CN204827302U - Rotating blowout preventer assembly shirks rope - Google Patents
Rotating blowout preventer assembly shirks rope Download PDFInfo
- Publication number
- CN204827302U CN204827302U CN201520471848.2U CN201520471848U CN204827302U CN 204827302 U CN204827302 U CN 204827302U CN 201520471848 U CN201520471848 U CN 201520471848U CN 204827302 U CN204827302 U CN 204827302U
- Authority
- CN
- China
- Prior art keywords
- card
- rope
- blowout preventer
- shirks
- rotating blowout
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
Landscapes
- Lift-Guide Devices, And Elevator Ropes And Cables (AREA)
Abstract
(B, ) the utility model relates to a rotating blowout preventer assembly shirks instrument technical field, is a rotating blowout preventer assembly shirks rope, and it includes wire rope, steel cable cutting ferrule and card pendant, two tip of wire rope do not pass through the fixed becket bridle that forms of steel cable cutting ferrule, are fixed with the card pendant on two becket bridles respectively, block the pendant and hang transverse section and connection riser including the card, and the one end that transverse section was hung to the card links as an organic wholely and is L shape with the upper end of connecting the riser, and the middle part that transverse section was hung to the card is equipped with the card hanging hole, and the lower extreme of connecting the riser is equipped with the bridle port, and the becket bridle passes the bridle port and installs on the connection riser. The utility model has the advantages of reasonable and compact structure, convenient to use, it is hung transverse section and blocks the hanging hole through the card and can make things convenient for, swiftly, firmly fix on the rotating blowout preventer assembly, effectively stops the emergence of junk in the pit, and simultaneously, it can make job step reliable and simple, has improved dismantling efficiency's security and standardization. (B, )
Description
Technical field
the utility model relates to rotating blowout preventer assembly and shirks technical field of tools, is that a kind of rotating blowout preventer assembly shirks rope.
Background technology
about rotating the assembly security tool that neither one is ready-made in dismounting (pull-off from drilling rod) process in existing under balance pressure drilling equipment, thus in this process, the fixed instrument of rotation assembly can be made can to bring for operation when drilling rod is carried, namely do not have specification there is no code yet, more there is no standard.
a kind of method more common in Contraction in Site, substantially be carry out bolt by ropes such as wire rope, the rope made of hemp, iron chains to draw assembly, other end is affiliated to be had on the elevator of drilling tool at seat, and the weight by its drilling tool is carried out bolt and held rotation assembly, now tourist bus is carried, detach rotation assembly and fulfil assignment.There is following shortcoming in it: 1. the degree of adhesion of assembly and drilling rod is uncertain, causes when shirking assembly and need to adopt the rope of what intensity uncertain.2., as used the rope made of hemp, post-rift rope can not cause any impact (rope made of hemp fall well then be easily grated), if use steel wire cable, and the down hole problem very likely causing trouble of lost tool in hole to cause after fracture generation.3. the rope owing to using has lack of standard, usually only has an origin of force when bolt hangs assembly lower glue core, upper carry drilling rod time due to discontinuity, certain damage can be caused to rotation assembly inside.
another kind shirks and rotates the way of assembly is under empty well state, putting into well, again setting hanging with the drill rod stand column rotating assembly well head, by closing the clip fluid cylinder on rotating blowout preventer, blocking rotation assembly, then row carries drilling rod shirks object to reach.There is following shortcoming in it: 1. the method does not belong to the operation of Unbalance technique service regulation.2. operating procedure is many, need operating personnel back and forth up and down well head be affiliated to puffer rope and locking, unblock vessel safety bolt, there is certain danger and uncertainty.
therefore, the rotating blowout preventer assembly instrument that shirks of existing use has the following disadvantages in actual use: use rope lack of standardization, rotate the inner easy damaged of assembly, fracture wire rope easily causes trouble of lost tool in hole, clip fluid cylinder carries drilling rod and shirk by closing and there is potential safety hazard.
Summary of the invention
the utility model provides a kind of rotating blowout preventer assembly and shirks rope, overcome the deficiency of above-mentioned prior art, its can effectively solve the existing rotating blowout preventer assembly instrument that shirks exist use rope lack of standardization, rotate the inner easy damaged of assembly, fracture wire rope 1 easily causes trouble of lost tool in hole, clip fluid cylinder carries drilling rod shirk by closing the problem that there is potential safety hazard.
the technical solution of the utility model is realized by following measures: a kind of rotating blowout preventer assembly shirks rope, comprises wire rope, steel cable cutting ferrule and card suspension member; Two ends of wire rope form becket bridle respectively by steel cable cutting ferrule is fixing, two becket bridles are fixed with card suspension member respectively, card suspension member comprises card and hangs transverse sheet and be connected riser, card is hung one end of transverse sheet and to be connected as a single entity with the upper end being connected riser and L-shaped, the middle part that transverse sheet hung by card is provided with card hanging hole, the lower end connecting riser is provided with bridle port, and becket bridle is arranged on through bridle port and connects on riser.
here is the further optimization and/or improvements to above-mentioned utility model technical scheme:
above-mentioned card hanging hole can be circular hole, and the diameter of card hanging hole is 18 centimetre to 22 centimetres.
above-mentioned bridle port can be circular hole, and the diameter of bridle port is 18 centimetre to 22 centimetres.
the length of above-mentioned wire rope can be 13 meter to 17 meter.
above-mentioned steel cable cutting ferrule can be cast iron steel cable cutting ferrule.
the utility model reasonable and compact in structure, easy to use, it hangs transverse sheet by card and card hanging hole can convenient, fast, firmly be fixed on rotating blowout preventer assembly, effectively stop the generation of trouble of lost tool in hole, simultaneously, it can make job step simple, improves safety and the normalization of field-strip.
Accompanying drawing explanation
accompanying drawing 1 is the main TV structure schematic diagram of the utility model most preferred embodiment.
accompanying drawing 2 is the left TV structure schematic diagram of accompanying drawing 1.
accompanying drawing 3 is the first using method schematic diagram of the utility model most preferred embodiment.
accompanying drawing 4 is the left TV structure schematic diagram of accompanying drawing 3.
accompanying drawing 5 is the second using method schematic diagram of the utility model most preferred embodiment.
coding in accompanying drawing is respectively: 1 is wire rope, and 2 is steel cable cutting ferrule, and 3 is becket bridle, and 4 is card extension transverse sheet, and 5 for connecting riser, and 6 is card hanging hole, and 7 is bridle port, and 8 is rotating blowout preventer assembly, and 9 is elevator, and 10 is safety plug, and 11 is drilling rod.
Detailed description of the invention
the utility model by the restriction of following embodiment, can not determine concrete embodiment according to the technical solution of the utility model and actual conditions.
in the utility model, for convenience of description, the description of the relative position relation of each parts is all be described according to the Butut mode of Figure of description 1, as: the position relationship of forward and backward, upper and lower, left and right etc. determines according to the Butut direction of Figure of description.
below in conjunction with embodiment and accompanying drawing, the utility model is further described:
as shown in accompanying drawing 1,2, this rotating blowout preventer assembly shirks rope and comprises wire rope 1, steel cable cutting ferrule 2 and card suspension member; Two ends of wire rope 1 form becket bridle 3 respectively by steel cable cutting ferrule 2 is fixing, two becket bridles 3 are fixed with card suspension member respectively, card suspension member comprises card and hangs transverse sheet 4 and be connected riser 5, card is hung one end of transverse sheet 4 and to be connected as a single entity with the upper end being connected riser 5 and L-shaped, the middle part that transverse sheet 4 hung by card is provided with card hanging hole 6, the lower end connecting riser 5 is provided with bridle port 7, and becket bridle 3 is arranged on through bridle port 7 and connects on riser 5.Transverse sheet 4 and card hanging hole 6 is hung by card, the utility model can convenient, fast, firmly be fixed on rotating blowout preventer assembly 8, the generation of trouble of lost tool in hole event when effectively stopping to dismantle rotating blowout preventer assembly 8 operation, simultaneously, it effectively can hang rotating blowout preventer assembly 8 by bolt, what facilitate rotating blowout preventer assembly 8 shirks operation, required job step is simple, fill up dismounting in under-balanced drilling technology and rotated assembly operation without the blank of special tool, improve safety and the normalization of field-strip.
according to actual needs, rope can be shirked to above-mentioned rotating blowout preventer assembly and makes further optimization and/or improvements:
as shown in accompanying drawing 1,2, card hanging hole 6 is circular hole, and the diameter of card hanging hole 6 is 18 centimetre to 22 centimetres.The diameter of card hanging hole 6 is preferably two centimetres.
as shown in accompanying drawing 1,2, bridle port 7 is circular hole, and the diameter of bridle port 7 is 18 centimetre to 22 centimetres.The diameter of bridle port 7 is preferably two centimetres.
as shown in accompanying drawing 1,2, the length of wire rope 1 is 13 meter to 17 meter.The length of wire rope 1 is preferably 15 meter.
as shown in accompanying drawing 1,2, steel cable cutting ferrule 2 is cast iron steel cable cutting ferrule.
above technical characteristic constitutes most preferred embodiment of the present utility model, and it has stronger compliance and best implementation result, can increase and decrease non-essential technical characteristic according to actual needs, meet the demand of different situations.
the use procedure of the utility model most preferred embodiment: when through the drilling rod pin thread leave from office terrace of rotating blowout preventer assembly 8 and rotating blowout preventer assembly 8 distance when being less than 50 centimetres, field-strip is carried out: as shown in accompanying drawing 3,4 by using a basic utility model, first, the card suspension member at the utility model two ends is tangled respectively on rotation assembly lower glue core two symmetrical bolts; Afterwards, nut right-hand thread is screwed on; Then, wire rope 1 is hung on elevator arm; Finally, make pneumatic puffer tangle the top suspension ring rotating assembly, by drilling tool carried by tourist bus, fulfil assignment.
because housing fluid cylinder is opened too early, cause through the drilling rod pin thread step surface of rotating blowout preventer assembly 8 and rotating blowout preventer assembly 8 apart from time larger, field-strip is carried out: as shown in Figure 5 by using two basic utility models, first, respectively the card suspension member of two basic utility model one end is hung on rotation assembly lower glue core two symmetrical bolts; Afterwards, nut right-hand thread is screwed on; Then, the card suspension member of the two basic utility model other ends is hung on the right and left arm of elevator, then with safety plug through the card hanging hole 6 on elevator and card suspension member; Finally, make pneumatic puffer tangle the top suspension ring rotating assembly, by drilling tool carried by tourist bus, fulfil assignment.
Claims (9)
1. rotating blowout preventer assembly shirks a rope, it is characterized in that comprising wire rope, steel cable cutting ferrule and card suspension member; Two ends of wire rope form becket bridle respectively by steel cable cutting ferrule is fixing, two becket bridles are fixed with card suspension member respectively, card suspension member comprises card and hangs transverse sheet and be connected riser, card is hung one end of transverse sheet and to be connected as a single entity with the upper end being connected riser and L-shaped, the middle part that transverse sheet hung by card is provided with card hanging hole, the lower end connecting riser is provided with bridle port, and becket bridle is arranged on through bridle port and connects on riser.
2. rotating blowout preventer assembly according to claim 1 shirks rope, it is characterized in that card hanging hole is circular hole, and the diameter of card hanging hole is 18 centimetre to 22 centimetres.
3. rotating blowout preventer assembly according to claim 1 and 2 shirks rope, it is characterized in that bridle port is circular hole, and the diameter of bridle port is 18 centimetre to 22 centimetres.
4. rotating blowout preventer assembly according to claim 1 and 2 shirks rope, it is characterized in that the length of wire rope is 13 meter to 17 meter.
5. rotating blowout preventer assembly according to claim 3 shirks rope, it is characterized in that the length of wire rope is 13 meter to 17 meter.
6. rotating blowout preventer assembly according to claim 1 and 2 shirks rope, it is characterized in that steel cable cutting ferrule is cast iron steel cable cutting ferrule.
7. rotating blowout preventer assembly according to claim 3 shirks rope, it is characterized in that steel cable cutting ferrule is cast iron steel cable cutting ferrule.
8. rotating blowout preventer assembly according to claim 4 shirks rope, it is characterized in that steel cable cutting ferrule is cast iron steel cable cutting ferrule.
9. rotating blowout preventer assembly according to claim 5 shirks rope, it is characterized in that steel cable cutting ferrule is cast iron steel cable cutting ferrule.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201520471848.2U CN204827302U (en) | 2015-07-03 | 2015-07-03 | Rotating blowout preventer assembly shirks rope |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201520471848.2U CN204827302U (en) | 2015-07-03 | 2015-07-03 | Rotating blowout preventer assembly shirks rope |
Publications (1)
Publication Number | Publication Date |
---|---|
CN204827302U true CN204827302U (en) | 2015-12-02 |
Family
ID=54684913
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201520471848.2U Expired - Fee Related CN204827302U (en) | 2015-07-03 | 2015-07-03 | Rotating blowout preventer assembly shirks rope |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN204827302U (en) |
-
2015
- 2015-07-03 CN CN201520471848.2U patent/CN204827302U/en not_active Expired - Fee Related
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN101864904B (en) | Operation device for stripping sucker rod at pressure | |
CN209873584U (en) | Hang basket template and demolish device | |
RU90480U1 (en) | DEVICE FOR CRACKING, ATTACHING, UNFINDING AND UNLOADING THE COLUMN HEAD OF THE OPERATING COLUMN | |
CN204827302U (en) | Rotating blowout preventer assembly shirks rope | |
CN104675383B (en) | Downhole electronic pressure bomb hanger | |
CN202109098U (en) | Electrical-logging overflow safety control cable hanger in oil-gas layer | |
CN201924865U (en) | Slip type casing head sealing device | |
CN103573204A (en) | Fallen steel wire fisher passing through tapered string | |
CN206834605U (en) | Monolithic insulator hanging apparatus | |
CN206463375U (en) | Rig anti-falling overhead device | |
CN205315026U (en) | Anchor agent even ends ware | |
CN205778685U (en) | Two-stage hangs thermal extraction casing head | |
CN211287668U (en) | Wellhead fixing device | |
CN209115484U (en) | A kind of hook-shaped anchor bolt of antidetonation base expanding and base expanding type | |
CN210893151U (en) | Underground wire point suspension device | |
CN208203182U (en) | Quick sand flushing device | |
CN201915864U (en) | Automatic adjustment beam hanger for oil extractor | |
CN207402705U (en) | Sunpender Fast Installation spanner | |
US2291649A (en) | Wire line hitch assembly | |
CN110902614A (en) | Adjustable suspension device used in well | |
CN202689973U (en) | Rope locking device used for dismantling operation machine roller large rope | |
CN211570033U (en) | Adjustable suspension device used in well | |
CN211573420U (en) | Novel beam-pumping unit polished rod centralizer | |
CN209568993U (en) | A kind of super-pressure welding cementing head | |
CN205778686U (en) | Anti-leak thermal extraction casing head |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C14 | Grant of patent or utility model | ||
GR01 | Patent grant | ||
CF01 | Termination of patent right due to non-payment of annual fee |
Granted publication date: 20151202 Termination date: 20200703 |
|
CF01 | Termination of patent right due to non-payment of annual fee |