CN204715725U - 悬挑式卸料平台节点固定结构 - Google Patents
悬挑式卸料平台节点固定结构 Download PDFInfo
- Publication number
- CN204715725U CN204715725U CN201520443056.4U CN201520443056U CN204715725U CN 204715725 U CN204715725 U CN 204715725U CN 201520443056 U CN201520443056 U CN 201520443056U CN 204715725 U CN204715725 U CN 204715725U
- Authority
- CN
- China
- Prior art keywords
- shear wall
- discharging platform
- utility
- wire rope
- overhanging type
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
Landscapes
- Devices Affording Protection Of Roads Or Walls For Sound Insulation (AREA)
- Refuge Islands, Traffic Blockers, Or Guard Fence (AREA)
Abstract
本实用新型涉及建筑施工技术领域,具体公开一种悬挑式卸料平台节点固定结构,包括钢丝绳与剪力墙,还包括环形螺栓,所述环形螺栓一端与钢丝绳固定,另一端穿透剪力墙通过螺母固定。本实用新型优点是,环形螺栓是将普通螺栓端头采用搭接焊做成封闭式圆环,安装时在剪力墙内侧加垫钢板垫片,以加大此处的混凝土受力面积,并用双螺母紧固,固定更为可靠。
Description
技术领域
本实用新型涉及建筑施工技术领域,特别是指一种悬挑式卸料平台节点固定结构。
背景技术
目前,在高层建筑施工中经常采用钢制定型悬挑式倒料平台,配合塔吊周转施工材料。这种平台通常由现场进行设计,专业加工厂加工,安装于柱间或窗口处,随模板拆除逐层提升。悬挑式倒料平台由钢平台、悬吊系统、防护系统组成。钢平台通常采用工字钢或槽钢焊接而成,通过悬挑主梁与结构固定;悬吊系统一般为钢丝绳,内外各两道,一道做为受力绳,另一道为安全绳;防护系统由护身栏、安全网、挡脚板等组成。
倒料平台是技术安全管理的一项重要内容,由于设计标准不统一,倒料平台常常存在着较大的安全隐患。只有解决好悬挑式倒料平台关键技术安全问题,才能切实保证倒料平台的安全。
钢丝绳与结构连接主要有预埋吊环、利用预留孔穿入钢丝绳内侧固定或利用螺栓固定等几种方式。预埋吊环对模板施工有一定的影响,不利于施工操作,且预埋环位置、锚固长度需要严格控制,管理难度较大。若采用将钢丝绳穿入外墙或边梁预留孔,在内侧别钢管套住钢丝绳的固定方式,如图1一方面容易误拆;另外每次安装倒料平台时均需重新固定钢丝绳,操作复杂,同时容易造成钢丝绳紧固程度不一,影响钢丝绳受力。
实用新型内容
本实用新型的目的是提供一种悬挑式卸料平台节点固定结构,该结构可解决上述问题,应用此结构可增大节点受力面积,使用方便,固定安全可靠。
为了实现上述目的,本实用新型采用了以下的技术方案:一种悬挑式卸料平台节点固定结构,包括钢丝绳与剪力墙,还包括环形螺栓,所述环形螺栓一端与钢丝绳固定,另一端穿透剪力墙通过螺母固定。
其中,所述螺母为两个,均与环形螺栓的一端固定,在靠近所述剪力墙一侧的螺母与剪力墙之间设有钢板垫片。
本实用新型的有益效果在于:采用上述模具后,环形螺栓是将普通螺栓端头采用搭接焊做成封闭式圆环,安装时在剪力墙内侧加垫钢板垫片,以加大此处的混凝土受力面积,并用双螺母紧固,固定更为可靠。
附图说明
为了更清楚地说明本实用新型实施例技术方案,下面将对实施例描述中所需要使用的附图作简单地介绍,显而易见地,下面描述中的附图仅仅是本实用新型为了更清楚地说明本实用新型实施例或现有技术中的技术方案,下面将对-实施例或现有技术描述中所需要使用的附图作简单地介绍,对于本领域普通技术人员来讲,在不付出创造性劳动的前提下,还可以根据这些附图获得其他的附图。
图1为传统技术中剪力墙与钢丝绳固定结构示意图;
图2为本实用新型的结构示意图。
具体实施方式
下面将结合本实用新型实施例中的附图,对本实用新型实施例中的技术方案进行清楚、完整地描述,显然,所描述的实施例仅仅是本实用新型一部分实施例,而不是全部的实施例。基于本实用新型中的实施例,本领域普通技术人员在没有作出创造性劳动前提下所获得的所有其他实施例,都属于本实用新型保护的范围。
如图2所示的一种悬挑式卸料平台节点固定结构,包括钢丝绳与剪力墙(1),还包括环形螺栓(2),环形螺栓(2)是将普通螺栓端头采用搭接焊做成封闭式圆环。所述环形螺栓(2)一端与钢丝绳固定,另一端穿透剪力墙(1)通过螺母(3)固定。所述螺母(3)为两个,均与环形螺栓(2)的一端固定,在靠近所述剪力墙(1)一侧的螺母(3)与剪力墙(1)之间设有钢板垫片(4)。
安装时在剪力墙(1)内侧加垫钢板垫片(4),以加大此处的混凝土受力面积,并用双螺母(3)紧固,固定更为可靠。
以上所述仅为本实用新型的较佳实施例而已,并不用以限制本实用新型,凡在本实用新型的精神和原则之内,所作的任何修改、等同替换、改进等,均应包含在本实用新型的保护范围之内。
Claims (2)
1.悬挑式卸料平台节点固定结构,包括钢丝绳与剪力墙(1),其特征在于,还包括环形螺栓(2),所述环形螺栓(2)一端与钢丝绳固定,另一端穿透剪力墙(1)通过螺母(3)固定。
2.根据权利要求1所述的悬挑式卸料平台节点固定结构,其特征在于:所述螺母(3)为两个,均与环形螺栓(2)的一端固定,在靠近所述剪力墙(1)一侧的螺母(3)与剪力墙(1)之间设有钢板垫片(4)。
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201520443056.4U CN204715725U (zh) | 2015-06-25 | 2015-06-25 | 悬挑式卸料平台节点固定结构 |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201520443056.4U CN204715725U (zh) | 2015-06-25 | 2015-06-25 | 悬挑式卸料平台节点固定结构 |
Publications (1)
Publication Number | Publication Date |
---|---|
CN204715725U true CN204715725U (zh) | 2015-10-21 |
Family
ID=54314727
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201520443056.4U Expired - Fee Related CN204715725U (zh) | 2015-06-25 | 2015-06-25 | 悬挑式卸料平台节点固定结构 |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN204715725U (zh) |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN108612310A (zh) * | 2018-05-31 | 2018-10-02 | 中国二十冶集团有限公司 | 一种用于喷涂真石漆时的窗洞防护方法 |
-
2015
- 2015-06-25 CN CN201520443056.4U patent/CN204715725U/zh not_active Expired - Fee Related
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN108612310A (zh) * | 2018-05-31 | 2018-10-02 | 中国二十冶集团有限公司 | 一种用于喷涂真石漆时的窗洞防护方法 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN106168054B (zh) | 带干字型连接件预制剪力墙板的连接构造及其施工方法 | |
CN104947850B (zh) | 屋盖梭形桁架及其施工方法 | |
CN205000252U (zh) | 高墩钢筋绑扎体外劲性骨架 | |
CN204715725U (zh) | 悬挑式卸料平台节点固定结构 | |
CN103821234A (zh) | 一种型钢混凝土柱与钢筋混凝土梁的节点构造 | |
CN206308626U (zh) | 用于安装桥墩墩身顶部吊篮的操作平台 | |
CN206052767U (zh) | 可周转使用的施工电梯基础 | |
CN105804416B (zh) | 预制装配式建筑塔吊的连接结构 | |
CN204023422U (zh) | 一种装配式盖梁施工操作平台 | |
CN207944555U (zh) | 一种预制钢筋混凝土柱机械连接节点 | |
CN204529157U (zh) | 塔吊附墙操作平台 | |
CN205444570U (zh) | 一种墙板连接节点 | |
CN204530747U (zh) | 一种钢塔机平台的地下基础结构 | |
CN205116685U (zh) | 可拆卸悬挑型钢卸料平台 | |
CN205804999U (zh) | 预制装配式建筑塔吊的连接结构 | |
CN203855332U (zh) | 一种施工升降机扶墙加固装置 | |
CN204983157U (zh) | 一种钢筋混凝土柱与牛腿的连接结构 | |
CN206667743U (zh) | 新型下沉式楼板吊模结构 | |
CN203924044U (zh) | 一种扩底桩与钢管立柱连接的节点结构 | |
CN205476576U (zh) | 叠合式混凝土构件及其施工结构 | |
CN203806956U (zh) | 型钢梁下吊钩梁的连接结构 | |
CN204781621U (zh) | 一种空间网格结构钢筋连接器 | |
CN203998726U (zh) | 塔机套架防扭装置 | |
CN214575930U (zh) | 一种既有建筑的上接结构 | |
CN204753298U (zh) | 一种水泥覆工板 |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C14 | Grant of patent or utility model | ||
GR01 | Patent grant | ||
CF01 | Termination of patent right due to non-payment of annual fee |
Granted publication date: 20151021 Termination date: 20160625 |
|
CF01 | Termination of patent right due to non-payment of annual fee |