CN204728701U - Shear wall junction box positioning supporting part - Google Patents
Shear wall junction box positioning supporting part Download PDFInfo
- Publication number
- CN204728701U CN204728701U CN201520452638.9U CN201520452638U CN204728701U CN 204728701 U CN204728701 U CN 204728701U CN 201520452638 U CN201520452638 U CN 201520452638U CN 204728701 U CN204728701 U CN 204728701U
- Authority
- CN
- China
- Prior art keywords
- strut
- credit
- junction box
- support bar
- money
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
Abstract
The utility model discloses a kind of shear wall junction box positioning supporting part, first strut (1) and second strut (4) of drawing money on credit of drawing money on credit be arranged in parallel, to draw money on credit the first short support bar (2) and the second short support bar (5) that to be welded with between strut (4) and to be arranged in parallel at the described first strut (1) and second of drawing money on credit, the described first draw money on credit strut (4), the first short support bar (2) and the second short support bar (5) of strut (1), second of drawing money on credit surrounds the region (3) that can be held junction box.The utility model be a kind of when can prevent concreting shear wall junction box location there is the shear wall junction box positioning supporting part of common quality defect.Easy to make, structure is simple, dependable performance, with low cost, improve effect, environmental protection, can large-scale popularization use.
Description
Technical field
The utility model relates to a kind of positioning supporting part, particularly relates to a kind of for coordinating steel bar template to carry out the support member of shear wall junction box location during civil engineering concreting.
Background technology
Electrical engineering steel conduit secretly joins shear wall junction box, conventional 86 serial common corner junction boxes, the dark 60mm of box, knock down hole is 15mm apart from box mouth, and shear wall level, vertical reinforcement generally adopt the screw-thread steel of Φ about 16, electric piping lays in the reinforcing bar of shear wall both sides, horizontal, vertical two muscle are added together generally between 30mm ~ 40mm, and thus junction box mouth cannot be adjacent to template, and after form removal, box body is too dark apart from wall surface, the position of box is not obvious, and inconvenience is found; Moreover wall rebar covering layer 15mm; in addition plaster; box mouth distance wall decorative surface is greatly about 55mm; to install terminal block panel, kit can only be refilled on former box, and the position of pipe distance wall surface approximately 70mm ~ 80mm at the bottom of box; junction box is excessively dark apart from wall surface; cause threading, angle is little when dragging line, and threading difficulty is increased, and easily cause wire insulation skin damaged.Moreover during concreting, the impact force of box is easily caused box to be out of shape, is shifted.
Utility model content
Technical problem to be solved in the utility model be to provide a kind of when can prevent concreting shear wall junction box location there is the shear wall junction box positioning supporting part of common quality defect.
In order to solve the problems of the technologies described above, the shear wall junction box positioning supporting part that the utility model provides, first strut and second strut of drawing money on credit of drawing money on credit be arranged in parallel, to draw money on credit the first short support bar and the second short support bar that to be welded with between strut and to be arranged in parallel at the described first strut and second of drawing money on credit, the described first draw money on credit strut, the first short support bar and the second short support bar of strut, second of drawing money on credit surrounds the region that can be held junction box.
Described first the draw money on credit length of strut of strut and second of drawing money on credit is 240mm, and the length of the described first short support bar and the second short support bar is 80mm.
Adopt the shear wall junction box positioning supporting part of technique scheme, during use, after the position of junction box is determined, junction box is laid on a corresponding position, shear wall junction box positioning supporting part is enclosed within junction box, check errorless after, four frames of shear wall junction box positioning supporting part are welded on the seamed edge of junction box, first of shear wall junction box positioning supporting part strut and second of drawing money on credit is drawn money on credit on wall steel bar that strut is welded in concrete wall, or with on the wall steel bar of galvanized wire colligation in concrete wall.
After adopting the utility model, its advantage is as follows:
1, the problem that junction box box mouth can not be close to template is well solved;
2, this support member can be good at protective wire box, avoids the distortion of line box and displacement when concreting;
3, before welding support member, first make support member mould according to real size, ensure that the standard of support member, reduce because in manufacturing process, operate miss causes waste of material.
In sum, the utility model be a kind of when can prevent concreting shear wall junction box location there is the shear wall junction box positioning supporting part of common quality defect, easy to make, structure is simple, dependable performance, with low cost, improve effect, environmental protection, can large-scale popularization use.
Accompanying drawing explanation
Fig. 1 is structural representation of the present utility model.
Fig. 2 is installation front view of the present utility model.
Fig. 3 is installation side view of the present utility model.
Detailed description of the invention
Below in conjunction with the drawings and specific embodiments, the utility model is described in further detail.
See Fig. 1, first strut 1 and second strut 4 of drawing money on credit of drawing money on credit be arranged in parallel, the region 3 that one can be held junction box is surrounded at the first strut 1 and second the first short support bar 2 of being welded with between strut 4 and be arrangeding in parallel and the second short support bar 5, the first the draw money on credit short support bar 2 of strut 4, first and the second short support bar 5 of strut 1, second of drawing money on credit of drawing money on credit of drawing money on credit.
See Fig. 1, manufacturing process of the present utility model is as follows with use:
1) key points for operation.Make support member mould: first on the operational platform, according to the box size of installing, draw the fixed point of mould.
1. blanking: adopt Φ 6 round steel, conventional hacksaw, abrasive cutoff saw cut, and needs are cut off reinforcing bar Length Quantity accurate, and firmly, port flushes, not crooked, fracture Ex-all iron filings to be placed on card in jaw.First the draw money on credit length of strut 4 of strut 1 and second of drawing money on credit is 240mm (wall steel bar spacing is 200*200), first draw money on credit strut 1 and second draw money on credit strut 4 will with wall steel bar 7 spot welding or galvanized wire colligation, the length of the first short support bar 2 and the second short support bar 5 is 80mm.
2. assembled spot welding: be arranged on by institute's circle of contact steel on the corresponding position of mould, after confirming that size is errorless, carries out spot welding.
3. weld: strut 1, second of drawing money on credit first of spot welding is drawn money on credit strut 4, first short support bar 2 and the second short support bar 5, be placed on card jail in bench vice mouth, carry out full weld after compound size is errorless, postwelding knows welding slag, is placed on assigned address and deposits.
2) surely junction box is connect.After the position of junction box 6 is determined, junction box 6 is laid on a corresponding position, the region 3 of shear wall junction box positioning supporting part is enclosed within junction box 6, check errorless after, four frames of shear wall junction box positioning supporting part i.e. the first the draw money on credit short support bar 2 of strut 4, first and the second short support bar 5 of strut 1, second of drawing money on credit is welded on the seamed edge of junction box 6, first strut 1 and second of drawing money on credit is drawn money on credit on wall steel bar 7 that strut 4 is welded in concrete wall, or with on the wall steel bar 7 of galvanized wire colligation in concrete wall, as Fig. 2 and Fig. 3.
Claims (2)
1. a shear wall junction box positioning supporting part, it is characterized in that: the first strut (1) and second strut (4) of drawing money on credit of drawing money on credit be arranged in parallel, to draw money on credit the first short support bar (2) and the second short support bar (5) that to be welded with between strut (4) and to be arranged in parallel at the described first strut (1) and second of drawing money on credit, the described first draw money on credit strut (4), the first short support bar (2) and the second short support bar (5) of strut (1), second of drawing money on credit surrounds the region (3) that can be held junction box.
