CN204885956U - Complete indoor one deck transformer substation of integrative transformer of 35kV - Google Patents
Complete indoor one deck transformer substation of integrative transformer of 35kV Download PDFInfo
- Publication number
- CN204885956U CN204885956U CN201520411694.8U CN201520411694U CN204885956U CN 204885956 U CN204885956 U CN 204885956U CN 201520411694 U CN201520411694 U CN 201520411694U CN 204885956 U CN204885956 U CN 204885956U
- Authority
- CN
- China
- Prior art keywords
- transformer
- room
- space
- transformer station
- electrical
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Active
Links
- 239000003990 capacitor Substances 0.000 claims abstract description 13
- 230000008676 import Effects 0.000 claims description 9
- 230000010485 coping Effects 0.000 claims description 3
- 230000007306 turnover Effects 0.000 abstract 1
- 238000010276 construction Methods 0.000 description 6
- 230000010354 integration Effects 0.000 description 2
- 230000009466 transformation Effects 0.000 description 2
- 230000000739 chaotic effect Effects 0.000 description 1
- 238000004146 energy storage Methods 0.000 description 1
- 238000005516 engineering process Methods 0.000 description 1
- 230000017525 heat dissipation Effects 0.000 description 1
- 238000007689 inspection Methods 0.000 description 1
- 238000005259 measurement Methods 0.000 description 1
- 230000035515 penetration Effects 0.000 description 1
- 238000004804 winding Methods 0.000 description 1
Landscapes
- Gas-Insulated Switchgears (AREA)
Abstract
The utility model provides a complete indoor one deck transformer substation of integrative transformer of 35kV, the transformer substation is equipped with: three transformer room 11, 10kV electrical room 12, 35kV electrical room 13, 10kV capacitor chamber 14 and secondary equipment room 15, three transformer room 11, 10kV electrical room 12, 35kV electrical room 13, 10kV capacitor chamber 14 and secondary equipment room 15 all be equipped with with the business turn over confession personnel of the outside intercommunication of transformer substation are current.
Description
Technical field
The utility model relates to substation structure design field, is specifically related to a kind of 35kV one complete indoor one deck transformer station of transformer.
Background technology
Namely transformer station changes the place of voltage, control and distribution electric energy, and transformer is the capital equipment of transformer station, and in addition transformer station also comprises the plurality of devices such as controller switching equipment, energy storage device, secondary device.
Because the capital equipment volume be used in transformer station is larger, so the floor space of transformer station is usually larger, designer needs the structure spending the plenty of time according to the land area design transformer station planned in advance usually, make the structural difference between each transformer station larger thus, and the transformer station designed may be unsuitable for periphery situation, such as outdoor structure can produce noise and interference, or arranges unreasonable due to the position of each canyon, causes the cable arrangement in transformer station chaotic.
Utility model content
For this reason, technical problem to be solved in the utility model is to provide a kind of substation structure, to save land area, and reduces the impact on surrounding enviroment.
The utility model provides a kind of 35kV one complete indoor one deck transformer station of transformer, and described transformer station is provided with: three transformer rooms 11,10kV electrical room 12,35kV electrical room 13,10kV capacitor chamber 14 and secondary device rooms 15; Described three transformer rooms 11,10kV electrical room 12,35kV electrical room 13,10kV capacitor chamber 14 and secondary device room 15 are equipped with passes through for personnel with the import and export of described transformer station ft connection.
Preferably, described three transformer rooms 11 are arranged on the first space in building, described 10kV capacitor chamber 14 and secondary device room 15 are arranged on the second space in described building, described 10kV electrical room 12 and 35kV electrical room 13 are arranged on the 3rd space in described building, and the wherein said 3rd is spatially located between described first space and second space.
Preferably, the height in described first space, second space and the 3rd space is all unequal, and is provided with the ventilating window 16 with described transformer station ft connection every coping.
Preferably, the import and export of described transformer room 11 are ventilating blind door.
Preferably, cable half storey 17 is also provided with below described transformer station, for power cable laying.
Preferably, the wall of described transformer room 11 is fire compartment wall.
Compared with prior art, the complete indoor one deck transformer station of 35kV one transformer that the utility model provides adopts complete indoor design to reduce noise, meets city planning; Each canyon is equipped with directly and the design of import and export of ft connection improves fail safe and the practicality of transformer station, personnel are facilitated to make an inspection tour, and this structure can omit interior walkway, station to save land area, and then investment of saving the area, accelerate area power grid engineering design and construction speed simultaneously, improve construction quality, facilitate resource-conserving and environment-friendly society's construction.
Accompanying drawing explanation
In order to make content of the present utility model be more likely to be clearly understood, below according to specific embodiment of the utility model also by reference to the accompanying drawings, the utility model is described in further detail, wherein
Fig. 1 is the plane structure chart of the 35kV one complete indoor one deck transformer station of transformer that the utility model embodiment provides;
Fig. 2 is the cross-section structure of the 35kV one complete indoor one deck transformer station of transformer that the utility model embodiment provides.
Embodiment
The utility model embodiment provides a kind of 35kV one complete indoor one deck transformer station of transformer, Fig. 1 and Fig. 2 shows the structure of the transformer station that the utility model provides, equipment in each canyon described in the utility model and device room is the common equipment in transformer station, it will be appreciated by those skilled in the art that the annexation between each equipment, Gu Tuzhong eliminates the stube cable of each equipment room.As shown in Figure 1, this transformer station is provided with three for arranging the 35kV one transformer room 11 of transformer, 10kV electrical room 12,35kV electrical room 13,10kV capacitor chamber 14 and secondary device room 15; Wherein, in order to improve the fail safe of transformer station, the wall of transformer room 11 can select fire compartment wall.
Described three transformer rooms 11,10kV electrical room 12,35kV electrical room 13,10kV capacitor chamber 14 and secondary device room 15 are equipped with passes through for personnel with the import and export of described transformer station ft connection.As shown in Figure 1, all canyons all arrange and are communicated with outside import and export, separately can not establish walkway, and switchgear house and transformer room can be mutually isolated, do not arrange current mouth in standing; Meanwhile, in order to strengthen the air circulation performance of transformation room 11, the import and export of described transformer room 11 can be preferably ventilating blind door.
Above-mentioned transformer station is provided with 3 and returns back out line back into line, 24.The mode of connection is bridge+line change group or line change group, 10kV side employing single busbar connection four section wiring in 35kV side adopts.Transformer in standing can select 35kV double winding one transformer, every platform capacity 31.5MVA, indoor layout; 10kV power distribution equipment is indoor switch cabinet dually arrayed, cable outlet; 35kV power distribution equipment is the single-row layout of indoor switch cabinet, cable outlet; Capacitor is reactive-load compensation capacitor in station, and be arranged on 10kV side, capacity is 3 × (2+2) Mvar, adopts long cable section of ingoing line.Ground connection change selects ground connection to become blowout coil set apparatus, capacity 400MVA, and wherein the double station of doing of ground connection change becomes, long cable section of ingoing line.
In secondary device room, can instrument transformer be set, such as routine transformer, establish merge cells, do not establish intelligent terminal; 35kV and main transformer adopt protection measurement and control integration device, and 10kV adopts protection, observing and controlling, metering All-in-One device; Configure independently prepared auto restart and low cycles unloading device; Adopt integration power-supply system in station.
The scope of application of above-mentioned transformer station comprises:
1, being planned to end load station, does not have penetration;
2 limit by external condition, the siting of station area in hardship;
3 serious atmospheric pollution areas;
4 lines are the project of cable;
To noise requirements higher position in 5 city planning;
6 are applicable to there is requirement place to floor height in city.
The complete indoor one deck transformer station of 35kV one transformer that the utility model provides adopts complete indoor design to reduce noise, meets city planning; Each canyon is equipped with and directly improves the fail safe of transformer station with the design of the import and export of ft connection, and can to omit in station walkway to save land area, and then investment of saving the area, and is convenient to staff's tour simultaneously.This substation structure accelerates area power grid engineering design and construction speed, improves construction quality, facilitates resource-conserving and environment-friendly society's construction.
In order to save the floor space of transformer station further and optimize the cable arrangements in standing, as shown in Figure 1, three transformer rooms 11 can be arranged on the first space 101 in building, described 10kV capacitor chamber 14 and secondary device room 15 are arranged on the second space 102 in described building, such as form rectangular space side by side, described 10kV electrical room 12 and 35kV electrical room 13 are arranged on the 3rd space 103 in described building, above-mentioned space can be all rectangular parallelepiped space, and wherein said 3rd space 103 is between described first space 101 and second space 102.
More preferably, in order to strengthen the air circulation performance of transformation room, the height in described first space 101, second space 102 and the 3rd space 103 is all unequal, and is provided with the ventilating window 16 with described transformer station ft connection every coping.Such as shown in Fig. 2, the first space 101 is the highest, second space 102 is minimum, the 3rd space 103 is moderate, makes the top side wall at place adjacent one another are, three spaces by out exposed thus, can arrange ventilating window at this place, plays result of ventilating heat dissipation.
As shown in Figure 2, described transformer station can also be provided with cable half storey 17, described cable half storey 17 is arranged on below transformer station, for power cable laying, namely below transformer station, be also provided with a space, separately for cabling, optimize the cable arrangements in station further, and the top side wall of cable half storey, the position being namely positioned at more than ground also can arrange ventilating window.Power cable in standing can by cable testing bridge and corresponding equipment connection.
