CN221348232U - Overhead hoist is used in water and electricity installation - Google Patents
Overhead hoist is used in water and electricity installation Download PDFInfo
- Publication number
- CN221348232U CN221348232U CN202323008729.7U CN202323008729U CN221348232U CN 221348232 U CN221348232 U CN 221348232U CN 202323008729 U CN202323008729 U CN 202323008729U CN 221348232 U CN221348232 U CN 221348232U
- Authority
- CN
- China
- Prior art keywords
- fixed
- rod
- connecting rod
- installation
- fixing
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Active
Links
- 238000009434 installation Methods 0.000 title claims abstract description 39
- 230000005611 electricity Effects 0.000 title description 4
- XLYOFNOQVPJJNP-UHFFFAOYSA-N water Substances O XLYOFNOQVPJJNP-UHFFFAOYSA-N 0.000 title description 4
- 230000007246 mechanism Effects 0.000 claims abstract description 26
- 238000010276 construction Methods 0.000 description 11
- 238000000034 method Methods 0.000 description 5
- 230000008859 change Effects 0.000 description 4
- 230000008569 process Effects 0.000 description 3
- 230000006978 adaptation Effects 0.000 description 2
- 230000002457 bidirectional effect Effects 0.000 description 2
- 230000000694 effects Effects 0.000 description 2
- 230000004048 modification Effects 0.000 description 2
- 238000012986 modification Methods 0.000 description 2
- 230000002035 prolonged effect Effects 0.000 description 2
- 230000009286 beneficial effect Effects 0.000 description 1
- 239000004566 building material Substances 0.000 description 1
- 230000007547 defect Effects 0.000 description 1
- 230000006872 improvement Effects 0.000 description 1
- 238000003780 insertion Methods 0.000 description 1
- 230000037431 insertion Effects 0.000 description 1
Classifications
-
- Y—GENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
- Y02—TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
- Y02E—REDUCTION OF GREENHOUSE GAS [GHG] EMISSIONS, RELATED TO ENERGY GENERATION, TRANSMISSION OR DISTRIBUTION
- Y02E10/00—Energy generation through renewable energy sources
- Y02E10/20—Hydro energy
Landscapes
- Load-Engaging Elements For Cranes (AREA)
Abstract
The utility model discloses a hoisting device for hydroelectric installation, which comprises an installation seat, wherein a fixing lug is arranged on the outer wall of the top of the installation seat, an electric telescopic rod is arranged on the fixing lug, a driving mechanism for driving the electric telescopic rod to rotate is arranged on the top of the installation seat, a fixing plate is fixed on the top of the electric telescopic rod, and a plurality of pressing mechanisms are arranged on the fixing plate; the pressing mechanism comprises a connecting rod, a jack for the connecting rod to pass through is formed in the fixing plate, an installation rod is detachably arranged at the top of the connecting rod, an arc-shaped clamping plate is fixed at the bottom of the installation rod, a balancing weight is fixed at the bottom of the connecting rod, an external thread sleeve shell is fixed at the top of the connecting rod, and a thread head is fixed at the bottom of the installation rod. The installation rod drives the arc-shaped clamping plate to move downwards, and the pipeline is extruded and fixed, so that the pipeline is kept stable to a certain extent, is convenient to take, and is suitable for lifting pipelines of different types.
Description
Technical Field
The utility model relates to the technical field of building engineering construction, in particular to a hoisting device for hydroelectric installation.
Background
In the construction engineering construction, a large number of construction building materials such as hydropower pipelines, fire-fighting pipelines and the like are paved, most of the pipelines have large weight and large volume, and in the traditional construction, constructors often adopt a mode of manually carrying and dragging by a plurality of workers to carry out transportation and installation.
However, because the building equipment layer height of the common equipment layer is relatively high, construction operators generally need to set up auxiliary devices such as scaffolds in the process of carrying and installing pipelines, so that the construction amount is greatly increased, the construction cost is increased, the construction efficiency is reduced due to low construction operation efficiency to a great extent, and the construction period is prolonged and further prolonged.
