CN204875840U - Communication iron tower rag bolt mounting bracket with adjustable - Google Patents
Communication iron tower rag bolt mounting bracket with adjustable Download PDFInfo
- Publication number
- CN204875840U CN204875840U CN201520557992.8U CN201520557992U CN204875840U CN 204875840 U CN204875840 U CN 204875840U CN 201520557992 U CN201520557992 U CN 201520557992U CN 204875840 U CN204875840 U CN 204875840U
- Authority
- CN
- China
- Prior art keywords
- module
- iron tower
- connecting rod
- mounting bracket
- adjustable
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Active
Links
Landscapes
- Foundations (AREA)
Abstract
The utility model discloses a pre -buried mounting bracket of installing and use of communication iron tower rag bolt, the name is communication iron tower rag bolt mounting bracket with adjustable, including T frame, three installation template, the three tip of T frame the sleeve pipe has, the module of installation template below including with connect the connecting rod in the module, in the connecting rod inserted casing, have the slot hole and have first screw on the sleeve pipe, the module on install the uide bushing, the uide bushing have the hollow structure and pierce through and install in the module, the module above connecting plate in addition, the connecting plate connecting the connecting rod, connecting plate and installation template be with the 2nd screwed connection, such communication iron tower rag bolt mounting bracket with adjustable has safe and reliable, convenient operation, compact structure, with low costs, the advantage of installing be convenient for.
Description
Technical field
The utility model is the installing rack installed and used about communication foundation of iron tower bolt embedment.
Background technology
Communication steel tower, after workshop has been welded, needs to install in concrete foundation.By pre-embedded anchoring bolts in concrete foundation, the locking of the lower margin flange of communication steel tower is arranged in concrete foundation.In concrete foundation during pre-embedded anchoring bolts, need the relative position between fixing each stone bolt, after concrete foundation solidifies, to be successfully arranged between each stone bolt by lower margin flange.Current mounting means, main employing length ruler measures the relative position between each stone bolt, after each stone bolt is fixing, then fluid concrete basis.This method bothers very much, also easily makes mistakes, and is difficult to ensure the parallelism between each stone bolt simultaneously, installs bring a lot of problem to follow-up lower margin flange.Also can adopt the coxopodite of crane lifting communication steel tower, each stone bolt is sleeved on lower margin flange, the relative position of fixing lower margin, then fluid concrete basis.Coxopodite due to communication steel tower is very large very heavy, and this method construction cost is very high, also bothers very much.
Summary of the invention
The utility model is exactly for the problems referred to above, provides a kind of easy to operate, communication foundation of iron tower screw bolt installing frame that compact conformation, cost are low, quick for installation.
The technical scheme that the utility model adopts is: adjustable communication foundation of iron tower screw bolt installing frame, it is characterized in that: comprise T-bar, three installation forms, described T-bar three ends have sleeve pipe, the connecting rod that described installation form comprises module below and is connected in module, connecting rod inserts in sleeve pipe, sleeve pipe has elongated hole and has the first screw, described module installs fairlead, described fairlead has hollow core structures and penetrates and is arranged in module.
Say further, also have junction plate above described module, described junction plate is connected to connecting rod, and junction plate is connected with installation form the second screw.
The beneficial effects of the utility model are: so adjustable communication foundation of iron tower screw bolt installing frame have safe and reliable, easy to operate, compact conformation, cost are low, be convenient to install advantage; Also have junction plate above described module, described junction plate is connected to connecting rod, and junction plate is connected with template the second screw, also has and changes the easier advantage of module.
Accompanying drawing explanation
Fig. 1 is structural representation of the present utility model.
In figure: 1, T-bar 2, installation form 3, sleeve pipe 4, module 5, connecting rod 6, first screw 7, fairlead 8, junction plate 9, second screw.
detailed description of the invention:
Below in conjunction with accompanying drawing, the utility model is described further
As shown in Figure 1, adjustable communication foundation of iron tower screw bolt installing frame, it is characterized in that: comprise T-bar 1, three installation forms 2, described T-bar three ends have sleeve pipe 3, the connecting rod 5 that described installation form comprises module 4 below and is connected in module, connecting rod inserts in sleeve pipe, sleeve pipe has elongated hole and has the first screw 6, described module is installed fairlead 7, described fairlead has hollow core structures and penetrates and is arranged in module.
Say further, also have junction plate 8 above described module, described junction plate is connected to connecting rod, and junction plate is connected with installation form the second screw 9.
By adjustment T-bar and connecting rod locked position, adapt to the required distance between different foundation of iron tower.
Installation form is fixed with by welding or bolted mode the fairlead of different size, and this fairlead is hollow-core construction.In actual use, foundation bolt bush is through in fairlead, the stone bolt location of different-diameter can be met, ensure its parallel and high and low position requirement.
In the use of reality, first the position of T-bar and mount pad is adjusted on request, and lock, more satisfactory installation form is installed, and lock.And the fairlead required is fixed on installation form.Stone bolt is through in fairlead, above fairlead, is screwed on stone bolt with nut, ensure that stone bolt exceeds length in fairlead.Screw bolt installing frame and stone bolt are together placed in foundation pit, fluid concrete basis.After concreting completes, take off screw bolt installing frame, the position of stone bolt is exactly satisfactory installation site.
Junction plate is connected with installation form the second screw 9, in actual use, according to designing requirement, is processed with series installation template 4.By locking different installation forms under junction plate, the different arrangement requirement of different size communication steel tower to stone bolt namely can be met.
Claims (2)
1. adjustable communication foundation of iron tower screw bolt installing frame, it is characterized in that: comprise T-bar, three installation forms, described T-bar three ends have sleeve pipe, the connecting rod that described installation form comprises module below and is connected in module, connecting rod inserts in sleeve pipe, sleeve pipe has elongated hole and has the first screw, described module installs fairlead, described fairlead has hollow core structures and penetrates and is arranged in module.
2. adjustable communication foundation of iron tower screw bolt installing frame according to claim 1, is characterized in that: also have junction plate above described module, described junction plate is connected to connecting rod, and junction plate is connected with installation form the second screw.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201520557992.8U CN204875840U (en) | 2015-07-29 | 2015-07-29 | Communication iron tower rag bolt mounting bracket with adjustable |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201520557992.8U CN204875840U (en) | 2015-07-29 | 2015-07-29 | Communication iron tower rag bolt mounting bracket with adjustable |
Publications (1)
Publication Number | Publication Date |
---|---|
CN204875840U true CN204875840U (en) | 2015-12-16 |
Family
ID=54820232
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201520557992.8U Active CN204875840U (en) | 2015-07-29 | 2015-07-29 | Communication iron tower rag bolt mounting bracket with adjustable |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN204875840U (en) |
-
2015
- 2015-07-29 CN CN201520557992.8U patent/CN204875840U/en active Active
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN103982045B (en) | A kind of roofing latticed shell structure is encorbelmented construction method of installation without support | |
CN101892812B (en) | Reciprocating drill or electric drill support | |
CN203247603U (en) | High-order rag bolt positioner | |
CN203809870U (en) | Supporting and fixing tool for level pump pipe on concrete floor | |
CN203625921U (en) | Precision control device for pre-embedded mounting of foundation bolts | |
CN204213590U (en) | A kind of adjustable pressure box fixing device | |
CN203270599U (en) | Foundation bolt pre-buried die | |
CN202000651U (en) | Adjustable wall-mounted supporting device for reinforcing upright columns | |
CN203583380U (en) | Movable cast-in-situ culvert cover plate template support | |
CN204920263U (en) | But height-adjusting's guardrail | |
CN205934960U (en) | Foundation bolt positioning device | |
CN204875840U (en) | Communication iron tower rag bolt mounting bracket with adjustable | |
CN202850476U (en) | Scaffold through-wall adjustable tool type wall connection device | |
CN205153515U (en) | Overhanging bearing frame makes up positioner | |
CN204898704U (en) | Tower machine rag bolt mounting bracket with adjustable | |
CN204139622U (en) | Adjustable segmented column steel bar positioning fixture | |
CN203394941U (en) | Foundation bolt fixing device | |
CN206319628U (en) | One kind building assembled wallboard fitting machine | |
CN202390850U (en) | Quick mounting structure for foundation of machine tool | |
CN204689525U (en) | A kind of equipment jacking apparatus being convenient to measure | |
CN204342302U (en) | For the tower machine attachment changed course bracing or strutting arrangement be arranged in parallel | |
CN203247718U (en) | Steel column butt-joint mounting device | |
CN204703530U (en) | For the thrustor of Construction of Steel Structure | |
CN203361596U (en) | Auxiliary support of integrated lifting operation platform | |
CN204040052U (en) | A kind of outer posture fixed mount being applicable to framework foundation built-in bolt and fixing |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C14 | Grant of patent or utility model | ||
GR01 | Patent grant |