CN204791796U - Multipurpose is surveyed location and is used mark stake - Google Patents

Multipurpose is surveyed location and is used mark stake Download PDF

Info

Publication number
CN204791796U
CN204791796U CN201520393925.7U CN201520393925U CN204791796U CN 204791796 U CN204791796 U CN 204791796U CN 201520393925 U CN201520393925 U CN 201520393925U CN 204791796 U CN204791796 U CN 204791796U
Authority
CN
China
Prior art keywords
stake
pile body
pile
steel nail
neck
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201520393925.7U
Other languages
Chinese (zh)
Inventor
刘磊
陈勇
陈照兴
刘冉
赵娜
马仁荣
施超
李永民
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Guo Wang Shandong Ningyang Power Supply Co
State Grid Corp of China SGCC
TaiAn Power Supply Co of State Grid Shandong Electric Power Co Ltd
Original Assignee
Guo Wang Shandong Ningyang Power Supply Co
State Grid Corp of China SGCC
TaiAn Power Supply Co of State Grid Shandong Electric Power Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Guo Wang Shandong Ningyang Power Supply Co, State Grid Corp of China SGCC, TaiAn Power Supply Co of State Grid Shandong Electric Power Co Ltd filed Critical Guo Wang Shandong Ningyang Power Supply Co
Priority to CN201520393925.7U priority Critical patent/CN204791796U/en
Application granted granted Critical
Publication of CN204791796U publication Critical patent/CN204791796U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Piles And Underground Anchors (AREA)

Abstract

The utility model discloses a multipurpose is surveyed location and is used mark stake, include: the pile head is cuboid shape, pile head lower surface and stake neck surface connections with the stake neck, stake platform and pile body are the prismatoid shape, and stake bench surface is connected with stake neck lower surface, stake platform lower surface and pile body surface connections, the stake point is connected with the lower surface of pile body for triangle bodily form form, the bottom surface of stake point, respectively be equipped with a steel nail hole on each side of stake platform and pile body, and the steel nail hole on to the side of the pile body relative with this side of the steel nail hole on the stake platform side is link up mutually, pile head, stake neck, stake platform and pile body adopt reinforced composite to make, the stake point adopts the stainless steel to make. The utility model discloses can play mark point and carry out effectual warning effect, owing to improved the material of mark stake, also increase the intensity of mark stake, lengthen life, pass through the fixed of long steel nail simultaneously, can effectually realize the firm fixed of mark stake, prevent to miss and pull out the phenomenon, guarantee going on smoothly of engineering.

