force dancing device 26 and admission machine 27 are laterally arranged side by side, this master control electronic box 28 controls initiatively paying out machine 11, first tension force dancing device 12, steel band puts band machine 13, online welding machine 14, steel band belt machine 15, steel band embossing calender 16, gel filling device 17, longitudinal covering model tool platform 18, extrusion main unit 19, mobile tank 20, fixing tank 21, blow-dry device 22, caliper 23, colour band inker 24, caterpillar-tractor 25, the work of the second tension force dancing device 26 and admission machine 27.In the present embodiment, the first rolling stand 29 is also provided with between described active paying out machine 11 and the first tension force dancing device 12, second tin roller support 30 is provided with between this second tension force dancing device 26 and admission machine 27, described active paying out machine 11 is planer-type initiatively paying out machine, described mobile tank 20 is 4 meters of mobile tanks, described fixing tank 21 is 12 meters of fixing tanks, and the two ends of described fixing tank 21 are provided with reverse wheel 31.
During work, heart yearn released by this active paying out machine 11, initiatively the external diameter of the actinobacillus wheel of paying out machine 11 is 800mm-1600mm, heart yearn enters in the first tension force dancing device 12 through the first rolling stand 29 and carries out appropriate tensioning, then, heart yearn puts band machine 13 through steel band, steel band put band machine 13 release steel band and with heart yearn walk abreast, it is two that steel band puts band machine 13, when one of them steel band puts the steel band of band machine 13 close to when discharging, the upper steel band that last steel band puts band machine 13 leaves in steel band belt machine 15 in advance, then, put band machine 13 by a rear steel band and release steel band, and last steel band put by online welding machine 14 steel band that the remaining steel band of band machine 13 and a rear steel band put on band machine 13 and be welded to connect, thus steel band can be avoided to carry interruption, this steel band embossing calender 16 pairs of steel bands carry out embossing, so that follow-up parcel, then, gel filling device 17 exports ointment, then vertical bag is carried out by longitudinal covering model tool platform 18 pairs of steel bands, steel band is made to encase heart yearn, then, the steel band wrapping heart yearn enters extrusion main unit 19, extrusion main unit 19 extrusion plastic, thus form sheath outward at steel band, then, enter mobile tank 20 successively and fixing tank 21 cools, then, dried up by blow-dry device 22, then, calibrated by caliper 23 pairs of sheaths, after having calibrated, lettering is carried out by colour band inker 24 pairs of sheaths, and then carry out traction by caterpillar-tractor 25 and enter the second tension force dancing device 26, finally carry out take-up by admission machine 27.
Design focal point of the present utility model is: utilize each device and mechanism by coordinating; achieve the automatic production of cable jacket overall process; instead of the mode adopting human assistance machine to complete of tradition; the machine can carry out the splicing of steel band under non-stop-machine state; automaticity is high; decrease manpower to expend, and effectively improve work efficiency, for manufacturing enterprise brings more Multi benefit.
Below know-why of the present utility model is described in conjunction with specific embodiments.These describe just in order to explain principle of the present utility model, and can not be interpreted as the restriction to the utility model protection domain by any way.Based on explanation herein, those skilled in the art does not need to pay performing creative labour can associate other embodiment of the present utility model, and these modes all will fall within protection domain of the present utility model.

Claims (7)

1. a cable jacket production line, is characterized in that: include initiatively paying out machine, the first tension force dancing device, steel band and put band machine, online welding machine, steel band belt machine, steel band embossing calender, gel filling device, longitudinal covering model tool platform, extrusion main unit, mobile tank, fixing tank, blow-dry device, caliper, colour band inker, caterpillar-tractor, the second tension force dancing device, admission machine and master control electronic box, this is paying out machine initiatively, first tension force dancing device, steel band puts band machine, online welding machine, steel band belt machine, steel band embossing calender, gel filling device, longitudinal covering model tool platform, extrusion main unit, mobile tank, fixing tank, blow-dry device, caliper, colour band inker, caterpillar-tractor, second tension force dancing device and admission machine are laterally arranged side by side, this master control electronic box controls initiatively paying out machine, first tension force dancing device, steel band puts band machine, online welding machine, steel band belt machine, steel band embossing calender, gel filling device, longitudinal covering model tool platform, extrusion main unit, mobile tank, fixing tank, blow-dry device, caliper, colour band inker, caterpillar-tractor, the work of the second tension force dancing device and admission machine.
2. cable jacket production line as claimed in claim 1, is characterized in that: be provided with the first rolling stand between described active paying out machine and the first tension force dancing device, is provided with second tin roller support between this second tension force dancing device and admission machine.
3. cable jacket production line as claimed in claim 1, is characterized in that: described active paying out machine is planer-type initiatively paying out machine.
4. cable jacket production line as claimed in claim 1, is characterized in that: described mobile tank is 4 meters of movable water tanks.
5. cable jacket production line as claimed in claim 1, is characterized in that: described fixing tank is 12 meters of fixing tanks.
6. cable jacket production line as claimed in claim 1, is characterized in that: the two ends of described fixing tank are provided with reverse wheel.
7. cable jacket production line as claimed in claim 1, is characterized in that: it is two that are arranged side by side that described steel band puts band machine.
CN201520658003.4U 2015-08-28 2015-08-28 Cable jacket production line Expired - Fee Related CN204945452U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201520658003.4U CN204945452U (en) 2015-08-28 2015-08-28 Cable jacket production line

