CN204940271U - Embedded anchor bar node - Google Patents

Embedded anchor bar node Download PDF

Info

Publication number
CN204940271U
CN204940271U CN201520399724.8U CN201520399724U CN204940271U CN 204940271 U CN204940271 U CN 204940271U CN 201520399724 U CN201520399724 U CN 201520399724U CN 204940271 U CN204940271 U CN 204940271U
Authority
CN
China
Prior art keywords
anchor
node
clamp
node clamp
embedded
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201520399724.8U
Other languages
Chinese (zh)
Inventor
梁枫
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Fujian Pingtan Bethlehem science and Technology Co. Ltd.
Original Assignee
Chengdu Jiameijia Science and Technology Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Chengdu Jiameijia Science and Technology Co Ltd filed Critical Chengdu Jiameijia Science and Technology Co Ltd
Priority to CN201520399724.8U priority Critical patent/CN204940271U/en
Application granted granted Critical
Publication of CN204940271U publication Critical patent/CN204940271U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Piles And Underground Anchors (AREA)

Abstract

The utility model discloses a kind of embedded anchor bar node, comprise anchor node clamp and the node clamp that casts anchor, upper anchor node clamp and casting anchor between node clamp is connected by coal tar layer of paste, cast anchor node clamp and upper anchor node clamp is all connected in coal tar layer of paste, vertically embedded board is installed in coal tar layer of paste, embedded board top is connected with upper anchor node clamp through coal tar layer of paste, coal tar layer of paste and the node clamp that casts anchor setting is each passed through bottom it, embedded board is two, laterally extra play is provided with between two embedded boards, extra play two ends are each passed through two embedded boards and arrange, built-in pipe is connected with between extra play and upper anchor node clamp.This embedded anchor bar node eliminates ground tackle, construct simpler, the requirement of constructor is also decreased, reliable construction quality is higher, pre-buried effect is very good, has good support performance, in addition the humidification of additional structure layers, make its waterproof effect more obvious, not easily occur Seepage.

Description

Embedded anchor bar node
Technical field
The utility model relates to a kind of anchor pole node, particularly a kind of embedded anchor bar node.
Background technology
Bolt support is a kind of its support reinforcement mode adopted in the earth's surface engineerings such as side slope, ground deep foundation ditch and the construction of the underground chamber such as tunnel, stope, roofbolt is made with metalwork, wooden piece, polymer member or other materials, squeeze in earth's surface rock mass or the pre-drilled hole of chamber surrounding rock body, utilize special tectonic and the afterbody supporting plate of its head, the body of rod, or depend on bonding effect and country rock and rock mass stability are combined and produces suspension effectiveness, compound beam effect and reinforcing effect, to reach the object of supporting.Anchor pole is provided with node, can better play reinforcement by connection effect, general anchor pole nodal function is single, easily occurs obscission, can not better play pre-buried effect, needs to carry out corresponding improvement to it, can better be applied in bolt support.
Utility model content
The technical problems to be solved in the utility model is: overcome the problems referred to above, provides one to eliminate ground tackle, constructs simpler, the requirement of constructor is also decreased, reliable construction quality is higher, and pre-buried effect is very good, has the embedded anchor bar node of good support performance.
To achieve these goals, the technical solution adopted in the utility model is such: embedded anchor bar node of the present utility model, comprise anchor node clamp and the node clamp that casts anchor, upper anchor node clamp and casting anchor between node clamp is connected by coal tar layer of paste, cast anchor node clamp and upper anchor node clamp is all connected in coal tar layer of paste, vertically embedded board is installed in coal tar layer of paste, embedded board top is connected with upper anchor node clamp through coal tar layer of paste, coal tar layer of paste and the node clamp that casts anchor setting is each passed through bottom it, embedded board is two, laterally extra play is provided with between two embedded boards, extra play two ends are each passed through two embedded boards and arrange, built-in pipe is connected with between extra play and upper anchor node clamp, arrange through extra play bottom built-in pipe, its top is arranged through upper anchor node clamp.
Further, as a kind of concrete form of structure, upper anchor node clamp described in the utility model and the node clamp that casts anchor all adopt nonmetals to make.
Further, as a kind of concrete form of structure, upper anchor node clamp soffit described in the utility model and the node clamp upper surface that casts anchor all have draw-in groove.
Further, as a kind of concrete form of structure, in upper anchor node clamp soffit described in the utility model and the node clamp draw-in groove that casts anchor, all slide rail is installed.
Further, as a kind of concrete form of structure, coal tar layer of paste upper surface described in the utility model and soffit are all placed in anchor node clamp soffit and cast anchor in the draw-in groove of node clamp, and coal tar layer of paste and upper anchor node clamp soffit and node clamp junction of casting anchor are provided with advance ball, advance ball is placed in draw-in groove.
Further, as a kind of concrete form of structure, coal tar layer of paste thickness described in the utility model is between five to ten centimetres.
Compared with prior art, the utility model has the advantage of: this embedded anchor bar node eliminates ground tackle, construct simpler, also decrease the requirement of constructor, reliable construction quality is higher, and pre-buried effect is very good, there is good support performance, in addition the humidification of additional structure layers, makes its waterproof effect more obvious, not easily occurs Seepage.
Accompanying drawing explanation
Below in conjunction with drawings and Examples, the utility model is further illustrated.
Fig. 1 is structural representation of the present utility model; In figure: 1. go up anchor node clamp; 2. embedded board; 3. built-in pipe; 4. extra play; 5. coal tar layer of paste; 6. cast anchor node clamp.
Detailed description of the invention
Be described in further detail the utility model by reference to the accompanying drawings now, these accompanying drawings are the schematic diagram of simplification, only basic structure of the present utility model are described in a schematic way, and therefore it only shows the formation relevant with the utility model.
The preferred embodiment of the utility model embedded anchor bar node as shown in Figure 1, comprise anchor node clamp 1 and the node clamp 6 that casts anchor, upper anchor node clamp 1 and casting anchor between node clamp 6 is connected by coal tar layer of paste 5, cast anchor node clamp 1 and upper anchor node clamp 6 is all connected in coal tar layer of paste 5, in coal tar layer of paste 5, embedded board 2 is vertically installed, embedded board 2 top is connected with upper anchor node clamp 1 through coal tar layer of paste 5, coal tar layer of paste 5 is each passed through and the node clamp 6 that casts anchor is arranged bottom it, embedded board 2 is two, laterally extra play 4 is provided with between two embedded boards 2, extra play 4 two ends are each passed through two embedded boards 2 and arrange, built-in pipe 3 is connected with between extra play 4 and upper anchor node clamp 1, 4 are established to put through extra play bottom built-in pipe 3, its top is arranged through upper anchor node clamp 1, described upper anchor node clamp 1 and the node clamp 6 that casts anchor all adopt nonmetals to make, described upper anchor node clamp 1 soffit and node clamp 6 upper surface that casts anchor all have draw-in groove, all slide rail is installed in described upper anchor node clamp 1 soffit and node clamp 6 draw-in groove that casts anchor, the equal soffit of described coal tar layer of paste 5 upper surface is all placed in anchor node clamp 1 soffit and casts anchor in the draw-in groove of node clamp 6, and coal tar layer of paste 5 is provided with advance ball with upper anchor node clamp 1 soffit and node clamp 6 junction of casting anchor, advance ball is placed in draw-in groove, described coal tar layer of paste 5 thickness is between five to ten centimetres.
Embedded anchor bar node of the present utility model eliminates ground tackle, construct simpler, also decrease the requirement of constructor, reliable construction quality is higher, and pre-buried effect is very good, there is good support performance, in addition the humidification of additional structure layers, makes its waterproof effect more obvious, not easily occurs Seepage, described upper anchor node clamp 1 and the node clamp 6 that casts anchor all adopt nonmetals to make, and alleviate self structure weight, described upper anchor node clamp 1 soffit and node clamp 6 upper surface that casts anchor all have draw-in groove, all slide rail is installed in described upper anchor node clamp 1 soffit and node clamp 6 draw-in groove that casts anchor, the equal soffit of described coal tar layer of paste 5 upper surface is all placed in anchor node clamp 1 soffit and casts anchor in the draw-in groove of node clamp 6, and coal tar layer of paste 5 is provided with advance ball with upper anchor node clamp 1 soffit and node clamp 6 junction of casting anchor, advance ball is placed in draw-in groove, can be slidably connected, and switching performance is stablized, there will not be obscission, connect secure rigid more, described coal tar layer of paste 5 thickness is between five to ten centimetres, and actual field result of use is better.
With above-mentioned according to desirable embodiment of the present utility model for enlightenment, by above-mentioned description, relevant staff completely can in the scope not departing from this utility model technological thought, carry out various change and amendment, the technical scope of this utility model is not limited to the content on manual, must determine its technical scope according to right.

