CN204703954U - Tunnel draining blind pipe - Google Patents

Tunnel draining blind pipe Download PDF

Info

Publication number
CN204703954U
CN204703954U CN201520156969.8U CN201520156969U CN204703954U CN 204703954 U CN204703954 U CN 204703954U CN 201520156969 U CN201520156969 U CN 201520156969U CN 204703954 U CN204703954 U CN 204703954U
Authority
CN
China
Prior art keywords
pipe
blind pipe
telescopic pipe
face
blind
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201520156969.8U
Other languages
Chinese (zh)
Inventor
孟宪超
于海军
张科辉
张明东
李健学
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Seventh Engineering Co Ltd of China Railway 19th Bureau Group Co Ltd
Original Assignee
Seventh Engineering Co Ltd of China Railway 19th Bureau Group Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Seventh Engineering Co Ltd of China Railway 19th Bureau Group Co Ltd filed Critical Seventh Engineering Co Ltd of China Railway 19th Bureau Group Co Ltd
Priority to CN201520156969.8U priority Critical patent/CN204703954U/en
Application granted granted Critical
Publication of CN204703954U publication Critical patent/CN204703954U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Excavating Of Shafts Or Tunnels (AREA)

Abstract

The utility model provides a kind of tunnel draining blind pipe, at water outlet design and installation telescopic pipe of blind pipe, for piling up the sandstone mud in blind pipe in massif flowing water.By pulling off sleeves pipe, it is cleared up, can prevent sandstone mud pile up cannot clear up and cause draining blind pipe blocking.

Description

Tunnel draining blind pipe
Technical field
The utility model relates to the realm of building construction, particularly a kind of measurement mechanism measuring water level in sedimentation basin.
Background technology
In the building-up work in tunnel, need to arrange many tunnel draining blind pipes, for massif flowing water is drained into sewer along an arch ancient piece of jade, round, flat and with a hole in its centre in tunnel body of wall.Existing tunnel construction drainage plant be one group containing the soft draining blind pipe being uniformly distributed permeable aperture, the two ends outlet of water pipe is respectively at two side bottoms of tunnel camber arch, enter in water pipe to facilitate massif flowing water by permeable aperture, sewer is flowed out in pipe, and often containing sandstone mud in massif flowing water.The subject matter of prior art is, owing to containing a certain amount of sandstone mud in massif flowing water, thus the phenomenon that often easily results in blockage in the position of blind pipe delivery port, and be often difficult to operation cleaning difficulty by the mode of disclosing stamp and easily damage water pipe.
Summary of the invention
For above-mentioned defect, the purpose of this utility model be to provide one can easy cleaning draining blind pipe delivery port sandstone mud, the tunnel draining blind pipe of infringement body when preventing mouth of pipe clogging and prevent from removing the mouth of pipe.
To achieve these goals, the utility model provides a kind of tunnel draining blind pipe, comprises blind pipe and telescopic pipe, and telescopic pipe is nested to be installed in blind pipe outlet, and telescopic pipe has exposed parts relative to blind pipe mouth end face.From such scheme, when the sandstone mud in massif flowing water arrives blind pipe exit, can accumulate in telescopic pipe, dismounting is cleared up, and can reach the effect preventing from blocking.
More concrete scheme is, telescopic pipe exposed junction arranges the shaft shoulder.From such scheme, utilize the shaft shoulder can more convenient dismounting and cleaning, the large 10-20mm of shaft shoulder external diameter comparable blind pipe diameter dimension.
Preferably, the nested mounting means be installed in blind pipe of telescopic pipe adopts interference fits.From above scheme, telescopic pipe can be made so not easily to come off due to the thrust of sandstone mud, also can not be difficult to dismounting because of cooperation tension simultaneously.
Preferably, telescopic pipe body one end is greater than 45 degree of chamfered.From above scheme, when sandstone mud arrives blind pipe outlet with flowing water, sandstone mud can guide in telescopic pipe by interior chamfering more easily.
Preferably, telescopic pipe wall thickness gets 2-5mm.Sleeve adopts the thickness of thinner tube wall to be guided in telescopic pipe by sandstone mud more easily.
Preferably, telescopic pipe inwall whole installation tapering 5-30 degree.From above scheme, telescopic pipe inwall whole installation tapering is convenient to sandstone mud and is entered in telescopic pipe.
Preferably, bobbin inwall arranges arc from interior to end face.From above scheme, the inwall of arc line shaped sandstone mud of being more convenient for enters in telescopic pipe.
Accompanying drawing explanation
Fig. 1 is overall sectional view figure of the present utility model;
Fig. 2 is the local structural graph of the utility model first embodiment;
Fig. 3 is the local structural graph of the utility model second embodiment;
Fig. 4 is the local structural graph of the utility model the 3rd embodiment;
Fig. 5 is the local structural graph of the utility model the 4th embodiment;
Fig. 6 is the local structural graph of the utility model the 5th embodiment.
Detailed description of the invention
Below in conjunction with drawings and Examples, the utility model is described in further detail.
First embodiment:
As depicted in figs. 1 and 2, draining blind pipe in tunnel is made up of blind pipe 1 and telescopic pipe 2, and the revealed section of telescopic pipe has the shaft shoulder 21 of external diameter 10-20mm larger than blind pipe 1 diameter dimension.Telescopic pipe 2 is installed in blind pipe 1 ordinatedly with embedded mode hole axle, and fit system takes interference fits.The sandstone mud of massif flowing water moves downward from blind pipe body 11, is finally deposited in the telescopic pipe 2 of blind pipe mouth 12, and the shaft shoulder 21 of telescopic pipe 2 makes it dismantle extraction more easily, and telescopic pipe 2 is taken apart from blind pipe 1, then clears up telescopic pipe 2.
Second embodiment:
The structure of the present embodiment and the similar of the first embodiment, difference is telescopic pipe inwall is provided with chamfering.
As shown in Figure 3, the shaft shoulder 21 of the external diameter 10-20mm larger than blind pipe 1 diameter dimension that the revealed section of telescopic pipe 2 has, telescopic pipe 2 embedded hole axle coordinates and is installed in blind pipe 1, and fit system takes interference fits.Sleeve body 22 inwall one end arranges 75 ° of chamferings.The sandstone mud of massif flowing water down moves from blind pipe 1, finally be deposited in the telescopic pipe 2 of blind pipe mouth 12, the shaft shoulder 21 of telescopic pipe 2 makes it dismantle extraction more easily, telescopic pipe 2 is taken apart from blind pipe 1, again telescopic pipe 2 is cleared up, and sandstone mud can guide in telescopic pipe 2 by the interior chamfering of sleeve body 22, accumulation effect is better.
3rd embodiment:
The structure of the present embodiment and the similar of the first embodiment, difference is that the inwall of telescopic pipe is thinner.
As shown in Figure 4, the revealed section of telescopic pipe 2 has the shaft shoulder 21 of external diameter 10-20mm larger than blind pipe 1 diameter dimension.The axle cooperation of telescopic pipe 2 embedded hole is installed in blind pipe 1, and fit system takes interference fits.Sleeve body 22 thickness is set to 2-5mm, such as, can be 3mm.The sandstone mud of massif flowing water down moves from blind pipe, is finally deposited in the telescopic pipe 2 of blind pipe mouth 12, and the shaft shoulder 21 of telescopic pipe 2 makes it dismantle extraction more easily, and telescopic pipe 2 is taken apart from blind pipe 1, then clears up telescopic pipe 2; And sleeve body 22 thickness is only 3mm, thinner thickness can play and help sandstone mud to enter in telescopic pipe 2, and don't can cause the defect of body strength deficiency because of too thin.
4th embodiment:
The structure of the present embodiment and the similar of the first embodiment, difference is that telescopic pipe inwall is taper surface.
As shown in Figure 5, the revealed section of telescopic pipe has the shaft shoulder 21 of external diameter 10-20mm larger than blind pipe 1 diameter dimension.The axle cooperation of telescopic pipe 2 embedded hole is installed in blind pipe 1, and fit system takes interference fits.Sleeve body 22 inwall arranges overall tapering 15 degree of-30 degree.The sandstone mud of massif flowing water down moves from blind pipe, is finally deposited in the telescopic pipe 2 of blind pipe mouth 12, and the shaft shoulder 21 of telescopic pipe 2 makes it dismantle extraction more easily, and telescopic pipe 2 is taken apart from blind pipe 1, then clears up telescopic pipe 2; And sleeve body 22 inwall arranges tapering, can make interior to face area reduce, the barrier effect of end face to the motion of sandstone mud can be greatly reduced, sandstone mud is guided in telescopic pipe 2, pile up effect better.
5th embodiment:
The structure of the present embodiment and the similar of the first embodiment, difference is that telescopic pipe inwall is set to arcwall face.
As shown in Figure 6, the revealed section of telescopic pipe 2 has the shaft shoulder 21 of external diameter 10-20mm larger than blind pipe 1 diameter dimension.The axle cooperation of telescopic pipe 2 embedded hole is installed in blind pipe 1, and fit system takes interference fits.Sleeve body 22 inwall is set to arcwall face.The sandstone mud of massif flowing water down moves from blind pipe, is finally deposited in the telescopic pipe 2 of blind pipe mouth 12, and the shaft shoulder 21 of telescopic pipe 2 makes it dismantle extraction more easily, and telescopic pipe 2 is taken apart from blind pipe 1, then clears up telescopic pipe 2; And sleeve body 22 inwall is set to arcwall face, round and smooth cambered surface can reduce the obstruction to sandstone mud movement, guides in telescopic pipe 2 better by sandstone mud, and accumulation effect is better.

