CN204782747U - 一种全套管全回转钻机 - Google Patents

一种全套管全回转钻机 Download PDF

Info

Publication number
CN204782747U
CN204782747U CN201520166571.2U CN201520166571U CN204782747U CN 204782747 U CN204782747 U CN 204782747U CN 201520166571 U CN201520166571 U CN 201520166571U CN 204782747 U CN204782747 U CN 204782747U
Authority
CN
China
Prior art keywords
full
frame
hoisting mechanism
front frame
rotation drill
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201520166571.2U
Other languages
English (en)
Inventor
刘可可
魏垂勇
刘金
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Shanghai Engineering Machinery Co Ltd
Original Assignee
XUZHOU DUN AN HEAVY INDUSTRY MACHINERY MANUFACTURING Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by XUZHOU DUN AN HEAVY INDUSTRY MACHINERY MANUFACTURING Co Ltd filed Critical XUZHOU DUN AN HEAVY INDUSTRY MACHINERY MANUFACTURING Co Ltd
Priority to CN201520166571.2U priority Critical patent/CN204782747U/zh
Application granted granted Critical
Publication of CN204782747U publication Critical patent/CN204782747U/zh
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Earth Drilling (AREA)

Abstract

一种全套管全回转钻机,包括动力单元、后车架、履带底盘、操作台、用于取土的卷扬机构、前车架、安装在前车架内的钻机工作装置和铰接在前车架上的吊杆,前车架通过法兰与后车架连接,后车架安装在履带底盘上,动力单元、操作台、卷扬机构固定在后车架上。本实用新型的全套管全回转钻机在施工中除安装套管需使用普通吊机外,其余各环节均可自行解决,极大地降低吊机的使用时间与成本,降低了成本。

Description

一种全套管全回转钻机
技术领域
本实用新型涉及一种工程机械,特别涉及一种全套管全回转钻机。
背景技术
随着我国基础建设的不断加快,在高原、山区、丘陵、海滩、江河湖海滩涂等各种复杂地质环境下的施工越来越多,现场施工时经常遇到地下有流沙,溶洞、岩层等各种复杂地质状况,传统的挖掘机具和施工方法很难施工。近几年国内外出现了全套管全回转钻机。
全套管全回转钻机主要由动力站、工作站以及连接动力站与工作站的液压快速连接软管三大部分组成。目前市场上出现的全套管全回转钻机,主要是动力站简单地固定在工作装置上,由履带底盘带动做简单的移动,但这种设备需要借助大型吊机协助完成取土作业,所以,工地上的一般的做法是一台全套管全回转钻机捆绑一台带快放功能的起吊设备作业。也就是说在钻机需要取土作业的时候,必须有一台带快放功能的起吊设备,才能完成取土工作。这一作业模式存在一个缺点:因为全套管全回转钻机在施工中需要全程取土,所以一台吊机就被时刻捆绑住无法参与到其他作业中去,增加了投入成本。
有鉴于此,有必要提供一种使用成本更低的全套管全回转钻机。
实用新型内容
本实用新型要解决的技术问题是:提供一种成本更低的全套管全回转钻机。
为达到上述目的,本实用新型提供了如下技术方案:一种全套管全回转钻机,包括动力单元、后车架、履带底盘、操作台、用于取土的卷扬机构、前车架、安装在前车架内的钻机工作装置和铰接在前车架上的吊杆,前车架通过法兰与后车架连接,后车架安装在履带底盘上,动力单元、操作台、卷扬机构固定在后车架上。
本实用新型的全套管全回转钻机在前后车架的基础上,集成钻机工作装置、履带底盘、动力单元、操作台、卷扬机构和吊杆等主要结构件部分,从而达到自取土、自行走和一体化的目的,可以实现自取土,系统使用成本更低。由于在整机上集成吊杆与卷扬机构,可以使本机具有实现自取土所需的必要条件,从而实现自取土功能。由于将履带底盘、动力单元、液压与电气控制等集成在整机中,整机具备自行走功能,方便移位与定桩。由于将整机所需的功能单元全部集成在一个履带底盘与车架上,各单元连接可靠,整机稳定性与可靠性等性能大幅提升,实现高度一体化。在施工中除安装套管需使用普通吊机外,其余各环节均可自行解决,极大地降低吊机的使用时间与成本,降低了成本。
附图说明
图1为本实用新型的一种全套管全回转钻机的结构示意图。
图2是图1所示的全套管全回转钻机的俯视图。
图3是图1所示全套管全回转钻机的前车架示意图。
具体实施方式
下面结合图1至图3描述本实用新型全套管全回转钻机的结构及详细内容。
本实用新型的全套管全回转钻机,包括动力单元1、后车架2、履带底盘3、操作台4、卷扬机构5、前车架6、钻机工作装置7和吊杆8。另外还包括电气和液压系统及附件,未在图上示出。
钻机工作装置7固定在前车架6内部,前车架6包括固定的上部机架9和可以上下伸缩的基板10,前车架6中间通过油缸连接。基板10可以带动工作装置7上下运动。前车架6通过法兰与后车架2连接,后车架2安装在履带底盘3上,动力单元1、操作台4、卷扬机构5以及电气系统、液压系统固定在后车架2上,这样,全套管全回转钻机就可以在履带底盘3的带动下独立行走。吊杆8通过销轴铰接在前车架6上,由油缸推动,可以在全套管全回转钻机的轴线平面内以铰接点为中心做俯仰运动,在全套管全回转钻机工作的时候吊杆8竖起,在全套管全回转钻机移动的时候吊杆8倒伏,以方便运输通过。卷扬机构5具有快放功能,钢丝绳通过缠绕穿过吊杆8顶部,钢丝绳的另一端连接冲抓斗,因此,全套管全回转钻机具备自取土与其他提放功能。全套管全回转钻机由于所有的结构件以及液压、电气等全都集成在一个履带底盘3上,形成一体,结构更为紧凑。
前车架6的基板10可以带动钻机工作装置7上下伸缩,作为钻机工作装置7的安装平台使用,基板10伸展时作为全套管全回转钻机的前支腿使用。前车架6通过法兰与后车架2连接,连接部位可以自由拆卸。
综上所述,以上仅为本实用新型的较佳实施例而已,不应以此限制本实用新型的范围。即凡是依本实用新型权利要求书及说明书内容所作的简单的等效变化与修饰,皆应仍属本实用新型专利涵盖的范围内。

Claims (4)

1.一种全套管全回转钻机,包括动力单元、后车架、履带底盘、操作台、卷扬机构、前车架、安装在前车架内的钻机工作装置和铰接在前车架上的吊杆,前车架通过法兰与后车架连接,后车架安装在履带底盘上,动力单元、操作台、卷扬机构固定在后车架上。
2.如权利要求1所述的全套管全回转钻机,其特征在于:所述的前车架包括固定的上部机架和可以上下伸缩的基板。
3.如权利要求1所述的全套管全回转钻机,其特征在于:所述的卷扬机构包括通过缠绕穿过吊杆顶部的钢丝绳,钢丝绳的另一端连接冲抓斗。
4.如权利要求1所述的全套管全回转钻机,其特征在于:还包括安装在履带底盘上的电气系统、液压系统。
CN201520166571.2U 2015-03-23 2015-03-23 一种全套管全回转钻机 Expired - Fee Related CN204782747U (zh)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201520166571.2U CN204782747U (zh) 2015-03-23 2015-03-23 一种全套管全回转钻机

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201520166571.2U CN204782747U (zh) 2015-03-23 2015-03-23 一种全套管全回转钻机

Publications (1)

Publication Number Publication Date
CN204782747U true CN204782747U (zh) 2015-11-18

Family

ID=54522816

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201520166571.2U Expired - Fee Related CN204782747U (zh) 2015-03-23 2015-03-23 一种全套管全回转钻机

Country Status (1)

Country Link
CN (1) CN204782747U (zh)

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN105887813A (zh) * 2016-05-07 2016-08-24 深圳市宏业基基础工程有限公司 全套管全回转与旋挖钻在岩溶地区大直径超长桩施工方法
CN106638746A (zh) * 2017-03-09 2017-05-10 上海易谦岩土工程有限公司 一体式套管钻机
CN107780917A (zh) * 2016-08-25 2018-03-09 徐州盾安重工机械制造有限公司 全回转钻机动力控制系统
CN110685597A (zh) * 2019-10-10 2020-01-14 徐州徐工基础工程机械有限公司 一种可自行式全套管全回转钻机

Cited By (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN105887813A (zh) * 2016-05-07 2016-08-24 深圳市宏业基基础工程有限公司 全套管全回转与旋挖钻在岩溶地区大直径超长桩施工方法
CN107780917A (zh) * 2016-08-25 2018-03-09 徐州盾安重工机械制造有限公司 全回转钻机动力控制系统
CN106638746A (zh) * 2017-03-09 2017-05-10 上海易谦岩土工程有限公司 一体式套管钻机
CN106638746B (zh) * 2017-03-09 2024-05-31 广元建工集团有限公司 一体式套管钻机
CN110685597A (zh) * 2019-10-10 2020-01-14 徐州徐工基础工程机械有限公司 一种可自行式全套管全回转钻机
CN110685597B (zh) * 2019-10-10 2021-02-09 徐州徐工基础工程机械有限公司 一种可自行式全套管全回转钻机

Similar Documents

Publication Publication Date Title
CN204782747U (zh) 一种全套管全回转钻机
CN104695984A (zh) 隧道多功能施工台车
CN103061673B (zh) 多功能微桩钻机
CN106245985B (zh) 液压电线杆立杆车
CN104695965B (zh) 盾构进出洞多功能始发台及始发方法
CN108952573B (zh) 水平定向钻机
CN102659060A (zh) 一种钻机同井场整拖平移装置及其平移方法
CN105178884A (zh) 一种车载钻机提升加压装置
CN204627622U (zh) 一种隧道多功能施工台车
CN103397843A (zh) 一种微型非开挖水平钻孔设备
CN102518396A (zh) 一种自动钻机
CN201882805U (zh) 井下自移式多功能安装机
CN204532065U (zh) 一种新型的全套管全回转钻机工作站
CN205100570U (zh) 一种多功能竖杆安装设备
CN202360025U (zh) 全液压式煤层气车装钻机
CN204510303U (zh) 多臂组合变幅式挖掘钻装一体机
CN204371347U (zh) 盾构进出洞多功能始发台
CN204851268U (zh) 一种高效的隧道拱顶监测点安装设备
CN203066073U (zh) 一种拔桩机构及具有其的拔桩机械、起重机械
CN206737820U (zh) 一种自行式大吨位水平定向钻机
CN105201036A (zh) 一种抓管装置
CN202673191U (zh) 石油钻机多功能维修服务装置
CN208074266U (zh) 一种伸缩式管道精确入槽拼装装置
CN207092988U (zh) 双滚筒组合冲砂修井机
CN102661126A (zh) 石油钻机多功能维修服务装置

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
TR01 Transfer of patent right
TR01 Transfer of patent right

Effective date of registration: 20200610

Address after: 221140 No. 8 Tongfa Road, Quanshan Economic Development Zone, Xuzhou City, Jiangsu Province

Patentee after: Xuzhou Dun'an Construction Machinery Manufacturing Co.,Ltd.

Address before: 1-6 No. 221140 Jiangsu city of Xuzhou Province era North Development Zone Quanshan District Road

Patentee before: XUZHOU DUN'AN HEAVY INDUSTRY MACHINERY MANUFACTURING Co.,Ltd.

TR01 Transfer of patent right
TR01 Transfer of patent right

Effective date of registration: 20210803

Address after: 201901 5 / F, 6 / F, building 5, No. 258, Yangnan Road, Baoshan District, Shanghai

Patentee after: SHANGHAI ENGINEERING MACHINERY Co.,Ltd.

Address before: 221140 No.8 Tongfa Road, Quanzhou Economic Development Zone, Quanzhou District, Xuzhou City, Jiangsu Province

Patentee before: Xuzhou Dun'an Construction Machinery Manufacturing Co.,Ltd.

CF01 Termination of patent right due to non-payment of annual fee
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20151118