CN204753811U - Green light steel prefabricated buildings are built in letter - Google Patents

Green light steel prefabricated buildings are built in letter Download PDF

Info

Publication number
CN204753811U
CN204753811U CN201520424515.4U CN201520424515U CN204753811U CN 204753811 U CN204753811 U CN 204753811U CN 201520424515 U CN201520424515 U CN 201520424515U CN 204753811 U CN204753811 U CN 204753811U
Authority
CN
China
Prior art keywords
wallboard
mainboard
light steel
combo box
main
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201520424515.4U
Other languages
Chinese (zh)
Inventor
肖中发
赵洋
周黎军
姚春胜
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Jiangsu Baoli assembly housing industry Co., Ltd
Original Assignee
Beijing Dagong Jianzhu Science & Technology Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Beijing Dagong Jianzhu Science & Technology Co Ltd filed Critical Beijing Dagong Jianzhu Science & Technology Co Ltd
Priority to CN201520424515.4U priority Critical patent/CN204753811U/en
Application granted granted Critical
Publication of CN204753811U publication Critical patent/CN204753811U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Finishing Walls (AREA)

Abstract

The utility model provides a green light steel prefabricated buildings are built in letter, the house includes wallboard, mainboard, compound frame post and main connecting piece, two wallboards through main for the connecting piece self tapping screw connect. Compound frame post and wallboard through main for the connecting piece self tapping screw be connected. Lean on tight compound frame post with main connecting piece earlier during the connection, twist self tapping screw to compound frame post and make it fixed, then take one's place the wallboard, make main connecting piece card go into the side recess of wallboard. Mainboard and compound frame support connnection, and then the main part column sleeve of the compound frame post through the mainboard top layer inserts on the tenon post of last dew, then fix with the bolt. Full batch production through wallboard, mainboard is prefabricated, improves building primary member's prefabricated rate greatly to more be favorable to guaranteeing the structure safety and the quality of building, reduced the site operations volume, reduce construction environmental pollution, shorten construction period, practice thrift the cost.

