CN204898518U - Bridge drain pipe installation device - Google Patents

Bridge drain pipe installation device Download PDF

Info

Publication number
CN204898518U
CN204898518U CN201520638486.1U CN201520638486U CN204898518U CN 204898518 U CN204898518 U CN 204898518U CN 201520638486 U CN201520638486 U CN 201520638486U CN 204898518 U CN204898518 U CN 204898518U
Authority
CN
China
Prior art keywords
hook
bearing
water pipe
erecting device
vertical beam
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201520638486.1U
Other languages
Chinese (zh)
Inventor
常永健
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
CCCC First Highway Engineering Co Ltd
Haiwei Engineering Construction Co Ltd of FHEC of CCCC
Original Assignee
CCCC First Highway Engineering Co Ltd
Haiwei Engineering Construction Co Ltd of FHEC of CCCC
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by CCCC First Highway Engineering Co Ltd, Haiwei Engineering Construction Co Ltd of FHEC of CCCC filed Critical CCCC First Highway Engineering Co Ltd
Priority to CN201520638486.1U priority Critical patent/CN204898518U/en
Application granted granted Critical
Publication of CN204898518U publication Critical patent/CN204898518U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Abstract

The utility model relates to a bridge drain pipe installation device, including a work platform, work platform is connected with a vertical bearing of upwards extending and gets in touch, the portion that articulates that the bearing couple set up including its top, be provided with a plurality of removal truckles on the bearing couple. This bridge drain pipe installation device solves the problem that the operation is difficult, the potential safety hazard is big, construction cost is high that exists among the prior art, the device simple structure easily operates, and the construction work platform is stable, with low costs, and the security is high, and the construction progress is fast.