Description

Multi-usage exploration location peg
Technical field
The utility model relates to technical field of mechanical equipment, is specifically related to a kind of multi-usage exploration location peg.
Background technology
When carrying out the selection in power circuit path, bar position exploration fixed point or carry out the on-site land survey of communication line etc. in power industry in the industry such as communication, because fixed position in circuit is more, distant, just needing the position to fixing a point in circuit to mark, so that convenient, circuit being assessed, improve and finally determine.
At present, carry out in power industry in the planning process of power circuit, the comparatively original method of usual employing carries out the mark of circuit, carry out as used the timber of suggestion in the line the method such as marking, but although these methods are cheap, and use conveniently, but effectively can not carry out warning to other staff to remind, simultaneously, because it is only simply insert ground, be not effectively fixed, often occur by the situation of pulling out by mistake, thus make the aspects such as the selection of circuit, record, optimization bring very burden, have a strong impact on the progress of engineering.
Therefore, how to design one and can apply conveniently, locate firmly, the exploration location peg that simultaneously can play effective warning function just becomes thing urgently to be resolved hurrily.
Utility model content
For solving problems of the prior art, the utility model provides a kind of multi-usage exploration location peg, and it is simple that it has structure, uses advantage easily.
The technical solution of the utility model is:
A kind of multi-usage exploration location peg, is characterized in that, comprising: pile crown, stake neck, stake platform, pile body and pile top;
Pile crown and stake neck are rectangular shape, and pile crown lower surface is connected with stake neck upper surface;
Stake platform and pile body are prismatoid shape, and stake platform upper surface is connected with stake neck lower surface, and stake platform lower surface is connected with pile body upper surface;
Pile top is triangle body shape, and the bottom surface of pile top is connected with the lower surface of pile body;
Wherein, each side of stake platform and pile body is respectively provided with a steel nail hole, and the steel nail hole on the pile body side relative with this side, steel nail hole on stake platform side connects;
Pile crown, stake neck, stake platform and pile body adopt reinforced composite to make;
Pile top adopts stainless steel to make.
Preferably, also comprise long steel nail, the steel nail hole of long steel nail on described stake platform is inserted, and is passed by the steel nail hole on pile body.
Preferably, a side of pile crown is provided with sign frame, for placing industry mark and caveat.
Preferably, the lower surface length of side of pile crown is 2 times of a neck upper surface length of side.
Preferably, the angle of stake platform side and lower surface is 45 °.
It is simple that multi-usage exploration location of the present utility model peg has structure, use advantage easily, can play gauge point and carry out effective warning function, owing to improving the material of peg, too increase the intensity of peg, extend serviceable life, fixing simultaneously by long steel nail, effectively can realize the firm fixing of peg, prevent and pull out phenomenon by mistake, ensure carrying out smoothly of engineering.
Accompanying drawing explanation
Fig. 1 is the structural drawing of the utility model multi-usage exploration location peg embodiment.
Embodiment
For making the purpose of this utility model, technical scheme and advantage clearly, below in conjunction with the accompanying drawing in the utility model embodiment, technical scheme in the utility model embodiment is clearly and completely described, obviously, described embodiment is the utility model part embodiment, instead of whole embodiments.Based on the embodiment in the utility model, those of ordinary skill in the art are not making the every other embodiment obtained under creative work prerequisite, all belong to the scope of the utility model protection.
As shown in Figure 1, be respectively labeled as in figure: 1 is pile crown, 2 is stake neck, and 3 is stake platform, and 4 is pile body, and 5 is pile top, and 6 is steel nail hole, and 7 is long steel nail.
As shown in Figure 1, the multi-usage exploration location peg of the present embodiment, is characterized in that, comprising: pile crown 1, stake neck 2, stake platform 3, pile body 4 and pile top 5;
Pile crown 1 and stake neck 2 are rectangular shape, and pile crown 1 lower surface is connected with stake neck 2 upper surface;
Stake platform 3 and pile body 4 are prismatoid shape, and stake platform 3 upper surface is connected with stake neck 2 lower surface, and stake platform 3 lower surface is connected with pile body 4 upper surface;
Pile top 5 is triangle body shape, and the bottom surface of pile top 5 is connected with the lower surface of pile body 4;
Wherein, each side of stake platform 3 and pile body 4 is respectively provided with a steel nail hole 6, and the steel nail hole 6 on pile body 4 side relative with this side, steel nail hole 6 on stake platform 3 side connects;