Description

Green light steel assembling house is built in a kind of letter
Technical field
The utility model relates to green house technical field of buildings, particularly relates to a kind of letter and builds green light steel assembling house.
Background technology
Advance industrialization of construction industry, be conducive to realizing energy-saving and emission-reduction, advance green safety construction, improve workmanship, improve human settlement, promote upgrading of industrial structures.Assembled architecture is the inevitable choice realizing industrialization of construction industry.Prefabricated building adopt prefabricate standardized component, carries out in-site installation.At present, the use of prefabricated building gets more and more, but, existing prefabricated building mostly adopt steel structure frame and concrete prefabricated board system or adopt the light steel of thin-walled close rib keel composite construction system, assemblingization degree is lower, concrete material deadweight is comparatively large, and the workload of light steel close rib keel composite construction is general comparatively large, and mounting means is single and installation process is complicated simultaneously.How to found a kind of structural system clear, easy for installation, more save the duration thus the novel fabricated house reduced costs and mounting method thereof, be a current difficult problem urgently to be resolved hurrily.
Summary of the invention
The purpose of this utility model provides a kind of letter to build green light steel assembling house, makes its structural system clear, easy for installation, to save the duration thus to reduce costs.
For achieving the above object, the technical solution adopted in the utility model is as follows, green light steel assembling house is built in a kind of letter, and this house comprises wallboard (1), mainboard (2), combo box trestle (3) and main connector (4).
Described wallboard (1) is prefabricate composite plate, and wallboard (1) comprises light steel section bar (101), connector a (102), heat insulating material (103), LIFT (104), the lightgage steel joist of frame with Baltimore groove; The section of light steel section bar (101) and lightgage steel joist is M type or shape for hat or C type shape.Be interconnected by connector a (102) with self-tapping screw between light steel section bar (101) and lightgage steel joist.Wallboard (1) central filler has heat insulating material (103); The outermost of wallboard (1) is the LIFT (104) of modified cement mortar or light aggregate concrete material; Heat insulating material (103) is polyphenyl plate or stalk board or glass silk floss or foam cement.
Described mainboard (2) is also prefabricate composite plate, when factory process, first be interconnected with self-tapping screw by the connector b (202) in mainboard bight by the light steel truss structure beam (201) of surrounding, afterwards light steel secondary beam (203) is inserted the montant in light steel truss structure beam (201) by design interval, two ends are fixed with self-tapping screw, light steel secondary beam (203) lays pressure profiled steel decking sheets (204) and steel mesh reinforcement (205) successively, the top of mainboard (2) is LIFT (206), the LIFT material of LIFT (206) is light aggregate concrete or other mixed slurry.
Described combo box trestle (3) is prefabricated in the factory part, and combo box trestle (3) comprises main column (301), tenon post (302) and surface layer plate (303).Main column (301) and tenon post (302) are shaped steel of remaining silent, and both section configurations are rectangle or circle.The bottom of main column (301) and tenon post (302) are all reserved with bolt hole (304).The cross sectional shape of tenon post (302) and the identical of main column (301), and be in same central axis, size is that equal proportion is shunk to central axis.The top of tenon post (302) is shunk further, and form pyramidal structure, the grafting being up and down beneficial to combo box trestle (3) is in place.
When being prefabricated in the factory, first by one end welded closure that main column (301) is connected with tenon post (302) by steel plate, then weld tenon post (302).Surface layer plate (303) outside combo box trestle is for sticking production board or building plate, and production board selects GRC plate or leisure plate or cement fibrolite plate or calcium silicate board, builds plate and selects modified cement mortar or light aggregate concrete.
Combo box trestle (3) is when building on different positions, for the coupled column welded together by main column (301) that 1-4 radical amount does not wait, coupled column top is the tenon post (302) be separated from each other that corresponding 1-4 radical amount does not wait.
Described two wallboards (1) are connected with self-tapping screw by main connector (4).Main connector (4) is light steel section bar, and its section configuration is 8 fonts or drum type or rectangle or C-type steel shape, at different link positions, and its sectional dimension or its twice identical with the side grooves degree of depth of wallboard (1).When main connector (4) is for opening-closed sectional material, at its side minor face, be interval with preformed hole.When wallboard (1) straight line connects, first main connector (4) embedded the side grooves of first piece of wallboard (1) and expose half, being screwed into self-tapping screw afterwards makes connector (4) and wallboard fix, then by place for another block wallboard (1), main connector (4) remaining half is made to snap in the side grooves of wallboard (1).When wallboard (1) vertically connects, first the minor face of main connector (4) is close to wallboard (1), be screwed into self-tapping screw to wallboard (1) to be fixed, then by place for another block wallboard (1), main connector (4) is made to snap in the side grooves of wallboard (1).
Described combo box trestle (3) is connected with self-tapping screw by main connector (4) with wallboard (1).First main connector (4) is close to combo box trestle (3) during connection, being screwed into self-tapping screw to combo box trestle (3) makes it fix, then by place for wallboard (1), main connector (4) is made to snap in the side grooves of wallboard (1).
Described mainboard (2) is connected with combo box trestle (3), carry out in place by the tenon post (302) at combo box trestle (3) top through the connector b (202) in mainboard (2) bight, and then be inserted on the tenon post (302) of dew by main column (301) cover of the combo box trestle (3) of mainboard (2) top layer, then use bolt (305) to be fixed.
