CN204804265U - Steel construction elevated floor presss from both sides line structure - Google Patents

Steel construction elevated floor presss from both sides line structure Download PDF

Info

Publication number
CN204804265U
CN204804265U CN201520362314.6U CN201520362314U CN204804265U CN 204804265 U CN204804265 U CN 204804265U CN 201520362314 U CN201520362314 U CN 201520362314U CN 204804265 U CN204804265 U CN 204804265U
Authority
CN
China
Prior art keywords
clamp
sleeve
stay pipe
movable floor
wire clamp
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201520362314.6U
Other languages
Chinese (zh)
Inventor
施婉娟
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Foshan City And Gang Huayu Metallic Article Co Ltd
Original Assignee
Individual
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Individual filed Critical Individual
Priority to CN201520362314.6U priority Critical patent/CN204804265U/en
Application granted granted Critical
Publication of CN204804265U publication Critical patent/CN204804265U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Installation Of Indoor Wiring (AREA)

Abstract

The utility model provides a steel construction elevated floor presss from both sides line structure belongs to the steel construction field, when it has been solved current elevated floor and has laid, the direct problem with the ground contact of circuit. The utility model discloses an elevated floor and support, still including connecting the crossbeam that is used for supporting elevated floor on the support, elevated floor is including establishing respectively at under and steel sheet of the veneer of top layer and bottom to and fill at veneer foaming cement packing layer between the steel sheet under with, the support includes and is equipped with elasticity fastener no. 1, elasticity fastener no. 2 and elasticity fastener no. 3 on, time steel sheet and the crossbeam respectively by the tubulose stay tube. When laying elevated floor, the circuit that will need dark dress blocks respectively on fastener no. 1, fastener no. 2 and fastener no. 3, makes the unsettled setting in dark wiring way through the mode of setting up, consequently can prevent circuit and ground direct contact, leads to the fact the potential safety hazard.

Description

Steel work movable floor clamping-line structure
Technical field
The utility model belongs to long strands field, relates to a kind of steel work movable floor clamping-line structure.
Background technology
Exhibition is not stopped paying out along with modern society, people are more and more extensive for the use of computer, comparatively speaking, computed occasion just becomes more and more, more especially needs circuit to arrange intensive place and also becomes more, such as computer floor, laboratory, broadcasting and TV office machine room etc., and the antistatic base steel movable floor adapting to the intensive setting place of these circuits also arises at the historic moment, its convenient installation, dismounting, and energy antistatic, meet the demand in the comparatively intensive place of the above electronic equipment.
But lay simultaneously at movable floor, the circuit in machine room is generally layered on bottom movable floor with regard to entirety, there is certain potential safety hazard in direct and earth surface.
Summary of the invention
The purpose of this utility model is for the above-mentioned problems in the prior art, provides the steel work movable floor clamping-line structure of the unsettled construction of line of a kind of energy.
The purpose of this utility model realizes by following technical proposal: a kind of steel work movable floor clamping-line structure, comprise movable floor and support, also comprise and being connected on support for supporting the crossbeam of described movable floor, described movable floor comprises the thick china and lower steel plate that are located at top layer and bottom respectively, and the foam cement packing layer be filled between thick china and lower steel plate, described support comprises tubular support pipe, it is characterized in that: described stay pipe, lower steel plate and crossbeam are respectively equipped with elastic wire clamp one, elastic wire clamp two and elastic wire clamp three.
While laying movable floor, will the circuit of concealed installation be needed to be stuck on wire clamp one, wire clamp two and wire clamp three, make the unsettled setting of concealed installation circuit by the mode of erection, therefore can prevent circuit from directly contacting with ground, cause potential safety hazard.
As preferably, described wire clamp one comprises sleeve and is located at clamp one outside sleeve, and between clamp one and sleeve, form the clamp mouth of opening upwards, described stay pipe is round tube, and stay pipe is provided with the annular sleeve coaxial with stay pipe, described jacket casing on stay pipe and sleeve bottom be against in annular sleeve, and described sleeve can rotate around described stay pipe axis.
Therefore clamp one can be made to meet the needs of different directions stringing by turnbarrel.
As preferably, described annular sleeve is screwed onto on stay pipe, and by making annular sleeve move along stay pipe axis direction around stay pipe axis rotary annular cover.
Can annular sleeve be made to move up and down to regulate the height of stringing by rotary annular cover.
As preferably, described wire clamp two comprises circular shaped motion plate and is fixed on the clamp two that portable plate bottom surface is arranged in right-angled intersection, clamp two corner location all bends to arc shape, and clamp two corner location and portable plate bottom surface form four clamp mouths, described portable plate is rotatable to be connected on lower steel plate bottom surface.
The clamp two made by rotary moveable plate meets the needs of different directions stringing.
As preferably, described lower steel plate is rectangular, and described wire clamp two is located at lower steel plate geometric center position, and described wire clamp three is located at crossbeam length direction geometric center position.
Therefore convenient stringing.
Compared with prior art, the utility model tool has the following advantages:
While laying movable floor, will the circuit of concealed installation be needed to be stuck on wire clamp one, wire clamp two and wire clamp three, make the unsettled setting of concealed installation circuit by the mode of erection, therefore can prevent circuit from directly contacting with ground, cause potential safety hazard.
Accompanying drawing explanation
Fig. 1 is overall structure elevational schematic view of the present utility model;
Fig. 2 is partial structurtes schematic diagram of the present utility model;
Fig. 3 is the structural representation of wire clamp two in the utility model.
Coding in figure is respectively:
1, movable floor; 11, thick china; 12, lower steel plate; 13, foam cement packing layer; 14, wire clamp two; 15, portable plate; 16, clamp two; 2, support; 21, stay pipe; 22, wire clamp one; 23, sleeve; 24, clamp one; 25, clamp mouth; 26, annular sleeve; 3, crossbeam; 31, wire clamp three.
Detailed description of the invention
Be below specific embodiment of the utility model and by reference to the accompanying drawings, the technical solution of the utility model is further described, but the utility model be not limited to these embodiments.
As shown in Figure 1, Figure 2 and Figure 3, this steel work movable floor clamping-line structure, comprise movable floor 1 and support 2, also comprise the crossbeam 3 be connected to for movable support floor 1 on support 2, movable floor 1 comprises the thick china 11 and lower steel plate 12 that are located at top layer and bottom respectively, and the foam cement packing layer 13 be filled between thick china 11 and lower steel plate 12, support 2 comprises tubular support pipe 21, stay pipe 21, lower steel plate 12 and crossbeam 3 is respectively equipped with elastic wire clamp 1, elastic wire clamp 2 14 and elastic wire clamp 3 31.
As shown in Figure 1, Figure 2 and Figure 3, the clamp 1 that wire clamp 1 comprises sleeve 23 and is located at outside sleeve 23, and between clamp 1 and sleeve 23, form the clamp mouth 25 of opening upwards, stay pipe 21 is round tube, and stay pipe 21 is provided with the annular sleeve 26 coaxial with stay pipe 21, sleeve 23 to be enclosed within stay pipe 21 and to be against in annular sleeve 26 bottom sleeve 23, and sleeve 23 can rotate around stay pipe 21 axis.Annular sleeve 26 is screwed onto on stay pipe 21, and by making annular sleeve 26 move along stay pipe 21 axis direction around stay pipe 21 axis rotary annular cover 26.Wire clamp 2 14 comprises circular shaped motion plate 15 and is fixed on the clamp 2 16 that portable plate 15 bottom surface is arranged in right-angled intersection, clamp 2 16 corner location all bends to arc shape, and clamp 2 16 corner location and portable plate 15 bottom surface form four clamp mouths 25, portable plate 15 is rotatable to be connected on lower steel plate 12 bottom surface.Lower steel plate 12 is rectangular, and wire clamp 2 14 is located at lower steel plate 12 geometric center position, and wire clamp 3 31 is located at crossbeam 3 length direction geometric center position.
While laying movable floor 1, will the circuit of concealed installation be needed to be stuck on wire clamp 1, wire clamp 2 14 and wire clamp 3 31, make the unsettled setting of concealed installation circuit by the mode of erection, therefore can prevent circuit from directly contacting with ground, cause potential safety hazard.

Claims (5)