Disclosure of utility model
The utility model aims to solve the defects in the prior art and provides a lifting device for hydroelectric installation.
In order to achieve the above purpose, the present utility model adopts the following technical scheme:
The utility model provides a water and electricity installation is with hoisting device, includes the mount pad, the fixed ear is installed to the top outer wall of mount pad, be provided with electric telescopic handle on the fixed ear, the actuating mechanism of drive electric telescopic handle pivoted is installed at the top of mount pad, electric telescopic handle's top is fixed with the fixed plate, be provided with a plurality of pressing mechanism on the fixed plate;
The pressing mechanism comprises a connecting rod, a jack for the connecting rod to pass through is formed in the fixing plate, an installation rod is detachably arranged at the top of the connecting rod, and an arc-shaped clamping plate is fixed at the bottom of the installation rod.
As a further scheme of the utility model, the bottom of the connecting rod is fixed with a balancing weight.
As a further scheme of the utility model, the top of the connecting rod is fixed with an external thread sleeve, the bottom of the mounting rod is fixed with a thread head, and the thread head and the external thread sleeve are fixed through a fixing cap.
As a further scheme of the utility model, the fixing cap comprises a first thread bush matched with the thread head, and a second thread bush matched with the external thread sleeve is fixed at the bottom of the first thread bush.
As a further scheme of the utility model, one side of the outer wall of the fixing plate is fixed with a mounting plate, and the outer wall of the mounting plate is fixed with a plurality of fixing clamps with different sizes.
As a further scheme of the utility model, a rubber pad corresponding to the arc clamping plate is fixed at the top of the mounting seat.
As a further scheme of the utility model, the driving mechanism comprises a bidirectional motor fixed at the top of the mounting seat, a first gear is fixed on an output shaft of the bidirectional motor, a second gear is meshed with the first gear, a fixing rod is coaxially fixed at the top of the second gear, a mounting disc is movably penetrated through the fixing lug, and the electric telescopic rod is fixed at the top of the mounting disc.
The beneficial effects of the utility model are as follows:
The utility model comprises the following steps: through mount pad, electric telescopic handle, actuating mechanism, fixed plate and the pressing mechanism that set up, the electric telescopic handle that sets up can height-adjusting, actuating mechanism can change the angle, convenient to use, wherein pressing mechanism includes balancing weight, connecting rod, installation pole, arc splint, screw thread head, block cap and external screw thread cover shell, places the pipeline on the rubber pad, under the counter weight effect of balancing weight for the connecting rod moves down in the jack, and the installation pole drives arc splint and moves down, extrudees fixedly to the pipeline, makes the pipeline keep certain stability, and conveniently takes.
The utility model comprises the following steps: the screw thread head and the external screw thread cover shell are connected through the fixed cap to the setting, realize the whole dismouting of installation pole and arc splint, wherein arc splint can join in marriage different models, can be convenient for carry out holistic change according to the pipeline
The utility model comprises the following steps: the pipeline clamping device is provided with a mounting plate and a fixing clamp, wherein the fixing clamp is provided with different sizes, so that pipelines with different sizes and models can be clamped conveniently.
Drawings
Fig. 1 is a schematic perspective view of a lifting device for hydropower installation according to the present utility model;
fig. 2 is a schematic view of a partially three-dimensional unfolding structure of a lifting device for hydropower installation;
FIG. 3 is an enlarged schematic view of the structure of the lifting device for hydropower installation shown in FIG. 2A;
Fig. 4 is a schematic structural view of a driving mechanism of a lifting device for hydropower installation.
In the figure: 1. a mounting base; 2. a driving mechanism; 3. a fixed ear; 4. an electric telescopic rod; 5. a fixing plate; 6. a pressing mechanism; 7. a mounting plate; 8. a fixing clamp; 9. a jack; 10. balancing weight; 11. a connecting rod; 12. a mounting rod; 13. an arc clamping plate; 14. a thread head; 15. a fixing cap; 16. an external thread sleeve; 17. a bi-directional motor; 18. a first gear; 19. and a second gear.