Described mainboard (2) is connected by main connector (4) with wallboard (1).First main connector (4) is close to mainboard (2) during connection, being screwed into self-tapping screw to mainboard (2) makes it fix, then mainboard (2) is overlapped on wallboard (1) top together with main connector (4), makes main connector (4) snap in the top groove of wallboard (1).
Described wallboard (1) is flush-mounted between combo box trestle (3) and mainboard (2), and the combo box trestle (3) of periphery, house and wallboard (1) are on same central axis.
In described wallboard (1), mainboard (2) and combo box trestle (3) adopt light steel section bar and main connector (4) to adopt light steel section bar be cold bending thin wall galvanized steel.
A mounting method for green light steel assembling house is built in letter, comprises the steps,
S1 carries out patten construction according to construction design drawing, and pre-buried good stone bolt, is arranged on combo box trestle (3) on patten by design sequence, and makes tenon post (302) expose to design elevation;
S2 lifts mainboard (2) as base plate, and lift and be socketed on the tenon post (302) of combo box trestle (3), tenon post (302) stretches out mainboard (2) corner connector b (202);
S3 by combo box trestle (3) by number inserting stretched out the tenon post (302) in mainboard (2) bight, be joined with bolts;
Special main connector (4) is separately fixed at the upper surface of light steel truss structure beam (201) and the side of combo box trestle (3) of mainboard (2) by S4 along body of wall center line;
S5 is by prefabricated wallboard (1) hoisted in position make horizontal side and lower side groove snap in main connector (4) successively in order;
Special main connector (4) is fixed on the soffit of the light steel truss structure beam (201) of mainboard (2) by S6 by design attitude;
S7 by mainboard (2) together with main connector (4) hoisted in position of soffit in wallboard 1 top, make main connector (4) snap in the groove at the top of wallboard (1), make the tenon post (302) of combo box trestle (3) insert simultaneously and stretch out the corner connector b (202) of mainboard (2);
S8 grafting upper strata combo box trestle (3), connects with bolt (305);
S9 installs wallboard (1) as parapet, then carries out roof slope making, waterproof and roof tile and mats formation.
Compared with prior art, the utility model has the following advantages:
1, prefabricated by the full batch production of wallboard, mainboard, greatly improve the prefabricated rate of building main member, thus be more conducive to the structural safety and the quality that ensure building, decrease field operation amount, reduce construction environment and pollute, shorten construction period, cost-saving.
2, by optimizing the connected mode of light steel frame formula structural system and parts, greatly reducing constructional materials consumption and job site workload, really achieving rapid green construction.
3, factory-made component selects more green, low-carbon (LC), environmental protection, energy-conservation material.
4, sturdy and durable, the thermal insulation of building integral, and quality is light, energy-conserving and environment-protective, is applicable to various building construction, and applicability is strong, will bring good economic benefit and social benefit.
Accompanying drawing explanation
Above-mentioned is only the general introduction of technical solutions of the utility model, and in order to better understand technological means of the present utility model, below in conjunction with accompanying drawing and detailed description of the invention, the utility model is described in further detail.
Fig. 1 is that the wallboard of green light steel assembling house, mainboard and combo box trestle mounting structure schematic diagram are built in a kind of letter of the utility model.
Fig. 2 is wallboard installing structure schematic diagram of the present utility model.
Fig. 3 is the mounting structure schematic diagram of mainboard of the present utility model.
Fig. 4 .1 is the structural representation of combo box trestle of the present utility model.
Fig. 4 .2 is the structural representation of coupled column of the present utility model.
Fig. 5 is the annexation schematic diagram between wallboard of the present utility model.
Fig. 6 .1 is the annexation of steel structure frame post of the present utility model and wallboard and combination one schematic diagram of combo box trestle.
Fig. 6 .2 is the annexation of steel structure frame post of the present utility model and wallboard and combination two schematic diagram of combo box trestle.
Fig. 6 .3 is the annexation of steel structure frame post of the present utility model and wallboard and combination three schematic diagram of combo box trestle.
Fig. 6 .4 is the annexation of steel structure frame post of the present utility model and wallboard and combination four schematic diagram of combo box trestle.
Fig. 7 is the annexation schematic diagram of steel structure frame post of the present utility model and mainboard.
Fig. 8 is the annexation schematic diagram of wallboard of the present utility model and mainboard.
In figure: 1, wallboard, 2, mainboard, 3, combo box trestle, 4, main connector, 101, light steel section bar, 102, connector a, 103, heat insulating material, 104, LIFT, 201, light steel truss structure beam, 202, connector b, 203, light steel secondary beam, 204, pressure profiled steel decking sheets, 205, steel mesh reinforcement, 206, LIFT, 301, main column, 302, tenon post, 303, surface layer plate, 304, bolt hole, 305, bolt.
Detailed description of the invention
Below in conjunction with Figure of description and embodiment, the technical solution of the utility model is described in further details.
Green light steel assembling house is built in a kind of letter, and this house comprises wallboard (1), mainboard (2), combo box trestle (3) and main connector (4).
With reference to shown in Fig. 2, described wallboard (1) is prefabricate composite plate, and wallboard (1) comprises light steel section bar (101), connector a (102), heat insulating material (103), LIFT (104), the lightgage steel joist of frame with Baltimore groove; The section of light steel section bar (101) and lightgage steel joist is M type or shape for hat or C type shape.Be interconnected by connector a (102) with self-tapping screw between light steel section bar (101) and lightgage steel joist.Wallboard (1) central filler has heat insulating material (103); The outermost of wallboard (1) is the LIFT (104) of modified cement mortar or light aggregate concrete material; Heat insulating material (103) is polyphenyl plate or stalk board or glass silk floss or foam cement.
