CN204837288U - Simple and easy lian dong greenhouse skeleton - Google Patents
Simple and easy lian dong greenhouse skeleton Download PDFInfo
- Publication number
- CN204837288U CN204837288U CN201520487802.XU CN201520487802U CN204837288U CN 204837288 U CN204837288 U CN 204837288U CN 201520487802 U CN201520487802 U CN 201520487802U CN 204837288 U CN204837288 U CN 204837288U
- Authority
- CN
- China
- Prior art keywords
- crossbeam
- utility
- greenhouse skeleton
- easy
- model
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
Classifications
-
- Y—GENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
- Y02—TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
- Y02A—TECHNOLOGIES FOR ADAPTATION TO CLIMATE CHANGE
- Y02A40/00—Adaptation technologies in agriculture, forestry, livestock or agroalimentary production
- Y02A40/10—Adaptation technologies in agriculture, forestry, livestock or agroalimentary production in agriculture
- Y02A40/25—Greenhouse technology, e.g. cooling systems therefor
Landscapes
- Greenhouses (AREA)
Abstract
The utility model discloses a simple and easy lian dong greenhouse skeleton, including a plurality of companies that connect gradually unit, company's unit includes two side frames and the bow roof beam of connecting two side frames, the crossbeam that the side frame includes the vertical stand of a plurality of roots and connects the stand top, be equipped with water drainage tank on the crossbeam, two side frames are parallel to each other, be equipped with first acting as go -between between two side frames, it acts as go -between to be equipped with the second between side frame and the earth. The utility model discloses utilize stand supporting beam, the bow roof beam is established on the crossbeam, and first acting as go -between with the second combined action that acts as go -between makes this utility model structure safe and reliable more, and anti -wind snow ability is strengthened.
Description
Technical field
The utility model relates to green house technical field, specifically, relates to simple and easy attached-greenhouse skeleton.
Background technology
Attached-greenhouse is a kind of framework structure of film with outstanding heat-insulating property, and its appearance makes people can have vegetables in improper season and fruit.Attached-greenhouse generally uses skeletal support, is covered with one or more layers thermal insulation plastic film above skeleton, material is thus formed a greenhouse space.The loss of the carbonic acid gas that adventitia stops inner crop growth to produce well, makes to have good heat insulation effect in greenhouse.Along with agrotechnique development, more and more higher to the requirement in crop growth greenhouse, the requirement of people to crops greenhouse starts towards low cost, and daylighting degree is good, and space is larger, and life cycle is longer, has the future development of certain wind loading rating.
Utility model content
The purpose of this utility model is the weak point overcoming above-mentioned conventional art, provides simple and easy attached-greenhouse skeleton.
For solving the problem, the technical scheme that the utility model adopts is:
Simple and easy attached-greenhouse skeleton, comprise some companies connected successively unit, described company's unit comprises two side frameworks and the bow beam being connected two side frameworks, described side framework comprises some vertical columns and the crossbeam being connected column top, described crossbeam is provided with rhone, described two side frameworks are parallel to each other, and are provided with the first bracing wire between described two side frameworks, are provided with the second bracing wire between described side framework and the earth.
One as technique scheme is improved:
The two ends of described first bracing wire are connected with crossbeam respectively.
One as technique scheme is improved:
Described second bracing wire one end is connected with crossbeam, and the other end is connected with the earth.
One as technique scheme is improved:
Described bow beam is located on crossbeam.
One as technique scheme is improved:
Described bow beam is provided with some first connecting rods being parallel to crossbeam.
Owing to have employed technique scheme, compared with prior art, the utility model utilizes upright supports crossbeam, and bow beam is located on crossbeam, and the first bracing wire, with the second bracing wire acting in conjunction, makes this utility model structure more safe and reliable, and wind resistance snow ability is strengthened.This utility model structure is simple, uses material few, greatly reduces cost.Because the supporting traverse that this utility model structure simply uses reduces, daylight is more sufficient to crop irradiation.
Below in conjunction with the drawings and specific embodiments, the utility model is described in further detail.
Accompanying drawing explanation
Fig. 1 is the structural representation of the utility model simple and easy attached-greenhouse skeleton company's unit;
Fig. 2 is the left view of the utility model simple and easy attached-greenhouse skeleton company's unit
Fig. 3 is the stereogram of the utility model suggestion attached-greenhouse skeleton.
In figure: 1-column; 201-first connecting rod; 202-second connecting rod; 3-rhone; 4-bends beam; 5-crossbeam; 601-first bracing wire; 602-second bracing wire; 7-connects a unit.
Embodiment
Embodiment:
As shown in Figure 1, Figure 2, Figure 3 shows, simple and easy attached-greenhouse skeleton, comprise some companies connected successively unit 7, described company's unit 7 comprises two side frameworks and the bow beam 4 being connected two side frameworks, described side framework comprises some vertical columns 1 and the crossbeam 5 being connected column 1 top, described crossbeam 5 is provided with rhone 3, described two side frameworks are parallel to each other, be provided with the first bracing wire 601 between described two side frameworks, between described side framework and the earth, be provided with the second bracing wire 602.
The two ends of described first bracing wire 601 are connected with crossbeam 5 respectively, and company's unit is provided with two the first parallel bracing wires 601.
Described second bracing wire 602 one end is connected with crossbeam 5, and the other end is connected with the earth.
Described bow beam 4 is located on crossbeam 5.
Described bow beam 4 is provided with some first connecting rods 201 being parallel to crossbeam 5.
The length of a described company's unit 7 middle cross beam 5 is 4 meters, and the span of bow beam 4 is 8 meters, and the distance between bow beam 4 is 1 meter.
