CN204832283U - Long -range on -line monitoring rack of electric energy measurement - Google Patents

Long -range on -line monitoring rack of electric energy measurement Download PDF

Info

Publication number
CN204832283U
CN204832283U CN201520468515.4U CN201520468515U CN204832283U CN 204832283 U CN204832283 U CN 204832283U CN 201520468515 U CN201520468515 U CN 201520468515U CN 204832283 U CN204832283 U CN 204832283U
Authority
CN
China
Prior art keywords
cabinet
dividing plate
electric energy
online monitoring
rack
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201520468515.4U
Other languages
Chinese (zh)
Inventor
吴彦奇
冷学道
祝晨伟
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Zhejiang Harnpu Power Technology Co Ltd
Original Assignee
Zhejiang Harnpu Power Technology Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Zhejiang Harnpu Power Technology Co Ltd filed Critical Zhejiang Harnpu Power Technology Co Ltd
Priority to CN201520468515.4U priority Critical patent/CN204832283U/en
Application granted granted Critical
Publication of CN204832283U publication Critical patent/CN204832283U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Cooling Or The Like Of Electrical Apparatus (AREA)

Abstract

The utility model relates to a rack discloses a long -range on -line monitoring rack of electric energy measurement, including the cabinet body, support frame, fixed strip, baffle, be equipped with the long -range on -line monitoring device of electric energy measurement on the baffle, an internal wiring space, the 2nd wiring space of being equipped with of cabinet is equipped with binding post on the support frame, and the wiring is guided in a wiring space and/or second space. The utility model discloses a design in the cabinet of space layering forms reasonable wiring space through install the support frame additional in the cabinet with the fixed strip for both make things convenient for binding post's installation, improved the wiring in the cabinet again greatly, the maintenance management of being convenient for, again through setting up the louvre in many places such as the cabinet body, fixed strips for the inside and outside air of rack forms the convection current, the inside and outside air continuous flow of the long -time during operation rack of rack, thus fine protected the various electron device in the rack effectively with the heat in the cabinet constantly outside the discharge rack, increased monitoring system's in the rack life.

Description

A kind of electric energy metrical remote online monitoring rack
Technical field
The utility model relates to a kind of rack, particularly relates to a kind of electric energy metrical remote online monitoring rack.
Background technology
Electric energy metrical is the important component part of power industry department economic work, ensure electric power meter accurately, reliability service, be the important evidence of organization of production, operation control and managerial decision.
Existing electric energy metrical remote online monitoring rack comprises cabinet, for installing the dividing plate of monitoring device, but mainly there are the following problems: one is the chaotic irrationality of connecting wiring in rack between numerous electronic equipment, monitoring devices, make troubles to operation and maintenance, also affect work efficiency; Two is that cabinet domestic demand installs special heat abstractor, as radiating block, fan lamp, brings the inconvenience of disassembly and maintenance to space narrow in rack; Three is lack the tool box for equipment in maintenance and management cabinet carried in rack.
Summary of the invention
Mainly there is following shortcoming for electric energy metrical remote online monitoring rack existing in prior art in the utility model: one is the chaotic irrationality of connecting wiring in rack between numerous electronic equipment, monitoring devices, make troubles to operation and maintenance, also affect work efficiency; Two is that cabinet domestic demand installs special heat abstractor, as radiating block, fan etc., brings the inconvenience of disassembly and maintenance to space narrow in rack; Three is lack the tool box for equipment in maintenance and management cabinet carried in rack, provides a kind of and makes wiring in cabinet methodically have bar with wiring space, arrange simple louvre and make rack have good heat sinking function and be with the electric energy metrical remote online monitoring rack being convenient to the tool box of maintenance management in cabinet by place, many places in cabinet.
In order to solve the problems of the technologies described above, the utility model is solved by following technical proposals:
A kind of electric energy metrical remote online monitoring rack, comprise cabinet, be located at the bracing frame in cabinet, be connected to the fixed strip on bracing frame, be located at the dividing plate on fixed strip, dividing plate is provided with electric energy metrical remote online monitoring device, the first wiring space is provided with between bracing frame and fixed strip, the second wiring space is provided with between bracing frame and cabinet inwall, bracing frame is provided with draw-in groove, terminal mount pad is arranged with in draw-in groove, terminal mount pad is provided with connection terminal, wiring between connection terminal and electric energy metrical remote online monitoring device is guided in the first wiring space and/or second space.
As preferably, dividing plate is four, four dividing plates are respectively the first dividing plate being arranged side by side from top to bottom and arranging, second partition, 3rd dividing plate, 4th dividing plate, first dividing plate, second partition, 3rd dividing plate, inner for cabinet space is up and down divided into five layers by the 4th dividing plate, ground floor is formed on the first dividing plate and cabinet top, between first dividing plate and second partition, the space of sandwiched forms the second layer, between second partition and the 3rd dividing plate, the space of sandwiched forms third layer, between 3rd dividing plate and the 4th dividing plate, the space of sandwiched forms the 4th layer, 4th dividing plate and bottom of cabinet bulk form layer 5.
As preferably, electric energy metrical remote online monitoring device comprises power isolation transformer, industrial computer, reset control enclosure, canonical measure unit, canonical measure unit respectively with industrial computer, reset control enclosure, connection terminal connects, industrial computer respectively with reset control enclosure, connection terminal connects, power isolation transformer is located on the first dividing plate, industrial computer, reset control enclosure is located on second partition, canonical measure unit card is located between second partition and the 3rd dividing plate, 4th dividing plate is provided with keyboard, mouse, keyboard, mouse is all connected with industrial computer, power isolation transformer is positioned at ground floor, industrial computer, reset control enclosure is all positioned at the second layer, canonical measure unit is positioned at third layer, keyboard, mouse is all positioned at the 4th layer.
As preferably, second partition is provided with guide rail fixing element, the second guide rail fixed plate that guide rail fixing element comprises the first guide rail fixed plate, is connected as a single entity with the first guide rail fixed plate, the angle of the first guide rail fixed plate and the second guide rail fixed plate is 90 degree, and canonical measure unit two ends are fastened in 90 degree of sandwiched spaces of the first guide rail fixed plate and the second guide rail fixed plate.
As preferably, cabinet is also provided with display installing plate, and display installing plate is positioned at the second layer, and display installing plate is provided with display.
As preferably, cabinet, fixed strip are equipped with louvre.
As preferably, cabinet top is provided with GPRS interface.
As preferably, cabinet base plate is provided with through wires hole, and bunch is from through wires hole access cabinet.
As preferably, the outer top of cabinet is provided with suspension ring.
As preferably, cabinet inner bottom part is provided with the tool box for repair and maintenance.
The utility model is owing to have employed above technical scheme, there is significant technique effect: adopt in the cabinet of space delamination and design, by installing bracing frame additional and fixed strip forms rational wiring space in cabinet, make the installation both facilitating connection terminal, substantially improve again the wiring in cabinet, be convenient to maintenance management; Again by arranging louvre in the many places such as cabinet, fixed strip; rack inner air and outer air is made to form convection current; rack inner air and outer air continuous flow when rack works long hours; thus well the heat in cabinet is constantly discharged outside rack; effectively protect the various electron devices in rack, add the serviceable life of monitoring system in rack.
Accompanying drawing explanation
Fig. 1 is the structure schematic diagram of the utility model electric energy metrical remote online monitoring rack embodiment.
Fig. 2 is the Facad structure schematic diagram of the utility model electric energy metrical remote online monitoring rack embodiment.
Fig. 3 is the front view of Fig. 1.
Fig. 4 is the structural representation of the utility model guide rail fixing element embodiment.
The toponym that in accompanying drawing, each number designation refers to is as follows: 1-cabinet, 2-canonical measure unit, 3-reset control enclosure, 4-industrial computer, 5-louvre, 6-suspension ring, 7-power isolation transformer, 8-first dividing plate, 9-connection terminal, 10-terminal mount pad, 11-second partition, 12-second wiring space, 13-bracing frame, 14-first wiring space, 15-draw-in groove, 16-fixed strip, 17-tool box, 18-display, 19-display installing plate, 20-guide rail fixing element, 21-the 3rd dividing plate, 22-the 4th dividing plate, 23-through wires hole, 24-GPRS antenna port, 201-first guide rail fixed plate, 202-second guide rail fixed plate.
Embodiment
Below in conjunction with accompanying drawing and embodiment, the utility model is described in further detail.
Embodiment 1
A kind of electric energy metrical remote online monitoring rack, as Figure 1-4, comprise cabinet 1, be located at the bracing frame 13 in cabinet 1, be connected to the fixed strip 16 on bracing frame 13, be located at the dividing plate on fixed strip 16, dividing plate is provided with electric energy metrical remote online monitoring device, the first wiring space 14 is provided with between bracing frame 13 and fixed strip 16, the second wiring space 12 is provided with between bracing frame 13 and cabinet 1 inwall, bracing frame 13 is provided with draw-in groove 15, terminal mount pad 10 is arranged with in draw-in groove 15, terminal mount pad 10 is provided with connection terminal 9, wiring between connection terminal 9 and electric energy metrical remote online monitoring device is guided in the first wiring space 14 and second space 12.
Dividing plate is four, four dividing plates are respectively the first dividing plate 8 being arranged side by side from top to bottom and arranging, second partition 11, 3rd dividing plate 21, 4th dividing plate 22, first dividing plate 8, second partition 11, 3rd dividing plate 21, inner for cabinet 1 space is up and down divided into five layers by the 4th dividing plate 22, first dividing plate 8 forms ground floor with cabinet 1 top, between first dividing plate 8 and second partition 11, the space of sandwiched forms the second layer, between second partition 11 and the 3rd dividing plate 21, the space of sandwiched forms third layer, between 3rd dividing plate 21 and the 4th dividing plate 22, the space of sandwiched forms the 4th layer, layer 5 is formed bottom 4th dividing plate 22 and cabinet 1.
Electric energy metrical remote online monitoring device comprises power isolation transformer 7, industrial computer 4, reset control enclosure 3, canonical measure unit 2, canonical measure unit 2 respectively with industrial computer 4, reset control enclosure 3, connection terminal 9 connects, industrial computer 4 respectively with reset control enclosure 3, connection terminal 9 connects, power isolation transformer 7 is located on the first dividing plate 8, industrial computer 4, reset control enclosure 3 is located on second partition 11, canonical measure unit 2 is fastened between second partition 11 and the 3rd dividing plate 21, 4th dividing plate 22 is provided with keyboard, mouse, keyboard, mouse is all connected with industrial computer 4, power isolation transformer 7 is positioned at ground floor, industrial computer 4, reset control enclosure 3 is all positioned at the second layer, canonical measure unit 2 is positioned at third layer, keyboard, mouse is all positioned at the 4th layer.
Second partition 11 is provided with guide rail fixing element 20, the second guide rail fixed plate 202 that guide rail fixing element 20 comprises the first guide rail fixed plate 201, is connected as a single entity with the first guide rail fixed plate 201, the angle of the first guide rail fixed plate 201 and the second guide rail fixed plate 202 is 90 degree, and canonical measure unit 2 two ends are fastened in 90 degree of sandwiched spaces of the first guide rail fixed plate 201 and the second guide rail fixed plate 202.
Cabinet 1 is also provided with display installing plate 19, and display installing plate 19 is positioned at the second layer, and display installing plate 19 is provided with display 18.
Cabinet 1, fixed strip 16 are equipped with louvre 5.
Cabinet 1 top is provided with GPRS antenna port 24.
Cabinet 1 base plate is provided with through wires hole 23, and bunch accesses in cabinet 1 from through wires hole 23.
The outer top of cabinet 1 is provided with suspension ring 6.
Cabinet 1 inner bottom part is provided with the tool box 17 for repair and maintenance.
In a word, the foregoing is only preferred embodiment of the present utility model, all equalizations done according to the utility model claim change and modify, and all should belong to the covering scope of the utility model patent.

Claims (10)

1. an electric energy metrical remote online monitoring rack, comprise cabinet (1), be located at the bracing frame (13) in cabinet (1), be connected to the fixed strip (16) on bracing frame (13), be located at the dividing plate on fixed strip (16), dividing plate is provided with electric energy metrical remote online monitoring device, it is characterized in that: between bracing frame (13) and fixed strip (16), be provided with the first wiring space (14), the second wiring space (12) is provided with between bracing frame (13) and cabinet (1) inwall, bracing frame (13) is provided with draw-in groove (15), terminal mount pad (10) is arranged with in draw-in groove (15), terminal mount pad (10) is provided with connection terminal (9), wiring between connection terminal (9) and electric energy metrical remote online monitoring device is guided in the first wiring space (14) and/or second space (12).
2. a kind of electric energy metrical remote online monitoring rack according to claim 1, it is characterized in that: dividing plate is four, four dividing plates are respectively the first dividing plate (8) being arranged side by side from top to bottom and arranging, second partition (11), 3rd dividing plate (21), 4th dividing plate (22), first dividing plate (8), second partition (11), 3rd dividing plate (21), inner for cabinet (1) space is up and down divided into five layers by the 4th dividing plate (22), ground floor is formed on the first dividing plate (8) and cabinet (1) top, between first dividing plate (8) and second partition (11), the space of sandwiched forms the second layer, between second partition (11) and the 3rd dividing plate (21), the space of sandwiched forms third layer, between 3rd dividing plate (21) and the 4th dividing plate (22), the space of sandwiched forms the 4th layer, 4th dividing plate (22) forms layer 5 with cabinet (1) bottom.
3. a kind of electric energy metrical remote online monitoring rack according to claim 1, it is characterized in that: electric energy metrical remote online monitoring device comprises power isolation transformer (7), industrial computer (4), reset control enclosure (3), canonical measure unit (2), canonical measure unit (2) respectively with industrial computer (4), reset control enclosure (3), connection terminal (9) connects, industrial computer (4) respectively with reset control enclosure (3), connection terminal (9) connects, power isolation transformer (7) is located on the first dividing plate (8), industrial computer (4), reset control enclosure (3) is located on second partition (11), canonical measure unit (2) is fastened between second partition (11) and the 3rd dividing plate (21), 4th dividing plate (22) is provided with keyboard, mouse, keyboard, mouse is all connected with industrial computer (4), power isolation transformer (7) is positioned at ground floor, industrial computer (4), reset control enclosure (3) is all positioned at the second layer, canonical measure unit (2) is positioned at third layer, keyboard, mouse is all positioned at the 4th layer.
4. a kind of electric energy metrical remote online monitoring rack according to claim 1, it is characterized in that: second partition (11) is provided with guide rail fixing element (20), guide rail fixing element (20) comprises the first guide rail fixed plate (201), the second guide rail fixed plate (202) be connected as a single entity with the first guide rail fixed plate (201), first guide rail fixed plate (201) is 90 degree with the angle of the second guide rail fixed plate (202), canonical measure unit (2) two ends are fastened on the first guide rail fixed plate (201) with in 90 degree of sandwiched spaces of the second guide rail fixed plate (202).
5. a kind of electric energy metrical remote online monitoring rack according to claim 2, it is characterized in that: cabinet (1) is also provided with display installing plate (19), display installing plate (19) is positioned at the second layer, and display installing plate (19) is provided with display (18).
6. a kind of electric energy metrical remote online monitoring rack according to claim 1, is characterized in that: cabinet (1), fixed strip (16) are equipped with louvre (5).
7. a kind of electric energy metrical remote online monitoring rack according to claim 1 or 2 or 5 or 6, is characterized in that: cabinet (1) top is provided with GPRS antenna port (24).
8. a kind of electric energy metrical remote online monitoring rack according to claim 7, is characterized in that: cabinet (1) base plate is provided with through wires hole (23), and bunch is from through wires hole (23) access cabinet (1).
9. a kind of electric energy metrical remote online monitoring rack according to claim 8, is characterized in that: cabinet (1) outer top is provided with suspension ring (6).
10. a kind of electric energy metrical remote online monitoring rack according to claim 9, is characterized in that: cabinet (1) inner bottom part is provided with the tool box (17) for repair and maintenance.
CN201520468515.4U 2015-06-24 2015-06-24 Long -range on -line monitoring rack of electric energy measurement Expired - Fee Related CN204832283U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201520468515.4U CN204832283U (en) 2015-06-24 2015-06-24 Long -range on -line monitoring rack of electric energy measurement

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201520468515.4U CN204832283U (en) 2015-06-24 2015-06-24 Long -range on -line monitoring rack of electric energy measurement

Publications (1)

Publication Number Publication Date
CN204832283U true CN204832283U (en) 2015-12-02

Family

ID=54689869

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201520468515.4U Expired - Fee Related CN204832283U (en) 2015-06-24 2015-06-24 Long -range on -line monitoring rack of electric energy measurement

Country Status (1)

Country Link
CN (1) CN204832283U (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN105827859A (en) * 2016-05-10 2016-08-03 南京铁道职业技术学院 Smartphone bluetooth infrared meter reading system and method of electric energy meter
CN109217123A (en) * 2017-06-29 2019-01-15 河南平芝高压开关有限公司 A kind of control cabinet

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN105827859A (en) * 2016-05-10 2016-08-03 南京铁道职业技术学院 Smartphone bluetooth infrared meter reading system and method of electric energy meter
CN109217123A (en) * 2017-06-29 2019-01-15 河南平芝高压开关有限公司 A kind of control cabinet
CN109217123B (en) * 2017-06-29 2020-12-29 河南平芝高压开关有限公司 Control cabinet

Similar Documents

Publication Publication Date Title
CN204832283U (en) Long -range on -line monitoring rack of electric energy measurement
CN106711880A (en) Combined cable bridge
CN203911284U (en) Power distribution box incoming and outgoing line structure
CN203289039U (en) Bus duct housing
CN204796001U (en) Local heat abstractor that concentrates of rack backplate
CN117080967A (en) Integrated bus duct
CN206117064U (en) Mistake proofing of accurate connection of bus duct is installed mutually
CN204243712U (en) A kind of low-voltage cable junction box
CN208914993U (en) A kind of integrated form wall hanging charging pile
CN203630343U (en) Automatic voltage-withstanding verification device integrated with three-phase electric energy meter and concentrator
CN207542574U (en) A kind of high-frequency dust removing power supply
CN201995230U (en) Electric control box of air conditioner outdoor unit
CN110783846A (en) Draw-out type non-contact position finding medium voltage switchgear
CN204051294U (en) A kind of assembling device for filter element
CN206470671U (en) A kind of computer cabinet for being easily installed dismounting
CN210291180U (en) Warning platform based on response energy big data management
CN205304617U (en) Novel active power filter power unit
CN214744454U (en) Artificial intelligence recognition device
CN203932769U (en) A kind of column-type transformer
CN204361915U (en) A kind of uninterrupted power supply(ups)
CN202975927U (en) Server case
CN203260924U (en) Intelligentized oil-field electrical control box
CN214849575U (en) Incoming line cabinet convenient to dismouting
CN203519772U (en) Automatic voltage withstand calibration device compatible with three-phase electric energy meter and electricity consumption information collection terminal
CN220122373U (en) Highway electromechanical device switch board

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20151202

Termination date: 20180624