CN204755145U - Boats and ships fuel system of preheating - Google Patents

Boats and ships fuel system of preheating Download PDF

Info

Publication number
CN204755145U
CN204755145U CN201520315394.XU CN201520315394U CN204755145U CN 204755145 U CN204755145 U CN 204755145U CN 201520315394 U CN201520315394 U CN 201520315394U CN 204755145 U CN204755145 U CN 204755145U
Authority
CN
China
Prior art keywords
compartment
fuel
partition
oil
fuel oil
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201520315394.XU
Other languages
Chinese (zh)
Inventor
王文中
黄信男
黄海啸
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Shanghai Merchant Ship Design and Research Institute
Original Assignee
Shanghai Merchant Ship Design and Research Institute
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Shanghai Merchant Ship Design and Research Institute filed Critical Shanghai Merchant Ship Design and Research Institute
Priority to CN201520315394.XU priority Critical patent/CN204755145U/en
Application granted granted Critical
Publication of CN204755145U publication Critical patent/CN204755145U/en
Anticipated expiration legal-status Critical
Expired - Fee Related legal-status Critical Current

Links

Landscapes

  • Feeding And Controlling Fuel (AREA)

Abstract

本实用新型涉及一种船舶燃油预热系统,其特征在于:在储存舱和沉淀柜之间设置燃油预热和输送两条分支管路,主管路共用,在沉淀柜附近分成两条支路,一路设置预热泵,为储存舱提供高温燃油,另一路设置输送泵,将加热的重油输送至沉淀柜,两条支路均设置相应方向的截止止回阀,防止管路方向错位;在储存舱一角设置小隔舱,所述小隔舱中间设置第一隔板,将隔舱X向一分为二,A、B管布置在第一分舱中;第一隔板右上角开孔,第二隔板左下角开孔,两孔呈对角布置;隔板底部开小孔,作扫舱用;隔舱上板设置若干透气孔,以保证产生的蒸汽及时溢出;所述A、B管与所述主管路连通,A、B管路各自设置调节阀。

The utility model relates to a fuel oil preheating system for a ship, which is characterized in that: two branch pipelines for fuel oil preheating and transportation are arranged between the storage cabin and the settling tank, the main pipeline is shared, and two branch lines are divided near the settling tank, One path is equipped with a preheat pump to provide high-temperature fuel for the storage compartment, and the other path is equipped with a transfer pump to transport the heated heavy oil to the settling tank. Both branches are equipped with cut-off check valves in the corresponding direction to prevent misalignment of the pipeline direction; in the storage compartment A small compartment is set at one corner, and a first partition is set in the middle of the small compartment, which divides the compartment into two in the X direction, and the A and B pipes are arranged in the first subdivision; the upper right corner of the first partition has a hole, and the second There is a hole in the lower left corner of the second partition, and the two holes are arranged diagonally; a small hole is opened at the bottom of the partition for cabin stripping; a number of air holes are set on the upper plate of the partition to ensure the timely overflow of the generated steam; the A and B pipes It communicates with the main pipeline, and the A and B pipelines are respectively equipped with regulating valves.

Description

一种船舶燃油预热系统A ship fuel oil preheating system

技术领域technical field

本实用新型涉及一种船舶燃油预热系统,属于船舶燃油预热技术领域。The utility model relates to a ship fuel oil preheating system, which belongs to the technical field of ship fuel oil preheating.

背景技术Background technique

船舶燃油输送系统中,需要将燃油从储存舱中输送至沉淀柜。储存舱中的燃油一般为重燃油,其粘度随温度不同变化差别极大,温度越高,粘度越低,如某一款重燃油在50℃下粘度为380cSt,而在0℃时接近20000cSt。粘度大会导致输送泵抽吸燃油时阻力大而增加功耗甚至无法泵送,因此有必要对燃油预先进行加热至一定温度以降低粘度再泵送。In the ship's fuel oil delivery system, it is necessary to transport the fuel oil from the storage tank to the settling tank. The fuel oil in the storage tank is generally heavy fuel oil, and its viscosity varies greatly with temperature. The higher the temperature, the lower the viscosity. For example, the viscosity of a certain type of heavy fuel oil is 380cSt at 50°C, and close to 20000cSt at 0°C. The high viscosity will lead to a large resistance when the transfer pump pumps fuel, which will increase power consumption and even make it impossible to pump. Therefore, it is necessary to pre-heat the fuel to a certain temperature to reduce the viscosity before pumping.

目前运营船舶重油的传统加热方式是通过在船两侧的燃油舱内布置加热盘管,通过蒸汽加热重油来达到驳运条件,如图1所示。采用加热盘管来加热重油,达到输运条件后,开启阀门,从吸口往外抽吸燃油。At present, the traditional heating method for heavy oil on ships is to arrange heating coils in the fuel oil tanks on both sides of the ship, and heat the heavy oil through steam to achieve lightering conditions, as shown in Figure 1. The heating coil is used to heat the heavy oil, and when the transportation condition is reached, the valve is opened to suck the fuel oil out from the suction port.

这种方式缺点明显:1)能量利用率较低。盘管加热的是整舱燃油,而实际中需要泵送的燃油量相对燃油储存舱容积很小,因此相当部分热量被用来加热不必泵送的燃油,而这部分热量易通过舱壁与外界进行热交换而被浪费。2)会产生较大范围高温区。当储存舱邻近压载舱或货舱时,压载舱壁高温会加速腐蚀的发生,同时也会给对温度敏感的货物,比方谷物,煤炭等带来破坏。3)当燃油液位低于加热盘管的时候,暴露在空气中的盘管会加速燃气挥发并形成硬垢。4)加热盘管布置高度不能太低,当燃油液位完全低于加热盘管的时候,燃油将很难被输送,导致了燃油留存。This mode has obvious disadvantages: 1) the energy utilization rate is low. The coil heats the entire tank of fuel, but the actual amount of fuel that needs to be pumped is relatively small compared to the volume of the fuel storage tank, so a considerable part of the heat is used to heat the fuel that does not need to be pumped, and this part of heat is easy to pass through the bulkhead and the outside world is wasted for heat exchange. 2) A large range of high temperature zones will be generated. When the storage tank is adjacent to the ballast tank or cargo tank, the high temperature of the ballast bulkhead will accelerate the occurrence of corrosion, and it will also cause damage to temperature-sensitive cargo, such as grain and coal. 3) When the fuel level is lower than the heating coil, the coil exposed to the air will accelerate the volatilization of gas and form hard scale. 4) The height of the heating coil arrangement should not be too low. When the fuel level is completely lower than the heating coil, the fuel will be difficult to be transported, resulting in fuel retention.

为了解决燃油输送系统中加热盘管带来的问题,现有技术中也出现了新型燃油转换装置,其主要设计思想是:在燃油储存舱中设置一个小隔舱,隔舱与储存舱相通,首先往小隔舱中泵入沉淀柜中的高温燃油,预热得到一定量的相对高温燃油,达到泵送条件,然后采用燃油输送泵抽吸燃油至沉淀柜,如此往复循环。图2给出的是燃油储存舱中的隔舱方案示意图。隔舱设计的主要目的是使注入的热燃油尽量主要被用来加热局部区域的冷燃油,且控制被加热的燃油不至于太分散,而是集中在小隔舱内,使被抽出燃油均为相对高温燃油,便于泵送。In order to solve the problems caused by the heating coil in the fuel delivery system, a new type of fuel conversion device has also appeared in the prior art. The main design idea is: a small compartment is set in the fuel storage compartment, and the compartment communicates with the storage compartment. First pump the high-temperature fuel in the settling tank into the small compartment, preheat to obtain a certain amount of relatively high-temperature fuel to meet the pumping conditions, and then use the fuel delivery pump to pump the fuel to the settling tank, and so on. Figure 2 shows a schematic diagram of the compartment scheme in the fuel storage tank. The main purpose of the compartment design is to make the injected hot fuel mainly be used to heat the cold fuel in a local area as much as possible, and to control the heated fuel so as not to disperse too much, but to concentrate in the small compartment, so that the extracted fuel is Relatively hot fuel for easy pumping.

