CN204781033U - Novel excavator extension arm - Google Patents

Novel excavator extension arm Download PDF

Info

Publication number
CN204781033U
CN204781033U CN201520317966.8U CN201520317966U CN204781033U CN 204781033 U CN204781033 U CN 204781033U CN 201520317966 U CN201520317966 U CN 201520317966U CN 204781033 U CN204781033 U CN 204781033U
Authority
CN
China
Prior art keywords
arm
steady job
active operation
metal oil
oil pipe
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201520317966.8U
Other languages
Chinese (zh)
Inventor
王晓雾
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Changsha Yagong Engineering Machinery Co Ltd
Original Assignee
Changsha Yagong Engineering Machinery Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Changsha Yagong Engineering Machinery Co Ltd filed Critical Changsha Yagong Engineering Machinery Co Ltd
Priority to CN201520317966.8U priority Critical patent/CN204781033U/en
Application granted granted Critical
Publication of CN204781033U publication Critical patent/CN204781033U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Abstract

The utility model relates to a novel excavator extension arm comprises steady job arm and activity work arm two parts, steady job arm one end links to each other with the excavator, the steady job arm other end passes through the flange and links to each other with activity work arm, all install metal oil pipe on steady job arm and the activity work arm, link to each other through soft oil pipe between metal oil pipe on the steady job arm and the metal oil pipe on the activity work arm. The utility model discloses can change different kinds of activity work arms according to the construction condition, the flexibility is good, the efficiency of construction is high, and the commonality is good, with low costs.

Description

A kind of dredger extension arm
Technical field
The utility model relates to a kind of excavator, particularly relates to a kind of extension arm of excavator.
Background technology
The type of existing working arm of excavating machine and length are generally fixing, at some construction site, longer or shorter working arm may be needed, or need the type changing different operating arm, just there is significant limitation in so existing excavator, can not adapt to the various constructions of special occasions.
Utility model content
The utility model, in order to overcome existing technical deficiency, provides a kind of excavator extension jib that can regulate working arm length, change working arm type.
The technical scheme that the utility model adopts is as follows:
A kind of dredger extension arm, it is characterized in that, described extension arm is made up of two parts, be respectively steady job arm and active operation arm, described steady job arm one end is connected with excavator, the described steady job arm other end is connected with active operation arm by flange, and described steady job arm and active operation arm are all provided with metal oil conduit, and the metal oil conduit on described steady job arm is connected by consistent lubricant pipe with between the metal oil conduit on active operation arm.
Further, described active operation arm upper end is also connected with forearm, large arm, between described active operation arm and forearm, is provided with support cylinder between described forearm and large arm.
Extension arm of the present utility model is made up of steady job arm and active operation arm, according to condition of construction, dissimilar active operation arm can be changed, to adapt to the requirement of different construction environment, different construction trade, flexibility is good, efficiency of construction is high, and versatility is good, cost is low.
Accompanying drawing explanation
Fig. 1 is structural representation of the present utility model.
In accompanying drawing, 1-steady job arm, 2-consistent lubricant pipe, 3-active operation arm, 4-support cylinder, 5-forearm, 6-large arm.
Detailed description of the invention
Below in conjunction with accompanying drawing, the utility model is described in further detail.
As shown in Figure 1, a kind of dredger extension arm, is characterized in that, described extension arm is made up of two parts, is respectively steady job arm 1 and active operation arm 3.Described steady job arm 1 one end is connected with excavator, and described steady job arm 1 other end is connected with active operation arm 3 by flange.Steady job arm 1 and active operation arm 3 are all provided with metal oil conduit, and the metal oil conduit on described steady job arm 1 is connected by consistent lubricant pipe 2 with between the metal oil conduit on active operation arm 3.Certainly, when practical application, also can be connected with the sleeve inlayed between steady job arm 1 and active operation arm 3, or be connected by other dismountable modes.Main purpose is in order to according to condition of construction, changes active operation arm 3 that is dissimilar, different length, to adapt to the requirement of different construction environment, different construction trade.
As shown in Figure 1, active operation arm 3 upper end is also connected with forearm 5, large arm 6, between described active operation arm 3 and forearm, is provided with support cylinder 4 between described forearm 5 and large arm 6.Forearm 5 and large arm 6 can increase the flexibility of construction further, adapt to some special construction requirement.
It is to be noted; the utility model is not limited to above-mentioned embodiment; any those skilled in the art, based on any simple modification done above-described embodiment in technical solutions of the utility model, Combination application, equivalent variations and modification, all belong in protection domain of the present utility model.

Claims (2)

1. a dredger extension arm, it is characterized in that: described extension arm is made up of two parts, be respectively steady job arm and active operation arm, described steady job arm one end is connected with excavator, the described steady job arm other end is connected with active operation arm by flange, described steady job arm and active operation arm are all provided with metal oil conduit, and the metal oil conduit on described steady job arm is connected by consistent lubricant pipe with between the metal oil conduit on active operation arm.
2. a kind of dredger extension arm according to claim 1, is characterized in that: described active operation arm upper end is also connected with forearm, large arm, between described active operation arm and forearm, is provided with support cylinder between described forearm and large arm.
CN201520317966.8U 2015-05-18 2015-05-18 Novel excavator extension arm Expired - Fee Related CN204781033U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201520317966.8U CN204781033U (en) 2015-05-18 2015-05-18 Novel excavator extension arm

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201520317966.8U CN204781033U (en) 2015-05-18 2015-05-18 Novel excavator extension arm

Publications (1)

Publication Number Publication Date
CN204781033U true CN204781033U (en) 2015-11-18

Family

ID=54521116

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201520317966.8U Expired - Fee Related CN204781033U (en) 2015-05-18 2015-05-18 Novel excavator extension arm

Country Status (1)

Country Link
CN (1) CN204781033U (en)

Similar Documents

Publication Publication Date Title
ATE339627T1 (en) STORAGE BETWEEN COMPONENTS ON CONSTRUCTION MACHINERY
CN204781033U (en) Novel excavator extension arm
CN203514386U (en) Bucket and excavator
CN205101830U (en) Excavator dipper centralized lubrication system
CN201221097Y (en) Digging device
CN202865883U (en) Retractable evacuating device for loader-digger
CN207582527U (en) Loader-digger digging end equipment
CN201981563U (en) Rocker for excavating machine
CN204475386U (en) A kind of rock excavator bucket rod structure
CN204590114U (en) A kind of hydraulic rotating grabs stone implement
CN203924156U (en) A kind of Shovel Bucket Attachment and excavator
CN203743619U (en) Large refining and chemical heating furnace or heating auxiliary machine pipe hanger
CN205604316U (en) Excavator shortens arm
CN205475382U (en) Modified wheel loader
CN204040099U (en) A kind of bucket tooth
CN105113557A (en) Double-rocker lengthened working device for hydraulic excavator
CN104372818A (en) Anti-blocking type digging bucket
CN203924159U (en) A kind of bucket device of many hydraulic connectings
CN204152520U (en) Civil air defense constructions and installations development machine
CN205590186U (en) Bushing structure of tower machine standard festival
CN204703221U (en) Power shovel thumb
CN202131620U (en) Stretchable dipper handle of excavating machine
CN102995685A (en) Bulldozer scraper knife manipulating assembly
CN204267425U (en) A kind of hydraulic jack with rapid pipe joint
CN204525509U (en) Annulus connection base of mechanical hand

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20151118

Termination date: 20170518

CF01 Termination of patent right due to non-payment of annual fee