CN204802855U - Hoist is used in bridge construction - Google Patents
Hoist is used in bridge construction Download PDFInfo
- Publication number
- CN204802855U CN204802855U CN201520591204.7U CN201520591204U CN204802855U CN 204802855 U CN204802855 U CN 204802855U CN 201520591204 U CN201520591204 U CN 201520591204U CN 204802855 U CN204802855 U CN 204802855U
- Authority
- CN
- China
- Prior art keywords
- pipe link
- base plate
- connecting rod
- bottom plate
- plate
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
Landscapes
- Bridges Or Land Bridges (AREA)
Abstract
The utility model relates to a hoist is used in bridge construction. Including bottom plate, four connecting rods and a pair of notch plate, the both ends symmetry is equipped with two pairs of fixed orificess about the bottom plate, connecting rod pretext portion and pole portion form, and the cross section of connecting rod head is greater than the cross section of fixed orifices on the bottom plate, it has a spacing hole to open in the pole portion of connecting rod, and still is equipped with a link on the free end of connecting rod pole portion, the symmetry is equipped with two screws on the mainboard of notch plate, and the fixed orifices on the bottom plate alternates in the pole portion of above -mentioned connecting rod when the notch plate is fixed on the bottom plate, and passes through bolted connection between the spacing hole on screw on the notch plate and the connecting rod, the both sides of bottom plate still symmetry are equipped with two couples of wire rope, and wire rope's free end is equipped with the couple. The utility model relates to a novelty, the structure is reasonable, has multiple security function, and equipment that can fine protection handling, can carry on the equipment of different models size, has very strong practical value.
Description
Technical field
The utility model relates to bridge construction professional skill field, is specifically related to a kind of bridge construction suspender.
Background technology
Since reform and opening-up, China's economic construction achieves remarkable progress, communication is also just in the paulin exhibition of breaking out, increase year by year based on the advanced road bridge quantity of express highway, the first class highway, bridge etc., China's road and bridge building cause starts the new stage of attaching most importance to build high-grade highway into people.Road and bridge is generally by roadbed, road surface, bridge, a few major part composition such as tunnel engineering and traffic engineering facilities, in road and bridge construction process, many construction equipment can be used, to increase work efficiency, this wherein the most general preparation of construction is lifting machine, because accessory very great in road and bridge construction is all assembled on the ground, must be lifted by crane by lifting appliance, when lifting by crane relevant building elements, the suspender carrying building elements must be used, to protect the integraty of building elements, and guarantee the position that the good handling of building elements energy should be placed to it.At present all too single for the suspender carrying large-scale building elements, the element size can carried and weight very limited, this is also one of present much reason that unit in charge of construction's construction phases are too permanent.
Utility model content
Technical problem to be solved in the utility model is to provide a kind of novel in design, and structure rationally, has maltilevel security function, and can protect the equipment of handling very well, can carry the bridge construction suspender of different model size equipment
For solving the problems of the technologies described above, the utility model provides following technical scheme: a kind of bridge construction suspender, comprise base plate, four pipe links and a pair notch plate, the two ends, left and right of described base plate are arranged with two pairs of fixed orifices, described pipe link is made up of head and bar portion, the cross-sectional plane of pipe link head is greater than the cross-sectional plane of fixed orifice on base plate, the bar portion of described pipe link has a spacing hole, and the free end in pipe link bar portion is also provided with a link, the mainboard of described notch plate is arranged with two screws, the fixed orifice that the bar portion of above-mentioned pipe link interts on base plate when notch plate is fixed on base plate, and be bolted between the screw on notch plate and the spacing hole on pipe link, the both sides of described base plate are also arranged with two pairs of steel ropes, and the free end of steel rope is provided with hook.