Detailed Description
The following description of the embodiments of the present utility model will be made clearly and completely with reference to the accompanying drawings, in which it is apparent that the embodiments described are only some embodiments of the present utility model, but not all embodiments.
It should be noted that, without conflict, the embodiments of the present utility model and features of the embodiments may be combined with each other. The utility model will be described in detail below with reference to the drawings in connection with embodiments.
Referring to fig. 1-4, a lifting device for water and electricity installation comprises a mounting seat 1, wherein a fixing lug 3 is arranged on the outer wall of the top of the mounting seat 1, an electric telescopic rod 4 is arranged on the fixing lug 3, a driving mechanism 2 for driving the electric telescopic rod 4 to rotate is arranged on the top of the mounting seat 1, a fixing plate 5 is fixed on the top of the electric telescopic rod 4, and a plurality of pressing mechanisms 6 are arranged on the fixing plate 5;
The pressing mechanism 6 comprises a connecting rod 11, an insertion hole 9 for the connecting rod 11 to pass through is formed in the fixing plate 5, an installation rod 12 is detachably arranged at the top of the connecting rod 11, and an arc-shaped clamping plate 13 is fixed at the bottom of the installation rod 12.
In this embodiment, the bottom of the connecting rod 11 is fixed with a counterweight 10.
In this embodiment, the top of the connecting rod 11 is fixed with an external thread casing 16, the bottom of the mounting rod 12 is fixed with a thread head 14, and the thread head 14 and the external thread casing 16 are fixed by a fixing cap 15.
In this embodiment, the fixing cap 15 includes the first thread bush with the screw thread head 14 adaptation, and the bottom of first thread bush is fixed with the second thread bush with the external screw thread cover shell 16 adaptation, and the screw thread head 14 and the external screw thread cover shell 16 are connected through the fixing cap 15 to the setting, realize the whole dismouting of installation pole 12 and arc splint 13, and wherein arc splint 13 can join in marriage different models, can be convenient for carry out holistic change according to the pipeline.
In this embodiment, the outer wall one side of fixed plate 5 is fixed with mounting panel 7, and the outer wall of mounting panel 7 is fixed with the mounting fixture 8 that a plurality of sizes are different, is provided with mounting panel 7 and mounting fixture 8, and wherein mounting fixture 8 is provided with the not unidimensional, the pipeline of the different size models of centre gripping of being convenient for.
In this embodiment, a rubber pad corresponding to the arc clamping plate 13 is fixed on the top of the mounting seat 1.
In this embodiment, the driving mechanism 2 includes a bi-directional motor 17 fixed at the top of the mounting base 1, an output shaft of the bi-directional motor 17 is fixed with a first gear 18, the first gear 18 is meshed with a second gear 19, a fixing rod is coaxially fixed at the top of the second gear 19, the fixing rod movably penetrates through the fixing lug 3 to be fixed with a mounting disc, and the electric telescopic rod 4 is fixed at the top of the mounting disc.
Working principle: when the device is used, the height of the arranged electric telescopic rod 4 can be adjusted through the arranged mounting seat 1, the electric telescopic rod 4, the driving mechanism 2, the fixing plate 5 and the pressing mechanism 6, the driving mechanism 2 can change the angle, the device is convenient to use, wherein the pressing mechanism 6 comprises a balancing weight 10, a connecting rod 11, a mounting rod 12, an arc clamping plate 13, a thread head 14, a fixing cap 15 and an external thread sleeve shell 16, a pipeline is arranged on a rubber pad, the connecting rod 11 moves downwards in a jack 9 under the balancing weight effect of the balancing weight 10, the mounting rod 12 drives the arc clamping plate 13 to move downwards, the pipeline is extruded and fixed, the pipeline is kept stable and is convenient to take, the thread head 14 and the external thread sleeve shell 16 are connected through the fixing cap 15, the whole disassembly and assembly of the mounting rod 12 and the arc clamping plate 13 are realized, the mounting rod 12 and the arc clamping plate 13 can be matched with different models, and the whole replacement of the pipeline can be conveniently carried out according to the pipeline; further, a mounting plate 7 and a fixing clamp 8 are arranged, wherein the fixing clamp 8 is provided with different sizes, so that pipelines with different sizes and models can be clamped conveniently.
Spatially relative terms, such as "above … …," "above … …," "upper surface on … …," "above," and the like, may be used herein for ease of description to describe one device or feature's spatial location relative to another device or feature as illustrated in the figures. It will be understood that the spatially relative terms are intended to encompass different orientations in use or operation in addition to the orientation depicted in the figures. For example, if the device in the figures is turned over, elements described as "above" or "over" other devices or structures would then be oriented "below" or "beneath" the other devices or structures. Thus, the exemplary term "above … …" may include both orientations "above … …" and "below … …". The device may also be positioned in other different ways (rotated 90 degrees or at other orientations) and the spatially relative descriptors used herein interpreted accordingly.
It is noted that the terminology used herein is for the purpose of describing particular embodiments only and is not intended to be limiting of exemplary embodiments according to the present application. As used herein, the singular is also intended to include the plural unless the context clearly indicates otherwise, and furthermore, it is to be understood that the terms "comprises" and/or "comprising" when used in this specification are taken to specify the presence of stated features, steps, operations, devices, components, and/or combinations thereof.
It should be noted that the terms "first," "second," and the like in the description and the claims of the present application and the above figures are used for distinguishing between similar objects and not necessarily for describing a particular sequential or chronological order. It is to be understood that the data so used may be interchanged where appropriate such that embodiments of the application described herein may be capable of being practiced otherwise than as specifically illustrated and described. Furthermore, the terms "comprises," "comprising," and "having," and any variations thereof, are intended to cover a non-exclusive inclusion, such that a process, method, system, article, or apparatus that comprises a list of steps or elements is not necessarily limited to those steps or elements expressly listed but may include other steps or elements not expressly listed or inherent to such process, method, article, or apparatus.
The above description is only of the preferred embodiments of the present utility model and is not intended to limit the present utility model, but various modifications and variations can be made to the present utility model by those skilled in the art. Any modification, equivalent replacement, improvement, etc. made within the spirit and principle of the present utility model should be included in the protection scope of the present utility model.
Claims (7)
1. The utility model provides a hoist device for hydroelectric installation, includes mount pad (1), its characterized in that, fixed ear (3) are installed to the top outer wall of mount pad (1), be provided with electric telescopic handle (4) on fixed ear (3), actuating mechanism (2) of the pivoted of drive electric telescopic handle (4) are installed at the top of mount pad (1), the top of electric telescopic handle (4) is fixed with fixed plate (5), be provided with a plurality of pressing mechanism (6) on fixed plate (5);
The pressing mechanism (6) comprises a connecting rod (11), an inserting hole (9) for the connecting rod (11) to pass through is formed in the fixing plate (5), an installation rod (12) is detachably installed at the top of the connecting rod (11), and an arc-shaped clamping plate (13) is fixed at the bottom of the installation rod (12).
2. A hoisting device for hydroelectric installation according to claim 1, characterized in that the bottom of the connecting rod (11) is fixed with a counterweight (10).
3. A hoisting device for hydroelectric installation according to claim 2, characterized in that the top of the connecting rod (11) is fixed with an external thread sleeve (16), the bottom of the installation rod (12) is fixed with a thread head (14), and the thread head (14) and the external thread sleeve (16) are fixed by a fixing cap (15).
4. A hoisting device for hydroelectric installation according to claim 3, characterized in that the fixing cap (15) comprises a first threaded sleeve fitted with a threaded head (14), and the bottom of the first threaded sleeve is fixed with a second threaded sleeve fitted with an externally threaded casing (16).
