CN204920865U - Shale gas well mouth main control valve area is pressed and is changed device - Google Patents

Shale gas well mouth main control valve area is pressed and is changed device Download PDF

Info

Publication number
CN204920865U
CN204920865U CN201520392436.XU CN201520392436U CN204920865U CN 204920865 U CN204920865 U CN 204920865U CN 201520392436 U CN201520392436 U CN 201520392436U CN 204920865 U CN204920865 U CN 204920865U
Authority
CN
China
Prior art keywords
hole
main control
control valve
flange
oil cylinder
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201520392436.XU
Other languages
Chinese (zh)
Inventor
钱伟强
黎明
任小玲
李红
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Sinopec Oilfield Equipment Corp
Research Institute of Sinopec Oilfield Equipment Co Ltd
Original Assignee
Research Institute of Sinopec Petroleum Engineering Machinery Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Research Institute of Sinopec Petroleum Engineering Machinery Co Ltd filed Critical Research Institute of Sinopec Petroleum Engineering Machinery Co Ltd
Priority to CN201520392436.XU priority Critical patent/CN204920865U/en
Application granted granted Critical
Publication of CN204920865U publication Critical patent/CN204920865U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Valve Housings (AREA)

Abstract

The utility model discloses a shale gas well mouth main control valve area is pressed and is changed device, include: stop up the mechanism, it be including can dismantling the blanking plug and the fixing device of connection, and the blanking plug is used for passing the main control valve and arrives preset position in order to stop up the oil pipe head, and fixing device fixes the blanking plug at preset position, the feed mechanism, its first hydro -cylinder that includes the piston rod -type for with blanking plug propelling movement to preset position, the supporting mechanism, it is including dismantling the first flange and a pair of pillar of connection, hoist mechanism, it is including setting up a pair of second hydro -cylinder at the piston rod -type of the both sides of first hydro -cylinder, and the free end of the piston rod of a pair of second hydro -cylinder is equipped with can dismantle the linear member of being connected with the main control valve for promote the main control valve. The utility model discloses can satisfy characteristics such as shale gas well mouth space is little, well head pressure height, environmental pollution problem and the output reduction problem of avoiding the kill -job method to bring, the operating cost is low, and the blanking plug has double locking function, has guaranteed to trade valve safe and reliable.

Description

A kind of shale gas well head main control valve replacing device operated under pressure
Technical field
The utility model relates to shale gas wellheadpressure field of operation, and more particularly, what relate to is a kind of shale gas well head main control valve replacing device operated under pressure.
Background technology
China's shale gas aboundresources, but because shale formation permeability is very low, need after shale gas well completion could obtain desirable output through reservoir reconstruction, and fracturing is one of core technology of shale gas exploitation, when pressing crack construction, because tubing head and main control valve will participate in segmentation sand fracturing construction, wellhead equipment high-pressure work liquid washes away, corrosion, damage main control valve spool, cause seal failure, valve pocket easily enters sand, after causing wellhead assembly pressure break, pressure testing is defective, after main control valve is not closed completely, result in following problem: the main control valve that (1) is positioned at tubing head export department is the master switch of gas production wellhead, it is the roof-cut resistence of most critical, if leak, whole well head is in no-console condition, heavy then cause well head accident, threaten well site and personal safety, subterranean resource is caused to waste, light then contaminated environment, (2) due to the collection (switching) that main control valve is gas in the direct well controlling to be in nearly 30MPa high pressure conditions, once installing, namely in running order, thus to maintenance, the replacing very difficulty of main control valve.
Traditional valve method of changing mainly contains two kinds, and one is well-killing valve replacing or maintenance, before changing valve, maintenance, first in well, injects mud, and makes mud fluid column pressure slightly larger than OIH (gas) pressure, to be held stable after carry out again changing valve process.Employing the method should be employed a tremendous amount of manpower, material resources, must stop production again and carry out, and due to mud impurity blocking formation pore in construction after kill-job, often will reduce gas output, even cause stripper well to become dried-up well, be not more suitable for shale gas; Two is adopt slips location stuck point to change valve or maintenance, and the method is engaged in the sealing of tube head inwall fixed point by slip insert; But due to tubing head runner because long-term work is corroded by acid medium, its inwall often selection that is uneven, stuck point position is more difficult, the poor reliability that dop engages with inwall, safety are again without ensureing, and take out after changing valve more difficult, therefore, the method is generally only limited to well and forces down and use on the oil, gas well mouth device of 20MPa.
At present, replace with pressure head valve technology is a kind of very economical technology, but is also the technology that a kind of risk is very large.Therefore, a kind of well head main control valve replacing device operated under pressure being applicable to the safe, quick of shale gas and low cost is needed badly.
Utility model content
An object of the present utility model solves at least the problems referred to above and/or defect, and provide the advantage will illustrated at least below.
The utility model also has an object to be to provide a kind of shale gas well head main control valve replacing device operated under pressure, it can meet, and shale gas well head space is little, well head pressure high, the problem of environmental pollution avoiding well killing method to bring and output reduce problem, operating cost is low, blanking plug has double locking function, ensure that to change valve safe and reliable.
In order to realize, according to these objects of the present utility model and other advantage, providing a kind of shale gas well head main control valve replacing device operated under pressure, comprising:
Blockage mechanism, it comprises the blanking plug and fastening devices that removably connect, and described blanking plug is used for arriving precalculated position to block tubing head through main control valve, with described tubing head, described fastening devices is fixedly connected with that described blanking plug is fixed on described precalculated position;
Feed mechanism, it comprises the first oil cylinder of piston rod type, and for described blanking plug is pushed to described precalculated position, free end and the described blanking plug of the piston rod of described first oil cylinder removably connect;
Supporting mechanism, it comprises the first flange and pair of posts that removably connect, described first flange is horizontally disposed with and is fixedly connected with described first oil cylinder, described pair of posts is vertically arranged on the both sides of described first oil cylinder, and the first end of described pair of posts and the second end removably connect with described first flange and described tubing head respectively;
Hoisting mechanism, it comprises a pair second oil cylinders of the piston rod type of the both sides being arranged on described first oil cylinder, described a pair second oil cylinders are fixedly connected with described first flange, the free end of the piston rod of described a pair second oil cylinders is provided with the linear structure removably connected with described main control valve, for promoting described main control valve.
Preferably, described shale gas well head main control valve replacing device operated under pressure, described blanking plug comprises the body of rod and cock body, the described body of rod realizes removably connecting by the free end of the piston rod of snap joint and described first oil cylinder, the periphery of described cock body is provided with annular recess, when described blanking plug arrives described precalculated position, the outside annular groove of the described tubing head corresponding with described annular recess is provided with multiple first through holes that can hold jackscrew.
Preferably, described shale gas well head main control valve replacing device operated under pressure, described fastening devices is the plate body having U-shaped opening, the curved portion of described U-shaped opening holds the described body of rod just, described plate body offers multiple third through-hole, the top of described tubing head is provided with three-flange, and described three-flange offers multiple second through hole vertically, described multiple third through-hole and described multiple second through hole one_to_one corresponding and form the through space that can realize being linked and packed.
Preferably, described shale gas well head main control valve replacing device operated under pressure, described snap joint comprises bulb and locking nut, one end of described bulb is threaded with the free end of the piston rod of described first oil cylinder, the other end of described bulb is spherical convex surface, described locking nut and the described body of rod are equipped with the spherical concave surface that matches with described spherical convex surface and are threaded connection, thus realize the described body of rod removably connecting by the free end of the piston rod of snap joint and described first oil cylinder.
Preferably, described shale gas well head main control valve replacing device operated under pressure, the upper cover of piston rod of described first oil cylinder is provided with the second flange be slidably connected, and is provided with sliding ring between the piston rod of described first oil cylinder and described second flange.
Preferably, described shale gas well head main control valve replacing device operated under pressure, described second flange offers the fourth hole being positioned at the center of circle and the multiple fifth holes being positioned at circumference vertically, and the piston rod of described first oil cylinder realizes the piston rod of described first oil cylinder and being slidably connected of described second flange through described fourth hole.
Preferably, described shale gas well head main control valve replacing device operated under pressure, the top of described main control valve is provided with the 4th flange, described 4th flange offers multiple 6th through hole vertically, described multiple fifth hole and described multiple 6th through hole one_to_one corresponding and form the through space that can realize being linked and packed.
Preferably, described shale gas well head main control valve replacing device operated under pressure, described first flange has the 7th through hole being positioned at the center of circle and multiple 8th through holes being positioned at circumference vertically, described first oil cylinder realizes being fixedly connected with of described first oil cylinder and described first flange through described 7th through hole, the first end of described pair of posts is each passed through described 8th through hole and realizes removably connecting of described pair of posts and described first flange, described a pair second oil cylinders are each passed through described 8th through hole and realize being fixedly connected with of described a pair second oil cylinders and described first flange.
Preferably, described shale gas well head main control valve replacing device operated under pressure, the outside annular groove of described tubing head is radially arranged with pair of L-shaped pulling block, for any one pulling block, its first right-angle side offers multiple 9th through hole or blind hole, described multiple second through hole and described multiple 9th through hole or blind hole one_to_one corresponding and form the through space that can realize being linked and packed, the second right-angle side of described pulling block has the tenth through hole.
Preferably, described shale gas well head main control valve replacing device operated under pressure, second end of described pair of posts is provided with U-shaped drop handle, the space of the second right-angle side holding described pulling block is provided with between be parallel to each other two long limits of described drop handle, be parallel to each other two long limits of described drop handle have the 11 through hole, described tenth through hole and two described 11 through holes are oppositely arranged and form the through space realizing being linked and packed, and pin realizes removably connecting of described pulling block and described drop handle through described tenth through hole and two described 11 through holes.
The utility model at least comprises following beneficial effect:
The first, the utility model is by arranging blockage mechanism, feed mechanism, supporting mechanism and hoisting mechanism, realize whole shale gas well head main control valve replace with pressure process, can meet that shale gas well head space is little, well head pressure high, the problem of environmental pollution that well killing method can be avoided to bring and output reduce problem;
The second, the utility model is sent to blanking plug by piston rod type oil cylinder group and is promoted under hydraulic pressure, has higher automaticity, uses manpower and material resources sparingly; After tubing head blocked by blanking plug, the plate body being connected with blanking plug is locked on tubing head, there is double locking function, guarantee to change valve safe and reliable; The installation of this device only needs first by each assembly assembled in advance together, being then connected on tubing head when changing valve by pin, having saved and having changed the valve time, having decreased potential safety hazard.
Part is embodied by explanation below by other advantage of the present utility model, target and feature, part also will by research and practice of the present utility model by those skilled in the art is understood.
Accompanying drawing explanation
Fig. 1 is the structural representation of shale gas well head main control valve replacing device operated under pressure described in the utility model;
Fig. 2 is the structural representation of plate body described in the utility model.
Detailed description of the invention
Below in conjunction with accompanying drawing, the utility model is described in further detail, can implements according to this with reference to manual word to make those skilled in the art.
As shown in Figure 1-2, the utility model provides a kind of shale gas well head main control valve replacing device operated under pressure, comprising:
Blockage mechanism, it comprises the blanking plug 6 and fastening devices that removably connect, described blanking plug 6 is for arriving precalculated position to block tubing head 902 through main control valve 802, with described tubing head 902, described fastening devices is fixedly connected with that described blanking plug 6 is fixed on described precalculated position;
Feed mechanism, it comprises the first oil cylinder 1 of piston rod type, and for described blanking plug 6 is pushed to described precalculated position, free end and the described blanking plug 6 of the piston rod of described first oil cylinder 1 removably connect;
Supporting mechanism 7, it comprises the first flange 3 and pair of posts 701 that removably connect, described first flange 3 is horizontally disposed with and is fixedly connected with described first oil cylinder 1, described pair of posts 701 is vertically arranged on the both sides of described first oil cylinder 1, and the first end of described pair of posts 701 and the second end removably connect with described first flange 3 and described tubing head 902 respectively;
Hoisting mechanism, it comprises a pair second oil cylinders 2 of the piston rod type of the both sides being arranged on described first oil cylinder 1, described a pair second oil cylinders 2 are fixedly connected with described first flange 3, the free end of the piston rod of described a pair second oil cylinders 2 is provided with the linear structure removably connected with described main control valve 802, for promoting described main control valve 802.
In another kind of technical scheme, described shale gas well head main control valve replacing device operated under pressure, described blanking plug 6 comprises the body of rod 601 and cock body 602, the described body of rod 601 realizes removably connecting by the free end of snap joint 5 with the piston rod of described first oil cylinder 1, the periphery of described cock body 602 is provided with annular recess, when described blanking plug 6 arrives described precalculated position, the outside annular groove of the described tubing head 902 corresponding with described annular recess is provided with multiple first through holes that can hold jackscrew.
In another kind of technical scheme, described shale gas well head main control valve replacing device operated under pressure, described fastening devices is the plate body 10 having U-shaped opening, the curved portion of described U-shaped opening holds the described body of rod 601 just, described plate body 10 offers multiple third through-hole, the top of described tubing head 902 is provided with three-flange 901, described three-flange 901 offers multiple second through hole vertically, described multiple third through-hole and described multiple second through hole one_to_one corresponding and form the through space that can realize being linked and packed.
In another kind of technical scheme, described shale gas well head main control valve replacing device operated under pressure, described snap joint 5 comprises bulb 501 and locking nut 502, one end of described bulb 501 is threaded with the free end of the piston rod of described first oil cylinder 1, the other end of described bulb 501 is spherical convex surface, described locking nut 502 and the described body of rod 601 are equipped with the spherical concave surface that matches with described spherical convex surface and are threaded connection, thus realize the described body of rod 601 removably connecting by the free end of snap joint 5 and the piston rod of described first oil cylinder 1.
In another kind of technical scheme, described shale gas well head main control valve replacing device operated under pressure, the upper cover of piston rod of described first oil cylinder 1 is provided with the second flange 4 be slidably connected, and is provided with sliding ring between the piston rod of described first oil cylinder 1 and described second flange 4.
In another kind of technical scheme, described shale gas well head main control valve replacing device operated under pressure, described second flange 4 offers the fourth hole being positioned at the center of circle and the multiple fifth holes being positioned at circumference vertically, and the piston rod of described first oil cylinder 1 realizes the piston rod of described first oil cylinder 1 and being slidably connected of described second flange 4 through described fourth hole.
In another kind of technical scheme, described shale gas well head main control valve replacing device operated under pressure, the top of described main control valve 802 is provided with the 4th flange 801, described 4th flange 801 offers multiple 6th through hole vertically, described multiple fifth hole and described multiple 6th through hole one_to_one corresponding and form the through space that can realize being linked and packed.
In another kind of technical scheme, described shale gas well head main control valve replacing device operated under pressure, described first flange 3 has the 7th through hole being positioned at the center of circle and multiple 8th through holes being positioned at circumference vertically, described first oil cylinder 1 realizes being fixedly connected with of described first oil cylinder 1 and described first flange 3 through described 7th through hole, the first end of described pair of posts 701 is each passed through described 8th through hole and realizes removably connecting of described pair of posts 701 and described first flange 3, described a pair second oil cylinders 2 are each passed through described 8th through hole and realize being fixedly connected with of described a pair second oil cylinders 2 and described first flange 3.