The beneficial effect that the utility model compared with prior art has is: wherein, the pipe link for connecting loop wheel machine and steel rope is provided with respectively in the utility model, the fixed position on loop wheel machine is hung over the hook on the link on pipe link and firm silk rope, base plate carrying can being built equipment is sling, here pipe link and steel rope just can play the effect of duplicate protection, prevent base plate from falling in the air; Wherein, in the application notch plate be fixed on base plate by pipe link; due to the special construction of notch plate; two pieces of notch plates are with the use of just forming a good protect system; all construction equipment being less than notch plate main board length can be placed therein; considerably increase the range of use of suspender, and collision mat can be padded when handling can prevent equipment from moving between equipment and notch plate, can equipment be protected.The utility model is novel in design, and rationally, flexible operation is simple and easy, has very strong practical value for structure.
Accompanying drawing explanation
Fig. 1 is integral structure schematic diagram of the present utility model;
Fig. 2 is the constructional drawing of base plate in the utility model;
Fig. 3 is the constructional drawing of pipe link in the utility model.
Number in the figure is: 1-base plate, 101-fixed orifice, 2-pipe link, 201-spacing hole, 3-notch plate, 4-bolt, 5-steel rope, and 6-links up with, 7-link.
Detailed description of the invention
In order to make the purpose of this utility model, technical scheme and advantage clearly understand, below in conjunction with drawings and Examples, the utility model is further elaborated.Should be appreciated that specific embodiment described herein only in order to explain the utility model, and be not used in restriction the utility model.
In description of the present utility model, it will be appreciated that, term " longitudinal direction ", " transverse direction ", " on ", D score, " front ", " afterwards ", " left side ", " right side ", " vertically ", " level ", " top ", " end ", " interior ", orientation or the position relationship of the instruction such as " outward " are based on orientation shown in the drawings or position relationship, it is only the utility model for convenience of description, instead of indicate or imply that the device of indication or element must have specific orientation, with specific azimuth configuration and operation, therefore can not be interpreted as restriction of the present utility model.
With reference to Fig. 1, Fig. 2 and Fig. 3 is known, a kind of bridge construction suspender, comprise base plate 1, four pipe links 2 and a pair notch plate 3, the two ends, left and right of described base plate 1 are arranged with two pairs of fixed orifices 101, described pipe link 2 is made up of head and bar portion, the cross-sectional plane of pipe link 2 head is greater than the cross-sectional plane of fixed orifice 101 on base plate 1, the bar portion of described pipe link 2 has a spacing hole 201, and the free end in pipe link 2 bar portion is also provided with a link 7, the mainboard of described notch plate 3 is arranged with two screws, when notch plate 3 is fixed on base plate 1, the fixed orifice 101 on base plate 1 is interted in the bar portion of above-mentioned pipe link 2, and be connected by bolt 4 between screw on notch plate 3 and the spacing hole 201 on pipe link 2, the both sides of described base plate 1 are also arranged with two pairs of steel ropes 5, and the free end of steel rope 5 is provided with hook 6, the cross-sectional plane of described pipe link 2 is square or circular, and the sectional area of pipe link 2 cross-sectional plane is less than the sectional area of above-mentioned fixed orifice 101, the head of described pipe link 2 is spheroid or square body.
Wherein, the pipe link 2 for connecting loop wheel machine and steel rope 5 is provided with respectively in the utility model, the fixed position on loop wheel machine is hung over the hook 6 on the link 7 on pipe link 2 and firm silk rope, the base plate 1 carrying can being built equipment is sling, here pipe link and steel rope 5 just can play the effect of duplicate protection, prevent base plate 1 from falling in the air; Wherein, in the application notch plate 3 be fixed on base plate 1 by pipe link 2; due to the special construction of notch plate 3; two pieces of notch plates 3 are with the use of just forming a good protect system; all construction equipment being less than notch plate 3 main board length can be placed therein; considerably increase the range of use of suspender, and collision mat can be padded when handling can prevent equipment from moving between equipment and notch plate 3, can equipment be protected.The foregoing is only preferred embodiment of the present utility model; not in order to limit the utility model; all do within spirit of the present utility model and principle any amendment, equivalent to replace and improvement etc., all should be included within protection domain of the present utility model.
Claims (3)
1. a bridge construction suspender, comprise base plate, it is characterized in that: also comprise four pipe links and a pair notch plate, the two ends, left and right of described base plate are arranged with two pairs of fixed orifices, described pipe link is made up of head and bar portion, the cross-sectional plane of pipe link head is greater than the cross-sectional plane of fixed orifice on base plate, the bar portion of described pipe link has a spacing hole, and the free end in pipe link bar portion is also provided with a link, the mainboard of described notch plate is arranged with two screws, the fixed orifice that the bar portion of above-mentioned pipe link interts on base plate when notch plate is fixed on base plate, and be bolted between the screw on notch plate and the spacing hole on pipe link, the both sides of described base plate are also arranged with two pairs of steel ropes, and the free end of steel rope is provided with hook.
2. a kind of bridge construction suspender according to claim 1, is characterized in that: the cross-sectional plane of described pipe link is square or circular, and the sectional area of pipe link cross-sectional plane is less than the sectional area of above-mentioned fixed orifice.
3. a kind of bridge construction suspender according to claim 1, is characterized in that: the head of described pipe link is spheroid or square body.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201520591204.7U CN204802855U (en) | 2015-08-09 | 2015-08-09 | Hoist is used in bridge construction |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201520591204.7U CN204802855U (en) | 2015-08-09 | 2015-08-09 | Hoist is used in bridge construction |
Publications (1)
Publication Number | Publication Date |
---|---|
CN204802855U true CN204802855U (en) | 2015-11-25 |
Family
ID=54587711
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201520591204.7U Expired - Fee Related CN204802855U (en) | 2015-08-09 | 2015-08-09 | Hoist is used in bridge construction |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN204802855U (en) |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN106881581A (en) * | 2015-12-16 | 2017-06-23 | 中国二十冶集团有限公司 | A kind of installation tool and its application method for bulk lots volume transfer device |
-
2015
- 2015-08-09 CN CN201520591204.7U patent/CN204802855U/en not_active Expired - Fee Related
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN106881581A (en) * | 2015-12-16 | 2017-06-23 | 中国二十冶集团有限公司 | A kind of installation tool and its application method for bulk lots volume transfer device |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN206502579U (en) | Power pole hoisting device | |
CN204802855U (en) | Hoist is used in bridge construction | |
CN205892588U (en) | Hoisting equipment | |
CN106120571A (en) | Arch bridge suspender tensioning equipment | |
CN207677356U (en) | Reinforced steel pipe suspension cable scaffolding | |
CN206580440U (en) | A kind of girder steel string device for hoisting | |
CN103738852B (en) | Hoisting crane test mass device | |
CN210239095U (en) | High-rise building outer wall construction is with safe type manned hanging flower basket | |
CN205894852U (en) | Transformer substation security fence | |
CN204139697U (en) | Pole guy fastening devices | |
CN209797252U (en) | Frog air turnover device | |
CN203558824U (en) | Cable overhauling well lid plate lifting tool | |
CN207760729U (en) | A kind of road and bridge engineering protective device | |
CN206735623U (en) | Framework of steel reinforcement hanging apparatus | |
CN208347276U (en) | A kind of construction bracket | |
CN202749753U (en) | Bracket type motor-driven winch | |
CN207362706U (en) | Load carrying type hanging basket operating platform | |
CN206468014U (en) | A kind of concreting workbench | |
CN204847756U (en) | Special lifting device of box transformer | |
CN216764034U (en) | Adjustable scissors type shaft end lifting appliance | |
CN107806016A (en) | A kind of protector of bridge construction | |
CN205294610U (en) | Prevent novel device that overhead traveling crane hoist drops | |
CN107370075A (en) | Reinforced steel pipe suspension cable scaffolding | |
CN203624810U (en) | Special lifting tool for steel material with a huge section | |
CN208682849U (en) | A kind of trolley applied to building field |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C14 | Grant of patent or utility model | ||
GR01 | Patent grant | ||
CF01 | Termination of patent right due to non-payment of annual fee | ||
CF01 | Termination of patent right due to non-payment of annual fee |
Granted publication date: 20151125 Termination date: 20160809 |