Obviously, above-described embodiment is only for clearly example being described, and the restriction not to execution mode.For those of ordinary skill in the field, can also make other changes in different forms on the basis of the above description.Here exhaustive without the need to also giving all execution modes.And thus the apparent change of extending out or variation be still among the protection range that the utility model creates.
Claims (6)
1. the 35kV one complete indoor one deck transformer station of transformer, it is characterized in that, described transformer station is provided with: three transformer rooms (11), 10kV electrical room (12), 35kV electrical room (13), 10kV capacitor chamber (14) and secondary device room (15);
Described three transformer rooms (11), 10kV electrical room (12), 35kV electrical room (13), 10kV capacitor chamber (14) and secondary device room (15) are equipped with to be passed through for personnel with the import and export of described transformer station ft connection.
2. transformer station according to claim 1, it is characterized in that, described three transformer rooms (11) are arranged on the first space in building, described 10kV capacitor chamber (14) and secondary device room (15) are arranged on the second space in described building, described 10kV electrical room (12) and 35kV electrical room (13) are arranged on the 3rd space in described building, and the wherein said 3rd is spatially located between described first space and second space.
3. transformer station according to claim 2, is characterized in that, the height in described first space, second space and the 3rd space is all unequal, and is provided with and the ventilating window of described transformer station ft connection (16) every coping.
4. transformer station according to claim 1, is characterized in that, the import and export of described transformer room (11) are ventilating blind door.
5. transformer station according to claim 1, is characterized in that, is also provided with cable half storey (17), for power cable laying below described transformer station.
6. transformer station according to claim 1, is characterized in that, the wall of described transformer room (11) is fire compartment wall.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201520411694.8U CN204885956U (en) | 2015-06-15 | 2015-06-15 | Complete indoor one deck transformer substation of integrative transformer of 35kV |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201520411694.8U CN204885956U (en) | 2015-06-15 | 2015-06-15 | Complete indoor one deck transformer substation of integrative transformer of 35kV |
Publications (1)
Publication Number | Publication Date |
---|---|
CN204885956U true CN204885956U (en) | 2015-12-16 |
Family
ID=54830288
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201520411694.8U Active CN204885956U (en) | 2015-06-15 | 2015-06-15 | Complete indoor one deck transformer substation of integrative transformer of 35kV |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN204885956U (en) |
-
2015
- 2015-06-15 CN CN201520411694.8U patent/CN204885956U/en active Active
Similar Documents
Publication | Publication Date | Title |
---|---|---|
US9945142B2 (en) | Modular data center | |
AU2017381312B2 (en) | Electric vehicle charging station with medium voltage input | |
AU2013256165A2 (en) | Environmental system and modular power skid for a facility | |
CN103887725A (en) | All indoor transformer station | |
CN204905731U (en) | Complete indoor transformer substation of three winding components of a whole that can function independently transformers of 110kV | |
CN204793780U (en) | Half indoor two -layer transformer substation in integrative transformer of 110kV duplex winding | |
CN204885955U (en) | Complete indoor two -layer transformer substation of integrative transformer of 35kV | |
CN204760837U (en) | Complete indoor one deck transformer substation of 35kV components of a whole that can function independently transformer | |
CN204885956U (en) | Complete indoor one deck transformer substation of integrative transformer of 35kV | |
CN203553686U (en) | Small-size intelligent prefabricated substation | |
CN204741210U (en) | Two integrative transformer underground substations of 35kV | |
CN112186905A (en) | Container electric energy storage system | |
CN204615231U (en) | The full indoor substation of a kind of 110kV double winding split transformer | |
CN204760836U (en) | Half indoor transformer substation in integrative transformer of three windings of 110kV | |
CN204615230U (en) | A kind of complete indoor two-layer transformer station of 35kV split transformer | |
CN208445179U (en) | A kind of 110 kilovolts of modular assembly formula indoor substations | |
CN204885967U (en) | Three integrative transformer underground substations of 35kV | |
CN203826980U (en) | Flexible DC converter station | |
CN212046927U (en) | Box-type charging station | |
CN209913283U (en) | Module integration, quick plug, portable guarantor's electric system | |
CN203456931U (en) | High-voltage DC power supply system for data center | |
CN103580452A (en) | Chained SVG power cabinet | |
CN203285090U (en) | Power substation electrical equipment chamber | |
CN204651688U (en) | A kind of 220kV three winding one transformer half indoor substation | |
CN210224761U (en) | 220kV all-indoor transformer substation compactly arranged |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C14 | Grant of patent or utility model | ||
GR01 | Patent grant |