CN204826694U - Foldable protection canopy of encorbelmenting - Google Patents

Foldable protection canopy of encorbelmenting Download PDF

Info

Publication number
CN204826694U
CN204826694U CN201520385006.5U CN201520385006U CN204826694U CN 204826694 U CN204826694 U CN 204826694U CN 201520385006 U CN201520385006 U CN 201520385006U CN 204826694 U CN204826694 U CN 204826694U
Authority
CN
China
Prior art keywords
eaves
encorbelment
encorbelmenting
top board
canopy
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201520385006.5U
Other languages
Chinese (zh)
Inventor
闫军
陈慧乾
彭一飞
黄鸿宇
鞠国磊
徐鑫鑫
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China Construction Eighth Engineering Division Co Ltd
Original Assignee
China Construction Eighth Engineering Division Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China Construction Eighth Engineering Division Co Ltd filed Critical China Construction Eighth Engineering Division Co Ltd
Priority to CN201520385006.5U priority Critical patent/CN204826694U/en
Application granted granted Critical
Publication of CN204826694U publication Critical patent/CN204826694U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Working Measures On Existing Buildindgs (AREA)

Abstract

The utility model relates to a foldable protection canopy of encorbelmenting, include: the main canopy body includes the support column, encloses and close the connection the entablature and the bottom end rail at support column top and lay in the shed roof board of entablature, and locate the eaves of encorbelmenting of the at least lateral part of shed roof board, encorbelment the eaves with correspond the entablature is connected collapsiblely, encorbelment the eaves with correspond the bottom end rail closure is connected. Adopt the foldable eaves of encorbelmenting, when the former material of handling, turn over on the eaves that only needs to encorbelment to the shed roof board of the main canopy body can, can not influence the perpendicular transportation of former material, when not carrying out the handling, will encorbelment that the eaves puts down and be fixed, prevent that the strong wind from lifting, played the effect of protection. The foldable eaves of encorbelmenting can be solved effectively and have the problem that adds the builder's temporary shed and influence the handling now, and simple structure, uses the installation all convenient.

Description

To encorbelment Collapsible containment canopy
Technical field
The utility model relates to the realm of building construction, refers in particular to one and to encorbelment Collapsible containment canopy.
Background technology
Safe guarding shed is the common a kind of safety protection structure in job site, general employing rectangle steel framework is safe guarding shed, for reinforcing steel processing shed, because reinforcing bar former material rapidoprint is generally 9 meters even 12 meters, be subject to processing the stop of canopy two edge column in former material use tower crane handling process and affect handling to processing platform, so just make to need manually the former material of machining shed to be transported, then recycle tower crane and carry out handling, increase hand labor, and then increase human cost.
Utility model content
The purpose of this utility model is the defect overcoming prior art, provides one to encorbelment Collapsible containment canopy, solves the problem of increase hand labor that existing machining shed hinders the former material handling of reinforcing bar to cause to processing platform and human cost.
The technical scheme realizing above-mentioned purpose is:
The utility model one is encorbelmented Collapsible containment canopy, it is characterized in that, comprising:
Main shed, comprises support column, encloses the top rail and lower transverse beam that connect described support column top and the ceiling plate being layed in described top rail; And
Be located at the eaves of encorbelmenting of at least one sidepiece of described ceiling plate, described in eaves of encorbelmenting connect collapsibly with corresponding described top rail, described in encorbelment eaves and the corresponding sealed connection of described lower transverse beam.
Adopt folding eaves of encorbelmenting, when the former material of handling, the ceiling plate that only need will eaves of encorbelmenting turn over to main shed, can not affect the vertical transport of former material, when not carrying out handling, eaves of encorbelmenting puts down and fixes, and prevents strong wind from lifting, and serves the effect of protection.Folding eaves of encorbelmenting can solve the problem that existing machining shed affects handling effectively, and structure is simple, uses installation all convenient.
The encorbelment further improvement of Collapsible containment canopy of the utility model is, described in eaves of encorbelmenting comprise vertical bar in described eaves top board one end of eaves top board, vertical support and the hound of skewed horizontal load between described eaves top board and described vertical bar.
The encorbelment further improvement of Collapsible containment canopy of the utility model is, passes through gemel connection between the end of described eaves top board and adjacent top rail.The encorbelment further improvement of Collapsible containment canopy of the utility model is, described vertical bar is connected by latch is sealed away between the end of described eaves top board and adjacent lower transverse beam.
The encorbelment further improvement of Collapsible containment canopy of the utility model is, has installed bracing piece between described support column and described lower transverse beam.
The encorbelment further improvement of Collapsible containment canopy of the utility model is, described bracing piece is angle steel.
The encorbelment further improvement of Collapsible containment canopy of the utility model is, is coated with waterproof cloth between described top rail and described lower transverse beam.
Accompanying drawing explanation
Fig. 1 is that the structural representation of main shed is located in encorbelment eaves turnover of encorbelmenting in Collapsible containment canopy of the utility model;
Fig. 2 is that encorbelment eaves of encorbelmenting in Collapsible containment canopy of the utility model turns down the structural representation be placed on main shed; And
Fig. 3 is the perspective view of Fig. 1.
Detailed description of the invention
Below in conjunction with the drawings and specific embodiments, the utility model is described in further detail.
The utility model provides one and to encorbelment Collapsible containment canopy, facilitate the vertical handling that the former material in protection canopy carries out, former material can be the reinforcing bar processed, this Collapsible containment canopy of encorbelmenting comprises the eaves of encorbelmenting that can fold, eaves of encorbelmenting can prop up to be located on main shed, increase the shielded area of ceiling plate, when carrying out handling, this eaves of encorbelmenting can be folded and placed on the ceiling plate of main shed, do not affect the vertical handling of former material, eaves of encorbelmenting is by folding the effect being connected to main shed and realizing folding, by being connected with the sealed of main shed, strengthen the structural safety of eaves of encorbelmenting, can prevent strong wind from lifting, the effect of protection can be played, the effect of handling material can not be hindered again.Below in conjunction with accompanying drawing, the encorbelment structure of Collapsible containment canopy of the utility model is described.
Consult Fig. 1, show encorbelment eaves turnover of encorbelmenting in Collapsible containment canopy of the utility model and be located at the structural representation of main shed.Consulting Fig. 3, is the perspective view of Fig. 1.Below in conjunction with Fig. 1 and Fig. 3, the encorbelment structure of Collapsible containment canopy of the utility model is described.
As shown in figures 1 and 3, the utility model Collapsible containment canopy of encorbelmenting comprises main shed 11 and eaves 12 of encorbelmenting, main shed 11 comprises ceiling plate 111, support column 112, top rail 113 and lower transverse beam 114, support column 112 is erected on ground, enclose at the top of support column 112 and connect top rail 113 and lower transverse beam 114, ceiling plate 111 is layed on top rail 113, and preferably, ceiling plate 111 is also layed on lower transverse beam 114.。Eaves 12 of encorbelmenting is arranged at least one sidepiece of ceiling plate 111, and the sidepiece that eaves 12 of encorbelmenting is corresponding with ceiling plate 111 connects collapsibly, and eaves 12 of encorbelmenting connects collapsibly with corresponding top rail 113, eaves 12 of encorbelmenting connection sealed with corresponding lower transverse beam.Be connected collapsibly by adopting with top rail 113, the eaves 12 that can make to encorbelment can be folded to the end face of ceiling plate 111 along folding junction, by being connected with lower transverse beam 114 is sealed, when eaves 12 is encorbelmented in needs turnover, just remove the connection of encorbelmenting between eaves 12 and lower transverse beam 114, do not need turnover encorbelment eaves 12 time, sealed between eaves 12 and lower transverse beam 114 being connected and fixed of just encorbelmenting, strengthen the fastness of eaves 12 of encorbelmenting, serve the effect of protection.
Eaves 12 of encorbelmenting comprises eaves top board 121, vertical bar 122 and hound 123, eaves top board 121 has two ends, when eaves top board 121 turnover launches to prop up and is located on main shed 11, the end vertical support adjacent with main shed 11 is connected vertical bar 122, vertical bar 122 has hound 123 away from skewed horizontal load between the end of eaves top board 121 and eaves top board 121, supports eaves top board 121 by vertical bar 122 and hound 123.The end along eaves top board 121 at vertical bar 122 interval is arranged, and hound 123 can be supported in the end of eaves top board 121, also can be supported in the middle part of eaves top board 121.
By gemel connection between the end of eaves top board 121 and adjacent top rail 113, make eaves top board 121 can along hinge folded turnover, eaves top board 121 can be turned to the end face of ceiling plate 111, can also be turned to the outside of ceiling plate 111.Vertical bar 122 is connected and fixed by latch is sealed away between the end of eaves top board 121 and adjacent lower transverse beam 114, when eaves 12 of encorbelmenting is located on main shed 11, eaves top board 121 is turned to the outside of ceiling plate 111, at this moment the latch between vertical bar 122 and lower transverse beam 114 is connected, ensure that being connected firmly of eaves 12 of encorbelmenting.When eaves 12 of encorbelmenting needs turnover to regain, vertical bar 122 is removed with the latch between lower transverse beam 114 and is connected, eaves top board 121 is upwards overturn the end face being placed in ceiling plate 111.As shown in Figure 1, show eaves 12 of encorbelmenting and be located on main shed 11, the outside of ceiling plate 111 is located in eaves top board 121 upset of eaves 12 of encorbelmenting, and as shown in Figure 2, show eaves 12 of encorbelmenting and be folded on main shed 11, eaves top board 121 is placed in the end face of ceiling plate 111.
Collapsible containment canopy of encorbelmenting of the present utility model may be used for the processing of reinforcing bar, carried out steel bar meter in protection canopy after, eaves of encorbelmenting is folded to the end face of main shed, just for reinforcing bar provides the space of vertical handling, reaches the effect of the vertical transport not affecting reinforcing bar.Eaves of encorbelmenting is unsettledly install the top being connected to main shed, without supporting rod between its overhanging portion and ground, solves traditional protection canopy stops handling problem because of upright supports.
Main shed 11 is preferably rectangular configuration, include four support columns 112, four support columns 112 prop up four bights being located at ceiling plate 111 respectively, bracing piece 115 has been installed between support column 112 and lower transverse beam 114, this bracing piece 115 is for strengthening the structural strength of main shed 11, and bracing piece is preferably angle steel.Between top rail 113 and lower transverse beam 114, be coated with waterproof cloth 116, ceiling plate 111 is also coated with waterproof cloth.Waterproof cloth 116 has been sticked caution slogan.The wooden springboard of the better employing of ceiling plate 111.The better employing steel sheet of eaves top board 121.
The encorbelment beneficial effect of Collapsible containment canopy of the utility model is:
Adopt folding eaves of encorbelmenting, when the former material of handling, the ceiling plate that only need will eaves of encorbelmenting turn over to main shed, can not affect the vertical transport of former material, when not carrying out handling, eaves of encorbelmenting puts down and fixes, and prevents strong wind from lifting, and serves the effect of protection.Folding eaves of encorbelmenting can solve the problem that existing machining shed affects handling effectively, and structure is simple, uses installation all convenient.
Below embodiment has been described in detail the utility model by reference to the accompanying drawings, and those skilled in the art can make many variations example to the utility model according to the above description.Thus, some details in embodiment should not formed restriction of the present utility model, the utility model by the scope that defines using appended claims as protection domain of the present utility model.

Claims (7)

1. to encorbelment a Collapsible containment canopy, it is characterized in that, comprising:
Main shed, comprises support column, encloses the top rail and lower transverse beam that connect described support column top and the ceiling plate being layed in described top rail; And
Be located at the eaves of encorbelmenting of at least one sidepiece of described ceiling plate, described in eaves of encorbelmenting connect collapsibly with corresponding described top rail, described in encorbelment eaves and the corresponding sealed connection of described lower transverse beam.
2. to encorbelment as claimed in claim 1 Collapsible containment canopy, it is characterized in that, described in eaves of encorbelmenting comprise vertical bar in described eaves top board one end of eaves top board, vertical support and the hound of skewed horizontal load between described eaves top board and described vertical bar.
3. to encorbelment as claimed in claim 2 Collapsible containment canopy, it is characterized in that, between the end of described eaves top board and adjacent top rail, pass through gemel connection.
4. to encorbelment as claimed in claim 2 Collapsible containment canopy, it is characterized in that, described vertical bar is connected by latch is sealed away between the end of described eaves top board and adjacent lower transverse beam.
5. to encorbelment as claimed in claim 1 Collapsible containment canopy, it is characterized in that, between described support column and described lower transverse beam, installed bracing piece.
6. encorbelment as claimed in claim 5 Collapsible containment canopy, it is characterized in that, described bracing piece is angle steel.
7. to encorbelment as claimed in claim 1 Collapsible containment canopy, it is characterized in that, between described top rail and described lower transverse beam, be coated with waterproof cloth.
CN201520385006.5U 2015-06-04 2015-06-04 Foldable protection canopy of encorbelmenting Expired - Fee Related CN204826694U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201520385006.5U CN204826694U (en) 2015-06-04 2015-06-04 Foldable protection canopy of encorbelmenting

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201520385006.5U CN204826694U (en) 2015-06-04 2015-06-04 Foldable protection canopy of encorbelmenting

Publications (1)

Publication Number Publication Date
CN204826694U true CN204826694U (en) 2015-12-02

Family

ID=54684309

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201520385006.5U Expired - Fee Related CN204826694U (en) 2015-06-04 2015-06-04 Foldable protection canopy of encorbelmenting

Country Status (1)

Country Link
CN (1) CN204826694U (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106381997A (en) * 2016-10-31 2017-02-08 深圳前海特辰科技有限公司 Top protection shed structure of climbing scaffold
CN113513191A (en) * 2021-03-01 2021-10-19 广东省建筑装饰工程有限公司 Pull rod assembly type ticket booth structure and construction method

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106381997A (en) * 2016-10-31 2017-02-08 深圳前海特辰科技有限公司 Top protection shed structure of climbing scaffold
CN106381997B (en) * 2016-10-31 2018-08-28 深圳前海特辰科技有限公司 A kind of top protection booth structure of climbing scaffold
CN113513191A (en) * 2021-03-01 2021-10-19 广东省建筑装饰工程有限公司 Pull rod assembly type ticket booth structure and construction method

Similar Documents

Publication Publication Date Title
CN202370253U (en) Assembly type single-row vertical rod machining shed for building construction site
CN109898819A (en) A kind of the overhanging tool type scaffold system and its installation method of foldable telescopic
CN203441073U (en) Hoop-type high-altitude guard platform suitable for super high-rise building outline boarder structural column
CN207260338U (en) Pseudo-classic architecture wood sets of brackets on top of the columns roofing and concrete main body frame connecting structure
CN204826694U (en) Foldable protection canopy of encorbelmenting
CN206664894U (en) One kind auxiliary hatch board middle hinge latch mounting operation platform
CN208056469U (en) Coupling beam framework of steel reinforcement fixing device between a kind of assembled superimposed sheet
CN105926918A (en) Foldable elevator shaft operation steel platform device and erecting method
CN201546176U (en) Curtain board mounting trolley
CN103971884B (en) The tower stand distribution transformer of a kind of angle steel
CN205577394U (en) Support system suitable for construction of silo bottom plate conical surface structure
CN202416824U (en) Steel structure movable type outer cantilever frame device
CN205555855U (en) Set up promotion support on steel structure platform
CN204040494U (en) The assembled moulding bed of easy unloading type triangular pipe truss
CN109025367A (en) Assembled architecture Prefabricated stacking floor installs gusseted system and construction method
CN201377167Y (en) High-altitude assembly platform for segmented factory-building pillars
CN204456811U (en) A kind of Portable scaffold
CN106836765A (en) Building builds frame
CN203544828U (en) Rain-leakage-preventing structure of open top container
CN209958809U (en) null
CN109203218B (en) Prefabricated T roof beam concrete placement protection canopy of railway
CN104195954B (en) Overhead column erection without scaffolding platform and erection method thereof
CN209450198U (en) A kind of folding bed with ladder
CN209010014U (en) A kind of prefabricated composite wallboard rest stand of reversible
CN206205452U (en) A kind of telescopic bulk concrete pours regularization operating platform

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20151202

Termination date: 20200604