CN204920242U - Transmission line tala line installation specialized tool that acts as go -between - Google Patents

Transmission line tala line installation specialized tool that acts as go -between Download PDF

Info

Publication number
CN204920242U
CN204920242U CN201520676928.1U CN201520676928U CN204920242U CN 204920242 U CN204920242 U CN 204920242U CN 201520676928 U CN201520676928 U CN 201520676928U CN 204920242 U CN204920242 U CN 204920242U
Authority
CN
China
Prior art keywords
otic placode
tower
splint
bracing wire
clamping plate
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201520676928.1U
Other languages
Chinese (zh)
Inventor
吴传南
于运涛
田玉波
王聪
邵国栋
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
SEPCO1 Electric Power Construction Co Ltd
Original Assignee
SEPCO1 Electric Power Construction Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by SEPCO1 Electric Power Construction Co Ltd filed Critical SEPCO1 Electric Power Construction Co Ltd
Priority to CN201520676928.1U priority Critical patent/CN204920242U/en
Application granted granted Critical
Publication of CN204920242U publication Critical patent/CN204920242U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Abstract

The utility model discloses a transmission line tala line installation specialized tool that acts as go -between, structural splint part, otic placode and the fastener of including, splint parts comprises the splint of the same and relative lock setting of two block structures and is formed, just is equipped with to be used for the act as go -between passageway of gold utensil of centre gripping in each splint, is equipped with the recess on the splint of passageway both sides respectively, and the otic placode of two looks isostructures is installed respectively in the recess, and set up a set of bolt hole used with splint fixed connection of being used for in the lower part of otic placode, have the fraising on the otic placode, two sets of fasteners, the fastener is located the splint upside. In forest or tower position with a varied topography, under road and geological conditions can't satisfy the condition that large -tonnage truck crane marched into the arena, transmission line tala line installation specialized tool that acts as go -between's use made the construction method of the tower of acting as go -between " the tower is found in the segmentation hoist and mount " realize, environmental disruption that reduced because deforestation etc. Was caused.

Description

Transmission line of electricity Guywire tower bracing wire installation special tool
Technical field
The utility model relates to transmission line of electricity Guywire tower installation Technology field, specifically a kind of anchoring instrument.
Background technology
In Brazilian transmission line of electricity, widely, wherein make somebody a mere figurehead in transmission line of alternation current on 500kV common-tower double-return road, Guywire tower proportion reaches 80% in the application of Guywire tower, and the installation of Guywire tower is the groundwork amount of overhead line structures construction.
Guywire tower tower engineering divides ground group tower and Li Ta two operations, and its neutral tower operation is exhaled according to steel tower and held high difference, lifting place situation is divided into again entirety to stand up and segmental hoisting two kinds.
In the common-tower double-return overhead wire of 500kV and above, Guywire tower integral hoisting needs to use large-tonnage truck crane, the requirement of large-tonnage truck crane to lifting place and mechanical road of marching into the arena is very high, construct in wood land, a large amount of trees need be cut down, drop into substantial contribution, difficulty of construction is large and do a lot of damage to Ecological environment.
Tower lifting construction is found in Guywire tower segmentation, because the fixed point of steel tower bracing wire is at steel tower epimere, therefore after hypomere steel tower stands up, needs to use temporary guy to carry out anchoring temporarily to steel tower, after whole tower crane installs into, after formal bracing wire being installed, then removes temporary guy.
The formal stayguy material of steel tower is stranded galvanized steel, " metal parts of pull wire " is installed at bracing wire two ends, bracing wire upper end is connected on the junction plate of steel tower, lower end is connected on the pre-buried gold utensil in stay rod basis, Lever Blocks need be used when bracing wire is installed bracing wire is tightened up, Lever Blocks suspension hook need be connected on stay rod basis, and chain suspension hook is connected on " fixing-line device " that be filled in advance in bracing wire, tightens up bracing wire and be finally fixed on metal parts of pull wire by Lever Blocks.
Temporary guy uses material to be wire rope, and wire rope upper end is connected on iron tower main material by suspender belt, and lower end is connected on the pre-buried gold utensil in stay rod basis, and Lever Blocks is installed in wire rope lower middle portion, for tightening up temporary guy.
Formal bracing wire lower end needs to be connected on the built-in fitting gold utensil of stay rod basis, and temporary guy also needs to be connected on basic built-in fitting gold utensil, but the pre-buried gold utensil top headspace of stay rod is too little, cannot connect temporary guy and formal bracing wire simultaneously.In addition, when installing formal bracing wire, tightening up bracing wire Lever Blocks used cannot take root, and bracing wire cannot be installed, and Guywire tower segmental hoisting scheme cannot be implemented.
At home and abroad on market, do not have the bracing wire pretension special tool that can meet construction requirement, the transmission line of electricity Guywire tower installation of 500kV and above also just cannot select the scheme of " segmental hoisting founds tower ".
Utility model content
Present Problems existing:
The tower position in forest or region with a varied topography, road and geological conditions can not meet large-tonnage truck crane and to march into the arena requirement, and Guywire tower cannot carry out integral hoisting, and little tonnage crane can only be used to carry out " segmental hoisting founds tower ".
" segmental hoisting founds tower " need use temporary guy to carry out anchoring temporarily to steel tower, has lifted rear temporary guy and need be replaced by formal bracing wire, and tightens up formal bracing wire Lever Blocks used and cannot take root.
In order to solve the deficiencies in the prior art, a kind of special tool must be had, can fix " temporary guy ", the Lever Blocks tightening up " formal bracing wire " can be fixed again, complete the transition of two kinds of bracing wires.
The utility model solves the technical scheme that its technical problem adopts:
Transmission line of electricity Guywire tower bracing wire installation special tool, is characterized in that, comprise
Clamp plate portion, described clamp plate portion is identical and relatively fasten the clamping plate arranged and form and form by two block structures, and the passage be provided with in each clamping plate for clamping metal parts of pull wire, described passage on each clamping plate in pairs and be symmetrical arranged, wherein, each passage comprises the straightway on top and the arc of bottom, arranges one group of bolt hole in the side of each passage respectively, the clamping plate of passage both sides are respectively equipped with a square groove, and are provided with three bolts hole in a groove;
Otic placode, two mutually isostructural otic placodes are arranged in described groove respectively, and one group of bolt hole for being connected with Boards wall is set in the bottom of otic placode, the top of otic placode to be positioned at outside groove and it to be arranged two fraisings carrying out being connected with interim wire rope and formal bracing wire respectively;
Two groups of securing members, each group is made up of two clamping plates, and vertically arrange a C shape groove in the centre of clamping plate, and arrange one group of bolt hole respectively in the both sides of C shape groove, described securing member is positioned on the upside of clamping plate.
Further, described otic placode thickness is the degree of depth sum of two grooves.
Further, described passage comprises the straightway on top and the arc of bottom, and wherein straightway is vertically arranged, and arc is the structure of an arc-shaped.
Transmission line of electricity Guywire tower stringing method, is characterized in that, order carries out following steps,
Step one, is installed on the earrings of basic pre-buried gold utensil by metal parts of pull wire,
Step 2, use described transmission line of electricity Guywire tower bracing wire installation special tool, just two clamping plate clamp and are fastened on metal parts of pull wire, otic placode is installed in clamping plate and uses bolton, then securing member to be arranged on the metal parts of pull wire on the upside of the clamping plate and to use bolton, stand-by;
4 of Guywire tower circumference stay rod bases are all installed special tool according to above operation by step 3;
Step 4, the lifting of steel tower, first carry out the lifting of steel tower hypomere to stand up, after the lifting of Guywire tower hypomere is stood up, temporary guy is installed, temporary guy connects two wire rope by Lever Blocks, and wire rope is connected on two inner side fraising holes of otic placode by snap ring, pulls Lever Blocks and is tightened up by temporary guy; Continue lifting Guywire tower epimere, after being connected by upper and lower section of tower body, formal bracing wire is installed, formal bracing wire top is connected to design attitude, bottom fixing-line device is connected after bracing wire end winding support with two Lever Blocks, two Lever Blocks are connected to respectively by snap ring on two outside fraising holes of the otic placode of special tool, pull Lever Blocks and formal bracing wire are tightened up;
After formal bracing wire is tightened up, to be mounted on metal parts of pull wire formal bracing wire lower end and fastening by fixing-line device, the Lever Blocks of come loose after adjustment temporary guy and formal bracing wire, removes temporary guy and special tool, steel tower installation.
The beneficial effects of the utility model are:
Transmission line of electricity Guywire tower bracing wire installation special tool can be fixed " temporary guy ", can fix again the Lever Blocks tightening up " formal bracing wire ", play the transitional function of two kinds of bracing wires.
In forest or tower position with a varied topography, road and geological conditions cannot meet large-tonnage truck crane when marching into the arena, the use of transmission line of electricity Guywire tower bracing wire installation special tool, the form of construction work of Guywire tower " segmental hoisting founds tower " is achieved, decreases the environmental disruption because deforestation etc. causes.
Use transmission line of electricity Guywire tower bracing wire installation special tool to coordinate little tonnage truck crane to carry out Guywire tower " segmental hoisting founds tower ", less equipment leasing expense, reduces engineering construction cost.
Accompanying drawing explanation
Fig. 1 be this special tool disassemble schematic diagram.
Fig. 2 is the stereogram of this special tool.
Fig. 3 is the front view of this special tool.
Fig. 4 is the top view of this special tool.
Fig. 5 be this special tool lateral view.
Fig. 6 be this special tool using state figure.
Fig. 7 is the design sketch after formal bracing wire tension.
Fig. 8 is the design sketch after temporary guy tension.
Fig. 9 is the design sketch of temporary guy and formal bracing wire tension transition stage.
Figure 10 is the whole structure figure of the Guywire tower tension that Fig. 7 is corresponding.
In figure: 1 basic pre-buried gold utensil, 2 otic placodes, 21 fraisings, 42 ' bolt hole, 3 securing members, 31 clamping plates, 32C shape groove, 42 " bolt hole; 4 clamping plate, 41 passages, 411 straightways; 412 arcs, 42 bolts hole, 43 grooves; 5 metal parts of pull wires, 61 Guywire tower hypomeres, 62 Guywire tower epimeres; 71 temporary guys, 72 formal bracing wires, 73 fixing-line devices.
Detailed description of the invention
As shown in Figures 1 to 7, for existing defect, exploitation be a kind of special tool-instrument, can be fixed on connects basic pre-buried gold utensil metal parts of pull wire on, this special tool can draw multiple bolt hanging point for fixing temporary guy and the Lever Blocks tightening up formal bracing wire.
The structure that metal parts of pull wire and the pre-buried gold utensil of bracing wire assemble is shown in accompanying drawing 6.Wherein, metal parts of pull wire 5 polycrystalline substance becomes V-type, and top, for connecting a straight-bar portion, is generally steelwork.
Tools section comprises clamping plate, otic placode and securing member, and its middle clamp plate, securing member are arrange in pairs.About otic placode each one, be described in detail with regard to its structure below.
Clamping plate 4 part, prepare the steel plate of two pieces of rectangles, two block plates process the passage 41 for installing metal parts of pull wire, this passage comprises two and is symmetrical arranged, wherein passage 41 comprises the straightway 411 on top and the arc 412 of bottom, wherein straightway is vertically arranged, and arc is the structure of an arc-shaped, two passages just with good the coordinating of metal parts of pull wire 5.A bolt hole 42 is set respectively in the side of each passage.The clamping plate of passage both sides are respectively equipped with a square groove 43, and as Fig. 1, groove and passage 41 are positioned at the same side, and groove is positioned at a corner of clamping plate, form the pattern that is similar to breach, with reference to figure 1, and are provided with three bolts hole in a groove.
Otic placode 2, adopt rectangular steel plates to process, its thickness is the degree of depth sum of two grooves.Otic placode 2 is provided with two groups of bolts hole, and wherein one group of bolt hole 42 ' of lower end comprises three, corresponding with the bolt hole in groove respectively, and uses bolt to connect.One group of bolt hole is above fraising 21, and quantity is two, is respectively used to be connected with formal bracing wire with interim wire rope.
Securing member 3 totally two groups, each group is made up of two clamping plates 31, vertically arranges a C shape groove 32, and arrange one group of bolt hole 42 respectively in the both sides of C shape groove 32 in the centre of clamping plate ", form connecting hole.
Wherein securing member 3 is arranged on the upside of clamping plate, for the auxiliary clamp of metal parts of pull wire 5 upper end.
In foregoing description, two passages in clamping plate, by downward virtual extension, form V-type shape, get out bolt hole in passage both sides simultaneously, by two clamping plates, be clamped in " metal parts of pull wire " bottom, and with bolted on connection, realize elementary fixing, then auxiliary clamp is carried out, the bond strength of both raisings at use securing member 3.Utilize metal parts of pull wire self structure, this instrument and metal parts of pull wire are combined together, fix two pieces of otic placodes 2 in instrument both sides, otic placode 2 is holed, and utilizes these two fraisings can fix temporary guy and Lever Blocks simultaneously, reaches object of taking root dexterously.
This instrument adopts " mounting board structure " design, peace is torn open conveniently, safe and reliable, body is arranged to rectangle, and reasonably taking root of rope utensil a little separated, inner side processes the passage of V-arrangement, the two ends of body be respectively equipped with pretension with, take root with port, play different effects respectively.
Based on above-mentioned description, this instrument is used to carry out bracing wire tension operation (with reference to accompanying drawing 6) according to following steps.
First, be installed on the earrings of basic pre-buried gold utensil 1 after metal parts of pull wire 5 being decomposed.
Then snap on metal parts of pull wire 5 respectively by two clamping plate 4, two passages 41 are oppositely arranged respectively, and are clamped in metal parts of pull wire 5, then otic placode 2 is installed in clamping plate 4, use bolton, make it melt as a whole, stand-by.
Then be arranged on metal parts of pull wire 5 by securing member 3, securing member 3 is positioned at the upside of clamping plate, strengthens the resistance of whole special tool, prevents from trying to shirk responsibility.
4 of Guywire tower stay rod bases are all installed special tool according to above operation, prepares to carry out steel tower hypomere 61 lifting and stand up.
After Guywire tower hypomere 61 lifting is stood up, install temporary guy 71, temporary guy 71 connects two wire rope by Lever Blocks, and wire rope is connected on two inner side fraising holes of the otic placode 2 of special tool by snap ring, pull Lever Blocks temporary guy 71 is tightened up, as Fig. 8.
Continue lifting Guywire tower epimere 62, after being connected by upper and lower section of tower body, formal bracing wire is installed, formal bracing wire top is connected to design attitude A, bottom fixing-line device is connected after bracing wire end winding support with two Lever Blocks, two Lever Blocks are connected on two outside fraising holes of the otic placode 2 of special tool respectively by snap ring, pull Lever Blocks formal bracing wire 72 is tightened up, as Fig. 9.
After formal bracing wire 72 is tightened up, to be mounted on metal parts of pull wire 5 formal bracing wire lower end and fastening by fixing-line device 73, as Fig. 7, the Lever Blocks of come loose after adjustment temporary guy and formal bracing wire, remove temporary guy and this special tool, steel tower installation, as Figure 10.
Embodiment recited above is only be described preferred embodiment of the present utility model; not scope of the present utility model is limited; under the prerequisite not departing from the utility model design spirit; relevant technical staff in the field, to various distortion of the present utility model and improvement, all should expand in protection domain as determined in the utility model claims.