尽管这种燃油转换装置能较好地避免盘管加热带来的问题,也更节约运营成本,但是也存在缺点——其预热效果的好坏依赖于隔舱方案的设计,不合理的隔舱设计可能导致隔舱内燃油温度分布不均、热油积聚在隔舱上方、冷热油换热不充分、吸口附近油温过低等问题,这将弱化其相对于传统盘管加热方式的优势,运行工况恶化时甚至可能增加运营成本,甚至经济性劣于盘管加热。因此,合理的隔舱方案设计是整个燃油预热系统的关键。Although this fuel conversion device can better avoid the problems caused by coil heating and save operating costs, it also has disadvantages—the preheating effect depends on the design of the compartment scheme, and unreasonable isolation The tank design may lead to problems such as uneven distribution of fuel oil temperature in the compartment, accumulation of hot oil above the compartment, insufficient heat exchange between hot and cold oil, and low oil temperature near the suction port, which will weaken its effectiveness compared with the traditional coil heating method. Advantages, when the operating conditions deteriorate, it may even increase operating costs, and even the economy is inferior to coil heating. Therefore, a reasonable compartment scheme design is the key to the entire fuel preheating system.

实用新型内容Utility model content

本实用新型需要解决的技术问题是:现有的船舶燃油预热系统中的燃油转换装置的隔舱设计导致隔舱内燃油温度分布不均、热油积聚在隔舱上方、冷热油换热不充分、吸口附近油温过低等问题,运行工况恶化时甚至可能增加运营成本,甚至经济性劣于盘管加热。The technical problem to be solved by the utility model is: the compartment design of the fuel oil conversion device in the existing ship fuel oil preheating system leads to uneven distribution of fuel oil temperature in the compartment, accumulation of hot oil above the compartment, and heat exchange between hot and cold oil. Insufficient, low oil temperature near the suction port, etc., may even increase operating costs when the operating conditions deteriorate, and even the economy is inferior to coil heating.

本实用新型采取以下技术方案:The utility model takes the following technical solutions:

一种船舶燃油预热系统,在储存舱和沉淀柜之间设置燃油预热和输送两条分支管路,主管路共用,在沉淀柜附近分成两条支路,一路设置预热泵,为储存舱提供高温燃油,另一路设置输送泵,将加热的重油输送至沉淀柜,两条支路均设置相应方向的截止止回阀,防止管路方向错位;在储存舱一角设置小隔舱,所述小隔舱中间设置第一隔板1,将隔舱X向一分为二,A、B管布置在第一分舱1中;第一隔板右上角开孔,第二隔板左下角开孔,两孔呈对角布置;隔板底部开小孔,作扫舱用;隔舱上板设置若干透气孔,以保证产生的蒸汽及时溢出;所述A、B管与所述主管路连通,A、B管路各自设置调节阀。A fuel oil preheating system for a ship. Two branch pipelines for fuel oil preheating and delivery are set between the storage tank and the settling tank. The main pipeline is shared, and it is divided into two branches near the settling tank. High-temperature fuel is provided, and a delivery pump is installed on the other side to transport the heated heavy oil to the settling tank. Both branches are equipped with cut-off check valves in the corresponding direction to prevent misalignment of the pipeline direction; The first partition 1 is set in the middle of the small compartment, which divides the compartment into two in the X direction, and the A and B pipes are arranged in the first subdivision 1; the upper right corner of the first partition is opened, and the lower left corner of the second partition is opened. Two holes are arranged diagonally; a small hole is opened at the bottom of the partition for cabin stripping; a number of ventilation holes are arranged on the upper plate of the compartment to ensure that the generated steam overflows in time; the A and B pipes are connected with the main pipeline , A and B pipelines are respectively equipped with regulating valves.