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201520658003.4U CN204945452U (en) 2015-08-28 2015-08-28 Cable jacket production line

Publications (1)

Publication Number Publication Date
CN204945452U true CN204945452U (en) 2016-01-06

Family

ID=55012863

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201520658003.4U Expired - Fee Related CN204945452U (en) 2015-08-28 2015-08-28 Cable jacket production line

Country Status (1)

Country Link
CN (1) CN204945452U (en)

Cited By (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106876048A (en) * 2017-02-22 2017-06-20 江苏通鼎光电科技有限公司 A kind of double sheath integrated production equipments of cable
CN107577018A (en) * 2017-10-13 2018-01-12 无锡市华翎电工机械设备有限公司 Cable jacket production method
CN108983375A (en) * 2018-04-26 2018-12-11 上海富瑞电缆股份有限公司 A kind of optical fiber production assembly line
CN109761106A (en) * 2017-11-09 2019-05-17 江苏亨通光电股份有限公司 Optical fiber cable surface identifies processing after-combustion mechanism
CN111487736A (en) * 2020-05-28 2020-08-04 深圳市达富光通信有限公司 Flexible optical cable sheath extrusion production line

Cited By (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106876048A (en) * 2017-02-22 2017-06-20 江苏通鼎光电科技有限公司 A kind of double sheath integrated production equipments of cable
CN107577018A (en) * 2017-10-13 2018-01-12 无锡市华翎电工机械设备有限公司 Cable jacket production method
CN109761106A (en) * 2017-11-09 2019-05-17 江苏亨通光电股份有限公司 Optical fiber cable surface identifies processing after-combustion mechanism
CN108983375A (en) * 2018-04-26 2018-12-11 上海富瑞电缆股份有限公司 A kind of optical fiber production assembly line
CN111487736A (en) * 2020-05-28 2020-08-04 深圳市达富光通信有限公司 Flexible optical cable sheath extrusion production line

Similar Documents

Publication Publication Date Title
CN204945452U (en) Cable jacket production line
CN205038390U (en) Full -automatic cable production facility of improvement
CN205665442U (en) Layer -stranding cable's integrative apparatus for producing of stranding sheath
CN204945456U (en) Twisted synthesizing cable production line
CN204945453U (en) Covered wire cable production line
CN102866475A (en) Secondary optical fiber and optical fiber ribbon coating composite production equipment and method using equipment
CN105070410A (en) Cable production system
CN204945457U (en) Flexible optical cable production line
CN103539999B (en) A kind of preparation method strengthening composite band and composite band thereof
CN205038391U (en) Full -automatic optical fiber cable production line
CN206311800U (en) A kind of fibre ribbon automatic winding machine
CN204807784U (en) Improved generation optical cable production facility
CN202916467U (en) Optical fiber and optical fiber ribbon secondary coating composite production device
CN205121025U (en) Pancake self -supporting introduces optical fiber ribbon optical cable
CN204832627U (en) Full -automatic cable production facility
CN102398796A (en) Wire reeling, unreeling and arranging device with multiple connected trays
CN204066889U (en) A kind of 1+6,+12 mono-secondary clearing reverse stranding process units
CN202940052U (en) Optical fiber composite overhead insulation cable
CN102915807A (en) Optical fiber composite aerial insulated cable and production method thereof
CN204945455U (en) Indoor tight sleeve optic cable production line
CN203652945U (en) Novel non-shutdown reel replacing device for multi-head wire winding machine
CN202854386U (en) Cooling water tank for optical cable sheath
CN202649561U (en) Air-blowing optical cable with no center reinforcement member
CN206460198U (en) Pencil optical cable production line
CN204188849U (en) A kind of skeleton cable

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20160106

Termination date: 20190828

CF01 Termination of patent right due to non-payment of annual fee