In another kind of technical scheme, described shale gas well head main control valve replacing device operated under pressure, the outside annular groove of described tubing head 902 is radially arranged with pair of L-shaped pulling block 704, for any one pulling block 704, its first right-angle side offers multiple 9th through hole or blind hole, described multiple second through hole and described multiple 9th through hole or blind hole one_to_one corresponding and form the through space that can realize being linked and packed, the second right-angle side of described pulling block 704 has the tenth through hole.
In another kind of technical scheme, described shale gas well head main control valve replacing device operated under pressure, second end of described pair of posts 701 is provided with U-shaped drop handle 702, the space of the second right-angle side holding described pulling block 704 is provided with between be parallel to each other two long limits of described drop handle 702, be parallel to each other two long limits of described drop handle 702 have the 11 through hole, described tenth through hole and two described 11 through holes are oppositely arranged and form the through space realizing being linked and packed, pin 703 realizes removably connecting of described pulling block 704 and described drop handle 702 through described tenth through hole and two described 11 through holes.
Blockage mechanism comprises blanking plug 6 and plate body 10, blanking plug 6 comprises the body of rod 601 and the cock body 602 of integration connection, the free end of the body of rod 601 is spherical concave surface and is provided with external screw thread, cock body 602 is improved by tubing hanger to form, adopt O RunddichtringO, squash type rubber ring, packing group combination sealing, be a kind of blocking device of mature and reliable, the excircle of cock body 602 is provided with annular recess.Plate body 10 has U-shaped opening, the curved portion of U-shaped opening holds the body of rod 601 just, plate body 10 offers multiple third through-hole, the three-flange 901 that tubing head 902 top is fixedly connected with offers multiple second through hole vertically, multiple third through-hole and multiple second through hole one_to_one corresponding and form the through space that can realize being linked and packed, multiple third through-hole and multiple second through hole realize being fixedly connected with of plate body 10 and three-flange 901 by such as bolted mode.
Feed mechanism comprises the oil cylinder that the first oil cylinder 1, first oil cylinder 1 is piston single lever-type, and the free end of the piston rod of the first oil cylinder 1 is provided with external screw thread, and the free end of the first oil cylinder 1 is connected by snap joint 5 with the body of rod 601.Snap joint 5 comprises bulb 501 and locking nut 502, one end of bulb 501 is provided with internal thread, and be threaded with the free end of the piston rod of the first oil cylinder 1, the other end of bulb 501 is spherical convex surface and is provided with external screw thread, locking nut 502 is provided with the spherical concave surface and internal thread that match with spherical convex surface, locking nut 502 and bulb 501 mating spherical surfaces and be threaded, the body of rod 601 is also provided with the spherical concave surface and external screw thread that match with spherical convex surface, and the body of rod 601 is with bulb 501 mating spherical surfaces and be threaded with locking nut 502.The upper cover of piston rod of the first oil cylinder 1 is provided with the second flange 4, second flange 4 and can slides up and down relative to the piston rod of the first oil cylinder 1, is provided with sliding ring between the piston rod of the first oil cylinder 1 and the second flange 4.Second flange 4 offers the fourth hole being positioned at the center of circle and the multiple fifth holes being positioned at circumference vertically, and the piston rod of the first oil cylinder 1 realizes the piston rod of the first oil cylinder 1 and being slidably connected of the second flange 4 through fourth hole.The top of main control valve 802 is fixedly connected with the 4th flange 801,4th flange 801 offers multiple 6th through hole vertically, multiple fifth hole and multiple 6th through hole one_to_one corresponding and form the through space that can realize being linked and packed, multiple fifth hole and multiple 6th through hole realize being fixedly connected with of the second flange 4 and the 4th flange 801 by such as bolted mode.
Supporting mechanism 7 comprises the first flange 3 and pair of posts 701, first flange 3 and pair of posts 701 realize removably connecting by the mode be such as threaded, first flange 3 is horizontally disposed with, first flange 3 has the 7th through hole that is positioned at the center of circle vertically and is positioned at multiple 8th through holes of circumference, and the first oil cylinder 1 realizes being fixedly connected with of the first oil cylinder 1 and the first flange 3 through described 7th through hole by the mode of such as welding or be threaded.The first end of pair of posts 701 realizes removably connecting of pair of posts 701 and the first flange 3 through the 8th through hole by the mode be such as threaded.Second end of pair of posts 701 is fixedly connected with U-shaped drop handle 702 by the mode be such as threaded, and be parallel to each other two long limits of drop handle 702 have the 11 through hole.The outside annular groove of tubing head 902 has multiple first through holes that can hold jackscrew, and when blanking plug 6 arrives precalculated position, the annular recess of cock body 602 is positioned in same level with the first through hole just.The outside annular groove of tubing head 902 is radially arranged with pair of L-shaped pulling block 704, for any one pulling block 704, its first right-angle side offers multiple 9th through hole or blind hole, multiple second through hole and multiple 9th through hole or blind hole one_to_one corresponding and form the through space that can realize being linked and packed, multiple second through hole and multiple 9th through hole or blind hole realize being fixedly connected with of three-flange 901 and pulling block 704 by such as bolted mode.In space between be parallel to each other two long limits that second right-angle side of pulling block 704 is arranged on drop handle 702 just, second right-angle side of pulling block 704 has the tenth through hole, tenth through hole and two the 11 through holes are oppositely arranged and form the through space realizing being linked and packed, and pin 703 realizes removably connecting of pulling block 704 and drop handle 702 through the tenth through hole and two the 11 through holes.
