CN204852849U - Hoist and mount stores pylon - Google Patents

Hoist and mount stores pylon Download PDF

Info

Publication number
CN204852849U
CN204852849U CN201520216060.7U CN201520216060U CN204852849U CN 204852849 U CN204852849 U CN 204852849U CN 201520216060 U CN201520216060 U CN 201520216060U CN 204852849 U CN204852849 U CN 204852849U
Authority
CN
China
Prior art keywords
fixing
top board
plate
fixing rod
screw
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201520216060.7U
Other languages
Chinese (zh)
Inventor
赵晓森
沙海鹏
蔡长青
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Shenzhne Mingmi Technology Co ltd
Original Assignee
SHENZHEN JINGZE PHOTOELECTRIC TECHNOLOGY Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by SHENZHEN JINGZE PHOTOELECTRIC TECHNOLOGY Co Ltd filed Critical SHENZHEN JINGZE PHOTOELECTRIC TECHNOLOGY Co Ltd
Priority to CN201520216060.7U priority Critical patent/CN204852849U/en
Application granted granted Critical
Publication of CN204852849U publication Critical patent/CN204852849U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Load-Engaging Elements For Cranes (AREA)

Abstract

The utility model discloses a hoist and mount stores pylon, hoist and mount stores pylon includes stationary roof, PMKD and runing rest, stationary roof is used for being fixed in on the indoor ceiling, stationary roof's cross section level sets up, PMKD is relative stationary roof is fixed, and is on a parallel with stationary roof, PMKD with fixedly connected with pivot between the stationary roof, rotatory rotate bracket connection in in the pivot, and lie in stationary roof with between the PMKD, the runing rest winds the pivot symmetry sets up a plurality of installation fixed parts, and is a plurality of the installation fixed part all expose in PMKD's edge, it is a plurality of the installation fixed part is for fixed connection hoist and mount article. Effectively solve the problem that hoist and mount stores pylon can not angle regulation to make the hoist and mount stores pylon structure firm, can realize the multi -angle simultaneously and adjust, satisfy the installation of diversified hoist and mount article.

Description

Lifting hanger
Technical field
The utility model relates to decorating apparatus field, particularly relates to a kind of lifting hanger.
Background technique
At present along with the kind of indoor equipment is more, more and more higher to the installation requirement of indoor equipment, the existing lifting hanger majority be arranged on overhead room utilizes blast screw to be fixed on ceiling board by mounting plate, then utilize and mounting plate arranges screw or Suspension hook structure hanging article hoisting, thus realize article hoisting and be fixed on ceiling board.Although this kind of structure is firm, but day by day diversified article hoisting equipment can not be met, can not solve the problem that article hoisting needs adjusting angle, when needing to regulate lifting object in the face of multi-angle, the lifting hanger of this kind of structure can not realize the installation of article hoisting.
Model utility content
In view of this, the utility model is for the disappearance of prior art existence, and its main purpose is to provide a kind of lifting hanger that can realize regulating.
For achieving the above object, the utility model provides a kind of lifting hanger, wherein, described lifting hanger comprises fixing top board, fixing bottom-plate and runing rest, described fixing top board is in order to be fixed in indoor ceiling, the cross-sectional horizontal of described fixing top board is arranged, the relatively described fixing top board of described fixing bottom-plate is fixed, and be parallel to described fixing top board, rotating shaft is fixedly connected with between described fixing bottom-plate and described fixing top board, described runing rest is rotationally connected with in described rotating shaft, and between described fixing top board and described fixing bottom-plate, described runing rest is symmetrical arranged multiple mounting part around described rotating shaft, multiple described mounting parts are all exposed to the edge of described fixing bottom-plate, multiple described mounting part is in order to be fixedly connected with article hoisting.
Wherein, described fixing top board is provided with the first horizontal slot of longitudinal extension and the second horizontal slot of horizontal expansion, in described first horizontal slot and described second horizontal slot, is provided with levelling bubble.
Wherein, described lifting hanger also comprises switching support, described switching support comprises the first fixing rod of horizontal expansion and the second fixing rod of longitudinal extension, described first fixing rod and described second fixing rod are all through described rotating shaft, described first fixing rod is fixed on described fixing top board, described second fixing rod is fixed on described first fixing rod, and described fixing bottom-plate is fixed on described second fixing rod.
Wherein, described first fixing rod is removably connected to described fixing bottom-plate, and be removably connected to described fixing top board, described second fixing rod is removably connected to described first fixing rod, and be removably connected to described fixing bottom-plate, and between described first fixing rod and described fixing top board.
Wherein, one end of described first fixing rod is provided with the first bolt apertures, corresponding described first bolt apertures of described fixing top board is provided with the second bolt apertures, the first screw is bolted with in described second bolt apertures, be compressed with elastic component between the nut of described first screw and described fixing top board, described first screw is bolted in described first bolt apertures away from nut one end.
Wherein, described fixing bottom-plate is extended with screw pole towards described first fixing rod, and described first fixing rod screw connects described fixing bottom-plate.
Wherein, described fixing top board is provided with multiple screw mounting hole, is provided with blast screw in described screw mounting hole, and described blast screw is for being fixed on described indoor ceiling.
Wherein, described runing rest is provided with the chute extended along circular arc, and the center of circle of described circular arc is arranged in described rotating shaft, and described fixing bottom-plate is provided with boss near described runing rest side, and described boss is slidably connected in described chute.
Wherein, multiple described fixed installation portion arranges screw hole, and multiple described fixed installation portion is in order to be bolted in article hoisting.
Wherein, described fixing top board, fixing bottom-plate and described runing rest all adopt metal material to make.
The lifting hanger that the utility model provides, be rotationally connected with between described fixing top board and described fixing bottom-plate by described runing rest, and utilize described runing rest to be fixedly connected with article hoisting, thus the rotation realizing article hoisting regulates, effective lifting hanger that solves can not the problem of adjusting angle, thus make lifting hanging rack structure firm, multi-angle can be realized simultaneously and regulate, meet the installation of diversified article hoisting.
Accompanying drawing explanation
For more clearly setting forth structure characteristics of the present utility model and effect, be described in detail below in conjunction with accompanying drawing and specific embodiment.
The decomposing schematic representation of the lifting hanger that Fig. 1 provides for the utility model;
Fig. 2 is the schematic diagram of the top board of the lifting hanger of Fig. 1.
Embodiment
Below in conjunction with the accompanying drawing in the utility model mode of execution, the technological scheme in the utility model mode of execution is clearly and completely described.
See also Fig. 1 and Fig. 2, the one lifting hanger 100 that the utility model provides.Described lifting hanger 100 comprises fixing top board 10, fixing bottom-plate 20 and runing rest 30.Described fixing top board 10 is in order to be fixed in indoor ceiling (not shown), and the cross-sectional horizontal of described fixing top board 10 is arranged.The relatively described fixing top board 10 of described fixing bottom-plate 20 is fixed, and is parallel to described fixing top board 10.Rotating shaft 10a is fixedly connected with between described fixing bottom-plate 20 and described fixing top board 10.Described runing rest 30 is rotationally connected with on described rotating shaft 10a, and between described fixing top board 10 and described fixing bottom-plate 20.Described runing rest 30 is symmetrical arranged multiple mounting part 31 around described rotating shaft 10a, and multiple described mounting parts 31 are all exposed to the edge of described fixing bottom-plate 20, and multiple described mounting part 31 is in order to be fixedly connected with article hoisting.
Be rotationally connected with between described fixing top board 10 and described fixing bottom-plate 20 by described runing rest 30, and utilize described runing rest 30 to be fixedly connected with article hoisting, rotate and regulate described runing rest 30, thus the rotation realizing article hoisting regulates, thus make lifting hanger 100 stabilized structure, multi-angle can be realized regulate simultaneously, meet the installation of diversified article hoisting.
In present embodiment, described fixing top board 10 is rectangle plate, and described fixing top board 10 comprises the first side 11 that two transverse directions are oppositely arranged, and the second side 12 that two longitudinal directions are oppositely arranged.One of them side 12 is extended with protruding 12a along the direction, face, rank street of fixing top board 10.Described protruding 12a increases the length of described fixing top board 10, thus increases the robust structure of described fixing top board 10, avoids described fixing top board 10 weight to increase simultaneously.Described first side 11 is extended with the first flange 11a towards described fixing bottom-plate 20.One end of described protruding 12a is extended with the second flange 12b towards described fixing bottom-plate 20.Described first flange 11a and described second flange 12b can strengthen the robust structure of described fixing top board 10, prevents described fixing top board 10 to be out of shape, and makes described fixing top board 10 can carry larger suspension force.In other embodiments, described fixing top board 10 can also be circular plate, and described fixing top board 10 can also arrange flange at periphery.
In present embodiment, described fixing bottom-plate 20 is circular plate, the geometrical center of described fixing bottom-plate 20 is extended with screw pole (sign) towards described fixing top board 10, described screw pole is fixed between described fixing bottom-plate 20 and described fixing top board 10, and described screw pole forms described rotating shaft 10a.In other embodiments, can also be that block button hole is set on described fixing top board 10, fixing column is extended towards described fixing top board 10 in the geometrical center of described fixing bottom-plate 20, described fixing column one end is sticked in described block button hole, realize the fixing of described fixing top board 10 and described fixing bottom-plate 20, and described fixing column forms described rotating shaft 10a.
In present embodiment, described runing rest 30 is rectangle plate.The geometrical center of described runing rest 30 arranges manhole 30a, and described manhole 30a is sheathed on described rotating shaft 10a, and namely described screw pole inserts described manhole 30a.Thus described runing rest 30 can rotate relative to described rotating shaft 10a.The cross section of described runing rest 30 is greater than the cross section of described circular bottom plate 20, thus the periphery of described runing rest 30 exposes the edge of described circular bottom plate 20.Thus the periphery of described runing rest 30 forms described mounting part 31.Described mounting part 31 can be arrange screw hole, and be spirally connected article hoisting, also can be to arrange buckle to be connected together article hoisting, and can also be arrange pin post, article hoisting be fixed by pin.
Further, described fixing top board 10 is provided with the first horizontal slot 14 of longitudinal extension and the second horizontal slot 15 of horizontal expansion, in described first horizontal slot 14 and described second horizontal slot 15, is provided with levelling bubble (not shown).
In present embodiment, described first horizontal slot 14 and described second horizontal slot 15 are rectangular recess.Described first horizontal slot 14 and described second horizontal slot are provided with mark (sign) in the middle of length direction, described mark can align with described levelling bubble, when described levelling bubble aims at described mark, thus the cross-sectional horizontal of described fixing top board 10 is arranged.Thus described runing rest 30 can be made in horizontal plane effectively to rotate adjustment.In other embodiments, can also be that Miniature water level is set on described fixing top board 10, make the Level tune of described fixing top board 10 more accurate.
Further, described lifting hanger 100 also comprises switching support 40, and described switching support 40 comprises the first fixing rod 41 of horizontal expansion and the second fixing rod 42 of longitudinal extension.Described first fixing rod 41 and described second fixing rod 42 are all through described rotating shaft 10a.Described first fixing rod 41 is fixed on described fixing top board 10a, and described second fixing rod 42 is fixed on described first fixing rod 41, and described fixing bottom-plate 20 is fixed on described second fixing rod 42.
In present embodiment, described switching support 40 is fixedly connected between described fixing bottom-plate 20 and described fixing top board 10.Thus described switching support 40 makes the fixed structure of described fixing bottom-plate 20 and described fixing top board 10 more firm.Concrete, when described fixing bottom-plate 20 is fixed on described fixing top board 10, first described runing rest 30 is placed on described rotating shaft 10a, then described first fixing rod 41 is fixed on described fixing bottom-plate 20 near described fixing top board 10 side.And then described second fixing rod 42 is fixed on described first fixing rod 41 deviates from described fixing bottom-plate 20 side.Finally the assembly that described fixing bottom-plate 20, runing rest 30 and switching support 40 are formed is fixed on described fixing top board 10 jointly.Described switching support 40, runing rest 30 and described fixing bottom-plate 20 is utilized to form assembly, while making the stabilized structure of described lifting hanger 100, easy for installation, be easy to safeguard.In other embodiments, described first fixing rod and described second fixing rod are wholely set.
Further, described first fixing rod 41 is removably connected to described fixing bottom-plate 20, and is removably connected to described fixing top board 10.Described second fixing rod 42 is removably connected to described first fixing rod 41, and is removably connected to described fixing bottom-plate 20, and between described first fixing rod 41 and described fixing top board 10.
In present embodiment, described first fixing rod 41 passes described rotating shaft 10a, near described fixing bottom-plate 20.Described first fixing rod 41 offers the first groove 41a of opening towards described fixing bottom-plate 20.Two screw hole 41b that relatively described fixing bottom-plate is arranged are offered in described first groove 41a.Corresponding described two the screw hole 41b of described fixing bottom-plate 20 are extended with two the first screw columns 21, and described fixing bottom-plate 20 is also provided with boss 22 near described first fixing rod 41 side.Described first screw column 21 is bolted in the screw in described first screw hole 41b.The top of described boss 22 is contained in described first groove 41a, thus facilitates described first fixing rod 41 to position on described fixing bottom-plate 20.Distance is there is between the opening of described first groove 41a and described fixing bottom-plate 20.Described runing rest 30 is positioned at described distance.In other embodiments, described first fixing rod 41 can also be fastened on described fixing bottom-plate 20.
In present embodiment, the second fixing rod 42 offers the second groove 42a of opening towards described fixing top board 10.In described second groove 42a, corresponding described rotating shaft 10a offers screw hole (sign), screw is locked in described screw hole 42b, thus described second fixing rod 42 can be bolted on described rotating shaft 42a, described second groove 42a also offers two the second screw hole 42b of relatively described fixing bottom-plate 20.Described fixing bottom-plate 20 is also extended with the second screw column 23 near corresponding two the described second screw hole 42b in described fixing top board 10 side.Described second screw column 23 is bolted in the screw in described second screw hole 42b.Thus described second fixing rod 42, first fixing rod 41, runing rest 30 and described fixing bottom-plate 20 form assembly.After described runing rest 30 installs article hoisting, conveniently article hoisting and described assembly are installed on described fixing top board 10 jointly.In other embodiments, described second fixing rod 42 can also be connected together on described fixing bottom-plate 20.
Further, described fixing top board 10 is provided with two hook 10b near described fixing bottom-plate 20 side, and the two ends difference hooking of described second fixing rod 42 is on described two hook 10b.
In present embodiment, described two hook 10b are respectively adjacent to described two the first flange 11a.Thus strengthen the structure of described hook 10b.When described switching support 40 is installed on described fixing top board 10, the two ends of described second fixing rod 42 are filled in respectively in described two hook 10b, thus realize described second fixing rod 42 and be fixed on described fixing top board 10, and then the described switching support 40 of convenient installation, and described runing rest 30 and article hoisting, achieve easy for installation, be easy to safeguard.In other embodiments, can also being, at described fixing top board 10, chute is set near described fixing bottom-plate 20 side, when installing described runing rest 40, the two ends of described second fixing rod 42 being filled in described chute respectively.
Further, one end of described first fixing rod 41 is provided with the first bolt apertures 411, described fixing top board described first bolt apertures 411 should be provided with the second bolt apertures 16 to 10, the first screw 17 is bolted with in described second bolt apertures 16, be compressed with elastic component (not shown) between the nut of described first screw 17 and described fixing top board 10, described first screw 17 is bolted in described first bolt apertures 411 away from nut one end.
In present embodiment, described second bolt apertures 16 is arranged on described second flange 12b.Utilize described first screw 17 to be bolted in described first to be spirally connected screw 411, thus convenient described first fixing rod 41 to be fixed on described fixing top board 10.Same, the other end of described first fixing rod 41 also can arrange identical bolt apertures, more firm with the structure of described fixing top board 10 to realize described first fixing rod 41, facilitates installing/dismounting, also maintains easily simultaneously.Described elastic component prevents described first screw 17 from coming off and described fixing top board 10, easy to use, saves setting tool.Described fixing top board 10 is except fixing with described first fixing rod 41, and described fixing top board 10 also offers buckle (sign) in the inner side of described first flange 11a, and described buckle is sticked in one end of described second fixing rod 42.Thus the two ends realizing described second fixing rod 42 are sticked on described two the first flange 11a.Thus it is more firm with the structure of described fixing top board 10 to increase described switching support 40.In other embodiments, can also be that the two ends of described second fixing rod 42 are bolted in described fixing top board 10, the two ends of described first fixing rod 41 be bolted in described fixing top board 10.
Further, described fixing top board 10 is provided with multiple screw mounting hole 18, and be provided with blast screw 18a in described screw mounting hole 18, described blast screw 18a is for being fixed on described indoor ceiling.
In present embodiment, described fixing top board 10 is provided with four corners that four screw mounting holes, 18, four institute's screw mounting holes 18 are installed on described fixing top board 10 respectively.Thus utilize four described blast screw 18a to strengthen the mounting structure of described fixing top board 10, four described quick-fried photographs between screw 18a and described fixing top board 10 are also provided with pad (not shown), utilize described pad can regulate the level of described fixing top board 10.In other embodiments, described fixing top board 10 can also be the screw mounting hole 18 arranging other numbers.
Further, described runing rest 30 is provided with the chute extended along circular arc, and the center of circle of described circular arc is arranged on described rotating shaft 10a, and described fixing bottom-plate 20 is provided with boss 22 near described runing rest side, and described boss 22 is slidably connected in described chute.
In present embodiment, described runing rest 30 offers the first chute 32 and the second chute 33.Described first screw column 21 and described boss 22 are all through described first chute 32, and when described runing rest 30 rotates, described first screw column 21 and described boss 22 slide in described first chute 32.Described second screw column 23 is through described second chute 33, and described second screw column 23 is slidably connected in described second chute 33.Thus facilitate the adjustment of described runing rest 30 multi-angle.
Further, multiple described fixed installation portion 31 arranges screw hole 31a, and multiple described fixed installation portion 31 is in order to be bolted in article hoisting.Utilize described fixed installation portion 31 that screw hole 31a is set, thus facilitate described fixed installation portion 31 to removably connect described article hoisting, be easy to installation and maintenance.
Further, described fixing top board 10, fixing bottom-plate 20 and described runing rest 30 all adopt metal material to make.Concrete, described fixing top board 10, fixing bottom-plate 20 and described runing rest 30 all can adopt aluminium alloy panels to make, thus make described lifting hanger 100 stabilized structure, antirust protection against the tide simultaneously, corrosion-resistant.
The lifting hanger that the utility model provides, be rotationally connected with between described fixing top board and described fixing bottom-plate by described runing rest, and utilize described runing rest to be fixedly connected with article hoisting, thus the rotation realizing article hoisting regulates, effective lifting hanger that solves can not the problem of adjusting angle, thus make lifting hanging rack structure firm, multi-angle can be realized simultaneously and regulate, meet the installation of diversified article hoisting.
The above is preferred implementation of the present utility model; it should be pointed out that for those skilled in the art, under the prerequisite not departing from the utility model principle; can also make some improvements and modifications, these improvements and modifications are also considered as protection domain of the present utility model.

Claims (10)

1. a lifting hanger, it is characterized in that, described lifting hanger comprises fixing top board, fixing bottom-plate and runing rest, described fixing top board is in order to be fixed in indoor ceiling, the cross-sectional horizontal of described fixing top board is arranged, the relatively described fixing top board of described fixing bottom-plate is fixed, and be parallel to described fixing top board, rotating shaft is fixedly connected with between described fixing bottom-plate and described fixing top board, described runing rest is rotationally connected with in described rotating shaft, and between described fixing top board and described fixing bottom-plate, described runing rest is symmetrical arranged multiple mounting part around described rotating shaft, multiple described mounting parts are all exposed to the edge of described fixing bottom-plate, multiple described mounting part is in order to be fixedly connected with article hoisting.
2. lifting hanger according to claim 1, is characterized in that, described fixing top board is provided with the first horizontal slot of longitudinal extension and the second horizontal slot of horizontal expansion, is provided with levelling bubble in described first horizontal slot and described second horizontal slot.
3. lifting hanger according to claim 2, it is characterized in that, described lifting hanger also comprises switching support, described switching support comprises the first fixing rod of horizontal expansion and the second fixing rod of longitudinal extension, described first fixing rod and described second fixing rod are all through described rotating shaft, described first fixing rod is fixed on described fixing top board, and described second fixing rod is fixed on described first fixing rod, and described fixing bottom-plate is fixed on described second fixing rod.
4. lifting hanger according to claim 3, it is characterized in that, described first fixing rod is removably connected to described fixing bottom-plate, and be removably connected to described fixing top board, described second fixing rod is removably connected to described first fixing rod, and be removably connected to described fixing bottom-plate, and between described first fixing rod and described fixing top board.
5. lifting hanger according to claim 4, is characterized in that, described fixing top board is provided with two hooks near described fixing bottom-plate side, and the two ends difference hooking of described second fixing rod is on described two hooks.
6. lifting hanger according to claim 5, it is characterized in that, one end of described first fixing rod is provided with the first bolt apertures, corresponding described first bolt apertures of described fixing top board is provided with the second bolt apertures, the first screw is bolted with in described second bolt apertures, be compressed with elastic component between the nut of described first screw and described fixing top board, described first screw is bolted in described first bolt apertures away from nut one end.
7. lifting hanger according to claim 1, is characterized in that, described fixing top board is provided with multiple screw mounting hole, is provided with blast screw in described screw mounting hole, and described blast screw is for being fixed on described indoor ceiling.
8. lifting hanger according to claim 1, it is characterized in that, described runing rest is provided with the chute extended along circular arc, and the center of circle of described circular arc is arranged in described rotating shaft, described fixing bottom-plate is provided with boss near described runing rest side, and described boss is slidably connected in described chute.
9. lifting hanger according to claim 1, is characterized in that, multiple described fixed installation portion arranges screw hole, and multiple described fixed installation portion is in order to be bolted in article hoisting.
10. lifting hanger according to claim 1, is characterized in that, described fixing top board, fixing bottom-plate and described runing rest all adopt metal material to make.
CN201520216060.7U 2015-04-10 2015-04-10 Hoist and mount stores pylon Expired - Fee Related CN204852849U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201520216060.7U CN204852849U (en) 2015-04-10 2015-04-10 Hoist and mount stores pylon

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201520216060.7U CN204852849U (en) 2015-04-10 2015-04-10 Hoist and mount stores pylon

Publications (1)

Publication Number Publication Date
CN204852849U true CN204852849U (en) 2015-12-09

Family

ID=54743394

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201520216060.7U Expired - Fee Related CN204852849U (en) 2015-04-10 2015-04-10 Hoist and mount stores pylon

Country Status (1)

Country Link
CN (1) CN204852849U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109373155A (en) * 2018-11-07 2019-02-22 嘉兴盛和网络科技有限公司 A kind of extension wall construction of recognition of face device

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109373155A (en) * 2018-11-07 2019-02-22 嘉兴盛和网络科技有限公司 A kind of extension wall construction of recognition of face device

Similar Documents

Publication Publication Date Title
CN209298708U (en) A kind of isolator operating mechanism installation auxiliary device
CN202419085U (en) Hanging bracket of commercial liquid crystal display television
CN204282620U (en) Keel hanging member structure and ceiling structure
CN204852849U (en) Hoist and mount stores pylon
CN205088823U (en) Hanging piece for stone curtain wall
CN204420509U (en) A kind of LED combination hoisting structure
CN2674802Y (en) Handy hanger
CN209538694U (en) A kind of aluminum alloy mould plate holder device
CN209357405U (en) A kind of adjustable reflecting marking board
CN208503658U (en) A kind of antioverloading Combined changable spring support hanging frame using screw lock
CN212516334U (en) Electric power warning sign convenient to adjust
CN206093950U (en) Mounting bracket that falls is prevented to large -scale lamps and lanterns
CN201635219U (en) Curtain wall stone back bolt device
CN205206120U (en) Furred ceiling suspended structure
CN210482077U (en) Bearing device for bridge construction
CN203852765U (en) Stage fireproof curtain provided with LED screen
CN201635228U (en) Novel flash rack ceiling system
CN207564380U (en) A kind of installs fixture of street lamp post
CN107611866B (en) Adjustable aluminium alloy chute
CN206299019U (en) A kind of large span ceiling decoration board mounting structure
CN205973583U (en) Flip -chip of assembled steel board cabin is with hoist and mount subassembly
CN214351890U (en) Electromechanical maintenance fixing device
CN204590319U (en) Precast shear wall secured adjusted bar
CN213923747U (en) Crane suspension device convenient to adjust
CN208676959U (en) A kind of curtain rod bracket

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
C41 Transfer of patent application or patent right or utility model
CB03 Change of inventor or designer information

Inventor after: Zhao Xiaosen

Inventor after: Sha Haipeng

Inventor after: Zou Shengkui

Inventor before: Zhao Xiaosen

Inventor before: Sha Haipeng

Inventor before: Cai Changqing

COR Change of bibliographic data
TR01 Transfer of patent right

Effective date of registration: 20160206

Address after: 518000 Guangdong Province, Nanshan District Shenzhen tea light industrial zone 17 708 Lu Wenguang

Patentee after: SHENZHNE MINGMI TECHNOLOGY CO.,LTD.

Address before: 518101 18B, D, hung hung garden, west turn Avenue, Xin'an street, Baoan District, Guangdong, China

Patentee before: SHENZHEN JINGZE PHOTOELECTRIC TECHNOLOGY Co.,Ltd.

CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20151209

CF01 Termination of patent right due to non-payment of annual fee