Description

Bridge platoon water pipe erecting device
Technical field
The utility model relates to bridge platoon waterpipe mounting technique, particularly relates to a kind of bridge platoon water pipe erecting device.
Background technology
Bridge platoon water pipe is generally positioned at below the wing plate of beam slab, sets up and is placed in across road and bridge beam.Because gutter construction belongs to work high above the ground, in construction, be difficult to the installation quality ensureing gutter.The method that current bridge platoon water pipe is installed comprises the blue Method for Installation of common extension, crane Method for Installation and utilizes bridge inspection vehicle Method for Installation etc.
Wherein, the blue Method for Installation of common extension is hung on anti-collision wall by extension indigo plant, is hung in below beam slab, and installing for gutter provides construction working platform; Crane Method for Installation utilizes crane that extension indigo plant is hung in gutter installation site, and constructor utilizes crane to hang the blue working platform provided and constructs; Bridge inspection vehicle Method for Installation and crane Method for Installation similar, the working platform that constructor utilizes bridge inspection vehicle to provide carries out gutter construction.
Mainly there is following problem in the method that current bridge platoon water pipe is installed: 1, operation not easily: the blue Method for Installation of common extension does not arrange moving structure, and hang when blue shift moves and need crane to coordinate, operation not easily, construction cost is high, progress is slow; 2, potential safety hazard is large: although crane Method for Installation often occurs in practice of construction, these class methods belong to violation operation, poor stability, and potential safety hazard is large, should forbid to adopt; 3, construction cost is high: bridge inspection vehicle Method for Installation is comparatively rare in practice of construction, because vehicle expense is too high and construction speed is relatively slow.
Thus, the present inventor relies on experience and the practice of being engaged in relevant industries for many years, proposes a kind of bridge platoon water pipe erecting device, to overcome the defect of prior art.
Utility model content
The purpose of this utility model is to provide a kind of bridge platoon water pipe erecting device, the problem that the operation existed in solution prior art not easily, potential safety hazard is large, construction cost is high, and this apparatus structure is simple to operation, and construction working platform stable, cost is low, and safety is high, and construction speed is fast.
The purpose of this utility model realizes like this, a kind of bridge platoon water pipe erecting device, described bridge platoon water pipe erecting device comprises a working platform, described working platform is connected with a load-bearing hook extended straight up, described load-bearing hook comprises the mounting part that its top is arranged, and described load-bearing hook is provided with multiple Moving caster.
In a better embodiment of the present utility model, described load-bearing hook is the U-shaped structure of opening upwards, described load-bearing hook bottom is horizontally disposed supporting traverse, described supporting traverse two ends are respectively arranged with the connection vertical beam with the vertical setting of described supporting traverse one bending forming, and the top of two described connection vertical beams is respectively equipped with described mounting part.
In a better embodiment of the present utility model, described mounting part comprise top with described be connected vertical beam one bending forming and be the horizontally disposed hook crossbeam of spatial vertical with described supporting traverse, the other end of described hook crossbeam be provided with described hook crossbeam one bending forming and be connected the parallel hook vertical beam of vertical beam with described, described connection vertical beam, described hook crossbeam and described hook vertical beam form the U-shaped structure that Open Side Down.
In a better embodiment of the present utility model, the below of each described hook crossbeam is connected with multiple described Moving caster, each described hook vertical beam is connected with described Moving caster towards the side of described connection vertical beam, and each described connection vertical beam arranges multiple described Moving caster towards interval, described hook vertical beam side.
In a better embodiment of the present utility model, be connected with the first web beam that multiple parallel and spaced horizontal is arranged between two described connection vertical beams, between two described hook crossbeams, be connected with one second web beam.
In a better embodiment of the present utility model, above described working platform, be positioned at and connect vertical beam side described in one and be provided with cat ladder, described cat ladder is fixedly connected with each described first web beam.
In a better embodiment of the present utility model, below described working platform, middle part is supported horizontally inside on the described supporting traverse of described load-bearing hook, the top circumference of described working platform is provided with working platform fence, and described working platform fence is provided with reinforcement cant beam with described connection between vertical beam.
In a better embodiment of the present utility model, described Moving caster comprises wheel, wheel carrier and bearing, and described wheel carrier is linked up with described load-bearing and is fixedly connected with.
In a better embodiment of the present utility model, described wheel is polyurethane wheel, and described wheel center place is provided with the rotating shaft running through described wheel, and bearing described in sheathed is rotated at the two ends of described rotating shaft respectively, and described bearing is fixed on described wheel carrier.
In a better embodiment of the present utility model, described bearing is roller bearing.
From the above mentioned, bridge platoon water pipe erecting device structure of the present utility model is simple, and easy to make, cost is low; Adopt paired caster design, be convenient to the movement in gutter installation process; Bridge platoon water pipe erecting device of the present utility model utilizes steel bar concrete anti-collision wall as load-carrying members and moving track, device adopts reinforcement fabrication to connect, and is stuck on steel bar concrete anti-collision wall, hangs below bridge beam slab, install for gutter and provide stable construction working platform, working security is high; Bridge platoon water pipe erecting device of the present utility model generally paired processing, to use in pairs, only need first time crane that device is in place, constructor can Self-operating afterwards, simple to operate, is convenient to raising efficiency of construction, reduction construction cost.
Accompanying drawing explanation
The following drawings is only intended to schematically illustrate the utility model and explain, does not limit scope of the present utility model.Wherein:
Fig. 1: be bridge platoon water pipe erecting device structural representation of the present utility model.
Fig. 2: be the load-bearing hook structure schematic diagram of bridge platoon water pipe erecting device of the present utility model.
Fig. 3: be bridge platoon water pipe erecting device working state schematic representation of the present utility model.
Fig. 4: be A place schematic enlarged-scale view in Fig. 3.
Fig. 5: be B place schematic enlarged-scale view in Fig. 3.
Detailed description of the invention
In order to there be understanding clearly to technical characteristic of the present utility model, object and effect, now contrast accompanying drawing and detailed description of the invention of the present utility model is described.
As shown in Figure 1, Figure 2, Figure 3 shows, the bridge platoon water pipe erecting device 100 that the utility model provides, comprise a working platform 1, working platform 1 adopts φ 12 hot rolling ribbed reinforced bar (HRB, the yield strength of the HRB adopted in present embodiment is 335MPa) make, alleviate the weight of working platform 1 while ensureing working platform 1 rigidity; Working platform 1 is connected with a load-bearing hook 2 extended straight up, and load-bearing hook 2 comprises the mounting part 3 that its top is arranged, and load-bearing hook 2 is provided with multiple Moving caster 4.In the present embodiment, load-bearing hook 2 is the U-shaped structure of opening upwards, be supporting traverse 21 bottom load-bearing hook 2, supporting traverse 21 two ends are respectively arranged with the top connecting vertical beam 22 with the connection vertical beam 22, two of described supporting traverse 21 one bending forming and are respectively equipped with described mounting part 3.Mounting part 3 comprise top be connected vertical beam 22 one bending forming and with the supporting traverse 21 horizontally disposed hook crossbeam 31 in spatial vertical, the other end of hook crossbeam 31 be provided with hook crossbeam 31 one bending forming and the hook vertical beam 32 parallel with being connected vertical beam 22, connect vertical beam 22, hook crossbeam 31 and hook vertical beam 32 and form the U-shaped structure that Open Side Down.The supporting traverse 21, two of load-bearing hook 2 connects vertical beam 22 and mounting part 3 adopts φ 25 hot rolling ribbed reinforced bar (HRB, the yield strength of the HRB adopted in present embodiment is 335MPa) make, ensure that the security reliability of bridge platoon water pipe erecting device 100.Load-bearing is linked up with 2 crooked positions and is all adopted intelligent bending machine (prior art) one-shot forming, ensure that stability and the safety of working platform 1.In order to ensure the rigidity of load-bearing hook 2, avoiding load-bearing to link up with 2 load-bearing distortion, being connected with between multiple parallel interval, horizontally disposed first web beam 23, two hook crossbeams 31 between two connection vertical beams 22 and being connected with one second web beam 24.Above working platform, be positioned at connection vertical beam 22 side and be provided with cat ladder 25, cat ladder 25 adopts φ 12 hot rolling ribbed reinforced bar (HRB, the yield strength of the HRB adopted in present embodiment is 335MPa) make, reduce the space taking working platform 1 under the premise that security is guaranteed as far as possible, for ensureing the safety of climbing process, cat ladder 25 is fixedly connected with each first web beam 23.
Further, as shown in Figure 1, Figure 3, the below of each hook crossbeam 31 is connected with multiple described Moving caster 4, and each hook vertical beam 32 is connected with Moving caster 4 towards the side connecting vertical beam 22, and the quantity of Moving caster 4 is 1 each or multiple herein; Each connection vertical beam 22 arranges multiple described Moving caster 4 towards interval, hook vertical beam 32 side, more smooth and easy in order to make bridge platoon water pipe erecting device 100 move, two positions connecting vertical beam 22 relative with hook vertical beam 32 are all connected with one or more Moving caster 4.Hook portion 3 is hooked on the steel bar concrete anti-collision wall 8 of bridge, and with the side of the steel bar concrete anti-collision wall 8 of bridge and end face abutting contact bottom each Moving caster 4, under the drive of multiple Moving caster 4, working platform 1 can move along the steel bar concrete anti-collision wall 8 of bridge.
Further; as shown in Figure 1 and Figure 2; below working platform 1, middle part is supported horizontally inside on the supporting traverse 21 of load-bearing hook 2; the top circumference of working platform 1 is provided with working platform fence 11; working platform fence 11 strengthens cant beam 12 with being connected to be provided with between vertical beam 22, and working platform fence 11 can carry out good safeguard protection to the constructor on working platform 1.Working platform fence 11 adopts φ 12 hot rolling ribbed reinforced bar (HRB, the yield strength of the HRB adopted in present embodiment is 335MPa) make, the safety meeting structure alleviates the weight of bridge platoon water pipe erecting device 100 simultaneously, be convenient to manual operation, working platform fence 11 and working platform 1 are welded and fixed, welding position ensures that weld seam is full, and firm welding is reliable.
As shown in Figure 4, Figure 5, in the present embodiment, Moving caster 4 comprises wheel 41, wheel carrier 42 and bearing 43, and wheel carrier 42 and load-bearing are linked up with 2 and be fixedly connected with (connected mode adopts and welds, and welding process will ensure firm welding and the reinforcing bar of load-bearing hook 2 of not burning).In the present embodiment, bridge platoon water pipe erecting device 100 needs along steel bar concrete anti-collision wall 8 walking with load, wheel 41 is for polyurethane wheel is (for avoiding crushing in high load capacity situation, high-strength polyurethane wheel selected by wheel 41), ensure that wheel 41 has the performances such as wear-resistant, high temperature resistant, shock resistance preferably and chemically corrosion; Wheel 41 center is provided with the rotating shaft 411 running through wheel 41, and bearing 43 described in sheathed is rotated at the two ends of rotating shaft 411 respectively, and bearing 43 is fixed on wheel carrier 42.In the present embodiment, wheel carrier 42 adopts steel plate punching press forge hot and welding fabrication, avoids the damage in high load capacity situation; Bearing 43 is selected through heat treated roller bearing, can bear heavier load.Select Moving caster 4 load capacity of wheel 41 as above, wheel carrier 42 and bearing 43 to reach more than 600kg, Moving caster 4 ensure that the steady safety of bridge platoon water pipe erecting device 100 moving process.
When using bridge platoon water pipe erecting device 100 of the present utility model to carry out the installation of bridge platoon water pipe, first outside the steel bar concrete anti-collision wall 8 with crane bridge platoon water pipe erecting device 100 being lifted into bridge, mounting part 3 is articulated in steel bar concrete anti-collision wall 8 top, working platform 1 is in below bridge beam slab, with the side of the steel bar concrete anti-collision wall 8 of bridge and end face abutting contact bottom each Moving caster 4, after mounting steadily, constructor arrives on working platform 1 along cat ladder 25, carries out gutter installation.When one section of gutter installation needs mobile, only need the steel bar concrete anti-collision wall 8 in the hand steered device front of constructor, pin pendulum working platform 1, completes the movement of bridge platoon water pipe erecting device 100.Because bridge platoon water pipe is generally installed in bridge both sides simultaneously, therefore bridge platoon water pipe erecting device generally paired use.
From the above mentioned, bridge platoon water pipe erecting device structure of the present utility model is simple, and easy to make, cost is low; Adopt paired caster design, be convenient to the movement in gutter installation process; Bridge platoon water pipe erecting device of the present utility model utilizes steel bar concrete anti-collision wall as load-carrying members and moving track, device adopts reinforcement fabrication to connect, and is stuck on steel bar concrete anti-collision wall, hangs below bridge beam slab, install for gutter and provide stable construction working platform, working security is high; Bridge platoon water pipe erecting device of the present utility model generally paired processing, to use in pairs, only need first time crane that device is in place, constructor can Self-operating afterwards, simple to operate, is convenient to raising efficiency of construction, reduction construction cost.
The foregoing is only the schematic detailed description of the invention of the utility model, and be not used to limit scope of the present utility model.Any those skilled in the art, equivalent variations done under the prerequisite not departing from design of the present utility model and principle and amendment, all should belong to the scope of the utility model protection.

Claims (10)

1. a bridge platoon water pipe erecting device, it is characterized in that: described bridge platoon water pipe erecting device comprises a working platform, described working platform is connected with a load-bearing hook extended straight up, described load-bearing hook comprises the mounting part that its top is arranged, and described load-bearing hook is provided with multiple Moving caster.
2. bridge platoon water pipe erecting device as claimed in claim 1, it is characterized in that: described load-bearing hook is the U-shaped structure of opening upwards, described load-bearing hook bottom is horizontally disposed supporting traverse, described supporting traverse two ends are respectively arranged with the connection vertical beam with the vertical setting of described supporting traverse one bending forming, and the top of two described connection vertical beams is respectively equipped with described mounting part.
3. bridge platoon water pipe erecting device as claimed in claim 2, it is characterized in that: described mounting part comprise top with described be connected vertical beam one bending forming and be the horizontally disposed hook crossbeam of spatial vertical with described supporting traverse, the other end of described hook crossbeam be provided with described hook crossbeam one bending forming and be connected the parallel hook vertical beam of vertical beam with described, described connection vertical beam, described hook crossbeam and described hook vertical beam form the U-shaped structure that Open Side Down.
4. bridge platoon water pipe erecting device as claimed in claim 3, it is characterized in that: the below of each described hook crossbeam is connected with multiple described Moving caster, each described hook vertical beam is connected with described Moving caster towards the side of described connection vertical beam, and each described connection vertical beam arranges multiple described Moving caster towards interval, described hook vertical beam side.
5. bridge platoon water pipe erecting device as claimed in claim 3, is characterized in that: be connected with the first web beam that multiple parallel and spaced horizontal is arranged between two described connection vertical beams, be connected with one second web beam between two described hook crossbeams.
6. bridge platoon water pipe erecting device as claimed in claim 5, is characterized in that: above described working platform, be positioned at and connect vertical beam side described in one and be provided with cat ladder, described cat ladder is fixedly connected with each described first web beam.
7. bridge platoon water pipe erecting device as claimed in claim 2, it is characterized in that: below described working platform, middle part is supported horizontally inside on the described supporting traverse of described load-bearing hook, the top circumference of described working platform is provided with working platform fence, and described working platform fence is provided with reinforcement cant beam with described connection between vertical beam.
8. bridge platoon water pipe erecting device as claimed in claim 1, it is characterized in that: described Moving caster comprises wheel, wheel carrier and bearing, described wheel carrier is linked up with described load-bearing and is fixedly connected with.
9. bridge platoon water pipe erecting device as claimed in claim 8, it is characterized in that: described wheel is polyurethane wheel, described wheel center place is provided with the rotating shaft running through described wheel, and bearing described in sheathed is rotated at the two ends of described rotating shaft respectively, and described bearing is fixed on described wheel carrier.
10. bridge platoon water pipe erecting device as claimed in claim 9, is characterized in that: described bearing is roller bearing.
CN201520638486.1U 2015-08-21 2015-08-21 Bridge drain pipe installation device Expired - Fee Related CN204898518U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201520638486.1U CN204898518U (en) 2015-08-21 2015-08-21 Bridge drain pipe installation device

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201520638486.1U CN204898518U (en) 2015-08-21 2015-08-21 Bridge drain pipe installation device

Publications (1)

Publication Number Publication Date
CN204898518U true CN204898518U (en) 2015-12-23

Family

ID=54920707

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201520638486.1U Expired - Fee Related CN204898518U (en) 2015-08-21 2015-08-21 Bridge drain pipe installation device

Country Status (1)

Country Link
CN (1) CN204898518U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN105155410A (en) * 2015-08-21 2015-12-16 中交第一公路工程局有限公司 Mounting device of bridge draining pipe

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN105155410A (en) * 2015-08-21 2015-12-16 中交第一公路工程局有限公司 Mounting device of bridge draining pipe

Similar Documents

Publication Publication Date Title
CN104878916B (en) With the dismantled and assembled simple and easy four-wheel Mobile operating platform of constructional materials elevating function
CN103306205A (en) Construction method of longitudinal wet joint formwork of prefabricated T beam or box beam
CN202500567U (en) Multilayer combined hanging scaffold for concrete liner of well wall of vertical well
CN102877637A (en) Method for implementing operating platform in bottom wall construction of cantilever beam
CN203834373U (en) Lifting movement mold carriage trolley for box culvert side wall formwork
CN204898518U (en) Bridge drain pipe installation device
CN205152787U (en) Movable trolley is repaired to bridge anticollision barrier
CN204781879U (en) Dismantled and assembled simple and easy four -wheel of taking building material raising and lowering functions removes operation platform
CN105155410A (en) Mounting device of bridge draining pipe
CN206051351U (en) Hang a kind of purlin for assembling and disassembling construction for bridge-collision-avoidance wall form
CN209957241U (en) Steel hanger
CN202379616U (en) Movable simple hoisting device
CN210049105U (en) Self-propelled bridge formwork operation trolley
CN201128882Y (en) Lifting and supporting brackets integrated construction device for bridge arch rib
CN201042756Y (en) Crane main girder turnover machine
CN201433051Y (en) Large-scale rack lower boom double-track single-beam lifting crane
CN203755153U (en) Simply supported plate bridge bottom plate maintenance construction moving operation platform
CN204551265U (en) A kind of frame type combination sky crane link
CN203393721U (en) Inner support main purlin component
CN205116757U (en) Girder steel conveyer that slides
CN206256382U (en) It is a kind of to suspend purlin car in midair for the triangle that Wavelike steel webplate is installed
CN205555882U (en) Heavy single track hangs
CN205046858U (en) Processing of major diameter steel reinforcement cage and transportation auxiliary device
CN205116748U (en) A column base device for steel construction slides
CN203877824U (en) Lifting barrow

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20151223