Hoisting mechanism comprises a pair second oil cylinders 2, a pair second oil cylinders 2 are symmetricly set on the both sides of the first oil cylinder 1, second oil cylinder 2 is the oil cylinder of piston single lever-type, and a pair second oil cylinders 2 realize being fixedly connected with of a pair second oil cylinders 2 and the first flange 3 through the 8th through hole by the mode of such as welding or be threaded.The free end of the piston rod of a pair second oil cylinders 2 is provided with the linear structure of such as rope and main control valve 802 realizes removably connecting.
When main control valve 802 changed by needs, the pulling block 704 of both sides is inserted the outside annular groove of tubing head 902, two pulling blocks 704 are fixedly connected with three-flange 901, the first end of pair of posts 701 is fixedly connected with the first flange 3 respectively, second end screws in drop handle 702 and is fixedly connected with, the piston rod of the first oil cylinder 1 is put the second flange 4 be then fixedly connected with blanking plug 6 by snap joint 5, first oil cylinder 1 is fixedly connected with the first flange 3 respectively with a pair second oil cylinders 2, and then drop handle 702 is connected by pin 703 soon with pulling block 704, so just by blockage mechanism, feed mechanism, supporting mechanism 7 and hoisting mechanism have assembled complete all.
Hydraulic Station controls the first oil cylinder 1 and a pair second oil cylinders 2, now the piston rod of the first oil cylinder 1 is sent by the first oil cylinder 1 under hydraulic pressure, the piston rod of the first oil cylinder 1 promotes the valve plate of blanking plug 6 to main control valve 802 to being in contact with it, second flange 4 is fixedly connected with the 4th flange 801, sliding ring is had to prevent gas from overflowing between second flange 4 and piston rod, then main control valve 802 is opened, the piston rod of the first oil cylinder 1 is sent completely under hydraulic pressure, and blanking plug 6 is delivered to the precalculated position being positioned at tubing head 902 inside, jackscrew is inserted the annular recess of blanking plug 6 from the first through hole of the outside annular groove of tubing head 902, now remove the lower flange of main control valve 802 and the connection of three-flange 901, a pair second oil cylinders 2 connect the second flange 4 and the lifting of the 4th flange 801 with rope under the control of Hydraulic Station, now the U-shaped curved portion of plate body 10 being inserted blanking plug 6 is positioned on the body of rod 601 on tubing head 902 top, plate body 10 is fixedly connected with three-flange 901, then the piston rod of the first oil cylinder 1 and the connection of blanking plug 6 is removed, remove the connection that pin 703 removes drop handle 702 and pulling block 704, now just upper unit entirety can be left under order, remove the connection of the second flange 4 and the 4th flange 801 again, then just tubing head 902 can be changed.
After main control valve 802 new for the piston rod fit on of a pair second oil cylinders 2, by feed mechanism, supporting mechanism 7 and hoisting mechanism assemble, open main control valve 802, make the valve plate of piston rod through main control valve 802 of the first oil cylinder 1, the piston rod of the first oil cylinder 1 is fixedly connected sequentially by the body of rod 601 of snap joint 5 with blanking plug 6, second flange 4 is fixedly connected with the 4th flange 801, then the drop handle 702 being positioned at pair of posts 701 second end is connected by pin 703 fast with pulling block 704, the precalculated position being positioned at tubing head 902 inside delivered to by piston rod blanking plug 6 under hydraulic pressure of the first oil cylinder 1, and compress blanking plug 6, now remove the connection of plate body 10 and three-flange 901, shift out plate body 10, then new main control valve 802 is delivered to above tubing head 902 by a pair second oil cylinders 2, main control valve 802 is resetted, and the lower flange of main control valve 802 is fixedly connected with three-flange 901, remove jackscrew, the piston rod of the first oil cylinder 1 is under Hydraulic Station controls, blanking plug 6 is upwards hung away from tubing head 902, after leaving main control valve 802 valve plate position, rapid closedown main control valve 802, remove the connection of the second flange 4 and the 4th flange 801, bleed off the residual air of more than the valve plate of main control valve 802, blanking plug 6 is thoroughly hung main control valve 802, finally remove the connection of drop handle 702 and pulling block 704, by blockage mechanism, feed mechanism, supporting mechanism 7 and hoisting mechanism entirety are withdrawn, remove the connection of pulling block 704 and three-flange 901, thus complete the overall process changing main control valve 802.
Although embodiment of the present utility model is open as above, but it is not restricted to listed in manual and embodiment utilization, it can be applied to various applicable field of the present utility model completely, for those skilled in the art, can easily realize other amendment, therefore do not deviating under the universal that claim and equivalency range limit, the utility model is not limited to specific details and illustrates here and the legend described.

Claims (10)

1. a shale gas well head main control valve replacing device operated under pressure, is characterized in that, comprising:
Blockage mechanism, it comprises the blanking plug and fastening devices that removably connect, and described blanking plug is used for arriving precalculated position to block tubing head through main control valve, with described tubing head, described fastening devices is fixedly connected with that described blanking plug is fixed on described precalculated position;
Feed mechanism, it comprises the first oil cylinder of piston rod type, and for described blanking plug is pushed to described precalculated position, free end and the described blanking plug of the piston rod of described first oil cylinder removably connect;
Supporting mechanism, it comprises the first flange and pair of posts that removably connect, described first flange is horizontally disposed with and is fixedly connected with described first oil cylinder, described pair of posts is vertically arranged on the both sides of described first oil cylinder, and the first end of described pair of posts and the second end removably connect with described first flange and described tubing head respectively;
Hoisting mechanism, it comprises a pair second oil cylinders of the piston rod type of the both sides being arranged on described first oil cylinder, described a pair second oil cylinders are fixedly connected with described first flange, the free end of the piston rod of described a pair second oil cylinders is provided with the linear structure removably connected with described main control valve, for promoting described main control valve.
2. shale gas well head main control valve replacing device operated under pressure as claimed in claim 1, it is characterized in that, described blanking plug comprises the body of rod and cock body, the described body of rod realizes removably connecting by the free end of the piston rod of snap joint and described first oil cylinder, the periphery of described cock body is provided with annular recess, when described blanking plug arrives described precalculated position, the outside annular groove of the described tubing head corresponding with described annular recess is provided with multiple first through holes that can hold jackscrew.
3. shale gas well head main control valve replacing device operated under pressure as claimed in claim 2, it is characterized in that, described fastening devices is the plate body having U-shaped opening, the curved portion of described U-shaped opening holds the described body of rod just, described plate body offers multiple third through-hole, the top of described tubing head is provided with three-flange, described three-flange offers multiple second through hole vertically, described multiple third through-hole and described multiple second through hole one_to_one corresponding and form the through space that can realize being linked and packed.
4. shale gas well head main control valve replacing device operated under pressure as claimed in claim 3, it is characterized in that, described snap joint comprises bulb and locking nut, one end of described bulb is threaded with the free end of the piston rod of described first oil cylinder, the other end of described bulb is spherical convex surface, described locking nut and the described body of rod are equipped with the spherical concave surface that matches with described spherical convex surface and are threaded connection, thus realize the described body of rod removably connecting by the free end of the piston rod of snap joint and described first oil cylinder.
5. shale gas well head main control valve replacing device operated under pressure as claimed in claim 4, it is characterized in that, the upper cover of piston rod of described first oil cylinder is provided with the second flange be slidably connected, and is provided with sliding ring between the piston rod of described first oil cylinder and described second flange.
6. shale gas well head main control valve replacing device operated under pressure as claimed in claim 5, it is characterized in that, described second flange offers the fourth hole being positioned at the center of circle and the multiple fifth holes being positioned at circumference vertically, and the piston rod of described first oil cylinder realizes the piston rod of described first oil cylinder and being slidably connected of described second flange through described fourth hole.
7. shale gas well head main control valve replacing device operated under pressure as claimed in claim 6, it is characterized in that, the top of described main control valve is provided with the 4th flange, described 4th flange offers multiple 6th through hole vertically, described multiple fifth hole and described multiple 6th through hole one_to_one corresponding and form the through space that can realize being linked and packed.
8. shale gas well head main control valve replacing device operated under pressure as claimed in claim 7, it is characterized in that, described first flange has the 7th through hole being positioned at the center of circle and multiple 8th through holes being positioned at circumference vertically, described first oil cylinder realizes being fixedly connected with of described first oil cylinder and described first flange through described 7th through hole, the first end of described pair of posts is each passed through described 8th through hole and realizes removably connecting of described pair of posts and described first flange, described a pair second oil cylinders are each passed through described 8th through hole and realize being fixedly connected with of described a pair second oil cylinders and described first flange.
9. shale gas well head main control valve replacing device operated under pressure as claimed in claim 8, it is characterized in that, the outside annular groove of described tubing head is radially arranged with pair of L-shaped pulling block, for any one pulling block, its first right-angle side offers multiple 9th through hole or blind hole, described multiple second through hole and described multiple 9th through hole or blind hole one_to_one corresponding and form the through space that can realize being linked and packed, the second right-angle side of described pulling block has the tenth through hole.
10. shale gas well head main control valve replacing device operated under pressure as claimed in claim 9, it is characterized in that, second end of described pair of posts is provided with U-shaped drop handle, the space of the second right-angle side holding described pulling block is provided with between be parallel to each other two long limits of described drop handle, be parallel to each other two long limits of described drop handle have the 11 through hole, described tenth through hole and two described 11 through holes are oppositely arranged and form the through space realizing being linked and packed, pin realizes removably connecting of described pulling block and described drop handle through described tenth through hole and two described 11 through holes.
CN201520392436.XU 2015-06-09 2015-06-09 Shale gas well mouth main control valve area is pressed and is changed device Active CN204920865U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201520392436.XU CN204920865U (en) 2015-06-09 2015-06-09 Shale gas well mouth main control valve area is pressed and is changed device

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201520392436.XU CN204920865U (en) 2015-06-09 2015-06-09 Shale gas well mouth main control valve area is pressed and is changed device

Publications (1)

Publication Number Publication Date
CN204920865U true CN204920865U (en) 2015-12-30

Family

ID=54970002

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201520392436.XU Active CN204920865U (en) 2015-06-09 2015-06-09 Shale gas well mouth main control valve area is pressed and is changed device

Country Status (1)

Country Link
CN (1) CN204920865U (en)

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN105019844A (en) * 2015-06-09 2015-11-04 中石化石油工程机械有限公司研究院 Pressure-containing replacing device for main control valve of shale gas wellhead
CN108890576A (en) * 2018-07-30 2018-11-27 江苏金石机械集团有限公司 A kind of method of replacement high pressure valve with pressure
CN113202432A (en) * 2021-04-21 2021-08-03 梅宗禄 High-pressure non-releasing pressure well head replacement main control valve device

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN105019844A (en) * 2015-06-09 2015-11-04 中石化石油工程机械有限公司研究院 Pressure-containing replacing device for main control valve of shale gas wellhead
CN105019844B (en) * 2015-06-09 2017-12-19 中石化石油机械股份有限公司研究院 A kind of shale gas well head main control valve replacing device operated under pressure
CN108890576A (en) * 2018-07-30 2018-11-27 江苏金石机械集团有限公司 A kind of method of replacement high pressure valve with pressure
CN113202432A (en) * 2021-04-21 2021-08-03 梅宗禄 High-pressure non-releasing pressure well head replacement main control valve device

Similar Documents

Publication Publication Date Title
CN204920865U (en) Shale gas well mouth main control valve area is pressed and is changed device
CN211851756U (en) Well head sealing device
CN206693997U (en) A kind of oil field is every excavating technology tubing string
CN105019844A (en) Pressure-containing replacing device for main control valve of shale gas wellhead
CN205189811U (en) Sealed wellhead assembly
CN110735609A (en) Use method of petroleum industrial devices
CN210013682U (en) Ultrahigh-pressure large-drift-diameter multi-runner injection fracturing wellhead device
CN110056325B (en) Pressure testing device and method for sucker rod pump oil production well mouth facility
CN208396678U (en) A kind of duplex single open-door blowout prevention box
CN111411914A (en) Blowout prevention blanking plug for shaft
CN201627562U (en) Switch plugging blowout relief device in wellhead
CN207739969U (en) A kind of well head hydraulic quick connecting device
CN210422547U (en) Wellhead valve is pressed and is changed and secondary seal device
CN210859161U (en) Hydraulic control blowout preventer for pump oil pipe
CN204877362U (en) Area pressure of not giving up is traded valve hydraulic pressure seat formula of sealing and is blockked up instrument
CN208184705U (en) A kind of pumping rod self seal device
CN210919028U (en) Pressure testing device of blowout preventer full-sealing flashboard
CN203961864U (en) A kind of coiled tubing sealed suspending device and dedicated operations window thereof
CN204024568U (en) Water injection well oil jacket plugging device
CN203161152U (en) Sucker rod self-sealing preventer
CN203808915U (en) Plugging device for oil pipe hanger
CN113123750A (en) Wellhead sealing device and method for replacing polished rod under pressure
CN107842336B (en) Lifting type oil pipe channel blowout preventer
CN114439410A (en) Wellhead blowout prevention packer and using method thereof
CN204386593U (en) Oil-water well blowout preventer set pressure testing device at well mouth

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
TR01 Transfer of patent right
TR01 Transfer of patent right

Effective date of registration: 20170912

Address after: 430223 Jianghan Oil bit Limited by Share Ltd office building, No. 5, Chinese workers' road, East Lake New Technology Development Zone, Wuhan, Hubei

Co-patentee after: SINOPEC OILFIELD EQUIPMENT CORPORATION

Patentee after: Sinopec Research Institute of petroleum machinery and Limited by Share Ltd

Address before: 430223 Hubei, East Lake New Technology Development Zone, Optics Valley Road, No. 77,, financial port, A2

Patentee before: Research Institute of SINOPEC Petroleum Engineering Machinery Co., Ltd.