1. a steel work movable floor clamping-line structure, comprise movable floor (1) and support (2), also comprise and being connected on support (2) for supporting the crossbeam (3) of described movable floor (1), described movable floor (1) comprises the thick china (11) and lower steel plate (12) that are located at top layer and bottom respectively, and the foam cement packing layer (13) be filled between thick china (11) and lower steel plate (12), described support (2) comprises tubular support pipe (21), it is characterized in that: described stay pipe (21), lower steel plate (12) and crossbeam (3) are respectively equipped with elastic wire clamp one (22), elastic wire clamp two (14) and elastic wire clamp three (31).
2. steel work movable floor clamping-line structure according to claim 1, it is characterized in that: described wire clamp one (22) comprises sleeve (23) and is located at the clamp one (24) in sleeve (23) outside, and between clamp one (24) and sleeve (23), form the clamp mouth (25) of opening upwards, described stay pipe (21) is round tube, and stay pipe (21) is provided with the annular sleeve (26) coaxial with stay pipe (21), described sleeve (23) is enclosed within stay pipe (21) and goes up and be against in annular sleeve (26) bottom sleeve (23), and described sleeve (23) can rotate around described stay pipe (21) axis.
3. steel work movable floor clamping-line structure according to claim 2, it is characterized in that: described annular sleeve (26) is screwed onto on stay pipe (21), and by making annular sleeve (26) move along stay pipe (21) axis direction around stay pipe (21) axis rotary annular cover (26).
4. steel work movable floor clamping-line structure according to claim 2, it is characterized in that: described wire clamp two (14) comprises circular shaped motion plate (15) and is fixed on the clamp two (16) that portable plate (15) bottom surface is arranged in right-angled intersection, clamp two (16) corner location all bends to arc shape, and clamp two (16) corner location and portable plate (15) bottom surface form four clamp mouths (25), described portable plate (15) is rotatable to be connected on lower steel plate (12) bottom surface.
5. steel work movable floor clamping-line structure according to claim 1, it is characterized in that: described lower steel plate (12) is rectangular, and described wire clamp two (14) is located at lower steel plate (12) geometric center position, described wire clamp three (31) is located at crossbeam (3) length direction geometric center position.
CN201520362314.6U 2015-05-27 2015-05-27 Steel construction elevated floor presss from both sides line structure Expired - Fee Related CN204804265U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201520362314.6U CN204804265U (en) 2015-05-27 2015-05-27 Steel construction elevated floor presss from both sides line structure

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201520362314.6U CN204804265U (en) 2015-05-27 2015-05-27 Steel construction elevated floor presss from both sides line structure

Publications (1)

Publication Number Publication Date
CN204804265U true CN204804265U (en) 2015-11-25

Family

ID=54589111

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201520362314.6U Expired - Fee Related CN204804265U (en) 2015-05-27 2015-05-27 Steel construction elevated floor presss from both sides line structure

Country Status (1)

Country Link
CN (1) CN204804265U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110965730A (en) * 2018-09-28 2020-04-07 积水房屋科技株式会社 Bathroom floor structure

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110965730A (en) * 2018-09-28 2020-04-07 积水房屋科技株式会社 Bathroom floor structure
CN110965730B (en) * 2018-09-28 2021-08-10 积水房屋科技株式会社 Bathroom floor structure

Similar Documents

Publication Publication Date Title
CN203674640U (en) Cable pay-off rack and cable laying device
CN203277686U (en) Detachable type ground wire pile head
CN204804265U (en) Steel construction elevated floor presss from both sides line structure
CN206116142U (en) Dry -type transformer of simple and easy installation
CN202817556U (en) Installation support for switch mechanism case
CN105435416A (en) Multifunctional device for indoor body building
CN209161144U (en) A kind of heavy cable laying device
CN205240924U (en) Novel winding machine
CN204349368U (en) A kind of rotation wiring emergency support
CN204112729U (en) Pipe well inner sleeve reserves fixed support
CN207122039U (en) A kind of ceiling joist
CN206397247U (en) A kind of energy saving type signal launching tower
CN213602337U (en) Low-voltage electrical wiring pipe convenient to penetrate through wall for installation
CN103625523B (en) A kind of machine room moves O&M device
CN210092779U (en) Cable support frame
CN207377116U (en) Casing direct-burried device on aluminum alloy pattern plate
CN204633186U (en) A kind of current conversion station converter transformer stable turning device
CN203150833U (en) Universal hook for ground lead
CN203334760U (en) Same rod tower cross span abnormal tower
CN202488562U (en) Wiring mechanism for pan-and-tilt camera and pan-and-tilt camera
CN201629520U (en) Vertical cable installation speed controller
CN221348232U (en) Overhead hoist is used in water and electricity installation
CN203716451U (en) Load-bearing bracket under machine room floor
CN208112184U (en) A kind of fixed device of architectural electricity construction being easily installed
CN204747807U (en) Construct special steel bar butt welding machine block terminal

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
CB03 Change of inventor or designer information

Inventor after: Zou Huawei

Inventor before: Shi Wanjuan

CB03 Change of inventor or designer information
TR01 Transfer of patent right

Effective date of registration: 20170316

Address after: 528313 Shunde City, Foshan province Chencun Town, Tan Village Industrial Zone, Road No. two, No. two, 6

Patentee after: Foshan City and Gang Huayu metallic article Co., Ltd

Address before: 362803 Quanzhou, Fujian, Quangang District, Hong Kong Road, No. 1179

Patentee before: Shi Wanjuan

TR01 Transfer of patent right
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20151125

Termination date: 20180527

CF01 Termination of patent right due to non-payment of annual fee