Described column 1 can be timber, bamboo, metal, concrete.
The column 1 of described simple and easy attached-greenhouse skeleton surrounding is provided with second connecting rod 202, for fixing greenhouse film, and can play the effect of reinforcing simple and easy attached-greenhouse skeleton.
This utility model has the advantage that cost is low, daylighting degree is good, space is large, life cycle is long, and generally produce in spring and autumn, increase by two films, three films, vegetables can one month earlier go on the market when spring, can delay a harvesting in month autumn.Structural safety is reliable, and wind resistance snow ability is strong.
Claims (5)
1. simple and easy attached-greenhouse skeleton, it is characterized in that: comprise some companies connected a successively unit (7), described company's unit (7) comprises two side frameworks and the bow beam (4) being connected two side frameworks, described side framework comprises some vertical columns (1) and the crossbeam (5) being connected column (1) top, described crossbeam (5) is provided with rhone (3), described two side frameworks are parallel to each other, the first bracing wire (601) is provided with between described two side frameworks, the second bracing wire (602) is provided with between described side framework and the earth.
2. simple and easy attached-greenhouse skeleton according to claim 1, is characterized in that: the two ends of described first bracing wire (601) are connected with crossbeam (5) respectively.
3. simple and easy attached-greenhouse skeleton according to claim 1, is characterized in that: described second bracing wire (602) one end is connected with crossbeam (5), and the other end is connected with the earth.
4. simple and easy attached-greenhouse skeleton according to claim 1, is characterized in that: described bow beam (4) is located on crossbeam (5).
5. simple and easy attached-greenhouse skeleton according to claim 1, is characterized in that: described bow beam (4) is provided with some first connecting rods (201) being parallel to crossbeam (5).
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201520487802.XU CN204837288U (en) | 2015-07-02 | 2015-07-02 | Simple and easy lian dong greenhouse skeleton |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201520487802.XU CN204837288U (en) | 2015-07-02 | 2015-07-02 | Simple and easy lian dong greenhouse skeleton |
Publications (1)
Publication Number | Publication Date |
---|---|
CN204837288U true CN204837288U (en) | 2015-12-09 |
Family
ID=54727904
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201520487802.XU Expired - Fee Related CN204837288U (en) | 2015-07-02 | 2015-07-02 | Simple and easy lian dong greenhouse skeleton |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN204837288U (en) |
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN109392880A (en) * | 2018-11-22 | 2019-03-01 | 深圳市仙湖植物园管理处(深圳市园林研究中心) | A kind of control method of Mikania micrantha and greenhouse for Mikania micrantha prevention and treatment |
CN111296128A (en) * | 2020-03-11 | 2020-06-19 | 四川华胜农业股份有限公司 | Big-arch shelter is planted to kiwi fruit |
-
2015
- 2015-07-02 CN CN201520487802.XU patent/CN204837288U/en not_active Expired - Fee Related
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN109392880A (en) * | 2018-11-22 | 2019-03-01 | 深圳市仙湖植物园管理处(深圳市园林研究中心) | A kind of control method of Mikania micrantha and greenhouse for Mikania micrantha prevention and treatment |
CN111296128A (en) * | 2020-03-11 | 2020-06-19 | 四川华胜农业股份有限公司 | Big-arch shelter is planted to kiwi fruit |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN201905093U (en) | Low-cost overwintering cold-proof structure for dragon fruits | |
CN204443370U (en) | Assembled multifunction energy-saving greenhouse by solar heat | |
CN204837288U (en) | Simple and easy lian dong greenhouse skeleton | |
CN107347504A (en) | A kind of setting structure of framework of glasshouse big shack | |
CN203912733U (en) | A kind of Novel planting canopy | |
CN203912761U (en) | The cold-proof wind resistance fender bracket of a kind of nursery stock | |
CN104686281A (en) | Novel grape trellis | |
CN203968811U (en) | A kind of light-duty zigzag greenhouse | |
CN104206210B (en) | Multifunctional long-span high-strength connected greenhouse | |
CN203735170U (en) | Connecting system of glass greenhouse heating pipeline and steel roof gutter | |
CN202759897U (en) | Simple steel frame connecting ridgepole greenhouse | |
CN210641644U (en) | Multi-span plastic greenhouse for scale production of melons, fruits and vegetables | |
CN204426161U (en) | A kind of steel structure Conjoined greenhouse | |
CN214853122U (en) | Novel greenhouse main body | |
CN101755637B (en) | Ultra-span greenhouse | |
CN207589639U (en) | The greenhouse that a kind of bamboo pole bamboo chip with plastic wraps makes | |
CN203912734U (en) | A kind of novel planting shed that dispels the heat | |
CN205511204U (en) | Novel resistance to compression greenhouse skeleton structure | |
CN203633245U (en) | Large-span assembled double-arc insulating greenhouse | |
CN203251736U (en) | Cultivation wind resisting canopy frame of peach orchard | |
CN203523444U (en) | Grape rain sheltering greenhouse support | |
CN205813025U (en) | The Fructus Vitis viniferae of a kind of umbrella-shaped structure is taken shelter from rain frame | |
CN203537982U (en) | Grape trellis greenhouse with reinforced heat-preserving top | |
CN202918774U (en) | A-shaped plastic greenhouse | |
CN220191600U (en) | Greenhouse framework and greenhouse |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C14 | Grant of patent or utility model | ||
GR01 | Patent grant | ||
CF01 | Termination of patent right due to non-payment of annual fee | ||
CF01 | Termination of patent right due to non-payment of annual fee |
Granted publication date: 20151209 Termination date: 20160702 |