Claims (6)

1. an embedded anchor bar node, comprise anchor node clamp and the node clamp that casts anchor, it is characterized in that: upper anchor node clamp and casting anchor between node clamp is connected by coal tar layer of paste, cast anchor node clamp and upper anchor node clamp is all connected in coal tar layer of paste, vertically embedded board is installed in coal tar layer of paste, embedded board top is connected with upper anchor node clamp through coal tar layer of paste, coal tar layer of paste and the node clamp that casts anchor setting is each passed through bottom it, embedded board is two, laterally extra play is provided with between two embedded boards, extra play two ends are each passed through two embedded boards and arrange, built-in pipe is connected with between extra play and upper anchor node clamp, arrange through extra play bottom built-in pipe, its top is arranged through upper anchor node clamp.
2. embedded anchor bar node according to claim 1, is characterized in that: described upper anchor node clamp and the node clamp that casts anchor all adopt nonmetals to make.
3. embedded anchor bar node according to claim 1, is characterized in that: described upper anchor node clamp soffit and the node clamp upper surface that casts anchor all have draw-in groove.
4. embedded anchor bar node according to claim 3, is characterized in that: be all provided with slide rail in described upper anchor node clamp soffit and the node clamp draw-in groove that casts anchor.
5. embedded anchor bar node according to claim 3, it is characterized in that: described coal tar layer of paste upper surface and soffit are all placed in anchor node clamp soffit and cast anchor in the draw-in groove of node clamp, and coal tar layer of paste and upper anchor node clamp soffit and node clamp junction of casting anchor are provided with advance ball, advance ball is placed in draw-in groove.
6. embedded anchor bar node according to claim 1, is characterized in that: described coal tar layer of paste thickness is between five to ten centimetres.
CN201520399724.8U 2015-06-11 2015-06-11 Embedded anchor bar node Expired - Fee Related CN204940271U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201520399724.8U CN204940271U (en) 2015-06-11 2015-06-11 Embedded anchor bar node

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201520399724.8U CN204940271U (en) 2015-06-11 2015-06-11 Embedded anchor bar node

Publications (1)

Publication Number Publication Date
CN204940271U true CN204940271U (en) 2016-01-06

Family

ID=55007713

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201520399724.8U Expired - Fee Related CN204940271U (en) 2015-06-11 2015-06-11 Embedded anchor bar node

Country Status (1)

Country Link
CN (1) CN204940271U (en)

Similar Documents

Publication Publication Date Title
CN103362131B (en) A kind of pattern foundation pit supporting structure compound bamboo reinforcement combined bolting and shotcrete and construction method thereof
CN209457028U (en) A kind of ruggedized construction of soft soil foundation
CN203795438U (en) Miniature anchored pile and soil nailing wall combined retaining structure
CN207567757U (en) A kind of novel prefabricated steel-pipe pile
CN207278276U (en) Cross the shallow-depth-excavation tunnel supporting construction of ground fissure crushed zone
CN105155548A (en) Cable double-row pile (wall) supporting structure
CN108316328A (en) A kind of pressurization sinking device and its construction method for open caisson construction
CN204940271U (en) Embedded anchor bar node
CN105002905B (en) Embedded anchor bar node
CN205188976U (en) Drag -line double row pile supporting construction
CN207672602U (en) The pull-type vertical retaining wall structure structure of anchor
CN207714357U (en) A kind of mountainous region reinforcement type iron tower foundation
CN207934486U (en) A kind of connection structure of masonry bearing capacity metope and basis
CN207878441U (en) A kind of ruggedized construction of soft soil foundation
CN203547758U (en) Zero-distance asymmetrical double-hole tunnel structure
CN207211388U (en) The vertical connection structure of precast shear wall
CN205295920U (en) An area supporting beam's thin wall abutment structure
CN204959733U (en) Bored concrete pile steel reinforcement cage structure
CN204645033U (en) Head for anchor shaft
CN201236408Y (en) Hollow bricks
CN204418208U (en) Anchor rod foundation
CN205591246U (en) A railway roadbed contact net column foundation structure
CN207727612U (en) Rib column formula anchored bolt retaining wall structure
CN207646732U (en) It is segmented self-tightening type anchor pole
CN207974834U (en) A kind of Tunnel Engineering pipe curtain support construction

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
CB03 Change of inventor or designer information

Inventor after: Lin Shengbin

Inventor after: Shen Jinzhong

Inventor after: You Chaoqiang

Inventor before: Liang Feng

CB03 Change of inventor or designer information
TR01 Transfer of patent right

Effective date of registration: 20170407

Address after: 350400 Fujian County, Pingtan Province, north of the town of Golden Bay Bay Road, Taiwan Venture Park, building 2, floor A1, zone two, zone 6

Patentee after: Fujian Pingtan Bethlehem science and Technology Co. Ltd.

Address before: 610000 Sichuan Province, Qingyang District, Jinyang Road, No. 7, building 6, building 19, No. 112

Patentee before: CHENGDU JIAMEIJIA SCIENCE & TECHNOLOGY CO., LTD.

TR01 Transfer of patent right
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20160106

Termination date: 20170611

CF01 Termination of patent right due to non-payment of annual fee