CN204919626U - Combo box posture insulation blocking system - Google Patents

Combo box posture insulation blocking system Download PDF

Info

Publication number
CN204919626U
CN204919626U CN201520652140.7U CN201520652140U CN204919626U CN 204919626 U CN204919626 U CN 204919626U CN 201520652140 U CN201520652140 U CN 201520652140U CN 204919626 U CN204919626 U CN 204919626U
Authority
CN
China
Prior art keywords
pressed
block
pile
preformed
blocking system
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Withdrawn - After Issue
Application number
CN201520652140.7U
Other languages
Chinese (zh)
Inventor
王国富
李罡
康学超
路林海
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Jinan Rail Transit Group Co Ltd
Original Assignee
Jinan Rail Transit Group Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Jinan Rail Transit Group Co Ltd filed Critical Jinan Rail Transit Group Co Ltd
Priority to CN201520652140.7U priority Critical patent/CN204919626U/en
Application granted granted Critical
Publication of CN204919626U publication Critical patent/CN204919626U/en
Withdrawn - After Issue legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Underground Structures, Protecting, Testing And Restoring Foundations (AREA)

Abstract

The utility model discloses a combo box posture insulation blocking system, including the precast pile, along estimating that excavation tunnel lateral separation in bank, longitudinal separation become row setting, the vertical mounting groove of impressing that is equipped with on the surface of every precast pile, a mounting groove internalization is equipped with the piece of impressing impressing, being equipped with between second section of every two piece adjacent precast piles is used for connecting the tensioning mechanism of take -up precast pile. The beneficial effects of the utility model are that: form the insulation blocking system through stull of two rows of multiseriate precast piles and tensioning mechanism and replace traditional box culvert, simple structure, the efficiency of construction is high, and each partial stress is reasonable, less to the disturbance of peripheral building moreover, connect two precast piles through the wire rope among the tensioning mechanism to carry out slip casting to the wire rope position department between two precast piles, the interval forms native crossbeam and plays a supporting role to the insulation blocking system, through the setting of impressing the piece, the piece of having realized impressing goes on with pressure stake substep.

Description

A kind of combined framework type insulation blocking system
Technical field
The utility model relates to tunnel excavation insulation blocking, particularly a kind of combined framework type insulation blocking system.
Background technology
Complicated surrounding enviroment are tunnel excavations, build period inevitable peripheral restraining factors, have bridge pier, architectural complex etc. near such as tunnel.Therefore, tunnel excavation must reduce the disturbance to periphery Important building soil layer, avoids producing large distortion.
Existing technology, mainly by box culvert is constructed in periphery, tunnel, makes it reduce peripheral disturbance.And box culvert many employings diaphragm wall, interlocking pile etc. need break ground more greatly the method for operation, although this makes the impact of tunnel excavation reduce, the additive factor becoming and affect the disturbance of periphery soil layer of breaking ground more greatly of box culvert.
Utility model content
The purpose of this utility model is to overcome the deficiencies in the prior art, provides a kind of combined framework type insulation blocking system that can substitute existing box culvert, that reduce the disturbance of periphery Important building soil layer.
In order to reach above-mentioned purpose, the utility model adopts following technical scheme:
A kind of combined framework type insulation blocking system, comprising:
Preformed pile, along estimating that tunneling lateral separation is in a row, longitudinal separation setting in column;
First stull, is laterally placed in the upper semisection with row's preformed pile and is rigidly connected with preformed pile;
Second stull, is longitudinally placed in the upper semisection of same column preformed pile and is rigidly connected with preformed pile;
The external surface of every root preformed pile is vertically provided with pressed-in block mounting groove, in pressed-in block mounting groove, is movably equipped with pressed-in block;
Be provided with for connecting and straining the tensioning mechanism of preformed pile between the lower semisection of every adjacent two preformed piles; By the vertical portion of two row's multiple row preformed piles framework as a whole; first stull and the second stull be the crossbeam that divides of framework upper as a whole; again by the crossbeam of tensioning mechanism framework lower part as a whole, constitute the frame type insulation blocking system of a combination.
Further, the steel-cable channel of L-type and the slip casting passage of L-type is provided with in described pressed-in block, the Grouting Pipe for slip casting between two described preformed piles is movably equipped with in slip casting passage, by slip casting passage and steel-cable channel are located in pressed-in block, again pressed-in block is embedded in preformed pile, piling and pressure pressed-in block separately can be carried out, reduce resistance when piling, ensure that the parallelism of two.
Further, tensioning mechanism comprises wire rope, wire rope from the top of the first pressed-in block in a preformed pile through steel-cable channel in the second pressed-in block in the steel-cable channel in the first pressed-in block, another root preformed pile to the top of the second pressed-in block, wire rope is level between two preformed piles, and wire rope connects and strained two preformed piles.
Further, arrange fixed pulley in the bending place of the steel-cable channel of each described pressed-in block, the pressed-in block mounting groove of described steel wire penetrating fixed pulley external surface, by the setting of fixed pulley, when wire rope tension, the internal construction of unlikely destruction pressed-in block.
Further, wire rope is at the top connecting screw rod of described pressed-in block, and screw rod is fixed on the top of pressed-in block by nut.
Further, at the bottom of the stake of described preformed pile, be provided with pile top, the lower end of pile top is tapered, is convenient to carry out piling to preformed pile by arranging pile top.
Further, the wire rope between the preformed pile described in adjacent two is enclosed with cement, by slip casting passage to the wire rope slip casting between two preformed piles, slurries diffuse to soil layer, wrapped wire rope, plays native horizontal beam action, has resisted the soil deformation between preformed pile after solidifying.
Further, pressed-in block one end is narrower than the other end, and narrow one end is arranged on the outer surface of described preformed pile, and on the shape of pressed-in block and preformed pile, the mating shapes of pressed-in block mounting groove, facilitates pressed-in block like this and be stuck on preformed pile.
Operating principle of the present utility model is: estimating that the both sides in the tunnel that will excavate respectively arrange row's preformed pile, connected by the first stull between the preformed pile of each row, connected by the second stull between the preformed pile of each row, the first stull and the second stull are equivalent to the top rail of frame type insulation blocking system; By the hypomere part of adjacent two preformed piles of wire rope tension in tensioning mechanism; and by slip casting, slip casting is carried out to the wire rope between two preformed piles; native crossbeam is formed between the hypomere part of such two preformed piles; be equivalent to the lower transverse beam of frame type insulation blocking system; constitute the insulation blocking system of a frame type; tensioning mechanism is located in pressed-in block, is pressed in preformed pile by pressed-in block by tensioning mechanism, pressure pressed-in block can be separated with piling and carry out.
The beneficial effects of the utility model are:
1) form insulation blocking system by two row's multiple row preformed pile stulls and tensioning mechanism and replace traditional box culvert, structure is simple, and efficiency of construction is high, and each several part stress is reasonable, and less to the disturbance of surrounding building.
2) connect two preformed piles by the wire rope in tensioning mechanism, and carry out slip casting to the wire rope position place between two preformed piles, gap-forming soil crossbeam plays a supporting role to insulation blocking system.
3) by the first stull of arranging between preformed pile upper portion and the second stull, be equivalent to the top rail of insulation blocking system, effectively prevent the distortion of insulation blocking system.
4) on preformed pile, be provided with pressed-in block, tensioning mechanism be located in pressed-in block, fixed pulley is set in pressed-in block, achieve piling and press pressed-in block substep to carry out, decrease resistance during piling, reduce the impact on two parallelism; In addition, because the setting of pressed-in block, the lower semisection part achieving often row and every row preformed pile has native crossbeam as support.
Accompanying drawing explanation
Fig. 1 is the structure chart of combined framework type insulation blocking system in the utility model;
Fig. 2 is preformed pile schematic diagram in the utility model;
Fig. 3 is Fig. 2 top view;
Fig. 4 is the schematic diagram of pressed-in block in the utility model;
Fig. 5 is Fig. 4 top view;
Fig. 6 is A-A sectional view in Fig. 4;
Fig. 7 is the inner enlarged drawing in B place in Fig. 1.
In figure, 1, preformed pile, 2, wire rope, the 3, first stull, 4, pressed-in block, 5, fixed pulley, 6, slip casting passage, 7, mouth spray, 8, steel-cable channel, 9, pressed-in block mounting groove, 10, stull mounting groove, the 11, second stull.
Detailed description of the invention
Below in conjunction with the accompanying drawing in the utility model embodiment, clear, complete description is carried out to the technical scheme in the utility model embodiment.
Fig. 1 is the structural representation of group frame insulation blocking system in the utility model, a kind of combined framework type insulation blocking system, comprising: preformed pile 1, at the bottom of the stake of preformed pile 1, is provided with pile top, the lower end of pile top is tapered, is convenient to carry out piling to preformed pile 1 by arranging pile top; Preformed pile 1 is in a row along expectation tunneling lateral separation, longitudinal separation setting in column; First stull 3, is laterally placed in the upper semisection with row's preformed pile 1 and is rigidly connected with preformed pile 1; Second stull 11, is longitudinally placed in the upper semisection of same column preformed pile 1 and is rigidly connected with preformed pile 1; The external surface of every root preformed pile 1 is vertically provided with pressed-in block mounting groove 9, in pressed-in block mounting groove 9, is movably equipped with pressed-in block 4; Be provided with for connecting and straining the tensioning mechanism of preformed pile 1 between the lower semisection of every adjacent two preformed piles 1; By the vertical portion of two row's multiple row preformed piles 1 framework as a whole; first stull 3 and the second stull 11 be the crossbeam that divides of framework upper as a whole; again by the crossbeam of tensioning mechanism framework lower part as a whole; constitute the frame type insulation blocking system of a combination; and whole frame size is greater than the diameter in tunnel, constructs from lower portion to tunnel.
Fig. 2 is preformed pile schematic diagram in the utility model; Fig. 3 is Fig. 2 top view, what as can be seen from Figure 2 preformed pile 1 adopted is square pile, also can be circle stake, every root preformed pile 1 is provided with two pressed-in block 4 mounting grooves or three for blocking the pressed-in block mounting groove 9 of pressed-in block 4, preformed pile 1 is provided with two stull mounting grooves 10 (square groove) or three stull mounting grooves 10,90 °, two pressed-in block mounting grooves, 9/ two stull mounting groove 10 intervals are arranged on preformed pile 1, or 90 °, three pressed-in block mounting grooves, 9/ 3 stull mounting groove 10 intervals are arranged on preformed pile 1; Because install the first stull 3 and the second stull 11, the appropriate section of pressed-in block 4 has corresponding disappearance.
Fig. 4 is the schematic diagram of pressed-in block, Fig. 5 is the top view of Fig. 4, Fig. 6 is the sectional view in A-A cross section in Fig. 4, therefrom can find out, is provided with the steel-cable channel 8 of L-type and the slip casting passage 6 of L-type in described pressed-in block 4, when needs slip casting time, Grouting Pipe be inserted in slip casting passage 6, injection slurry flows out from the horizontal segment of the slip casting passage 6 of L-type and mouth spray 7, horizontal segment part, slip casting passage 6 is located at the top of steel-cable channel 8, achieves the whitewashing to wire rope between adjacent two preformed piles; By slip casting passage 6 and steel-cable channel 8 are located in pressed-in block 4, then pressed-in block 4 is embedded in preformed pile 1, piling and pressure pressed-in block 4 separately can be carried out, reduce resistance when piling, ensure that the parallelism of two.
Wire rope 2 between the preformed pile 1 described in adjacent two is enclosed with cement, by slip casting passage 6 to wire rope 2 slip casting between two preformed piles 1, slurries diffuse to soil layer, wrapped wire rope 2, play native horizontal beam action after solidifying, resist the soil deformation between preformed pile 1.
In addition, pressed-in block 4 one end is narrower than the other end, and narrow one end is arranged on the outer surface of described preformed pile 1, and on the shape of pressed-in block 4 and preformed pile 1, the mating shapes of pressed-in block mounting groove 9, facilitates pressed-in block 4 like this and be stuck on preformed pile 1.
Tensioning mechanism comprises wire rope 2, wire rope 2 passes the outside of the steel-cable channel 8 in the first pressed-in block to the second pressed-in block in another root preformed pile 1 from the top of the first pressed-in block in a preformed pile 1, again by the top of steel-cable channel 8 to the second pressed-in block, wire rope 2 is level between two preformed piles 1, wire rope 2 connects and has strained two preformed piles 1, wire rope 2 is at the top connecting screw rod of described pressed-in block 4, screw rod is fixed on the top of pressed-in block by nut, by bolt and nut, two free ends of wire rope 2 are fixed on the stake top of pressed-in block 4, and locking pin is inserted on the top of screw rod, prevent the slippage of bolt and nut, nut is provided with a nut through hole inserted for Grouting Pipe.
Fig. 7 is the enlarged drawing at B place in figure, show in figure that the bending place of the steel-cable channel 8 at each described pressed-in block 4 arranges fixed pulley 5, described wire rope 2 is through the pressed-in block mounting groove 9 of fixed pulley 5 external surface, by the setting of fixed pulley 5, when wire rope 2 is strained, the internal construction of unlikely destruction pressed-in block 4.
The construction method of combined framework type insulation blocking system, concrete steps are as follows:
1) preformed pile 1, pile top and pressed-in block 4 is made;
2) pile top is fixed on the bottom of preformed pile 1;
3) by wire rope 2 from the top of a pressed-in block 4 through the steel-cable channel 8 of this pressed-in block 4, the steel-cable channel 8 of another pressed-in block 4 to the top of another pressed-in block 4;
4) all connect a screw rod at two free ends of wire rope 2, screw rod is connected with nut, arranges locking pin at the upper horizontal of screw rod;
5) in step 3) carry out while, many preformed piles 1 are arranged in the mode of two row's multiple rows and estimate the both sides of tunneling, by the mode of static pressed pile, piling is carried out to preformed pile 1;
6) by step 3) in two pressed-in blocks 4 be pressed into respectively in the pressed-in block mounting groove 9 of longitudinal adjacent two preformed piles 1, or in the pressed-in block mounting groove 9 of adjacent two preformed piles 1 of transverse direction;
7) wire rope 2 is strained, nut and screw rod are tightened fixing;
8) step 3 is repeated)-step 7), form the preformed pile framework of two row's multiple rows;
9) excavate a little soil layer on preformed pile 1 top, connect two preformed piles 1 on same row with the first stull 3, connect two preformed piles 1 on same row with the second stull 11;
10) Grouting Pipe is put in slip casting passage 6, wire rope 2 slip casting between adjacent two preformed piles 1, after slip casting completes, take out Grouting Pipe;
11) step 2 is repeated) to step 10), until complete combined framework type insulation blocking system.
Or, the construction method of combined framework type insulation blocking system, concrete steps are as follows:
1) preformed pile 1, pile top and pressed-in block 4 is made;
2) pile top is fixed on the bottom of preformed pile 1;
3) by wire rope 2 from the top of a pressed-in block 4 through the steel-cable channel 8 of this pressed-in block 4, the steel-cable channel 8 of another pressed-in block 4 to the top of another pressed-in block 4;
4) all connect a screw rod at two free ends of wire rope 2, screw rod is connected with nut, arranges locking pin at the upper horizontal of screw rod;
5) by step 3) in two pressed-in blocks 4 be pressed into respectively in the pressed-in block mounting groove 9 of longitudinal adjacent two preformed piles 1, or in the pressed-in block mounting groove 9 of adjacent two preformed piles of transverse direction;
6) be arranged on the both sides of estimating tunneling by many preformed piles 1 in the mode of two row's multiple rows, by the mode of static pressed pile, piling carried out to preformed pile 1;
7) wire rope 2 is strained, nut and screw rod are tightened fixing;
8) step 3 is repeated)-step 7), form the preformed pile framework of two row's multiple rows;
9) excavate a little soil layer on preformed pile top, connect two preformed piles 1 on same row with the first stull 3, connect two preformed piles 1 on same row with the second stull 11;
10) Grouting Pipe is put in slip casting passage 6, wire rope 2 slip casting between adjacent two preformed piles 1, after slip casting completes, take out Grouting Pipe;
11) step 2 is repeated) to step 11), until complete combined framework type insulation blocking system.
The difference of above two kinds of construction methods is: the first is first piling, after the pressed-in block 4 with tensioning mechanism is pressed in preformed pile 1, both realizations substep carry out, like this when piling, resistance of pressing in is little, can not have an impact to the parallelism of two preformed piles 1; The second is first pressed in preformed pile 1 by pressed-in block 4, then carries out pressure preformed pile 1, specifically can adopt different construction methods according to scene.
The above is only preferred embodiment of the present utility model; it should be pointed out that for those skilled in the art, under the prerequisite not departing from the utility model principle; can also make some improvements and modifications, these improvements and modifications also should be considered as protection domain of the present utility model.

Claims (8)

1. a combined framework type insulation blocking system, is characterized in that, comprising:
Preformed pile, along estimating that tunneling lateral separation is in a row, longitudinal separation setting in column;
First stull, is laterally placed in the upper semisection with row's preformed pile and is rigidly connected with preformed pile;
Second stull, is longitudinally placed in the upper semisection of same column preformed pile and is rigidly connected with preformed pile;
The external surface of every root preformed pile is vertically provided with pressed-in block mounting groove, in pressed-in block mounting groove, is movably equipped with pressed-in block;
Be provided with between the lower semisection of every adjacent two preformed piles for connecting and straining the tensioning mechanism of preformed pile.
2. insulation blocking system as claimed in claim 1, is characterized in that, be provided with the steel-cable channel of L-type and the slip casting passage of L-type in described pressed-in block, be movably equipped with the Grouting Pipe for slip casting between two described preformed piles in slip casting passage.
3. insulation blocking system as claimed in claim 2; it is characterized in that; described tensioning mechanism comprises wire rope, wire rope from the top of the first pressed-in block in a preformed pile through steel-cable channel in the second pressed-in block in the steel-cable channel in the first pressed-in block, another root preformed pile to the top of the second pressed-in block.
4. insulation blocking system as claimed in claim 3, is characterized in that, arrange fixed pulley in the bending place of the steel-cable channel of each described pressed-in block, the pressed-in block mounting groove of described steel wire penetrating fixed pulley external surface.
5. insulation blocking system as claimed in claim 3, it is characterized in that, described wire rope is at the top connecting screw rod of described pressed-in block, and screw rod is fixed on the top of pressed-in block by nut.
6. insulation blocking system as claimed in claim 1, it is characterized in that, at the bottom of the stake of described preformed pile, be provided with pile top, the lower end of pile top is tapered.
7. insulation blocking system as claimed in claim 3, is characterized in that, the wire rope between the preformed pile described in adjacent two is enclosed with cement.
8. insulation blocking system as claimed in claim 1, it is characterized in that, described pressed-in block one end is narrower than the other end, and narrow one end is arranged on the outer surface of described preformed pile.
CN201520652140.7U 2015-08-26 2015-08-26 Combo box posture insulation blocking system Withdrawn - After Issue CN204919626U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201520652140.7U CN204919626U (en) 2015-08-26 2015-08-26 Combo box posture insulation blocking system

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201520652140.7U CN204919626U (en) 2015-08-26 2015-08-26 Combo box posture insulation blocking system

Publications (1)

Publication Number Publication Date
CN204919626U true CN204919626U (en) 2015-12-30

Family

ID=54968770

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201520652140.7U Withdrawn - After Issue CN204919626U (en) 2015-08-26 2015-08-26 Combo box posture insulation blocking system

Country Status (1)

Country Link
CN (1) CN204919626U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN105133664A (en) * 2015-08-26 2015-12-09 济南轨道交通集团有限公司 Combined frame type isolation protection system and construction method thereof

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN105133664A (en) * 2015-08-26 2015-12-09 济南轨道交通集团有限公司 Combined frame type isolation protection system and construction method thereof

Similar Documents

Publication Publication Date Title
CN210177522U (en) Ecological slope protection structure of prefabricated assembled anchor rope lattice beam
JP2829825B2 (en) Close-contact protection net construction method for falling rocks and its rope / net anchor structure
CN204919627U (en) Frame -type insulation blocking system
CN203701092U (en) Extrusion lock stress dispersion type high-tonnage anchor cable
CN204919626U (en) Combo box posture insulation blocking system
CN110513129B (en) Advanced roof-protecting supporting structure and method for roadway of soft and thick coal seam working face
CN105133664A (en) Combined frame type isolation protection system and construction method thereof
CN104358260A (en) Preloaded pressure pile sealing working device of anchor rod static pressure pile
CN205036384U (en) Bias voltage dissolves tunnel supporting construction under environment of chamber
CN104594360A (en) Composite double-row pile foundation pit supporting structure
CN103806451A (en) Anchorage-type foundation pit reinforcing structure and construction method thereof
CN212129160U (en) Oblique-pulling foundation pit supporting structure for pile top
CN211948251U (en) Novel slope protection water conservancy net
CN201334668Y (en) Moso bamboo row pile
CN204920983U (en) Pipe installation suitable for collapsible loess tunnel advance support
CN105040746B (en) A kind of frame-type insulation blocking system and construction method thereof
CN212452735U (en) Oppositely clamped prestressed cable-stayed foundation
CN104631474B (en) A kind of side slope protection greening structure
CN211922646U (en) Foundation pit protection frame
CN204298819U (en) Anchor jacked pile precharge pressure envelope stake equipment
CN106677796A (en) Supporting method of intersection of Y-type roadway
CN110424762B (en) Cave dwelling reinforcing system
CN203855971U (en) Sparse-row pile anchor foundation pit supporting structure
CN212225231U (en) Protective structure for bias tunnel portal
CN211571780U (en) Rib plate type retaining wall structure for combined support of anchor rods and anchor cables

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
AV01 Patent right actively abandoned

Granted publication date: 20151230

Effective date of abandoning: 20170322

C25 Abandonment of patent right or utility model to avoid double patenting