Claims (3)

1. transmission line of electricity Guywire tower bracing wire installation special tool, is characterized in that, comprise
Clamp plate portion, described clamp plate portion is identical and relatively fasten the clamping plate arranged and form and form by two block structures, and the passage (41) be provided with in each clamping plate (4) for clamping metal parts of pull wire, described passage on each clamping plate in pairs and be symmetrical arranged, wherein, each passage comprises the straightway (411) on top and the arc (412) of bottom, one group of bolt hole (42) is set respectively in the side of each passage, the clamping plate of passage both sides are respectively equipped with a square groove (43), and are provided with three bolts hole in a groove;
Otic placode, two mutually isostructural otic placodes are arranged in described groove respectively, and one group of bolt hole (42 ') for being connected with Boards wall is set in the bottom of otic placode (2), the top of otic placode (2) to be positioned at outside groove and it to be arranged two fraisings (21) carrying out being connected with interim wire rope and formal bracing wire respectively;
Two groups of securing members (3), each group is made up of two clamping plates (31), in the centre of clamping plate (31), a C shape groove (32) is vertically set, and one group of bolt hole (42 ") is set respectively in the both sides of C shape groove (32), described securing member (3) is positioned at clamping plate (4) upside.
2. transmission line of electricity Guywire tower bracing wire installation special tool according to claim 1, is characterized in that, described otic placode thickness is the degree of depth sum of two grooves.
3. transmission line of electricity Guywire tower bracing wire installation special tool according to claim 1, it is characterized in that, described passage (41) comprises the straightway (411) on top and the arc (412) of bottom, wherein straightway is vertically arranged, and arc is the structure of an arc-shaped.
CN201520676928.1U 2015-09-02 2015-09-02 Transmission line tala line installation specialized tool that acts as go -between Active CN204920242U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201520676928.1U CN204920242U (en) 2015-09-02 2015-09-02 Transmission line tala line installation specialized tool that acts as go -between

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201520676928.1U CN204920242U (en) 2015-09-02 2015-09-02 Transmission line tala line installation specialized tool that acts as go -between

Publications (1)

Publication Number Publication Date
CN204920242U true CN204920242U (en) 2015-12-30

Family

ID=54969380

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201520676928.1U Active CN204920242U (en) 2015-09-02 2015-09-02 Transmission line tala line installation specialized tool that acts as go -between

Country Status (1)

Country Link
CN (1) CN204920242U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN105089282A (en) * 2015-09-02 2015-11-25 山东电力建设第一工程公司 Tool special for wire drawing installation of electric transmission line guyed tower and wire drawing method

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN105089282A (en) * 2015-09-02 2015-11-25 山东电力建设第一工程公司 Tool special for wire drawing installation of electric transmission line guyed tower and wire drawing method
CN105089282B (en) * 2015-09-02 2017-10-24 山东电力建设第一工程公司 Transmission line of electricity Guywire tower bracing wire installation special tool and stringing method

Similar Documents

Publication Publication Date Title
CN106013812B (en) A kind of two-way monolayer cable net structure without support high-altitude overhead cable construction method
CN204897151U (en) Transmission line tower integral hoisting specialized tool that acts as go -between
CN206580442U (en) A kind of hanging apparatus suitable for Assembled Building gangboard prefabricated components
CN204920242U (en) Transmission line tala line installation specialized tool that acts as go -between
CN201850777U (en) Special hoisting tool for heavy box-shaped section component
CN105089282B (en) Transmission line of electricity Guywire tower bracing wire installation special tool and stringing method
CN201813110U (en) Special clamp for drawing cable machine
CN215564668U (en) Safety belt hangs mobile device
CN107416685B (en) Installation of gas pipeline construction method and its supporting structure on the downside of a kind of bridge
CN109958819A (en) A kind of gas pipeline laying method and its supporting structure
CN205145443U (en) Transformer upper portion construction safety belt hanging device
CN104192720A (en) Windproof stay rope of crane
CN203624808U (en) Detachable steel structure hanger
CN202988556U (en) Special lifting appliance for angle-steel type frame body
CN202689588U (en) Safety rope cantilever support
CN207267787U (en) Electric block lifting mounting device
CN203626276U (en) Hanging structure of horizontal safety net
CN114934441A (en) Anti-slip temporary sling cable clamp structure
CN206114998U (en) Built on stilts communication cable land used wire clamping plate
CN209654738U (en) A kind of aerial protection structure for large span pipeline
CN205036065U (en) A adhere to formula and do not have a counter weight hanging flower basket for outer wall construction
CN202657829U (en) Hoisting in place device for fixing branch hinge of arc gate
CN104948001B (en) Power-transmission iron tower stay wire V-shaped anchoring device and construction method
CN112942777A (en) Ultrahigh-layer periphery protection cyclic telescopic detachable cantilever structure and mounting method
CN208814490U (en) A kind of novel drainage ditch cover plate hanging apparatus

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant