CN204715293U - Novel flood dam structure - Google Patents

Novel flood dam structure Download PDF

Info

Publication number
CN204715293U
CN204715293U CN201520245711.5U CN201520245711U CN204715293U CN 204715293 U CN204715293 U CN 204715293U CN 201520245711 U CN201520245711 U CN 201520245711U CN 204715293 U CN204715293 U CN 204715293U
Authority
CN
China
Prior art keywords
support column
control block
flood
flood control
dam structure
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201520245711.5U
Other languages
Chinese (zh)
Inventor
肖锐
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Liangshan Cave Luqiao Engineering Co ltd
Luo Huaibo
Luo Jianfeng
Luo Yangqiang
Luo Yangying
Original Assignee
Individual
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Individual filed Critical Individual
Priority to CN201520245711.5U priority Critical patent/CN204715293U/en
Application granted granted Critical
Publication of CN204715293U publication Critical patent/CN204715293U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y02TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
    • Y02ATECHNOLOGIES FOR ADAPTATION TO CLIMATE CHANGE
    • Y02A10/00TECHNOLOGIES FOR ADAPTATION TO CLIMATE CHANGE at coastal zones; at river basins
    • Y02A10/30Flood prevention; Flood or storm water management, e.g. using flood barriers

Landscapes

  • Ship Loading And Unloading (AREA)

Abstract

The utility model relates to novel flood dam structure, comprises basis flood control block and additional flood control block; Described basis flood control block comprises metal framework and is arranged at the building glass plate in metal framework, support column is connected with between adjacent two building glass plates, the inside of described support column is provided with the first passage extended along its length, and the top of support column is configured with dismountable, to cover the opening of described first passage cap; Described additional flood control block comprises dismountable support column extension device and is connected to the metal sheet of side of support column extension device, and the inside of described support column extension device is provided with the second channel extended along its length; When increasing the height of flood dam, remove described cap, described additional flood control block is connected to the top of described basis flood control block, and described first passage is also connected by a stopper rod with second channel consistency from top to bottom.The utility model can the height of simple and easy increase flood dam structure, and structure is simple, and it is convenient to install.

Description

Novel flood dam structure
Technical field
The invention relates to flood protection device field, is specifically related to novel flood dam structure.
Background technology
In correlation technique, the maximum height that the height of flood dam structure can reach according to flood is determined, flood dam is fixed to the height that can not increase flood dam after on architecture basics.Along with the rising on sea level, be necessary to design a kind of can the flood dam of simple and easy increase oneself height.
Summary of the invention
The object of the invention be to avoid above-mentioned weak point of the prior art and provide a kind of can the novel flood dam structure of simple and easy increase oneself height.
The object of the invention is achieved through the following technical solutions:
Provide novel flood dam structure, comprise basis flood control block and additional flood control block; Described basis flood control block comprises metal framework and is arranged at the building glass plate in metal framework, support column is connected with between adjacent two building glass plates, the inside of described support column is provided with the first passage extended along its length, and the top of support column is configured with dismountable, to cover the opening of described first passage cap; Described additional flood control block comprises dismountable support column extension device and is connected to the metal sheet of side of support column extension device, and the inside of described support column extension device is provided with the second channel extended along its length; When increasing the height of flood dam, remove described cap, described additional flood control block is connected to the top of described basis flood control block, and described first passage is also connected by a stopper rod with second channel consistency from top to bottom.
Described metal framework is bolted on architecture basics, it comprise lower frame set a roof beam in place and upper ledge set a roof beam in place; Described support column connect described upper ledge set a roof beam in place and lower frame set a roof beam in place.
The shape of cross section of described support column is " work " shape.
The bottom of described building glass plate is connected to lower frame by underframe seal and sets a roof beam in place, and its top is connected to upper ledge by upper frame seal and sets a roof beam in place, and its side is connected to support column by the glass seal of longitudinal extension.Further, described upper frame seal, underframe seal and glass seal clamp bolton on described metal framework by compression.
Described cap is fixed by set bolt, and is provided with the same surface profile of setting a roof beam in place with upper ledge.
Further, described flood dam structure also comprises for flood dam structure provides the adjustable lever of extra support; One end of described adjustable lever is connected to the back side of described support column extension device by connector, the other end is connected to architecture basics by connector; Described adjustable lever comprises shaft portion and sleeve part, and described shaft portion is provided with the projection of the spaced lengthwise along shaft portion, and described sleeve part is provided with the trepanning mated with described projection.
The beneficial effect of the invention: by connecting the height that additional flood control block increases flood dam structure on basis flood control block, structure is simple, and it is convenient to install.
Accompanying drawing explanation
Accompanying drawing is utilized to be described further innovation and creation, but the embodiment in accompanying drawing does not form any restriction to the invention, for those of ordinary skill in the art, under the prerequisite not paying creative work, other accompanying drawing can also be obtained according to the following drawings.
Fig. 1 is the structural representation of the invention basis flood control block.
The structural representation that Fig. 2 is the invention basis flood control block, adjustable lever is connected with support column extension device.
Fig. 3 is the structural representation of the invention.
Reference numeral:
1-support column; 2-upper ledge is set a roof beam in place; 3-cap; 4-lower frame is set a roof beam in place; 5-building glass plate; 8-upper frame seal; 9-underframe seal; 15-compresses fishbolt; 16-bolt; 19-support column extension device; 24-stopper rod; 30-metal sheet; 34-connector; 35-shaft portion; 36-sleeve part.
Detailed description of the invention
With the following Examples the invention is further described.
See Fig. 1 to Fig. 3, the flood dam structure of the invention, comprises the basis flood control block and additional flood control block that connect up and down; Described basis flood control block comprises metal framework and is arranged at the building glass plate 5 in metal framework, support column 1 is connected with between adjacent two building glass plates, the inside of described support column 1 is provided with the first passage extended along its length, and the top of support column is configured with the cap 3 of dismountable, to cover described first passage opening; Described additional flood control block comprises dismountable support column extension device 19 and is connected to the metal sheet 30 of side of support column extension device 19, and the inside of described support column extension device 19 is provided with the second channel extended along its length; When described basis flood control block and additional block of controlling flood are connected, described cap 3 is removed, and described first passage is with second channel consistency from top to bottom and be connected by a stopper rod 24.
Described metal framework is fixed on architecture basics by bolt 16, it comprise lower frame set a roof beam in place 4 and upper ledge set a roof beam in place 2; Described support column 1 connect upper ledge set a roof beam in place 2 and lower frame set a roof beam in place 4, the shape of cross section of support column 1 is " work " shape and it comprises the flange of connecting building glass plate 5.
The bottom of described building glass plate 5 is connected to lower frame by underframe seal 9 and sets a roof beam in place 4, and its top is connected to upper ledge by upper frame seal 8 and sets a roof beam in place 2, and its side is connected to support column 1 by the glass seal 12 of longitudinal extension.Further, described upper frame seal 8, underframe seal 9 and glass seal 12 is fastened on described metal framework by compression fishbolt 15.
Described cap 3 is fixed by set bolt, and is provided with 2 the same surface profiles of setting a roof beam in place with upper ledge.
Described flood dam structure also comprises for flood dam structure provides the adjustable lever of extra support; One end of described adjustable lever is connected to the back side of described support column extension device 19 by connector 34, the other end is connected to architecture basics by connector 34; Described adjustable lever comprises shaft portion 35 and sleeve part 36, and described shaft portion 35 is provided with the projection of the spaced lengthwise along shaft portion 35, and described sleeve part 36 is provided with the trepanning mated with described projection.
Finally should be noted that; above embodiment is only in order to illustrate the technical scheme of the invention; but not the restriction to the invention protection domain; although done to explain to the invention with reference to preferred embodiment; those of ordinary skill in the art is to be understood that; can modify to the technical scheme of the invention or equivalent replacement, and not depart from essence and the scope of the invention technical scheme.

Claims (4)

1. novel flood dam structure, is characterized in that: comprise the basis flood control block and additional flood control block that connect up and down; Described basis flood control block comprises metal framework and is arranged at the building glass plate in metal framework, support column is connected with between adjacent two building glass plates, the inside of described support column is provided with the first passage extended along its length, and the top of support column is configured with dismountable, to cover the opening of described first passage cap; Described additional flood control block comprises dismountable support column extension device and is connected to the metal sheet of side of support column extension device, and the inside of described support column extension device is provided with the second channel extended along its length; When increasing the height of flood dam, remove described cap, described additional flood control block is connected to the top of described basis flood control block, and described first passage is also connected by a stopper rod with second channel consistency from top to bottom.
2. novel flood dam structure according to claim 1, is characterized in that: also comprise for flood dam structure provides the adjustable lever of extra support; One end of described adjustable lever is connected to the back side of described support column extension device, and the other end is connected to architecture basics.
3. novel flood dam structure according to claim 1, is characterized in that: described metal framework is bolted on architecture basics, it comprise lower frame set a roof beam in place and upper ledge set a roof beam in place; Described support column connect described upper ledge set a roof beam in place and lower frame set a roof beam in place.
4. novel flood dam structure according to claim 1, is characterized in that: the shape of cross section of described support column is " work " shape.
CN201520245711.5U 2015-04-21 2015-04-21 Novel flood dam structure Expired - Fee Related CN204715293U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201520245711.5U CN204715293U (en) 2015-04-21 2015-04-21 Novel flood dam structure

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201520245711.5U CN204715293U (en) 2015-04-21 2015-04-21 Novel flood dam structure

Publications (1)

Publication Number Publication Date
CN204715293U true CN204715293U (en) 2015-10-21

Family

ID=54314297

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201520245711.5U Expired - Fee Related CN204715293U (en) 2015-04-21 2015-04-21 Novel flood dam structure

Country Status (1)

Country Link
CN (1) CN204715293U (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110029625A (en) * 2019-05-23 2019-07-19 中建科技(福州)有限公司 Detachable easily memory-type flood protection device
CN110822210A (en) * 2019-11-15 2020-02-21 广州市第三市政工程有限公司 Water supply and drainage pipeline assembled type blocking plate and construction method

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110029625A (en) * 2019-05-23 2019-07-19 中建科技(福州)有限公司 Detachable easily memory-type flood protection device
CN110029625B (en) * 2019-05-23 2024-05-10 中建科技(福州)有限公司 Detachable and easy-to-store flood control device
CN110822210A (en) * 2019-11-15 2020-02-21 广州市第三市政工程有限公司 Water supply and drainage pipeline assembled type blocking plate and construction method

Similar Documents

Publication Publication Date Title
CN101956438B (en) Three-dimensionally adjustable disconnectable curtain wall connecting device and construction method thereof
CN204645623U (en) Aluminium alloys wafts window template system
EP3133220A3 (en) Platform for a balcony and method for its manufacture
CN204715293U (en) Novel flood dam structure
CN205463755U (en) Simple and easy hydraulic pressure steel sheet bender
CN206346118U (en) A kind of large-span steel pipe truss beam falsework
CN104481087A (en) Light firm canopy easy for discharging water
CN204097852U (en) A kind of arch bridge framework
CN204875550U (en) Prevention of seepage steel construction pier shaft template
CN103835455A (en) Closing structure for technological seam reserved in wall surface or roof surface
CN204645708U (en) A kind of crossbeam support member for building
CN204418670U (en) The sealing concrete pad used in a kind of building operations
CN204386139U (en) Detachable structural steel anchor device
CN204491420U (en) A kind of reinforcement structure of bracket
CN203846655U (en) Short-cantilever dry-hanging device of stone curtain wall
CN204919921U (en) Bar nut is used in installation of metal curtain wall
CN206681159U (en) The spacer that roof girder is connected with connecting plate
CN204199680U (en) A kind of support preventing exterior sheathing seam faulting of slab ends
CN204552463U (en) A kind of adjustment pin assembly of aluminum window body for building
CN204040190U (en) A kind of small plant steel structure assembly
CN204983650U (en) Support bracket is pour to girder that construction was used
CN205617249U (en) Increase arched bridge supporting tool of arched bridge construction stability
CN104481088A (en) Glass rainshed for building
CN204000642U (en) The concrete prefabricated board mounting assembly of a kind of bridge construction
CN104131699B (en) A kind of light early stripping formwork system

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
C41 Transfer of patent application or patent right or utility model
TR01 Transfer of patent right

Effective date of registration: 20160412

Address after: 616550 Sichuan Province, Liangshan Xiang Nan Tang Cun Nan Tian Yi Autonomous Prefecture Leibo County group

Patentee after: Liangshan cave Luqiao Engineering Co.,Ltd.

Address before: 610000, No. 1, West Avenue, Chengdu hi tech Zone, Sichuan

Patentee before: Luo Huaibo

Patentee before: Luo Jianfeng

Patentee before: Luo Yangqiang

Patentee before: Luo Yangying

Effective date of registration: 20160412

Address after: 610000, No. 1, West Avenue, Chengdu hi tech Zone, Sichuan

Patentee after: Luo Huaibo

Patentee after: Luo Jianfeng

Patentee after: Luo Yangqiang

Patentee after: Luo Yangying

Address before: 510640 Guangdong city of Guangzhou province Tianhe District gold Yinglu No. 1 Jin Ying building room 1106

Patentee before: Xiao Rui

CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20151021

Termination date: 20160421

CF01 Termination of patent right due to non-payment of annual fee