CN204808163U - Cabinet - Google Patents

Cabinet Download PDF

Info

Publication number
CN204808163U
CN204808163U CN201520535651.0U CN201520535651U CN204808163U CN 204808163 U CN204808163 U CN 204808163U CN 201520535651 U CN201520535651 U CN 201520535651U CN 204808163 U CN204808163 U CN 204808163U
Authority
CN
China
Prior art keywords
front panel
hangers
cabinet
casing
bulge
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201520535651.0U
Other languages
Chinese (zh)
Inventor
王伟
张兴明
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Zhejiang Dahua Technology Co Ltd
Original Assignee
Zhejiang Dahua Technology Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Zhejiang Dahua Technology Co Ltd filed Critical Zhejiang Dahua Technology Co Ltd
Priority to CN201520535651.0U priority Critical patent/CN204808163U/en
Application granted granted Critical
Publication of CN204808163U publication Critical patent/CN204808163U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Abstract

The utility model relates to a cabinet technical field discloses a cabinet, and this cabinet includes the box and installs in the front panel of box, wherein: the box is including two hangers that are located the antetheca both sides of box respectively, two parallel settings of hangers, along the direction of perpendicular to box antetheca the front panel inserts between two hangers, just the front panel with peg graft between two hangers and cooperate. This cabinet is in the front in the panel installation, and orientation that perpendicular to box antetheca can be followed to the front panel is inserted between two hangers and respectively and the cooperation of pegging graft between two hangers to two side location of realizing the front panel, consequently, the predetermined position installation of front panel on the box stable good is so lock the in -process of perhaps unblock and need not hand front panel carrying out the front panel, and two hangers of grafting process have limiting displacement and conveniently observe, consequently, the maneuverability of the predetermined position installation of front panel on the box is strong.

Description

A kind of cabinet
Technical field
The utility model relates to casing structure technical field, particularly a kind of cabinet.
Background technology
In existing cabinet, the antetheca side of casing is provided with front panel, is the aesthetic property in order to increase cabinet on the one hand, but the more important thing is to protect hard disk, prevent hard disk from arbitrarily being plugged.General front panel all can with lock, needs to plug hard disk, when safeguarding, key need be used to unlock, then take off front panel and can carry out plugging, safeguarding.So, front panel pre-determined bit on casing needs to lock with key after installing, front panel needed to unlock with key before casing is pulled down, and staff cannot vacate both hands to help front panel and operates in the process, therefore, stability that pre-determined bit installation and front panel pre-determined bit install is carried out to front panel, operability seems particularly important.
The pre-determined bit installation method of current a kind of case front panel adopts and add guidepost on front panel, perforate on cabinet, the mode being inserted cabinet hole by the guidepost of front panel realizes pre-determined bit, but general cabinet front portion is hard-disk cartridge, some cabinet does not have sufficient space to open mounting hole, and therefore this kind of method has limitation; In addition, user needs to go hole in the pre-determined bit installation process adopting this kind of method to carry out front panel, and cannot observe bore region, and namely the installation of front panel often belongs to blindmate type, and operability is not strong, has a strong impact on production efficiency.Front panel is one-sided establishes bulge-structure separately to have a kind of pre-determined bit installation method of case front panel to adopt, perforate on the one-sided hangers of cabinet, the installation pre-determined bit effect of front panel is realized in the perforate of during installation, the bulge-structure of front panel side first being inserted hangers, but because this kind of pre-determined bit installation method only realizes pre-determined bit by one-sided location, a little in external force situation, front panel easily overturns around one-sided anchor point or comes off, and stability is not strong.
Utility model content
The utility model provides a kind of cabinet, the good stability, workable that front panel pre-determined bit in this cabinet is installed.
For achieving the above object, the utility model provides following technical scheme:
A kind of cabinet, comprises casing and the front panel being installed on casing, wherein:
Described casing comprises two hangers of the antetheca both sides laying respectively at casing, and described two hangers are parallel to be arranged;
Insert between described two hangers along perpendicular to the direction of casing antetheca, described front panel, and between described front panel with described two hangers, grafting coordinates.
Above-mentioned cabinet is in the process of carrying out front panel installation, when front panel is inserted between two hangers along the direction perpendicular to casing antetheca, the both sides of front panel can coordinate with two hangers grafting respectively, thus front panel can be made to fix relative to casing, therefore can realize the pre-determined bit of front panel on casing and install; Be fixed because above-mentioned front panel utilizes bilateral to locate, therefore, even if when cabinet is subject to external force, front panel is also not easy to come off from casing, and therefore, the stability that the pre-determined bit of front panel on casing is installed is better, reliability is stronger, therefore, in a pre-installation during panel, carry out locking or unlock in the process of front panel without the need to hand steered front panel; And, because above-mentioned grafting coordinates between front panel and the hangers of its both sides, so grafting process is conveniently observed, can guarantee fast by observing and correctly carry out contraposition grafting, therefore, what the pre-determined bit of front panel on casing was installed is workable.
Therefore, the good stability, workable that the pre-determined bit of the front panel in above-mentioned cabinet is installed.
In addition, the pre-determined bit of above-mentioned front panel is installed does not have limitation, is applicable to any cabinet.
Preferably, in described two hangers, each hangers is respectively equipped with towards the bulge-structure of another hangers projection along the two ends of its bearing of trend; Described front panel is provided with described bulge-structure one_to_one corresponding and the sliding groove structure that coordinates of grafting.
Preferably, the end of described bulge-structure is provided with lozenges, for playing the guiding role in bulge-structure and sliding groove structure grafting process.
Preferably, in described two hangers, hangers is provided with draw-in groove towards the side sidewall of another hangers; Or each hangers is provided with draw-in groove towards the side sidewall of another hangers; Described front panel is provided with the Elastic buckle of clamping corresponding to described draw-in groove.
Preferably, at least one door latch structure being installed on front panel is also comprised.
Preferably, described door latch structure is two, and described two door latch structures coordinate with described two hangers the locking or the unblock that realize front panel respectively.
Accompanying drawing explanation
The structural representation of a kind of cabinet that Fig. 1 provides for the utility model embodiment;
Fig. 2 is the side-looking structural representation of the cabinet in Fig. 1;
The structural representation of a hangers of a kind of cabinet that Fig. 3 provides for the utility model embodiment;
The structural representation of the bulge-structure that Fig. 4 is provided with for the hangers lower end shown in Fig. 3;
The part-structure schematic diagram of the front panel of a kind of cabinet that Fig. 5 provides for the utility model embodiment;
Fig. 6 coordinates schematic diagram with the part-structure of front panel for another hangers of a kind of cabinet that the utility model embodiment provides.
Embodiment
Below in conjunction with the accompanying drawing in the utility model embodiment, be clearly and completely described the technical scheme in the utility model embodiment, obviously, described embodiment is only the utility model part embodiment, instead of whole embodiments.Based on the embodiment in the utility model, those of ordinary skill in the art are not making the every other embodiment obtained under creative work prerequisite, all belong to the scope of the utility model protection.
Please refer to Fig. 1 ~ Fig. 6.
As shown in FIG. 1 to 3, a kind of cabinet that the utility model embodiment provides, comprises casing 1 and the front panel 2 being installed on casing 1, wherein:
Casing 1 comprises the parallel setting of two hangers, 3, two hangers 3 of antetheca 11 both sides laying respectively at casing 1;
Insert between two hangers 3 along perpendicular to the direction of casing 1 antetheca 11, front panel 2, and between front panel 2 with two hangers 3, grafting coordinates.
Above-mentioned cabinet is in the process of carrying out front panel 2 installation, when front panel 2 is inserted between two hangers 3 along the direction perpendicular to casing 1 antetheca 11, the both sides of front panel 2 can coordinate with the grafting of two hangers 3 respectively, thus front panel 2 can be made to fix relative to casing 1, therefore can realize the pre-determined bit of front panel 2 on casing 1 and install; Be fixed because above-mentioned front panel 2 utilizes bilateral to locate, therefore, even if when cabinet is subject to external force, front panel 2 is also not easy to come off from casing 1, and therefore, the stability that the pre-determined bit of front panel 2 on casing 1 is installed is better, reliability is stronger, therefore, in a pre-installation during panel 2, carry out locking or unlock in the process of front panel 2 without the need to hand steered front panel 2; And, because above-mentioned grafting coordinates between front panel 2 and the hangers 3 of its both sides, so grafting process is conveniently observed, can guarantee fast by the position-limiting action observed and two hangers 3 have itself and correctly carry out contraposition grafting, therefore, what the pre-determined bit of front panel 2 on casing 1 was installed is workable.
Therefore, the good stability, workable that the pre-determined bit of the front panel in above-mentioned cabinet is installed.
In addition, the pre-determined bit of above-mentioned front panel 2 is installed without the need to carrying out perforate on casing 1, so there is no limitation, goes for any cabinet.
In a kind of specific embodiment, between front panel 2 with two hangers 3, grafting coordinates, and specifically can comprise:
As shown in Fig. 1 ~ Fig. 6, in two hangers 3, each hangers 3 is respectively equipped with towards the bulge-structure 4 of another hangers 3 projection along the two ends of its bearing of trend; Front panel 2 is provided with bulge-structure 4 one_to_one corresponding and the sliding groove structure 5 that can coordinate with bulge-structure 4 grafting.As shown in Figure 1, Figure 2 with shown in Fig. 5, when front panel 2 is inserted between two hangers 3 along the direction perpendicular to antetheca 11, four bights of corresponding front panel 2 can be distinguished in the two ends of two hangers 3, and four bights of front panel 2 can be respectively equipped with and above-mentioned bulge-structure 4 sliding groove structure 5 one to one.When being inserted between two hangers 3 along the direction perpendicular to antetheca 11 by front panel 2, bulge-structure 4 can insert in the sliding groove structure 5 corresponding with it, thus the grafting realized between front panel 2 with two hangers 3 coordinates.
Because above-mentioned grafting coordinates four bights being positioned at front panel 2, so bulge-structure 4 can make front panel 2 be restricted on the four direction of upper and lower, left and right, in addition the position-limiting action on rear side of cabinet 1 antetheca 11 pairs of front panels 2, front panel 2 can be made very stable, even if when cabinet is subject to as more bigger External Force Actings such as vibrations, front panel 2 is also not easy to come off from casing 1, therefore, the pre-determined bit of front panel 2 on casing 1 is installed very stable, and reliability is very strong.
Certainly, between front panel 2 with two hangers 3, grafting coordinates and also can comprise: four bights of front panel 2 are provided with bulge-structure, and each hangers 3 is provided with bulge-structure one_to_one corresponding and the sliding groove structure that coordinates of grafting.Coordinated by the grafting between bulge-structure with sliding groove structure and realize grafting between front panel 2 with two hangers 3 and coordinate.
On the basis of above-described embodiment, in a kind of specific embodiment, as shown in Figure 3 and Figure 4, the end of bulge-structure 4 can be provided with lozenges 41, and lozenges 41 for playing the guiding role in bulge-structure 4 with sliding groove structure 5 grafting process, preferably, as shown in Figure 3, the lozenges 41 of the bulge-structure 4 at each hangers about 3 two ends is oppositely arranged, the end of bulge-structure 4 forms lozenges 41 can make the end of bulge-structure 4 narrower, thus in grafting process, make the easier contraposition of bulge-structure 4 insert sliding groove structure 5, and form lozenges 41 in the inner side that bulge-structure 4 is relative, the gradient that lozenges 41 has can make that bulge-structure 4 is easier to slide along sliding groove structure 5 thus realize the grafting of bulge-structure 4 and sliding groove structure 5, therefore lozenges 41 can play good guide effect in bulge-structure 4 with sliding groove structure 5 grafting process, grafting process can be made faster, thus the efficiency of front panel 2 pre-determined bit installation can be improved.
On the basis of the various embodiments described above, in a kind of specific embodiment, as shown in Fig. 2, Fig. 3 and Fig. 6, in two hangers 3, hangers 3 is provided with draw-in groove 6 towards the side sidewall of another hangers 3; Or each hangers 3 is provided with draw-in groove 6 towards the side sidewall of another hangers 3; As shown in Figure 2 and Figure 5, front panel 2 can be provided with the Elastic buckle 7 of clamping corresponding to draw-in groove 6.Preferably, as shown in figs. 1 to 6, two hangers 3 can lay respectively at the left and right sides of casing 1 antetheca 11, and each hangers 3 is provided with draw-in groove 6 towards the side sidewall of another hangers 3, and the left and right sides sidewall of front panel 2 is respectively equipped with can the Elastic buckle 7 of snap-fit engagement corresponding to draw-in groove 6.
As shown in Figure 6, when front panel 2 is inserted between two hangers 3 along the direction perpendicular to antetheca 11, the Elastic buckle 7 of front panel 2 left and right sides can snap in the draw-in groove 6 that two hangers 3 are provided with respectively, by the snap-fit engagement between Elastic buckle 7 and draw-in groove 6, the tight power of contract between front panel 2 and two hangers 3 can be increased, thus make the pre-determined bit of front panel 2 more reliable and more stable.
On the basis of the various embodiments described above, in a kind of specific embodiment, as depicted in figs. 1 and 2, cabinet can also comprise at least one door latch structure 8 be installed on front panel 2.Preferably, as depicted in figs. 1 and 2, each side installation door latch structure 8, two door latch structures 8 of front panel 2 can coordinate to realize locking or unlocking with two hangers 3 being positioned at casing 1 antetheca 11 left and right sides respectively.
As shown in Figure 1, Figure 2 and Figure 3, after the installation of front wall 2 pre-determined bit, door latch structure 8 can be locked by key, make produce transmission in door latch structure 8 thus make dead bolt 81 stretch out the sidewall of front panel 2 and insert in the lockhole (lockhole 31 on hangers 3 sidewall as shown in Figure 1 and Figure 3) on hangers 3 sidewall specifically by key, thus realize the locking of front panel 2 and casing 1; Each side installation door latch structure 8 of front panel 2 can make the locking between front panel 2 and casing 1 more reliable, and to make to pull down front panel by instrument when not having key, security is better.
Obviously, those skilled in the art can carry out various change and modification to the utility model embodiment and not depart from spirit and scope of the present utility model.Like this, if these amendments of the present utility model and modification belong within the scope of the utility model claim and equivalent technologies thereof, then the utility model is also intended to comprise these change and modification.

Claims (6)

1. a cabinet, is characterized in that, comprises casing and the front panel being installed on casing, wherein:
Described casing comprises two hangers of the antetheca both sides laying respectively at casing, and described two hangers are parallel to be arranged;
Insert between described two hangers along perpendicular to the direction of casing antetheca, described front panel, and between described front panel with described two hangers, grafting coordinates.
2. cabinet according to claim 1, is characterized in that,
In described two hangers, each hangers is respectively equipped with towards the bulge-structure of another hangers projection along the two ends of its bearing of trend;
Described front panel is provided with described bulge-structure one_to_one corresponding and the sliding groove structure that coordinates of grafting.
3. cabinet according to claim 2, is characterized in that, the end of described bulge-structure is provided with lozenges, for playing the guiding role in bulge-structure and sliding groove structure grafting process.
4. cabinet according to claim 1, is characterized in that,
In described two hangers, hangers is provided with draw-in groove towards the side sidewall of another hangers; Or each hangers is provided with draw-in groove towards the side sidewall of another hangers;
Described front panel is provided with the Elastic buckle of clamping corresponding to described draw-in groove.
5. the cabinet according to any one of Claims 1 to 4, is characterized in that, also comprises at least one door latch structure being installed on front panel.
6. cabinet according to claim 5, is characterized in that, described door latch structure is two, and described two door latch structures coordinate with described two hangers the locking or the unblock that realize front panel respectively.
CN201520535651.0U 2015-07-22 2015-07-22 Cabinet Active CN204808163U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201520535651.0U CN204808163U (en) 2015-07-22 2015-07-22 Cabinet

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201520535651.0U CN204808163U (en) 2015-07-22 2015-07-22 Cabinet

Publications (1)

Publication Number Publication Date
CN204808163U true CN204808163U (en) 2015-11-25

Family

ID=54592951

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201520535651.0U Active CN204808163U (en) 2015-07-22 2015-07-22 Cabinet

Country Status (1)

Country Link
CN (1) CN204808163U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN107193344A (en) * 2017-07-04 2017-09-22 江苏峰谷源储能技术研究院有限公司 A kind of insertion slot type front panel

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN107193344A (en) * 2017-07-04 2017-09-22 江苏峰谷源储能技术研究院有限公司 A kind of insertion slot type front panel

Similar Documents

Publication Publication Date Title
US20110005281A1 (en) Locking base for anti-theft lock
KR101961922B1 (en) A cover module for locking network port and apparatus having the same
CN204808163U (en) Cabinet
CN105350830A (en) Six-groove three-curve blade lockset
CN102691441A (en) Locking mechanism and electronic device with same
CN105257102A (en) Lock cylinder structure with changeable blade key thread pattern
CN109209025A (en) Door lock and electrical equipment
US20150184422A1 (en) Lock core structure
CN102381170B (en) Protective box for battery of electric automobile
JP4772655B2 (en) Cylinder lock
TWM486180U (en) Buckling device of card edge connector
JP2008008035A (en) Sliding door sash
CN204112933U (en) U-shape lock
CN206279879U (en) A kind of simple cabinet lock buckle side plate
CN105717978A (en) Locking device
CN204571525U (en) Lock 3 reverse anti-theft door lock cylinders of biplate
CN219013818U (en) On-frame type double-screen KVM
CN220151114U (en) Lock beam sheath and padlock
CN204859813U (en) Electronic equipment hasp
KR200494363Y1 (en) Clamp Unit for Locking Member of Door lock Having Extension Member
CN207776620U (en) A kind of lockset of adjustable world rod length
JP5489160B2 (en) Display board fixing method and display board fixing structure
TWI422307B (en) Locking device and assembly of a case and the locking device
CN203150827U (en) Circular electric connector
CN218675867U (en) Elastic deformation fixed key convenient to disassemble and assemble

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant