CN204767115U - But interim fire extinguishing system of cyclic utilization's modularization - Google Patents

But interim fire extinguishing system of cyclic utilization's modularization Download PDF

Info

Publication number
CN204767115U
CN204767115U CN201520332300.XU CN201520332300U CN204767115U CN 204767115 U CN204767115 U CN 204767115U CN 201520332300 U CN201520332300 U CN 201520332300U CN 204767115 U CN204767115 U CN 204767115U
Authority
CN
China
Prior art keywords
module
modularization
power plant
utility
model
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201520332300.XU
Other languages
Chinese (zh)
Inventor
黄益平
岳昌海
陆晓咏
徐义明
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China Construction Industrial and Energy Engineering Group Co Ltd
Original Assignee
China Construction Industrial Equipment Installation Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China Construction Industrial Equipment Installation Co Ltd filed Critical China Construction Industrial Equipment Installation Co Ltd
Priority to CN201520332300.XU priority Critical patent/CN204767115U/en
Application granted granted Critical
Publication of CN204767115U publication Critical patent/CN204767115U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Fire-Extinguishing By Fire Departments, And Fire-Extinguishing Equipment And Control Thereof (AREA)

Abstract

The utility model discloses a but interim fire extinguishing system of cyclic utilization's modularization, including water supply module, power module and control module, the water supply module includes a plurality of water tanks that communicate in proper order, water supply module and power module link to each other through connecting the water pipe, power module and control module connect. The utility model discloses the very big has saved the time limit for a project, improve technical level with efficiency in, shortened installation period, greatly ensured constructor's safety, the utility model discloses simple structure, the installation is swift, the reliability is high, and strong adaptability, and the turnover is quick, but cyclic utilization is good, and the level of IT application is high, is convenient for use in occasions such as convention center, high -rise building especially super high -rise building, realizes the industrialization popularization having better market prospect.

Description

A kind of interim fire-fighting system of modularization of reusable edible
Technical field
The utility model relates to the fire plant that a kind of construction uses, and particularly relates to a kind of interim fire-fighting system of modularization of reusable edible.
Background technology
Along with the fast development of China's economy, due to the limitation of building site, force the mankind to seek to expand space to high-altitude, in city, various high level or high-rise building are rised sheer from level ground.But, in the middle of high-building construction, the Construction Problems of the interim fire-fighting system of floor interlayer is given prominence to, by being equipped with secondary or repeatedly supply equipment, not only causing construction cost and raising, and secondary or repeatedly supply equipment is constant in order to meet water system pressure, pressure pump needs constantly to pressurize to meet water and the hydraulic pressure of executing expenditure of time to water pipe, cause water pump water supply time long, power consumption is serious, water pump shortening in service life.Simultaneously because tie system and not yet come into operation building the formal fire of high-rise building, more do not have automatic alarm and water sprinkler system, fire compartment has not yet been separated, so its fire-proof function is very weak.Along with the increase of high-rise building height, construction industrial water has difficulties equally.So prior art cannot meet the demand of high level or high-rise building temporary construction and fire demand water, does not reach ideal effect.In addition, for the dismounting more complicated in later stage after interim fire-fighting system after having built, and installation cost is higher.Therefore a kind of foundation of effective interim fire-fighting system builds key issue urgently to be resolved hurrily in dynamo-electric project at present.
Utility model content
Utility model object: the purpose of this utility model is for the deficiencies in the prior art, there is provided a kind of modularization of reusable edible interim fire-fighting system, both can lifting construction quality, guarantee construction speed and construction safety, realize again modularization and utilization is installed, improve production efficiency, reduce construction and maintenance cost simultaneously.
Technical scheme: interim fire-fighting system of the present utility model comprises water supply module, power plant module and control module; Described water supply module comprises multiple water tank be communicated with successively, and described water supply module is connected by connecting water pipe with power plant module, and described power plant module is connected with control module.
As one of preferred embodiment of the present utility model, described water tank is anticorrosion water tank.The specification of water tank and the size of high rise elevator and transport capacity match.
As one of preferred embodiment of the present utility model, described power plant module is selected from one or both the combination in the horizontal Pump for well group of motor dry type installation and the horizontal diesel power Pump for well group of Diesel engine dry type installation.
Power plant module security is high, structure is simple, installation and maintenance are convenient, can water outlet at once after starting without the need to exhaust during the work of horizontal Pump for well group, and horizontal diesel power Pump for well group can have a power failure time automatic generation, power supply is provided as fire-fighting emergent system, fire-fighting illuminator, and then does not affect fire-fighting work.
As one of preferred embodiment of the present utility model, the delivery port on described power plant module connects outside standpipe by connecting pipe.By power plant module, the water in water supply module is transferred in fire protection pipeline, realize fire-fighting function.
As one of preferred embodiment of the present utility model, described power plant module is connected by connection cable with control module.
As one of preferred embodiment of the present utility model, described power plant module is connected by wireless transport module with control module.
The utility model compared with prior art, its beneficial effect is: the unfavorable situations such as the utility model changes that traditional architecture interim fire-fighting system installation cost is high, complex procedures and dismounting difficulty, the modularization that dynamo-electric for building installation process proposes theory of installing is introduced in interim fire-fighting system installation process, the interim fire-fighting system of entirety is split into some modular assemblies, adopt flexible combination to connect between unit module, both ensure that construction quality also accelerates engineering integral construction progress.The utility model structure is simple, easy for installation, conveniently moving, capable of circulationly reuses, and avoid unnecessary waste, and security is high, structure is simple, and installation and maintenance are convenient, is that the effect that modular electromechanical installs brand new ideas embodies;
The utility model makes splitting into some unit modules, adopts respective accessory to connect between unit module; Adopt modular technology to install the establishment of interim fire-fighting system, changing the theory that the interim fire-fighting system of tradition is installed, is the innovation of a kind of interim fire-fighting system technology in dynamo-electric installation process;
The utility model utilizes Wireless remote control, convenient management, substantially increases the efficiency of management, embodies the high precision of digitizing technique application;
The utility model saves the duration greatly, is improving technical level and while efficiency, is shortening installation period, greatly ensured the safety of workmen;
The utility model structure is simple, quick for installation, reliability is high, and strong adaptability, turnover is fast, reusable edible is good, and the level of informatization is high, is convenient in applications such as Large conference center, skyscrapers especially high-rise building, realize industrialization promotion, there are good market prospects.
Accompanying drawing explanation
Fig. 1 is structural representation of the present utility model.
Detailed description of the invention
Below embodiment of the present utility model is elaborated; the present embodiment is implemented under premised on technical solutions of the utility model; give detailed embodiment and concrete operating process, but protection domain of the present utility model is not limited to following embodiment.
As shown in Figure 1, the present embodiment comprises water supply module 1, power plant module 2 and control module 3; Described water supply module 1 comprises multiple water tank be communicated with successively, and described water supply module 1 is connected by connecting water pipe 4 with power plant module 2, and described power plant module 2 is connected with control module 3.
The water tank of the present embodiment is anticorrosion water tank.The specification of water tank and the size of high rise elevator and transport capacity match.
Power plant module 2 is selected from one or both the combination in the horizontal Pump for well group of motor dry type installation and the horizontal diesel power Pump for well group of Diesel engine dry type installation.
Power plant module 2 security is high, structure is simple, installation and maintenance are convenient, can water outlet at once after starting without the need to exhaust during the work of horizontal Pump for well group, and horizontal diesel power Pump for well group can have a power failure time automatic generation, power supply is provided as fire-fighting emergent system, fire-fighting illuminator, and then does not affect fire-fighting work.
Delivery port on power plant module 2 connects outside standpipe by connecting pipe 5.By power plant module 2, the water in water supply module 1 is transferred in fire protection pipeline, realize fire-fighting function.
The power plant module 2 of the present embodiment is connected by connection cable with control module 3.
In other embodiments, power plant module 2 is connected by wireless transport module with control module 3, realizes Long-distance Control.
An installation method for the interim fire-fighting system of modularization of reusable edible, comprises the following steps:
(1) design according to job site and make modules; Modules is numbered.Be convenient to according to number class and installation; To modules labeing note for recording specification and numbering;
(2) modules lifts after transporting to job site, discharges successively in order;
(3) carry out assembled to module successively, multiple water tanks of water supply module 1 are communicated with successively, then power plant module 2 is connected by connecting water pipe 4 with water supply module 1, and then connect power plant module 2 and control module 3; According to Module Division order, the pre-assembled detection of factory is carried out to each module completed;
(4) installation accessories, completes the installation of whole interim fire-fighting system;
(5) after finishing using, disassemble modules successively, realize recycling.
The foregoing is only preferred embodiment of the present utility model; not in order to limit the utility model; all do within spirit of the present utility model and principle any amendment, equivalent to replace and improvement etc., all should be included within protection domain of the present utility model.

Claims (6)

1. the interim fire-fighting system of the modularization of reusable edible, is characterized in that, comprises water supply module, power plant module and control module; Described water supply module comprises multiple water tank be communicated with successively, and described water supply module is connected by connecting water pipe with power plant module, and described power plant module is connected with control module.
2. the interim fire-fighting system of modularization of a kind of reusable edible according to claim 1, is characterized in that, described water tank is anticorrosion water tank.
3. the interim fire-fighting system of modularization of a kind of reusable edible according to claim 1, it is characterized in that, described power plant module is selected from one or both the combination in the horizontal Pump for well group of motor dry type installation and the horizontal diesel power Pump for well group of Diesel engine dry type installation.
4. the interim fire-fighting system of modularization of a kind of reusable edible according to claim 1, is characterized in that, the delivery port on described power plant module connects outside standpipe by connecting pipe.
5. the interim fire-fighting system of modularization of a kind of reusable edible according to claim 1, it is characterized in that, described power plant module is connected by connection cable with control module.
6. the interim fire-fighting system of modularization of a kind of reusable edible according to claim 1, it is characterized in that, described power plant module is connected by wireless transport module with control module.
CN201520332300.XU 2015-05-21 2015-05-21 But interim fire extinguishing system of cyclic utilization's modularization Expired - Fee Related CN204767115U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201520332300.XU CN204767115U (en) 2015-05-21 2015-05-21 But interim fire extinguishing system of cyclic utilization's modularization

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201520332300.XU CN204767115U (en) 2015-05-21 2015-05-21 But interim fire extinguishing system of cyclic utilization's modularization

Publications (1)

Publication Number Publication Date
CN204767115U true CN204767115U (en) 2015-11-18

Family

ID=54507250

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201520332300.XU Expired - Fee Related CN204767115U (en) 2015-05-21 2015-05-21 But interim fire extinguishing system of cyclic utilization's modularization

Country Status (1)

Country Link
CN (1) CN204767115U (en)

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN104857659A (en) * 2015-05-21 2015-08-26 中建安装工程有限公司 Recyclable modular temporary firefighting system and mounting method thereof
CN109432662A (en) * 2018-11-26 2019-03-08 中建三局集团有限公司 Fire fighting water system and its construction method for the construction of super highrise building stage
CN111330201A (en) * 2018-12-18 2020-06-26 林城宇 Temporary fire-fighting water system for construction site

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN104857659A (en) * 2015-05-21 2015-08-26 中建安装工程有限公司 Recyclable modular temporary firefighting system and mounting method thereof
CN109432662A (en) * 2018-11-26 2019-03-08 中建三局集团有限公司 Fire fighting water system and its construction method for the construction of super highrise building stage
CN109432662B (en) * 2018-11-26 2023-08-01 中建三局集团有限公司 Fire-fighting water system for super high-rise building construction stage and construction method thereof
CN111330201A (en) * 2018-12-18 2020-06-26 林城宇 Temporary fire-fighting water system for construction site

Similar Documents

Publication Publication Date Title
CN204767115U (en) But interim fire extinguishing system of cyclic utilization's modularization
CN201543150U (en) High-rise industrial building fire-fighting water supply system configuration structure
CN103388350A (en) Frequency-conversion constant-pressure water supply system based on PLC (Programmable Logic Controller)
CN203939061U (en) A kind of pipe jacking tool pipe turnover hole antipriming
CN203947789U (en) Automatic spraying system based on creeping formwork system for walls concrete maintenance
CN105019695A (en) High-position arrangement method and structure of combined main power house of split-shaft gas-steam combined-cycle power plant
CN104857659A (en) Recyclable modular temporary firefighting system and mounting method thereof
CN208309620U (en) A kind of upper anchor slab tooling of bolt assembly
CN103362290A (en) Shaft with combined arrangement of underground powerhouse cable line outgoing system and air exhausting system
CN201391083Y (en) I beam dedicated fastener
CN104299662B (en) Nuclear power plant of movable marine nuclear power platform
CN102943960A (en) Device and method for preparing compressed air by using kinetic energy of tap water
CN205077914U (en) Split axle gas - steam combined -cycle power plant unites high -order arrangement structure of main building
CN206123542U (en) Erection equipment is connected to socket joint pipeline
CN101429774A (en) Secondary water supply preposition equipment and its control method
CN204269380U (en) A kind of exhaust tower of engine testsand
CN204785046U (en) Integrated module piping lane system
CN204066759U (en) A kind of nuclear power station of removable marine nuclear power platform
CN203487802U (en) Slant self-climbing protection screen unit system
CN202055496U (en) Easy-to-adjust moving operation platform
CN111330201A (en) Temporary fire-fighting water system for construction site
CN201714132U (en) Multifunctional accident water tower
CN206110310U (en) Bury intelligent sewage lifting pump station of formula integration
CN201588623U (en) Monoblock type polluted oil recoverer used for oil field/station
CN204024009U (en) The assembled operating platform of a kind of wind-power electricity generation precast concrete pylon

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
CP01 Change in the name or title of a patent holder

Address after: 210000 Yaojia Road, Qixia District, Nanjing, Jiangsu Province

Patentee after: CHINA CONSTRUCTION INDUSTRIAL & ENERGY ENGINEERING GROUP Co.,Ltd.

Address before: 210000 Yaojia Road, Qixia District, Nanjing, Jiangsu Province

Patentee before: China Construction Installation Engineering Co.,Ltd.

CP01 Change in the name or title of a patent holder
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20151118