With reference to shown in Fig. 3, described mainboard (2) is also prefabricate composite plate, when factory process, first be interconnected with self-tapping screw by the connector b (202) in mainboard bight by the light steel truss structure beam (201) of surrounding, afterwards light steel secondary beam (203) is inserted the montant in light steel truss structure beam (201) by design interval, two ends are fixed with self-tapping screw, light steel secondary beam (203) lays pressure profiled steel decking sheets (204) and steel mesh reinforcement (205) successively, the top of mainboard (2) is LIFT (206), the LIFT material of LIFT (206) is light aggregate concrete or other mixed slurry.
With reference to shown in Fig. 4 .1, described combo box trestle (3) is prefabricated in the factory part, and combo box trestle (3) comprises main column (301), tenon post (302) and surface layer plate (303).Main column (301) and tenon post (302) are shaped steel of remaining silent, and both section configurations are rectangle or circle.The bottom of main column (301) and tenon post (302) are all reserved with bolt hole (304).The cross sectional shape of tenon post (302) and the identical of main column (301), and be in same central axis, size is that equal proportion is shunk to central axis.The top of tenon post (302) is shunk further, and form pyramidal structure, the grafting being up and down beneficial to combo box trestle (3) is in place.
When being prefabricated in the factory, first by one end welded closure that main column (301) is connected with tenon post (302) by steel plate, then weld tenon post (302).Surface layer plate (303) outside combo box trestle is for sticking production board or building plate, and production board selects GRC plate or leisure plate or cement fibrolite plate or calcium silicate board, builds plate and selects modified cement mortar or light aggregate concrete.
Combo box trestle (3) is when building on different positions, for the coupled column (shown in Fig. 4 .2) welded together by main column (301) that 1-4 radical amount does not wait, coupled column top is the tenon post (302) be separated from each other that corresponding 1-4 radical amount does not wait.
With reference to shown in Fig. 5, described two wallboards (1) are connected with self-tapping screw by main connector (4).Main connector (4) is light steel section bar, and its section configuration is 8 fonts or drum type or rectangle or C-type steel shape, at different link positions, and its sectional dimension or its twice identical with the side grooves degree of depth of wallboard (1).When main connector (4) is for opening-closed sectional material, at its side minor face, be interval with preformed hole.When wallboard (1) straight line connects, first main connector (4) embedded the side grooves of first piece of wallboard (1) and expose half, being screwed into self-tapping screw afterwards makes connector (4) and wallboard fix, then by place for another block wallboard (1), main connector (4) remaining half is made to snap in the side grooves of wallboard (1).When wallboard (1) vertically connects, first the minor face of main connector (4) is close to wallboard (1), be screwed into self-tapping screw to wallboard (1) to be fixed, then by place for another block wallboard (1), main connector (4) is made to snap in the side grooves of wallboard (1).
Shown in Fig. 6 .1-6.4, described combo box trestle (3) is connected with self-tapping screw by main connector (4) with wallboard (1).First main connector (4) is close to combo box trestle (3) during connection, being screwed into self-tapping screw to combo box trestle (3) makes it fix, then by place for wallboard (1), main connector (4) is made to snap in the side grooves of wallboard (1).
With reference to shown in Fig. 7, described mainboard (2) is connected with combo box trestle (3), carry out in place by the tenon post (302) at combo box trestle (3) top through the connector b (202) in mainboard (2) bight, and then be inserted on the tenon post (302) of dew by main column (301) cover of the combo box trestle (3) of mainboard (2) top layer, then use bolt (305) to be fixed.
With reference to shown in Fig. 8, described mainboard (2) is connected by main connector (4) with wallboard (1).First main connector (4) is close to mainboard (2) during connection, being screwed into self-tapping screw to mainboard (2) makes it fix, then mainboard (2) is overlapped on wallboard (1) top together with main connector (4), makes main connector (4) snap in the top groove of wallboard (1).
Described wallboard (1) is flush-mounted between combo box trestle (3) and mainboard (2), and the combo box trestle (3) of periphery, house and wallboard (1) are on same central axis.
In described wallboard (1), mainboard (2) and combo box trestle (3) adopt light steel section bar and main connector (4) to adopt light steel section bar be cold bending thin wall galvanized steel.
A mounting method for green light steel assembling house is built in letter, comprises the steps,
S1 carries out patten construction according to construction design drawing, and pre-buried good stone bolt, is arranged on combo box trestle (3) on patten by design sequence, and makes tenon post (302) expose to design elevation;
S2 lifts mainboard (2) as base plate, and lift and be socketed on the tenon post (302) of combo box trestle (3), tenon post (302) stretches out mainboard (2) corner connector b (202);
S3 by combo box trestle (3) by number inserting stretched out the tenon post (302) in mainboard (2) bight, be joined with bolts;
Special main connector (4) is separately fixed at the upper surface of light steel truss structure beam (201) and the side of combo box trestle (3) of mainboard (2) by S4 along body of wall center line;
S5 is by prefabricated wallboard (1) hoisted in position make horizontal side and lower side groove snap in main connector (4) successively in order;
Special main connector (4) is fixed on the soffit of the light steel truss structure beam (201) of mainboard (2) by S6 by design attitude;
S7 by mainboard (2) together with main connector (4) hoisted in position of soffit in wallboard 1 top, make main connector (4) snap in the groove at the top of wallboard (1), make the tenon post (302) of combo box trestle (3) insert simultaneously and stretch out the corner connector b (202) of mainboard (2);
S8 grafting upper strata combo box trestle (3), connects with bolt (305);
S9 installs wallboard (1) as parapet, then carries out roof slope making, waterproof and roof tile and mats formation.

