CN204899980U - Ballastless track basement drainage system - Google Patents

Ballastless track basement drainage system Download PDF

Info

Publication number
CN204899980U
CN204899980U CN201520631562.6U CN201520631562U CN204899980U CN 204899980 U CN204899980 U CN 204899980U CN 201520631562 U CN201520631562 U CN 201520631562U CN 204899980 U CN204899980 U CN 204899980U
Authority
CN
China
Prior art keywords
inverted arch
ballastless track
fragment orbit
rhone
drainage system
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201520631562.6U
Other languages
Chinese (zh)
Inventor
陈绍华
张旭珍
王占东
程磊
孙春华
张竹清
刘建红
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China Railway First Survey and Design Institute Group Ltd
Original Assignee
China Railway First Survey and Design Institute Group Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China Railway First Survey and Design Institute Group Ltd filed Critical China Railway First Survey and Design Institute Group Ltd
Priority to CN201520631562.6U priority Critical patent/CN204899980U/en
Application granted granted Critical
Publication of CN204899980U publication Critical patent/CN204899980U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Abstract

The utility model relates to a ballastless track basement drainage system. The groundwater infiltration can result in the inverted arch to be packed and ballastless track binding site appearance cavity in the ballastless track tunnel, causes the ballastless track fracture, sinks. The utility model discloses setting up the inverted arch in inverted arch top and filling, the inverted arch is filled the surface and is set up water drainage tank at the bottom of the horizontal ballastless track, and the water drainage tank top is ballastless track bed course and ballastless track in proper order at the bottom of the ballastless track, water drainage tank stretches out at both ends the inverted arch packing face outlet of downward sloping at the bottom of the ballastless track, inserts in the tunnel lateral sulcus of inverted arch top both sides, at the bottom of the ballastless track water drainage tank to set up the construction joint that position and inverted arch filled corresponding. The utility model relates to a time remove inspersed groundwater, has effectually prevented that groundwater from getting into the inverted arch and filling and ballastless track binding site, and then has prevented the emergence of ballastless track disease.

Description

A kind of non-fragment orbit substrate drainage system
Technical field
The utility model belongs to traffic tunnel field of engineering technology, is specifically related to a kind of non-fragment orbit substrate drainage system.
Background technology
Adopt in the tunnel of non-fragment orbit, a kind of Major Diseases is the infiltration of underground water, inverted arch is caused to be filled and non-fragment orbit binding site appearance cavity, cause non-fragment orbit to ftracture, sink, the main cause of this disease is exactly fail to be drained by the ponding of binding site in time, under the impact of train, the long-term erosion of the concrete of binding site is caused to occur cavity.
Summary of the invention
The purpose of this utility model is to provide a kind of non-fragment orbit substrate drainage system, stops the generation of non-fragment orbit disease.
The technical scheme that the utility model adopts is:
A kind of non-fragment orbit substrate drainage system, is characterized in that:
Above inverted arch, arrange inverted arch fill, inverted arch is filled surface and is arranged rhone at the bottom of horizontal non-fragment orbit, is followed successively by non-fragment orbit bed course and non-fragment orbit above rhone at the bottom of non-fragment orbit;
Rhone two ends at the bottom of non-fragment orbit are stretched out downward-sloping inverted arch and are filled face spilled water hole, access in the tunnel lateral sulcus of both sides above inverted arch.
The setting position of rhone at the bottom of non-fragment orbit is corresponding with the constuction joint that inverted arch is filled.
Rhone at the bottom of non-fragment orbit is rectangular channel, and in tunnel, alignment both sides have the weathering of 1%.
At the bottom of non-fragment orbit, rhone end face is coated with cover sheet, is plank or steel plate.
The utility model has the following advantages:
The utility model is filled constuction joint position at inverted arch and is arranged rhone, the underground water infiltrated is drained in time from constuction joint, stops underground water and is retained in inverted arch filling and non-fragment orbit binding site for a long time, reduce railway roadbed Base pond odds.The utility model structure is simple, and constructability is safe and reliable, improves the safety of tunnel operation.
Accompanying drawing explanation
Fig. 1 is layout plan of the present utility model.
Fig. 2 is I-I sectional drawing in Fig. 1.
In figure, 1-inverted arch, 2-inverted arch is filled, 3-non-fragment orbit, 4-non-fragment orbit bed course, rhone at the bottom of 5-non-fragment orbit, and face spilled water hole filled by 6-inverted arch.
Detailed description of the invention
Below in conjunction with detailed description of the invention, the utility model is described in detail.
A kind of non-fragment orbit substrate drainage system that the utility model relates to, inverted arch is set above inverted arch 1 and fills 2, inverted arch is filled 2 surfaces and is arranged rhone 5 at the bottom of horizontal non-fragment orbit, at the bottom of non-fragment orbit, rhone 5 is rectangular channel, be of a size of 5cm × 5cm(wide × dark), in tunnel, alignment both sides have the weathering of 1%.At the bottom of non-fragment orbit, rhone 5 end face is coated with cover sheet, wide 22cm, thick 1.5cm, is plank or steel plate.Non-fragment orbit bed course 4 and non-fragment orbit 3 is followed successively by above rhone 5 at the bottom of non-fragment orbit.Rhone 5 two ends at the bottom of non-fragment orbit are stretched out downward-sloping inverted arch and are filled face spilled water hole 6, adopt diameter to be the pvc pipe of 50mm, access in the tunnel lateral sulcus of both sides above inverted arch 1.At the bottom of non-fragment orbit, the setting position of rhone 5 is corresponding with the constuction joint that inverted arch fills 2.
During construction, first build inverted arch 1 and inverted arch filling 2, then according to operation construction ditch sidewall, press the pre-buried inverted arch of design attitude simultaneously and fill face spilled water hole 6.Rhone 5 at the bottom of non-fragment orbit starts to perform after tunnel ditch sidewall has all been constructed again, and rhone adopts cutting machine on-site cutting.Can construct non-fragment orbit bed course and non-fragment orbit in the constructed location of rhone.
Content of the present utility model is not limited to cited by embodiment, and the conversion of those of ordinary skill in the art by reading the utility model manual to any equivalence that technical solutions of the utility model are taked, is claim of the present utility model and contains.

Claims (4)

1. a non-fragment orbit substrate drainage system, is characterized in that:
Arrange inverted arch in inverted arch (1) top and fill (2), inverted arch is filled (2) surface and is arranged rhone (5) at the bottom of horizontal non-fragment orbit, and rhone at the bottom of non-fragment orbit (5) top is followed successively by non-fragment orbit bed course (4) and non-fragment orbit (3);
Rhone at the bottom of non-fragment orbit (5) two ends are stretched out downward-sloping inverted arch and are filled face spilled water hole (6), in the tunnel lateral sulcus of both sides, access inverted arch (1) top.
2. a kind of non-fragment orbit substrate drainage system according to claim 1, is characterized in that:
The setting position of rhone at the bottom of non-fragment orbit (5) fills (2) constuction joint with inverted arch is corresponding.
3. a kind of non-fragment orbit substrate drainage system according to claim 2, is characterized in that:
Rhone at the bottom of non-fragment orbit (5) is rectangular channel, and in tunnel, alignment both sides have the weathering of 1%.
4. a kind of non-fragment orbit substrate drainage system according to claim 3, is characterized in that:
Rhone at the bottom of non-fragment orbit (5) end face is coated with cover sheet, is plank or steel plate.
CN201520631562.6U 2015-08-21 2015-08-21 Ballastless track basement drainage system Active CN204899980U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201520631562.6U CN204899980U (en) 2015-08-21 2015-08-21 Ballastless track basement drainage system

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201520631562.6U CN204899980U (en) 2015-08-21 2015-08-21 Ballastless track basement drainage system

Publications (1)

Publication Number Publication Date
CN204899980U true CN204899980U (en) 2015-12-23

Family

ID=54922166

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201520631562.6U Active CN204899980U (en) 2015-08-21 2015-08-21 Ballastless track basement drainage system

Country Status (1)

Country Link
CN (1) CN204899980U (en)

Cited By (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN107881857A (en) * 2017-11-10 2018-04-06 成都天府轨谷科技有限公司 Magnetic suspension tunnel draining of rail system
CN107964833A (en) * 2017-11-10 2018-04-27 成都天府轨谷科技有限公司 Ground magnetic-levitation subgrade drainage system
CN107964873A (en) * 2017-11-10 2018-04-27 成都天府轨谷科技有限公司 Magnetic suspension aerial conveyor bridge drainage system
CN108798778A (en) * 2018-07-23 2018-11-13 中铁十九局集团第六工程有限公司 The levelling layer sewerage system of the reserved filling in tunnel and its construction method
CN115791425A (en) * 2023-02-02 2023-03-14 石家庄铁道大学 Ballastless track stress deformation model test device under hydraulic pressure effect and detection method
CN117127440A (en) * 2023-10-27 2023-11-28 中国铁路设计集团有限公司 Double-block ballastless track structure of railway tunnel and construction method thereof

Cited By (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN107881857A (en) * 2017-11-10 2018-04-06 成都天府轨谷科技有限公司 Magnetic suspension tunnel draining of rail system
CN107964833A (en) * 2017-11-10 2018-04-27 成都天府轨谷科技有限公司 Ground magnetic-levitation subgrade drainage system
CN107964873A (en) * 2017-11-10 2018-04-27 成都天府轨谷科技有限公司 Magnetic suspension aerial conveyor bridge drainage system
CN107881857B (en) * 2017-11-10 2021-03-30 成都天府轨谷科技有限公司 Magnetic suspension tunnel track drainage system
CN108798778A (en) * 2018-07-23 2018-11-13 中铁十九局集团第六工程有限公司 The levelling layer sewerage system of the reserved filling in tunnel and its construction method
CN115791425A (en) * 2023-02-02 2023-03-14 石家庄铁道大学 Ballastless track stress deformation model test device under hydraulic pressure effect and detection method
CN117127440A (en) * 2023-10-27 2023-11-28 中国铁路设计集团有限公司 Double-block ballastless track structure of railway tunnel and construction method thereof
CN117127440B (en) * 2023-10-27 2024-03-12 中国铁路设计集团有限公司 Double-block ballastless track structure of railway tunnel and construction method thereof

Similar Documents

Publication Publication Date Title
CN204899980U (en) Ballastless track basement drainage system
CN204357484U (en) The drainage system of anti-tunnel invert constuction joint infiltration
CN204552818U (en) The drainage system of ditch, side, anti-tunnel bottom leaky
CN204385634U (en) Railway is not stopped transport the overall jacking mechanism of cross-line box culvert
CN204849851U (en) Retaining pile combines anti structure of floating in subway station of anti floating block
CN105274907B (en) Ballast track roadbed transform the Monolithic Track Bed Construction technique of non-fragment orbit as
CN204343339U (en) A kind of temporary support columns waterproof base plate
CN103147614B (en) Pool with multi-layer structure and building method thereof
CN203729324U (en) Anchor rod lattice type retaining wall structure
CN201485823U (en) Anti-seepage structure of hydraulic asphalt concrete panel
CN105697021A (en) Prefabricated tunnel allowing tunnel shield to penetrate shallow covering riverbed and construction method
CN103938634A (en) Deep foundation pit supporting structure and construction method
CN202416263U (en) Concrete faced rockfill dam compounded with gravity dam
CN105888724B (en) A kind of reverse drainage system reducing tunnel bottom water pressure
CN106981855A (en) A kind of high ferro roadbed cable tank systems
CN103603251B (en) Utilize saturated bittern clay slip to reinforce the method for salt lake railway bed
CN103089298B (en) Structure and method for building side direction multicolumn gob-side entry retaining filling wall body
CN202730785U (en) Anti-floating blind ditch water drainage structure for underground structure
CN207568084U (en) A kind of assembled landscape roofing
CN204282399U (en) A kind of subway space enclosing structure
CN206834684U (en) A kind of high ferro roadbed cable tank systems
CN109973095B (en) Method for reconstructing underground water storage space in coal mine solid filling mining
CN203321586U (en) Multifunctional prefabricated side type ditch in road tunnel for clean-up and separation of sewage and maintenance
CN202595758U (en) Batter post foundation structure for overhead transmission line
CN202440766U (en) Water-drainage open cut tunnel aqueduct of road cut section

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant