CN204827272U - Operation well completion is hung and is taken out with a seat section of thick bamboo - Google Patents

Operation well completion is hung and is taken out with a seat section of thick bamboo Download PDF

Info

Publication number
CN204827272U
CN204827272U CN201520531853.8U CN201520531853U CN204827272U CN 204827272 U CN204827272 U CN 204827272U CN 201520531853 U CN201520531853 U CN 201520531853U CN 204827272 U CN204827272 U CN 204827272U
Authority
CN
China
Prior art keywords
thick bamboo
hung
pin
open slot
seat cylinder
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201520531853.8U
Other languages
Chinese (zh)
Inventor
朱平
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China Petroleum and Chemical Corp
Sinopec Jiangsu Oilfield Co
Original Assignee
China Petroleum and Chemical Corp
Sinopec Jiangsu Oilfield Co
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China Petroleum and Chemical Corp, Sinopec Jiangsu Oilfield Co filed Critical China Petroleum and Chemical Corp
Priority to CN201520531853.8U priority Critical patent/CN204827272U/en
Application granted granted Critical
Publication of CN204827272U publication Critical patent/CN204827272U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Abstract

The utility model provides an operation well completion is hung and is taken out with a seat section of thick bamboo for specialized tool when oil field beam -pumping unit oil well borehole operation well completion is hung and to be taken out, including vertical layout, the cross section is for the seat section of thick bamboo of C shape, a C shape seat section of thick bamboo is formed by seat section of thick bamboo body and open slot, the outside welding relative with the open slot ladder of creeping sets up three pair at least pinholes on the present section of thick bamboo body on the present section of thick bamboo body, every two right pinholes respectively symmetrical settings in the both sides of open slot, the downthehole pin rod of all planting of every canceling. The utility model relates to an it uses at the oil well operation scene to complete the back, uses the back: the the use frequency of crane, shortened oil well operation time is shortened, the polished rod gets into the no dog marks of packing box position department, burr, does not have the operation potential safety hazard, and the workman evaluates effectually.

Description

A kind of operation completion is hung to take out and is used seat cylinder
Technical field
The utility model is used for a kind of special tool when oil field beam pumping unit oil well operation completion extension is taken out.
Background technology
Beam pumping unit oil well operation completion, has carried dead space with working vehicle, urgent side's clamp, by the load of down-hole under the effect of square clamp whole seat on wellhead packing box.Now walking beam on pumping units is horizontal, and after getting rid of positive horse head, the distance bottom hair plait between polished rod eye and polished rod box cupling, greatly between 80cm-140cm, is hung and taken out distance not, pumping unit horsehead must be got rid of just can carry out extension to bottom dead centre and take out.
Current most of oil pumper, under horse head no-load conditions, permanent magnet motor cannot by horse head running to bottom dead centre.In this case need to carry out rotating crank by crane to make horse head arrive bottom dead centre to carry out extension and take out.This conventional method adds the frequency of usage of crane, also extends the oil well operation time.
Summary of the invention
The purpose of this utility model is to overcome the deficiencies in the prior art, provides a kind of operation completion extension to take out and uses seat cylinder, reduce the frequency of usage of crane, shorten the oil well completion time.
The purpose of this utility model is achieved in that a kind of operation completion hangs to take out and uses seat cylinder, comprise vertical that arrange, that cross section is C shape seat cylinder, C shape seat cylinder is formed by seat cylinder body and open slot, outside welding creeping ladder relative with open slot on present cylinder body, present cylinder body arranges at least three pairs of pin-and-holes, two pin-and-holes of often pair are symmetricly set on the both sides of open slot respectively, a pin rod of all planting in often pair of pin-and-hole.
The utility model is by above design, and length is between 0.9 meter ~ 1.5 meters.The right opposite of seat cylinder open slot is provided with firmly creeping ladder, and handled easily work installation polished rod eye carries out extension and takes out.
When having carried dead space with working vehicle during operation completion, the urgent side's clamp in 20 ~ 30cm place above packing box, polished rod is carried with in working vehicle, by under the seat cylinder side of being placed in clamp, and pin rod is inserted in the pin-and-hole on seat cylinder, make down-hole load all be transferred to seat cylinder and square clamp from working vehicle slowly.Now walking beam is under horizontal level gets rid of positive horse head situation, is connected bottom hair plait between polished rod eye with polished rod box cupling by means of square clamp, carries out extension and take out after the brake that comes loose.
PRL is transferred on beam hanger for pumping machine, pulls out pin rod on seat cylinder, takes off swinging seat cylinder.Start oil pumper, according to the dead space position of setting, after using short seat cylinder (20 ~ 30cm) again to unload, polished rod eye is transferred to suitable position, two square clamps above urgent polished rod eye, now anti-lost card use (position need not be moved) is used as by original square clamp that 20 ~ 30cm place is urgent above packing box, and polished rod enters packing box position without dental impression, impulse-free robustness.
Now oil well operation completion extension exhausts complete.
Use at oil well operation scene after the utility model has designed and produced, after using: the frequency of usage decreasing crane, shorten the oil well operation time, polished rod enters packing box position without dental impression, burr, without handling safety hidden danger, workman's evaluation effect is good.
As improvement of the present utility model, described creeping ladder is provided with three to five step steps, and wherein the highest step is concordant with the top of seat cylinder, and minimum step is higher than the bottom of seat cylinder, and between step, range averaging distributes.
As improvement of the present utility model, it is six right that pin-and-hole has, and two to arranging the top, two of present cylinder body to arranging the middle part, two of present cylinder body to the bottom arranging present cylinder body.
As further improvement of the utility model, every root pin rod is all fixed by locking pin through after pin-and-hole.
Accompanying drawing explanation
Fig. 1 is a kind of structural representation of the present utility model.
Fig. 2 is the partial schematic diagram of Fig. 1.
Fig. 3 is A-A half sectional view in Fig. 2.
Fig. 4 is the left view of Fig. 3.
Detailed description of the invention
As Figure 1-4, operation completion is hung to take out and is used seat cylinder, comprise vertical that arrange, that cross section is C shape seat cylinder 1, C shape seat cylinder 1 is formed by seat cylinder body 2 and open slot 5, the outside welding creeping ladder 3 of the right opposite of present cylinder body 2 open slot 5, creeping ladder 3 needs to be provided with three to five step steps according to seat cylinder 1 length, and the highest step of creeping ladder 3 is concordant with the top of seat cylinder 1, minimum step is higher than the bottom of seat cylinder 1, and between step, range averaging distributes.The top of present cylinder body 2, middle part, bottom all arrange two pairs of pin-and-holes 4, and two pin-and-holes 4 of often pair are symmetricly set on the both sides of open slot 5 respectively.All to plant in often pair of pin-and-hole 4 pin rod 6 being fixed by locking pin 7.

Claims (4)

1. an operation completion is hung to take out and is used seat cylinder, it is characterized in that: comprise vertical that arrange, that cross section is C shape seat cylinder, C shape seat cylinder is formed by seat cylinder body and open slot, outside welding creeping ladder relative with open slot on present cylinder body, present cylinder body arranges at least three pairs of pin-and-holes, two pin-and-holes of often pair are symmetricly set on the both sides of open slot respectively, a pin rod of all planting in often pair of pin-and-hole.
2. operation completion according to claim 1 is hung to take out and is used seat cylinder, it is characterized in that: described creeping ladder is provided with three to five step steps, and wherein the highest step is concordant with the top of seat cylinder, and minimum step is higher than the bottom of seat cylinder, and between step, range averaging distributes.
3. operation completion according to claim 1 is hung to take out and is used seat cylinder, it is characterized in that: it is six right that pin-and-hole has, and two to arranging the top, two of present cylinder body to arranging the middle part, two of present cylinder body to the bottom arranging present cylinder body.
4. operation completion according to claim 1 is hung to take out and is used seat cylinder, it is characterized in that: every root pin rod is all fixed by locking pin through after pin-and-hole.
CN201520531853.8U 2015-07-22 2015-07-22 Operation well completion is hung and is taken out with a seat section of thick bamboo Active CN204827272U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201520531853.8U CN204827272U (en) 2015-07-22 2015-07-22 Operation well completion is hung and is taken out with a seat section of thick bamboo

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201520531853.8U CN204827272U (en) 2015-07-22 2015-07-22 Operation well completion is hung and is taken out with a seat section of thick bamboo

Publications (1)

Publication Number Publication Date
CN204827272U true CN204827272U (en) 2015-12-02

Family

ID=54684883

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201520531853.8U Active CN204827272U (en) 2015-07-22 2015-07-22 Operation well completion is hung and is taken out with a seat section of thick bamboo

Country Status (1)

Country Link
CN (1) CN204827272U (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN105863574A (en) * 2016-06-17 2016-08-17 中国石油化工股份有限公司 Beam-pumping unit operation well completion hung sucking method
CN112377120A (en) * 2020-10-29 2021-02-19 中国石油化工股份有限公司 Hanging height regulator for beam hanger of oil pumping unit

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN105863574A (en) * 2016-06-17 2016-08-17 中国石油化工股份有限公司 Beam-pumping unit operation well completion hung sucking method
CN105863574B (en) * 2016-06-17 2018-01-30 中国石油化工股份有限公司 A kind of beam pumping unit operation completion is hung and takes out method
CN112377120A (en) * 2020-10-29 2021-02-19 中国石油化工股份有限公司 Hanging height regulator for beam hanger of oil pumping unit

Similar Documents

Publication Publication Date Title
CN204827272U (en) Operation well completion is hung and is taken out with a seat section of thick bamboo
CN204370263U (en) A kind of grooved rail hydraulic rail bender
CN204843228U (en) Production hoist is with electric welding protective screen
CN204778321U (en) Reinforcement cage hoisting device
CN206680079U (en) Straddle truck wind resistance fixing device
CN204059927U (en) Disc type scaffold
CN204262776U (en) End cover of engine machining center clamping fixture
CN205684993U (en) A kind of coal mine machinery cylinder attaching/detaching apparatus
CN205806148U (en) U-shaped pin
CN206780278U (en) A kind of connecting rod tip end cap dismantling device
CN203045574U (en) Installation clamp for caterpillar band sections
CN207209753U (en) A kind of railway freight-car groove profile curb girder assembles dedicated lifting hook
CN205476450U (en) A light -duty automatic lifting die carrier of concave formula for surpassing construction of high rise elevator well vertical structure
CN203808514U (en) Template disassembly device
CN205552421U (en) Cable drum equipment frame
CN204778317U (en) Novel rectangle steel sheet hoist
CN203903790U (en) Hand-fork-shaped steel chip hook
CN204826683U (en) H shaped steel frock clamp device
CN204434075U (en) Side dump wagon air-cylinder piston tool specially for attaching and detaching
CN206205845U (en) Wireless drilling inclinometers fishing head
CN104358404B (en) A kind of fast simple scaffold of quick-detach
CN206035435U (en) Platform structure is hung to lubricator union nut
CN204000513U (en) Whole group of track switch track lining device of single casing
CN206465061U (en) New well workover integrated container
CN210622337U (en) Operation hanging stool for wall column reinforcement operation

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant