CN204893857U - Mounting tool of muscle is hung to superelevation floor hanging arch - Google Patents

Mounting tool of muscle is hung to superelevation floor hanging arch Download PDF

Info

Publication number
CN204893857U
CN204893857U CN201520623727.5U CN201520623727U CN204893857U CN 204893857 U CN204893857 U CN 204893857U CN 201520623727 U CN201520623727 U CN 201520623727U CN 204893857 U CN204893857 U CN 204893857U
Authority
CN
China
Prior art keywords
muscle
hangs
stock
erecting tools
super
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201520623727.5U
Other languages
Chinese (zh)
Inventor
李新民
尉篮
史伟
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Arts Group Engineering Consulting Co ltd
Original Assignee
Suzhou Industrial Park Construction Supervision Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Suzhou Industrial Park Construction Supervision Co Ltd filed Critical Suzhou Industrial Park Construction Supervision Co Ltd
Priority to CN201520623727.5U priority Critical patent/CN204893857U/en
Application granted granted Critical
Publication of CN204893857U publication Critical patent/CN204893857U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Ladders (AREA)

Abstract

The utility model relates to a mounting tool of muscle is hung to superelevation floor hanging arch, include: the stock, the setting of stock one end is revolved and is twisted the head, and the stock other end sets up the handle, revolves wrong first fixed connection and is in one side of stock tip, revolve and twist the bolt collar of head for having the side breach, the bolt collar bottom has to be encircleed the round step of sleeve inner wall, bolt collar hole shape size with bolt periphery shape size is coincide. Perforation cross sectional area is less than hole cross sectional area, hangs like this in the muscle can be just penetrates the hex bolts sleeve through the breach, the sleeve needn't penetrate from the tip of bolt collar and in, it is comparatively convenient to operate. The length of stock can reach 4m, and simultaneously the stock be the tubular metal resonator of hollow tube structure, and gently just intensity is higher for matter, installs under the condition that needn't hang high appurtenance with the help of ladder etc. Like this. The breach can let the hex bolts pass through just, conveniently hangs the integrative quick card of muscle and six bolts and goes into to the bolt collar in.

Description

Super-high storied building hangs the erecting tools that top hangs muscle
Technical field
The utility model relates to a kind of extension muscle erecting tools, particularly relates to a kind of super-high storied building and hangs the erecting tools that top hangs muscle.
Background technology
The room that usual floor is higher hangs the liftoff plate distance of apex distance more than 4 meters, and the instruments such as common ladder cannot be reached this height, but installs on outstanding top and hang muscle and need to reach outstanding top.
The utility model first adopts bar to connect electric drill to hang crown drill hole at floor, and the extension muscle then using erecting tools end to be provided with setscrew is arranged on outstanding top.
The structure of erecting tools is one more than the mounting rod of 3m, and mounting rod one end end winding support is provided with the inner hexagon spanner sleeve of breach, and the other end arranges cross bar.
Extension muscle with setscrew is passed the breach of inner hexagon spanner sleeve, then this section is lifted and reach outstanding useful drill hole of first accomplishing fluently, by setscrew extruding as boring, then the hex bolts on setscrew is answered back to by sleeve, to be impacted fastening after, rotary bar, is namely with moving sleeve to be screwed by hex bolts.
Summary of the invention
The utility model overcomes the deficiencies in the prior art, provides the simple super-high storied building of a kind of structure to hang the erecting tools of top extension muscle.
For achieving the above object, the technical solution adopted in the utility model is: a kind of super-high storied building hangs the erecting tools that top hangs muscle, screw in setscrew with externally threaded described extension muscle end, the extension muscle periphery of described extension muscle and described setscrew junction spins a bolt, described erecting tools comprises: stock, described stock one end arranges and screws head, the described stock other end arranges handle, it is characterized in that, describedly screw the side that head is fixedly connected on described stock end, the described head that screws is bolt collar with side breach, with the circle step around described sleeve lining bottom described bolt collar, described bolt collar internal via shape size and described bolt peripheral shape size are coincide.
In the utility model preferred embodiment, described bolt is hex bolts, and described bolt collar is hex bolts sleeve.
In the utility model preferred embodiment, the gap width that described bolt collar side is arranged is more than or equal to hangs muscle external diameter.
In the utility model preferred embodiment, described stock length is greater than 2m.
In the utility model preferred embodiment, described stock length is 3-5m.
In the utility model preferred embodiment, described handle be cross bar perpendicular to described stock, is fixedly connected with described stock in the middle of described cross bar.
In the utility model preferred embodiment, described stock is Telescopic rod structure.
In the utility model preferred embodiment, described step surrounds formation one perforation, and described perforation cross-sectional area is less than described endoporus cross-sectional area.
The utility model solves the defect existed in background technology, and the utility model possesses following beneficial effect:
(1) cross-sectional area of boring a hole is less than endoporus cross-sectional area, and hanging muscle like this can penetrate in hex bolts sleeve by breach just, need not penetrate in sleeve from the end of bolt collar, and operation more for convenience.
(2) length of stock can reach 4m, stock is the metal tube of tubular structure simultaneously, light weight and intensity is higher, like this when hanging high aid by ladder etc., erecting tools also can be fixed on hanging muscle and realizes in the installing hole that roof is accomplished fluently.
(3) handle conveniently screws bolt, is blown by setscrew and snaps onto in installing hole.
(4) breach can allow hex bolts pass through just, conveniently hangs muscle and six bolts one snaps onto in bolt collar fast.
Accompanying drawing explanation
Below in conjunction with drawings and Examples, the utility model is further illustrated.
Fig. 1 is the structural representation of preferred embodiment of the present utility model;
Fig. 2 is the three-dimensional structure diagram with bolt collar one end of preferred embodiment of the present utility model;
Fig. 3 be preferred embodiment of the present utility model the setscrew structural representation hanging muscle and hex bolts is installed;
In figure: 1, hang muscle, 2, setscrew, 3, hex bolts, 4, stock, 5, handle, 6, screw head, 7, bolt collar, 8, breach, 9, step, 10, endoporus, 11, perforation.
Detailed description of the invention
Be described in further detail the utility model in conjunction with the accompanying drawings and embodiments now, these accompanying drawings are the schematic diagram of simplification, only basic structure of the present utility model are described in a schematic way, and therefore it only shows the formation relevant with the utility model.
As Fig. 1, Fig. 2, shown in Fig. 3, a kind of super-high storied building hangs the erecting tools that top hangs muscle, screw in setscrew 2 with externally threaded extension muscle 1 end, extension muscle 1 periphery of extension muscle 1 and setscrew 2 junction spins a bolt, erecting tools comprises: stock 4, stock 4 one end arranges and screws 6, stock 4 other end arranges handle 5, screw the side that 6 are fixedly connected on stock 4 end, screwing 6 is bolt collar 7 with side breach 8, with the circle step 9 around sleeve lining bottom bolt collar 7, bolt collar 7 endoporus 10 shape size and bolt peripheral shape size are coincide.
11 cross-sectional areas of boring a hole are less than endoporus 10 cross-sectional area, and hanging muscle 1 like this can penetrate in hex bolts 3 sleeve by breach 8 just, need not penetrate in sleeve from the end of bolt collar 7, and operation more for convenience.
The length of stock 4 can reach 4m, stock 4 is the metal tube of tubular structure simultaneously, light weight and intensity is higher, like this when hanging high aid by ladder etc., erecting tools also can be fixed on hanging muscle and realizes in the installing hole that roof is accomplished fluently.
Bolt is hex bolts 3, and bolt collar 7 is hex bolts 3 sleeve, and breach 8 width that bolt collar 7 side is arranged is more than or equal to hangs muscle 1 external diameter.Breach 8 can allow hex bolts 3 pass through just, conveniently hangs muscle and six bolts one snaps onto in bolt collar 7 fast.
Stock 4 length is greater than 2m, and stock 4 length is 3-5m, preferred 4m.
Handle 5 be cross bar perpendicular to stock 4, is fixedly connected with stock 4 in the middle of cross bar, handle 5 conveniently screws bolt, is blown by setscrew 2 and snaps onto in installing hole.
Stock 4 is Telescopic rod structure, and such erecting tools just goes for the installment work of the operator of different height and the story height of differing heights.
Described step 9 surrounds formation one perforation 11,11 cross-sectional areas of boring a hole are less than endoporus 10 cross-sectional area, such extension muscle 1 can penetrate in hex bolts 3 sleeve by breach 8 just, need not penetrate in sleeve from the end of bolt collar 7, and operation more for convenience.
Above according to desirable embodiment of the present utility model for enlightenment, by above-mentioned description, related personnel in the scope not departing from this utility model technological thought, can carry out various change and amendment completely.The technical scope of this utility model is not limited to the content on description, must determine technical scope according to right.

Claims (8)

1. a super-high storied building hangs the erecting tools that top hangs muscle, screw in setscrew with externally threaded described extension muscle end, the extension muscle periphery of described extension muscle and described setscrew junction spins a bolt, described erecting tools comprises: stock, described stock one end arranges and screws head, the described stock other end arranges handle, it is characterized in that, describedly screw the side that head is fixedly connected on described stock end, the described head that screws is bolt collar with side breach, with the circle step around described sleeve lining bottom described bolt collar, described bolt collar internal via shape size and described bolt peripheral shape size are coincide.
2. super-high storied building according to claim 1 hangs the erecting tools that top hangs muscle, and it is characterized in that: described bolt is hex bolts, described bolt collar is hex bolts sleeve.
3. super-high storied building according to claim 1 hangs the erecting tools that top hangs muscle, it is characterized in that: the gap width that described bolt collar side is arranged is more than or equal to hangs muscle external diameter.
4. super-high storied building according to claim 1 hangs the erecting tools that top hangs muscle, it is characterized in that: described stock length is greater than 2m.
5. super-high storied building according to claim 4 hangs the erecting tools that top hangs muscle, it is characterized in that: described stock length is 3-5m.
6. super-high storied building according to claim 1 hangs top and hangs the erecting tools of muscle, it is characterized in that: described handle be the cross bar perpendicular to described stock, is fixedly connected with described stock in the middle of described cross bar.
7. super-high storied building according to claim 1 hangs the erecting tools that top hangs muscle, it is characterized in that: described stock is Telescopic rod structure.
8. super-high storied building according to claim 1 hangs the erecting tools that top hangs muscle, it is characterized in that: described step surrounds formation one perforation, and described perforation cross-sectional area is less than described endoporus cross-sectional area.
CN201520623727.5U 2015-08-19 2015-08-19 Mounting tool of muscle is hung to superelevation floor hanging arch Expired - Fee Related CN204893857U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201520623727.5U CN204893857U (en) 2015-08-19 2015-08-19 Mounting tool of muscle is hung to superelevation floor hanging arch

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201520623727.5U CN204893857U (en) 2015-08-19 2015-08-19 Mounting tool of muscle is hung to superelevation floor hanging arch

Publications (1)

Publication Number Publication Date
CN204893857U true CN204893857U (en) 2015-12-23

Family

ID=54916068

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201520623727.5U Expired - Fee Related CN204893857U (en) 2015-08-19 2015-08-19 Mounting tool of muscle is hung to superelevation floor hanging arch

Country Status (1)

Country Link
CN (1) CN204893857U (en)

Similar Documents

Publication Publication Date Title
CN203003208U (en) Airduct hanger drilling and mounting tool
CN204893857U (en) Mounting tool of muscle is hung to superelevation floor hanging arch
CN206029704U (en) Scalable double -end sleeve
CN205976180U (en) Hanger rod installation device
CN203034804U (en) Three-section type water-sealing screw for basement exterior wall
CN205276653U (en) Furred ceiling jib installation device
CN213927556U (en) Hang muscle mounting tool
CN204676756U (en) The fastener of top board furred ceiling
CN213014930U (en) Suspended ceiling top construction auxiliary tool
CN201362948Y (en) Steel hanger installer
CN203998784U (en) Bont
CN205009159U (en) Portable extra long formula expansion bolts installs sleeve
CN204920249U (en) A simple and easy quick erector for installation of floor jib
CN215281729U (en) Top plate expansion bolt spanner
CN203779402U (en) Screw rod fastener for expansion nut
CN201728629U (en) Installation tool for overhead wire boom
CN106078582A (en) A kind of dismountable sleeve
CN202656159U (en) Device for screwing up screws of ceiling lead screw and removing fillers out of roof junction box
CN106378476A (en) Long rod perforating machine and multi-functional long rod
CN107268868B (en) A kind of ceiling hanger rod mounting device
CN218747525U (en) Hang convenient instrument of muscle installation
CN211849582U (en) Multifunctional lifting hook of comprehensive pipe rack
CN203956804U (en) A kind of suspension rod quick-mounting instrument
CN206029705U (en) Dismountable sleeve
CN204238567U (en) Hanger erection device

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
C41 Transfer of patent application or patent right or utility model
TR01 Transfer of patent right

Effective date of registration: 20160126

Address after: 128 5B room, 215123 town building, 128 West Avenue, Suzhou Industrial Park, Jiangsu, China

Patentee after: ARTS GROUP ENGINEERING CONSULTING CO.,LTD.

Address before: Suzhou City, Jiangsu province 215021 Industrial Park in the new city building 128 West Avenue and 5F-C

Patentee before: SUZHOU INDUSTRIAL PARK CONSTRUCTION SUPERVISION Co.,Ltd.

CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20151223

Termination date: 20210819

CF01 Termination of patent right due to non-payment of annual fee