Claims (8)

1. a green light steel assembling house is built in letter, it is characterized in that: this house comprises wallboard (1), mainboard (2), combo box trestle (3) and main connector (4);
Described wallboard (1) is prefabricate composite plate, and wallboard (1) comprises light steel section bar (101), connector a (102), heat insulating material (103), LIFT (104), the lightgage steel joist of frame with Baltimore groove; The section of light steel section bar (101) and lightgage steel joist is M type or shape for hat or C type shape; Be interconnected by connector a (102) with self-tapping screw between light steel section bar (101) and lightgage steel joist; Wallboard (1) central filler has heat insulating material (103); The outermost of wallboard (1) is LIFT (104);
Described mainboard (2) is also prefabricate composite plate, when factory process, first be interconnected with self-tapping screw by the connector b (202) in mainboard bight by the light steel truss structure beam (201) of surrounding, afterwards light steel secondary beam (203) is inserted the montant in light steel truss structure beam (201) by design interval, two ends are fixed with self-tapping screw, light steel secondary beam (203) lays pressure profiled steel decking sheets (204) and steel mesh reinforcement (205) successively, and the top of mainboard (2) is LIFT (206);
Described combo box trestle (3) is prefabricated in the factory part, and combo box trestle (3) comprises main column (301), tenon post (302) and surface layer plate (303); The bottom of main column (301) and tenon post (302) are all reserved with bolt hole (304); The cross sectional shape of tenon post (302) and the identical of main column (301), and be in same central axis, size is that equal proportion is shunk to central axis; The top of tenon post (302) is shunk further, forms pyramidal structure;
One end Plate Welding that main column (301) is connected with tenon post (302) is closed, and then welds tenon post (302);
Combo box trestle (3) is when building on different positions, for the coupled column welded together by main column (301) that 1-4 radical amount does not wait, coupled column top is the tenon post (302) be separated from each other that corresponding 1-4 radical amount does not wait;
Described two wallboards (1) are connected with self-tapping screw by main connector (4); Main connector (4) is light steel section bar, and its section configuration is 8 fonts or drum type or rectangle or C-type steel shape, at different link positions, and its sectional dimension or its twice identical with the side grooves degree of depth of wallboard (1); When main connector (4) is for opening-closed sectional material, at its side minor face, be interval with preformed hole; When wallboard (1) straight line connects, first main connector (4) embedded the side grooves of first piece of wallboard (1) and expose half, being screwed into self-tapping screw afterwards makes connector (4) and wallboard fix, then by place for another block wallboard (1), main connector (4) remaining half is made to snap in the side grooves of wallboard (1); When wallboard (1) vertically connects, first the minor face of main connector (4) is close to wallboard (1), be screwed into self-tapping screw to wallboard (1) to be fixed, then by place for another block wallboard (1), main connector (4) is made to snap in the side grooves of wallboard (1);
Described combo box trestle (3) is connected with self-tapping screw by main connector (4) with wallboard (1);
Described mainboard (2) is connected with combo box trestle (3), is to carry out in place by the tenon post (302) at combo box trestle (3) top through the connector b (202) in mainboard (2) bight; The tenon post (302) being inserted in upper dew by main column (301) cover of the combo box trestle (3) of mainboard (2) top layer is gone up and uses bolt (305) to be fixed;
Described mainboard (2) is connected by main connector (4) with wallboard (1).
2. green light steel assembling house is built in a kind of letter according to claim 1, it is characterized in that: wallboard (1) is flush-mounted between combo box trestle (3) and mainboard (2), the combo box trestle (3) of periphery, house and wallboard (1) are on same central axis.
3. green light steel assembling house is built in a kind of letter according to claim 1, it is characterized in that: heat insulating material (103) is polyphenyl plate or stalk board or glass silk floss or foam cement.
4. green light steel assembling house is built in a kind of letter according to claim 1, it is characterized in that: LIFT (104) is modified cement mortar or light aggregate concrete material.
5. green light steel assembling house is built in a kind of letter according to claim 1, it is characterized in that: the LIFT material of LIFT (206) is light aggregate concrete or mixed slurry.
6. green light steel assembling house is built in a kind of letter according to claim 1, it is characterized in that: the surface layer plate (303) outside combo box trestle is for sticking production board or building plate, production board selects GRC plate or leisure plate or cement fibrolite plate or calcium silicate board, builds plate and selects modified cement mortar or light aggregate concrete.
7. green light steel assembling house is built in a kind of letter according to claim 1, it is characterized in that: main column (301) and tenon post (302) are shaped steel of remaining silent, and both section configurations are rectangle or circle.
8. green light steel assembling house is built in a kind of letter according to claim 1, it is characterized in that: in described wallboard (1), mainboard (2) and combo box trestle (3) adopt light steel section bar and main connector (4) to adopt light steel section bar be cold bending thin wall galvanized steel.
CN201520424515.4U 2015-06-18 2015-06-18 Green light steel prefabricated buildings are built in letter Active CN204753811U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201520424515.4U CN204753811U (en) 2015-06-18 2015-06-18 Green light steel prefabricated buildings are built in letter