本技术方案对现有技术的种燃油转换装置进行优化设计,采用第一隔板将小隔舱X向一分为二,在第一隔板右上角和第二隔板的左下角开设小孔,目的是在采用体积尽可能小的小隔舱,提高热利用效率的前提下,尽可能提高燃油在小隔舱内移动轨迹的距离,从而提高换热效率,根据高温燃油具有向上流动、低温燃油具有向下流动的特性,油管A、B的出口接近底部,而,第一分舱的出油孔位于右上角,第二分舱的出油孔位于左下角,从而增加热油行走距离,提升冷热油在小隔舱内的换热效果和均匀程度。设置A、B两根油管可交替使用,单根管路的燃油预热系统并不能取得良好的预热效果,原因在于刚被注入的高温燃油来不及与冷油热交换就被抽出,导致随后吸口附近的燃油温度急剧下降,达不到泵送条件。而使用双管路设计能有效解决该问题。This technical solution optimizes the design of the fuel conversion device in the prior art. The first partition is used to divide the small compartment into two in the X direction, and a small hole is opened in the upper right corner of the first partition and the lower left corner of the second partition. , the purpose is to increase the distance of the moving track of the fuel in the small compartment as much as possible under the premise of using a small compartment with a volume as small as possible to improve the heat utilization efficiency, so as to improve the heat exchange efficiency. Fuel oil has the characteristic of downward flow, and the outlets of oil pipes A and B are close to the bottom, while the oil outlet of the first subdivision is located in the upper right corner, and the oil outlet of the second subdivision is located in the lower left corner, thereby increasing the distance traveled by hot oil. Improve the heat exchange effect and uniformity of hot and cold oil in the small compartment. The two oil pipes A and B can be used alternately. The fuel preheating system of a single pipe cannot achieve a good preheating effect. The temperature of the nearby fuel oil dropped sharply, and the pumping conditions could not be reached. The use of dual pipeline design can effectively solve this problem.

进一步的,A、B管在第一分舱1中,沿X方向居中布置。Further, the pipes A and B are centrally arranged in the first subdivision 1 along the X direction.

进一步的,在热油不至于损坏舱底的情况下管口可尽量接近舱底,但不能太近,以免流动阻力过大。Further, the nozzle can be as close to the bilge as possible under the condition that the hot oil does not damage the bilge, but not too close to avoid excessive flow resistance.

进一步的,所述A、B管路管口在小隔舱中的高度相同。Further, the nozzles of the pipelines A and B have the same height in the small compartment.

一种船舶燃油预热方法,采用上述的船舶燃油预热系统,包括以下步骤:A method for preheating fuel oil for ships, using the above-mentioned fuel oil preheating system for ships, comprising the following steps:

A)由预热泵经油管B往小隔舱注入t1时间的温度为T的高温燃油流量Qv1;A) The high-temperature fuel flow Qv1 is injected into the small compartment by the preheat pump through the oil pipe B and the temperature is T during the time t1;

B)由输送泵经油管B抽吸燃油送至沉淀柜,持续时间为t2,流量Qv1;B) The delivery pump sucks the fuel oil through the oil pipe B and sends it to the settling tank, the duration is t2, and the flow rate is Qv1;

C)由预热泵经油管A往隔舱注入t3时间温度为T的高温燃油,流量Qv2;C) Inject high-temperature fuel oil with temperature T at time t3 from the preheat pump through oil pipe A to the compartment, and the flow rate is Qv2;

D)由输送泵经油管B抽吸燃油送至沉淀柜,持续时间为t2,流量Qv1;D) The delivery pump sucks the fuel oil through the oil pipe B and sends it to the settling tank, the duration is t2, and the flow rate is Qv1;

E)以t3+t2为周期,循环步骤C)-D)。E) Taking t3+t2 as the period, repeat steps C)-D).

管路的选择通过调节阀的启闭来实现,抽注时间的配比根据流量和燃油温度选定。The selection of the pipeline is realized by the opening and closing of the regulating valve, and the ratio of the injection time is selected according to the flow rate and the temperature of the fuel.

步骤A和步骤B的作用是刚启动时,及时将小隔舱油管B附近的燃油初步预热,因为刚启动时油管A附近的燃油还来不及被加热,待这A、B两个步骤完成后,就可往复进行步骤C和步骤D。The function of steps A and B is to preheat the fuel near the fuel pipe B in the small compartment in time at the beginning of the startup, because the fuel near the fuel pipe A has not had time to be heated at the beginning of the startup, after the two steps A and B are completed , step C and step D can be reciprocated.

本实用新型的有益效果在于:The beneficial effects of the utility model are:

1)绿色节能,降低营运成本。由于只加热部分燃油,且热量被有效利用,与外界热交换减少,符合绿色节能理念,并能有效降低船舶营运成本。1) Green and energy-saving, reducing operating costs. Since only part of the fuel oil is heated, and the heat is effectively used, the heat exchange with the outside world is reduced, which is in line with the concept of green energy saving and can effectively reduce the operating cost of the ship.

2)避免了由加热盘管带来的结垢、蒸汽泄漏、燃油留存等问题,且免于盘管加热系统的安装、维护。2) Avoid the scaling, steam leakage, fuel retention and other problems caused by the heating coil, and avoid the installation and maintenance of the coil heating system.

3)不会因为燃油储存舱温度高而损坏邻近货物,也不会造成压载舱的腐蚀。3) It will not cause damage to adjacent cargo due to high temperature of fuel oil storage tanks, nor will it cause corrosion of ballast tanks.

4)不同于盘管加热整舱燃油,本设计只需加热局部区域冷油,故比盘管方式加热速度更快,且系统简单、稳定、易操作。4) Different from the coil heating the whole fuel tank, this design only needs to heat the cold oil in a local area, so the heating speed is faster than the coil method, and the system is simple, stable and easy to operate.

5)对比现有技术中的燃油转换装置,双管设计能有效延长冷热重油热交换时间,得到更多符合泵送条件的燃油,可提高热量的利用率。5) Compared with the fuel conversion device in the prior art, the double-pipe design can effectively extend the heat exchange time of cold and hot heavy oil, obtain more fuel oil that meets the pumping conditions, and improve the utilization rate of heat.

6)双管隔舱设置。隔舱能使热量被主要用于加热隔舱内冷油,使被加热油仍相对集中于隔舱内,便于输送;6) Double-pipe compartment setting. The compartment can make the heat be mainly used to heat the cold oil in the compartment, so that the heated oil is still relatively concentrated in the compartment, which is convenient for transportation;

7)两根油管的交替使用及注排方案。经数值计算发现,单根管路的燃油预热系统并不能取得良好的预热效果,原因在于刚被注入的高温燃油来不及与冷油热交换就被抽出,导致随后吸口附近的燃油温度急剧下降,达不到泵送条件。而使用双管路设计能有效解决该问题。7) Alternate use of two oil pipes and injection and drainage scheme. Through numerical calculation, it is found that the fuel preheating system with a single pipeline cannot achieve a good preheating effect, because the high-temperature fuel that has just been injected is drawn out before it can exchange heat with the cold oil, resulting in a sharp drop in the temperature of the fuel near the suction port. , can not meet the pumping conditions. The use of dual pipeline design can effectively solve this problem.

8)隔板中通孔的对角布置。可以较好解决热油存在于死区问题,有效增加了冷热油热交换行程及延长热油滞留隔舱时间,强化换热效果。8) Diagonal arrangement of the through-holes in the partition. It can better solve the problem of hot oil in the dead zone, effectively increase the heat exchange stroke of hot and cold oil and prolong the time of hot oil staying in the compartment, and strengthen the heat exchange effect.

附图说明Description of drawings

图1是现有技术采用盘管加热的燃油预热系统的示意图。Fig. 1 is a schematic diagram of a fuel preheating system using coil heating in the prior art.

图2是现有技术采用燃油转换装置的燃油预热系统的示意图。Fig. 2 is a schematic diagram of a fuel preheating system using a fuel conversion device in the prior art.

图3是本实用新型船舶燃油预热系统的示意图的流程图。Fig. 3 is a flow chart of the schematic diagram of the fuel oil preheating system of the utility model.

图4是本实用新型船舶燃油预热系统的小隔舱设计示意图。Fig. 4 is a schematic diagram of the small compartment design of the fuel oil preheating system of the utility model.

图中,1.第一分舱,2.第一隔板,3.第二分舱,4.第二隔板。In the figure, 1. the first subdivision, 2. the first partition, 3. the second subdivision, 4. the second partition.

具体实施方式Detailed ways

下面结合附图和具体实施例对本实用新型进一步说明。Below in conjunction with accompanying drawing and specific embodiment the utility model is further described.