Pile crown 1, stake neck 2, stake platform 3 and pile body 4 adopt reinforced composite to make;
Pile top 5 adopts stainless steel to make.
Concrete, pile crown 1 and stake neck 2 are all rectangular shape, and stake platform 3 and pile body 4 are prismatoid shape, and pile top 5 is triangle body shape, and pile body 4 and pile top 5 are for being placed upside down.
Wherein, the lower surface of pile crown 1 and the upper surface of stake neck 2 are rigidly connected, and the lower surface of stake neck 2 and the upper surface of stake platform 3 are rigidly connected, and the lower surface of stake platform 3 is connected with the upper surface of pile body 4, and the lower surface of pile body 4 and the bottom surface of pile top 5 are rigidly connected.
And the lower surface length of side of pile crown 1 is the twice of a neck 2 upper surface length of side, stake neck 2 connects the center with pile crown 1 lower surface; The lower surface of stake neck 2 is identical with the upper surface size of stake platform 3; The lower surface of stake platform 3 is identical with the upper surface size of pile body 4; The lower surface of pile body 4 is identical with the bottom surface size of pile top 5.
Each side of stake platform 3 and pile body 4 is respectively provided with a steel nail hole 6, and, steel nail hole 6 on the side that steel nail hole 6 on stake platform 3 one sides is relative with this side on pile body 4 is through, make to produce steel nail 7 and can be inserted stake platform 3 inside by the steel nail hole 6 on stake platform 3, passed by the steel nail hole 6 on side relative on pile body 4.
Preferably, a side of pile crown 1 is provided with sign frame, for placing industry mark and caveat, come effectively to warn by health check-up industry mark and caveat in sign frame, the personnel preventing not clear situation pull out operation to peg by mistake.
Preferably, each side on stake platform 3 and the angle of lower surface are 45 °, so that when inserting long steel nail 7 by the steel nail hole 6 of stake platform 3, can be undertaken bearing the hitting power applied long steel nail by the side on stake platform 3.
Further, also by increasing on pile crown 1, there is the pigment coated of bright color, to make peg more eye-catching, being convenient to staff and identifying.
In the present embodiment, the design parameter of multi-usage exploration location peg is:
The lower surface length of side of pile crown 1 is 80mm, and height is 100mm;
The upper surface length of side of stake neck 2 is 40mm, and height is 30mm;
The upper surface length of side of stake platform 3 is 40mm, and the lower surface length of side is 80mm, and height is 20mm;
The upper surface length of side of pile body 4 is 80mm, and the lower surface length of side is 20mm, and height is 240mm;
The bottom surface length of side of pile top 5 is 20mm, and height is 30mm;
The diameter in steel nail hole 6 is 15mm;
The diameter of long steel nail 7 is 10mm, and the length of long steel nail 7 is selected according to actual service condition;
Pile crown 1, stake neck 2, stake platform 3, pile body 4 adopt reinforced composite manufacture;
Pile top 5 adopts stainless steel manufacture, with in the insertion soil making peg convenient.
Apply multi-usage exploration location of the present utility model peg, concrete steps are as follows:
(1) by behind exploration location, the mark position of peg is determined;
(2) knocked the pile crown 1 of peg by instruments such as iron hammers, during the pile body 4 of peg and pile top 5 are not all buried, only expose pile crown 1 and stake neck 2;
(3) by taking a small amount of soil, stake platform 3 is exposed;
(4) the steel nail hole 6 of long steel nail 7 on stake platform 3 is inserted, and use the instruments such as iron hammer to insert in soil by long steel nail 7;
(5) after long steel nail 7 fixes, by the earthen backfill of digging out.
The present embodiment is by using multi-usage of the present utility model exploration location peg, structure is simple, easy to operate, the firm fixing of peg is realized by long steel nail, preventing peg from loosening, pulling out operation by mistake, simultaneously by improving the material of peg, effectively extending the serviceable life of peg, and pass through the pattern, mark etc. of unified peg, effectively can realize warning function.
It is simple that multi-usage exploration location of the present utility model peg has structure, use advantage easily, can play gauge point and carry out effective warning function, owing to improving the material of peg, too increase the intensity of peg, extend serviceable life, fixing simultaneously by long steel nail, effectively can realize the firm fixing of peg, prevent and pull out phenomenon by mistake, ensure carrying out smoothly of engineering.
The above is only preferred implementation of the present utility model; should be understood that; for those skilled in the art; under the prerequisite not departing from the utility model know-why; can also make and suitably improving and distortion, these improve and distortion also should be considered as protection domain of the present utility model.