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201520424515.4U CN204753811U (en) 2015-06-18 2015-06-18 Green light steel prefabricated buildings are built in letter

Publications (1)

Publication Number Publication Date
CN204753811U true CN204753811U (en) 2015-11-11

Family

ID=54468534

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201520424515.4U Active CN204753811U (en) 2015-06-18 2015-06-18 Green light steel prefabricated buildings are built in letter

Country Status (1)

Country Link
CN (1) CN204753811U (en)

Cited By (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106013519A (en) * 2015-12-25 2016-10-12 山东农业大学 Straw concrete wall system in fabricated mixed structure and manufacturing method thereof
CN106854903A (en) * 2017-01-06 2017-06-16 陈贵 A kind of removable disaster relief room of antidetonation fire prevention
CN107178161A (en) * 2016-03-09 2017-09-19 时靖 The splicing structure in the house of combined wall and its composition
CN107355047A (en) * 2017-07-12 2017-11-17 应宣俊 Structural column and bridge construction formula building structure
CN108035433A (en) * 2018-01-14 2018-05-15 万华集成房屋(烟台)有限公司 Prefabricated house is built and its method of construction
CN113931320A (en) * 2021-11-05 2022-01-14 中国建筑技术集团有限公司 Fabricated light steel light concrete wallboard and wall body shaping column joint and construction method thereof

Cited By (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106013519A (en) * 2015-12-25 2016-10-12 山东农业大学 Straw concrete wall system in fabricated mixed structure and manufacturing method thereof
CN107178161A (en) * 2016-03-09 2017-09-19 时靖 The splicing structure in the house of combined wall and its composition
CN106854903A (en) * 2017-01-06 2017-06-16 陈贵 A kind of removable disaster relief room of antidetonation fire prevention
CN107355047A (en) * 2017-07-12 2017-11-17 应宣俊 Structural column and bridge construction formula building structure
CN108035433A (en) * 2018-01-14 2018-05-15 万华集成房屋(烟台)有限公司 Prefabricated house is built and its method of construction
CN113931320A (en) * 2021-11-05 2022-01-14 中国建筑技术集团有限公司 Fabricated light steel light concrete wallboard and wall body shaping column joint and construction method thereof
CN113931320B (en) * 2021-11-05 2023-11-03 中国建筑技术集团有限公司 Assembled light steel light concrete wallboard and wall shaping column joint and construction method thereof

Similar Documents

Publication Publication Date Title
CN104947792B (en) Green light steel assembling house and installation method are built in a kind of letter
CN204753811U (en) Green light steel prefabricated buildings are built in letter
CN104947788B (en) A kind of modular assembly formula building systems and its method of construction
CN204983131U (en) DGC modularization prefabricated buildings system
CN105863067B (en) A kind of modularization low layer assembled Special-Shaped Column steel house system
CN105696817A (en) Multilayer cold-formed steel integrally prefabricated house and splicing method thereof
CN110273466B (en) Fabricated shear wall and construction method thereof
CN103912063B (en) The prefabricated building system built by precast plate
CN104153462A (en) Staggered floor hanging type prefabricated bay window
CN103352569A (en) Construction method of integrally-poured architecture building
CN105672664A (en) Integral heat insulation wallboard building system
CN202324323U (en) Outer wall plate
CN210421394U (en) Assembled shear force wall
CN106351358A (en) Method for manufacturing and mounting fabricated steel structure house sandwich thermal insulation concrete external wall panel
CN103362307B (en) Construction method for modularizing insulation wall boards and pouring integrated house building
CN203821596U (en) Assembled house system built by prefabricated slabs
CN111927249B (en) Integral prefabricated embedded bay window, connecting node and manufacturing method
CN205475851U (en) Energy -conserving walling system of modularization detaching -free formwork
CN103362235B (en) Integrally-poured building house with wallboards integrating thermal insulating and templates
CN204728482U (en) A kind of prefabricated sheet-pile mortise and tenon type connected node
CN113529929A (en) Ultralow-energy-consumption assembled house structure and assembling method thereof
CN205475877U (en) Compound outer thermal insulation walling system of assembled self preservation temperature wallboard
CN204326313U (en) The residence outer wall plate of gas concrete batten assembling
CN204112529U (en) The residence outer wall plate of gas concrete
CN203412312U (en) Thermal-insulating integrated template wallboard construction building

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
TR01 Transfer of patent right

Effective date of registration: 20171207

Address after: No. 1, Yongning Road, Xu Zhuang Street, Gaogang Hi-tech Zone, Taizhou City, Jiangsu Province

Patentee after: Jiangsu Baoli Automation Technology Co., Ltd.

Address before: 101100 Beijing city Tongzhou District Tongzhou District Lu Yuan South Street No. 109 2-778

Co-patentee before: Xiao Zhongfa

Patentee before: BEIJING DAGONG JIANZHU SCIENCE & TECHNOLOGY CO., LTD.

TR01 Transfer of patent right

Effective date of registration: 20190313

Address after: 225324 North of Yongfeng Road, Xuzhuang Street, Gaogang District, Taizhou City, Jiangsu Province, and East of Longhui Textile Company

Patentee after: Taizhou Baoli Assembled Residential Industry Co., Ltd.

Address before: 225324 No. 1 Yongning Road, Xuzhuang Street, Gaogang High-tech Zone, Taizhou City, Jiangsu Province

Patentee before: Jiangsu Baoli Automation Technology Co., Ltd.

TR01 Transfer of patent right
CP01 Change in the name or title of a patent holder

Address after: 225324 North of Yongfeng Road, Xuzhuang Street, Gaogang District, Taizhou City, Jiangsu Province, and East of Longhui Textile Company

Patentee after: Jiangsu Baoli assembly housing industry Co., Ltd

Address before: 225324 North of Yongfeng Road, Xuzhuang Street, Gaogang District, Taizhou City, Jiangsu Province, and East of Longhui Textile Company

Patentee before: Taizhou Baoli Assembled Residential Industry Co., Ltd.

CP01 Change in the name or title of a patent holder