5. The hoisting device for hydroelectric installation according to claim 1, wherein a mounting plate (7) is fixed on one side of the outer wall of the fixing plate (5), and a plurality of fixing clamps (8) with different sizes are fixed on the outer wall of the mounting plate (7).
6. The hoisting device for hydroelectric installation according to claim 4, wherein a rubber pad corresponding to the arc-shaped clamping plate (13) is fixed at the top of the installation seat (1).
7. A hoisting device for hydroelectric installation according to claim 1, characterized in that the driving mechanism (2) comprises a bi-directional motor (17) fixed at the top of the installation seat (1), a first gear (18) is fixed on an output shaft of the bi-directional motor (17), a second gear (19) is meshed with the first gear (18), a fixing rod is coaxially fixed at the top of the second gear (19), a mounting disc is fixed through the fixing lug (3) in a movable manner, and the electric telescopic rod (4) is fixed at the top of the mounting disc.
Priority Applications (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| CN202323008729.7U CN221348232U (en) | 2023-11-08 | 2023-11-08 | Overhead hoist is used in water and electricity installation |
Applications Claiming Priority (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| CN202323008729.7U CN221348232U (en) | 2023-11-08 | 2023-11-08 | Overhead hoist is used in water and electricity installation |
Publications (1)
| Publication Number | Publication Date |
|---|---|
| CN221348232U true CN221348232U (en) | 2024-07-16 |
Family
ID=91834660
Family Applications (1)
| Application Number | Title | Priority Date | Filing Date |
|---|---|---|---|
| CN202323008729.7U Active CN221348232U (en) | 2023-11-08 | 2023-11-08 | Overhead hoist is used in water and electricity installation |
Country Status (1)
| Country | Link |
|---|---|
| CN (1) | CN221348232U (en) |
-
2023
- 2023-11-08 CN CN202323008729.7U patent/CN221348232U/en active Active
Similar Documents
| Publication | Publication Date | Title |
|---|---|---|
| CN221348232U (en) | Overhead hoist is used in water and electricity installation | |
| CN213782731U (en) | Join in marriage special lead wire instrument that connects of net live working | |
| CN218524477U (en) | Early crack resistance test device of concrete | |
| CN216266211U (en) | Plastic tubing cutting device | |
| CN212151348U (en) | Mechanical equipment mounting bracket | |
| CN209831566U (en) | Water heating pipeline erection bracing frame for building | |
| CN215071396U (en) | A cable support for municipal works | |
| CN212836741U (en) | Concrete building pouring workbench is built in room | |
| CN214894614U (en) | Municipal works building material detection device | |
| CN215291257U (en) | Glass installation fixed knot constructs for building engineering | |
| CN219636847U (en) | Outdoor display screen installation device | |
| CN222589737U (en) | A shell processing device for automobile water pump | |
| CN213402293U (en) | Pipeline fixing device on civil and industrial building scaffold | |
| CN223797830U (en) | Cable fixing clamp | |
| CN220719866U (en) | Adjustable portable device for punching air duct support | |
| CN217135103U (en) | Distribution lines plans and moves towards auxiliary device | |
| CN219345861U (en) | Warm pipeline hoist and mount shock-resistant structure that leads to | |
| CN215445309U (en) | A pipe-line erection strutting arrangement for municipal administration water supply line | |
| CN221370320U (en) | Tower crane balance arm is with installation location structure | |
| CN214273052U (en) | Height-adjustable's support base is used in building engineering installation | |
| CN221328489U (en) | Cable support for construction site | |
| CN219898689U (en) | Auxiliary paint spraying device | |
| CN220440297U (en) | Cable bridge bracket convenient for angle adjustment | |
| CN207228590U (en) | Building floor drilling and suspender installation equipment | |
| CN217692469U (en) | Cable fixing device |
Legal Events
| Date | Code | Title | Description |
|---|---|---|---|
| GR01 | Patent grant | ||
| GR01 | Patent grant |