Claims (5)

1. a multi-usage exploration location peg, is characterized in that, comprising: pile crown, stake neck, stake platform, pile body and pile top;
Described pile crown and stake neck are rectangular shape, and described pile crown lower surface is connected with described stake neck upper surface;
Described stake platform and pile body are prismatoid shape, and described stake platform upper surface is connected with described stake neck lower surface, and described stake platform lower surface is connected with described pile body upper surface;
Described pile top is triangle body shape, and the bottom surface of described pile top is connected with the lower surface of described pile body;
Wherein, each side of described stake platform and pile body is respectively provided with a steel nail hole, and the steel nail hole on the described pile body side relative with this side, steel nail hole on described stake platform side connects;
Described pile crown, stake neck, stake platform and pile body adopt reinforced composite to make;
Described pile top adopts stainless steel to make.
2. multi-usage exploration location according to claim 1 peg, it is characterized in that, also comprise long steel nail, the steel nail hole of described long steel nail on described stake platform is inserted, and is passed by the steel nail hole on described pile body.
3. multi-usage exploration location according to claim 1 peg, it is characterized in that, a side of described pile crown is provided with sign frame, for placing industry mark and caveat.
4. multi-usage exploration location according to claim 1 peg, it is characterized in that, the lower surface length of side of described pile crown is 2 times of the described stake neck upper surface length of side.
5. multi-usage exploration location according to claim 1 peg, it is characterized in that, the angle of described stake platform side and lower surface is 45 °.
CN201520393925.7U 2015-06-09 2015-06-09 Multipurpose is surveyed location and is used mark stake Expired - Fee Related CN204791796U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201520393925.7U CN204791796U (en) 2015-06-09 2015-06-09 Multipurpose is surveyed location and is used mark stake

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201520393925.7U CN204791796U (en) 2015-06-09 2015-06-09 Multipurpose is surveyed location and is used mark stake

Publications (1)

Publication Number Publication Date
CN204791796U true CN204791796U (en) 2015-11-18

Family

ID=54531799

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201520393925.7U Expired - Fee Related CN204791796U (en) 2015-06-09 2015-06-09 Multipurpose is surveyed location and is used mark stake

Country Status (1)

Country Link
CN (1) CN204791796U (en)

Similar Documents

Publication Publication Date Title
CN103758139B (en) Vegetation type anchor rod ecological bag and bank protecting method thereof
CN108149703A (en) Work transmission line basis precast construction method
CN204228155U (en) A kind of shallow-depth-excavation tunnel construction land tenure table settlement monitoring point buries structure underground
CN204791796U (en) Multipurpose is surveyed location and is used mark stake
CN105133614B (en) Engineering ground underground pile position sign instrument and marker method
CN201548175U (en) Grounding wire dug trench depth detector
CN208187393U (en) A kind of magnetic foot pin and measuring device for urban surface settlement deformation survey
CN207904918U (en) A kind of drilled pile casing locating rack
CN202323914U (en) Center fixed type sedimentation plate
CN206328742U (en) A kind of static sounding device
CN204475127U (en) For the road stake of road construction
CN201508179U (en) Stakes measuring lofting spotting annun-ciator
CN205276273U (en) Civil engineering construction uses hollow pile body
CN204326117U (en) Middle buried water stop locating rack
CN206772309U (en) Measure sign protection sleeve
CN204730795U (en) A kind of afforestation measures the instrument that moisture infiltrates depth of soil
CN201915835U (en) Drilling positioner for strip mine
CN208803475U (en) A kind of greening wire netting support rod
CN204475128U (en) Road construction pile pipe
CN204944499U (en) An instrument is adopted in dark stake
CN204023575U (en) Engineering ground underground pile position indicates instrument
CN205684630U (en) A kind of special equipment for the cutting of underground engineering anchor cable
CN204754254U (en) Longmen stake with protection device
CN204160342U (en) Micropore foreign material gripping tool
CN204196964U (en) A kind of simple and easy prepartion of land farm vehicle

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20151118

Termination date: 20170609

CF01 Termination of patent right due to non-payment of annual fee