本实用新型具体设计方案如图3所示:在燃油储存舱和燃油沉淀舱之间设置燃油预热和输送两条管路,主要管路共用,在沉淀舱附近分成两条支路,一路设置燃油预热泵,为储存舱提供高温燃油,一路设置燃油输送泵,将加热的重油输送至沉淀柜,两条支路均设置相应方向的截止止回阀,防止管路方向错位。为配合隔舱方案,使隔舱具有更好的燃油预热效果,本设计在小隔舱设置相同高度的两条管路,并各配置调节阀。The specific design scheme of the utility model is shown in Figure 3: two pipelines for fuel oil preheating and transportation are set between the fuel storage tank and the fuel oil sedimentation tank. The main pipelines are shared, and they are divided into two branches near the sedimentation tank. The fuel preheating pump provides high-temperature fuel for the storage tank. A fuel transfer pump is installed along the way to transport the heated heavy oil to the settling tank. Both branches are equipped with cut-off check valves in corresponding directions to prevent misalignment of the pipeline direction. In order to cooperate with the compartment scheme and make the compartment have a better fuel preheating effect, this design sets two pipelines of the same height in the small compartment, and each is equipped with a regulating valve.

隔舱方案设计如图4所示:在燃油储存舱一角,邻近无压载舱、货舱等易受高温影响处所,设置小隔舱,其体积大小取决于预热泵排量和柴油机燃油耗量;中间设置一隔板,将隔舱一分为二,A、B管布置在第一分舱中,沿X方向居中布置,沿Y方向四等分处附近布置,在热油不至于损坏舱底的情况下管口可尽量接近舱底,但不能太近,以免流动阻力过大;第一隔板右上角开孔,第二隔板左下角开孔,即呈对角布置;隔板底部开小孔,孔径较小,作扫舱用(图中未标出);隔舱上板设置若干透气孔(图中未标出),以保证产生的蒸汽及时溢出。The design of the compartment scheme is shown in Figure 4: a small compartment is set in a corner of the fuel storage tank, adjacent to non-ballast tanks, cargo tanks and other places that are easily affected by high temperature, and its volume depends on the displacement of the preheat pump and the fuel consumption of the diesel engine; A partition is set in the middle to divide the compartment into two. The A and B pipes are arranged in the first subdivision, arranged in the center along the X direction, and arranged near the quarters along the Y direction, so that the hot oil will not damage the bilge Under the circumstances, the nozzle can be as close as possible to the bilge, but not too close to avoid excessive flow resistance; the opening at the upper right corner of the first partition and the opening at the lower left corner of the second partition are arranged diagonally; the opening at the bottom of the partition The small hole is used for stripping the cabin (not shown in the figure); the upper plate of the compartment is provided with a number of ventilation holes (not shown in the figure) to ensure the timely overflow of the generated steam.

具体操作步骤为:The specific operation steps are:

A)由预热泵经油管B往隔舱注入t1时间的高温燃油,流量Qv1;A) The preheat pump injects high-temperature fuel oil for t1 time into the compartment through oil pipe B, and the flow rate is Qv1;

B)由输送泵经油管B抽吸燃油送至沉淀柜,持续时间为t2,流量Qv1;B) The delivery pump sucks the fuel oil through the oil pipe B and sends it to the settling tank, the duration is t2, and the flow rate is Qv1;

C)由预热泵经油管A往隔舱注入t3高温燃油,流量Qv2;C) Inject t3 high-temperature fuel into the compartment through the oil pipe A from the preheat pump, and the flow rate is Qv2;

D)由输送泵经油管B抽吸燃油送至沉淀柜,持续时间为t2,流量Qv1;D) The delivery pump sucks the fuel oil through the oil pipe B and sends it to the settling tank, the duration is t2, and the flow rate is Qv1;

E)以t3+t2为周期,循环布置C-D。E) With t3+t2 as the period, arrange C-D cyclically.

管路的选择通过调节阀的启闭来实现,抽注时间的配比与流量和燃油温度相关。The selection of the pipeline is realized by the opening and closing of the regulating valve, and the ratio of the pumping time is related to the flow rate and the temperature of the fuel.

本实用新型的目的在于使注入的热油与冷油热交换得到符合泵送条件的相对高温燃油,本设计以燃油t=40℃作为适合输送标准。因此,如何使热油和冷油充分热交换得到尽可能多的相对高温燃油,以及如何使热量被主要用于加热某区域内的燃油就显得十分重要。鉴于此,本实用新型的关键点为:The purpose of this utility model is to exchange heat between the injected hot oil and cold oil to obtain relatively high-temperature fuel oil that meets the pumping conditions. This design takes the fuel oil t=40°C as the suitable delivery standard. Therefore, how to make the heat exchange between hot oil and cold oil sufficiently to obtain as much relatively high-temperature fuel as possible, and how to make the heat mainly used to heat the fuel in a certain area is very important. In view of this, key point of the present utility model is:

双管隔舱设置。隔舱能使热量被主要用于加热隔舱内冷油,使被加热油仍相对集中于隔舱内,便于输送;而双管及隔板布置的合理与否会影响燃油预热效果。Double tube compartment setup. The compartment enables the heat to be mainly used to heat the cold oil in the compartment, so that the heated oil is relatively concentrated in the compartment for easy transportation; and whether the arrangement of double pipes and partitions is reasonable or not will affect the fuel preheating effect.

两根油管的交替使用及注排方案。经数值计算发现,单根管路的燃油预热系统并不能取得良好的预热效果,原因在于刚被注入的高温燃油来不及与冷油热交换就被抽出,导致随后吸口附近的燃油温度急剧下降,达不到泵送条件。而使用双管路设计能有效解决该问题。Alternate use of two oil pipes and injection and drainage scheme. Numerical calculations show that the fuel preheating system with a single pipeline cannot achieve a good preheating effect. The reason is that the high-temperature fuel that has just been injected is drawn out before it can exchange heat with the cold oil, resulting in a sharp drop in the temperature of the fuel near the suction port. , can not meet the pumping conditions. The use of dual pipeline design can effectively solve this problem.

隔板中通孔的对角布置。可以较好解决热油存在于死区问题,有效增加了冷热油热交换行程及延长热油滞留隔舱时间,强化换热效果。Diagonal arrangement of through-holes in the bulkhead. It can better solve the problem of hot oil in the dead zone, effectively increase the heat exchange stroke of hot and cold oil and prolong the time of hot oil staying in the compartment, and strengthen the heat exchange effect.

Claims (4)

1.一种船舶燃油预热系统,其特征在于: 1. A ship fuel oil preheating system, characterized in that: 在储存舱和沉淀柜之间设置燃油预热和输送两条分支管路,主管路共用,在沉淀柜附近分成两条支路,一路设置预热泵,为储存舱提供高温燃油,另一路设置输送泵,将加热的重油输送至沉淀柜,两条支路均设置相应方向的截止止回阀,防止管路方向错位; Set up two branch pipelines for fuel preheating and delivery between the storage tank and the settling tank. The main pipeline is shared. It is divided into two branches near the settling tank. A preheat pump is installed on one side to provide high-temperature fuel for the storage tank, and the other is set up to convey The pump transports the heated heavy oil to the settling tank, and the two branches are equipped with stop check valves in the corresponding direction to prevent the misalignment of the pipeline direction; 在储存舱一角设置小隔舱,所述小隔舱中间设置第一隔板(2),将隔舱X向一分为二,A、B管布置在第一分舱(1)中;第一隔板右上角开孔,第二隔板左下角开孔,两孔呈对角布置;隔板底部开小孔,作扫舱用;隔舱上板设置若干透气孔,以保证产生的蒸汽及时溢出; A small compartment is set at one corner of the storage cabin, and a first partition (2) is arranged in the middle of the small compartment, which divides the compartment into two in the X direction, and the A and B pipes are arranged in the first sub-compartment (1); A hole is opened in the upper right corner of one partition, and a hole is opened in the lower left corner of the second partition, and the two holes are arranged diagonally; small holes are opened at the bottom of the partition for cabin stripping; a number of ventilation holes are set on the upper plate of the compartment to ensure that the generated steam overflow in time; 所述A、B管与所述主管路连通,A、B管路各自设置调节阀。 The A and B pipes are in communication with the main pipeline, and the A and B pipelines are respectively provided with regulating valves. 2.如权利要求1所述的船舶燃油预热系统,其特征在于:A、B管在第一分舱(1)中,沿X方向居中布置。 2. The marine fuel oil preheating system according to claim 1, characterized in that: A and B pipes are centrally arranged in the first subdivision (1) along the X direction. 3.如权利要求1所述的船舶燃油预热系统,其特征在于:在热油不至于损坏舱底的情况下管口可尽量接近舱底,但不能太近,以免流动阻力过大。 3. The marine fuel oil preheating system according to claim 1, characterized in that the nozzle can be as close to the bilge as possible under the condition that the hot oil does not damage the bilge, but not too close to avoid excessive flow resistance. 4.如权利要求1所述的船舶燃油预热系统,其特征在于:所述A、B管路管口在小隔舱中的高度相同。 4. The marine fuel oil preheating system according to claim 1, characterized in that: the nozzles of the A and B pipelines have the same height in the small compartment.
CN201520315394.XU 2015-05-15 2015-05-15 Boats and ships fuel system of preheating Expired - Fee Related CN204755145U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201520315394.XU CN204755145U (en) 2015-05-15 2015-05-15 Boats and ships fuel system of preheating

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201520315394.XU CN204755145U (en) 2015-05-15 2015-05-15 Boats and ships fuel system of preheating

Publications (1)

Publication Number Publication Date
CN204755145U true CN204755145U (en) 2015-11-11

Family

ID=54469859

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201520315394.XU Expired - Fee Related CN204755145U (en) 2015-05-15 2015-05-15 Boats and ships fuel system of preheating

Country Status (1)

Country Link
CN (1) CN204755145U (en)

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN104819080A (en) * 2015-05-15 2015-08-05 上海船舶研究设计院 Ship fuel preheating system and preheating method
TWI657010B (en) * 2016-12-16 2019-04-21 日商北新產業股份有限公司 Fuel oil transfer device
CN110745393A (en) * 2019-11-23 2020-02-04 湖南嘉顺华新材料有限公司 A New Small Oil Tank Heating Device
NO20210481A1 (en) * 2021-04-19 2022-10-20 Englan As System for extracting heated heavy fuel oil from an elongated storage tank

Cited By (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN104819080A (en) * 2015-05-15 2015-08-05 上海船舶研究设计院 Ship fuel preheating system and preheating method
TWI657010B (en) * 2016-12-16 2019-04-21 日商北新產業股份有限公司 Fuel oil transfer device
CN110745393A (en) * 2019-11-23 2020-02-04 湖南嘉顺华新材料有限公司 A New Small Oil Tank Heating Device
NO20210481A1 (en) * 2021-04-19 2022-10-20 Englan As System for extracting heated heavy fuel oil from an elongated storage tank
NO346791B1 (en) * 2021-04-19 2023-01-09 Englan As System for extracting heated heavy fuel oil from an elongated storage tank

Similar Documents

Publication Publication Date Title
CN104819080B (en) A kind of marine fuel oil pre-heating mean
CN204755145U (en) Boats and ships fuel system of preheating
CN105201699B (en) Marine fuel oil pre-heating system and its pre-heating mean based on barrel forms
CN112128725A (en) An autoclave waste heat utilization system and method produced by a gas-filled plate
CN204900113U (en) Boats and ships fuel system of preheating of compulsory convection heat transfer
CN105089872B (en) The marine fuel oil pre-heating system and its pre-heating mean of forced-convection heat transfer
CN205876403U (en) Open circulation cooling water system
CN204984655U (en) Boats and ships fuel system of preheating based on sleeve pipe form
CN203768039U (en) Intercooled closed type recirculating cooling water system for calcium carbide furnace
CN221605593U (en) Auxiliary heating antifreeze cargo box
CN103016124A (en) High-low temperature automatic distributing and cooling system for diesel engine
CN110588940B (en) Environment-friendly ship fuel system
CN202301292U (en) Hydraulic oil cooling system of hydraulic machine
CN204398185U (en) The cooling system of internal mixer mixing chamber
CN203771541U (en) Shower waste water residual heat recovery device
CN211650811U (en) Cooling water waste heat recovery system of air compressor
CN210215861U (en) Energy-saving seamless underwear dyeing machine
CN108426460B (en) Low temperature water preparation system suitable for coke oven gas purification system
CN204705218U (en) A kind of equipment improving water jet system efficiency and condenser vacuum
CN205241618U (en) Primary cooler circulating water economize on electricity transformation system
CN203980396U (en) Thermal source flow balance controller
CN201944550U (en) System device for circulating and conveying liquid asphalt
CN201697426U (en) Bottle cooling water recycling device for bottle cooling machine
CN103658512A (en) Circulation cooling system for fused ceramisite
CN216406995U (en) Novel diesel oil heater

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20151111

Termination date: 20180515