2. shear wall junction box positioning supporting part according to claim 1, it is characterized in that: the described first draw money on credit length of strut (4) of strut (1) and second of drawing money on credit is 240mm, and the length of the described first short support bar (2) and the second short support bar (5) is 80mm.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201520452638.9U CN204728701U (en) | 2015-06-29 | 2015-06-29 | Shear wall junction box positioning supporting part |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201520452638.9U CN204728701U (en) | 2015-06-29 | 2015-06-29 | Shear wall junction box positioning supporting part |
Publications (1)
Publication Number | Publication Date |
---|---|
CN204728701U true CN204728701U (en) | 2015-10-28 |
Family
ID=54387062
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201520452638.9U Expired - Fee Related CN204728701U (en) | 2015-06-29 | 2015-06-29 | Shear wall junction box positioning supporting part |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN204728701U (en) |
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN105244827A (en) * | 2015-11-18 | 2016-01-13 | 上海市安装工程集团有限公司 | Fixing bracket and installation method of electrical end equipment |
CN109695347A (en) * | 2018-12-31 | 2019-04-30 | 陕西建工第八建设集团有限公司 | The construction techniques of curved device is held based on round steel |
-
2015
- 2015-06-29 CN CN201520452638.9U patent/CN204728701U/en not_active Expired - Fee Related
Cited By (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN105244827A (en) * | 2015-11-18 | 2016-01-13 | 上海市安装工程集团有限公司 | Fixing bracket and installation method of electrical end equipment |
CN105244827B (en) * | 2015-11-18 | 2017-11-03 | 上海市安装工程集团有限公司 | A kind of fixed support and its installation method of electric end-equipment |
CN109695347A (en) * | 2018-12-31 | 2019-04-30 | 陕西建工第八建设集团有限公司 | The construction techniques of curved device is held based on round steel |
CN109695347B (en) * | 2018-12-31 | 2020-01-24 | 陕西建工第八建设集团有限公司 | Building construction method based on round steel holding bender |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN205100120U (en) | Bury mounting structure of formula waterstop in box culvert | |
CN204728701U (en) | Shear wall junction box positioning supporting part | |
CN204984424U (en) | Prevent submerged cushion device of opening shield tail pipe piece | |
CN204626453U (en) | The supporting device of pipeline in Urban Underground pipe gallery | |
CN202431281U (en) | Waterproof structure outside side wall of subway station main body | |
CN202280152U (en) | Structure for arranging embedded part at bottom of reinforced concrete plate | |
CN216819356U (en) | PVC spool rubber protection stopper | |
CN203904462U (en) | Replaceable anode assembling device applied to town gas-electricity protection system | |
CN103590495B (en) | The construction method of indoor GIS universal adjustable flooring basis embedded part | |
CN106051316B (en) | A kind of pipeline wears the construction method in pond | |
CN104863347A (en) | Building scaffold wall connecting structure and construction process | |
CN205190954U (en) | With crossing petroleum pipeline of electric Railway road bed protective structure on spot | |
CN205857079U (en) | A kind of full-automatic lifting roadblock | |
CN204356915U (en) | The self waterproof structure that steel pipe column is crossing with concrete of basement exterior wall | |
CN209881341U (en) | Pre-buried positioner of water and electricity pipeline | |
CN210041268U (en) | Enhancement type cable trench | |
CN107965059A (en) | A kind of installation method of wall groove-type built-in fitting | |
CN201245974Y (en) | UPVC casing tube performing and pre-embedding system | |
CN202273345U (en) | Positioning and anti-floating device for BDF thin-walled cement hollow pipes | |
CN203979648U (en) | U-shaped caliber limits card | |
CN201874304U (en) | Positioning clamp for installing handrail | |
CN205421649U (en) | Novel hollow superstructure location is anti floats device | |
CN104121423A (en) | U-shaped pipe diameter limit clamp and construction method of U-shaped pipe diameter limit clamp in pore way embedment | |
CN106869134B (en) | For there is the bottom plate of the base pit engineering of subregion stake to connect method | |
CN205476474U (en) | Metal collapsible tube's protection device |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C14 | Grant of patent or utility model | ||
GR01 | Patent grant | ||
CF01 | Termination of patent right due to non-payment of annual fee | ||
CF01 | Termination of patent right due to non-payment of annual fee |
Granted publication date: 20151028 Termination date: 20190629 |