Claims (6)

1. tunnel draining blind pipe, comprises the blind pipe mouth being positioned at edge on sewer along the blind pipe main body of placing in tunnel body of wall and two ends, it is characterized in that, also comprise:
Telescopic pipe, adopts interference fits mode to be nested in described blind pipe mouth; The body of described telescopic pipe has exposed parts relative to the end face of described blind pipe mouth.
2. draining blind pipe in tunnel according to claim 1, is characterized in that:
The exposed parts of described telescopic pipe arranges the shaft shoulder, and the end face of the described shaft shoulder is concordant with the outer face of described telescopic pipe.
3. draining blind pipe in tunnel according to claim 2, is characterized in that:
Described telescopic pipe is provided with the chamfering tilted from inner face to inwall, the angle of described chamfering is greater than 45 degree.
4. draining blind pipe in tunnel according to claim 1 and 2, is characterized in that:
The thickness of described body is 2-5mm.
5. draining blind pipe in tunnel according to claim 3, is characterized in that:
The inwall of described telescopic pipe is set to taper surface, and described taper surface is greater than the opening of described taper surface in described outer face at the opening of described inner face, and the tapering of described taper surface is 5 degree of-30 degree.
6. draining blind pipe in tunnel according to claim 3, is characterized in that:
Described telescopic pipe inwall is set to arcwall face, and described arcwall face is greater than the opening of described arcwall face in described outer face at the opening of described inner face.
CN201520156969.8U 2015-03-19 2015-03-19 Tunnel draining blind pipe Expired - Fee Related CN204703954U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201520156969.8U CN204703954U (en) 2015-03-19 2015-03-19 Tunnel draining blind pipe

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201520156969.8U CN204703954U (en) 2015-03-19 2015-03-19 Tunnel draining blind pipe

Publications (1)

Publication Number Publication Date
CN204703954U true CN204703954U (en) 2015-10-14

Family

ID=54283577

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201520156969.8U Expired - Fee Related CN204703954U (en) 2015-03-19 2015-03-19 Tunnel draining blind pipe

Country Status (1)

Country Link
CN (1) CN204703954U (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110130980A (en) * 2019-04-11 2019-08-16 中铁隧道集团二处有限公司 A kind of tunnel drainage device, system and its construction method
CN112377252A (en) * 2020-10-12 2021-02-19 中国电建集团贵阳勘测设计研究院有限公司 Detachable tunnel side wall water outlet device convenient to dredge

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110130980A (en) * 2019-04-11 2019-08-16 中铁隧道集团二处有限公司 A kind of tunnel drainage device, system and its construction method
CN112377252A (en) * 2020-10-12 2021-02-19 中国电建集团贵阳勘测设计研究院有限公司 Detachable tunnel side wall water outlet device convenient to dredge

Similar Documents

Publication Publication Date Title
WO2008142879A1 (en) Pit for managing dust removal
CN204703954U (en) Tunnel draining blind pipe
US9732506B2 (en) Anti-overflow toilet with detachable primary and secondary drain tubes
CN201381548Y (en) Oval tube
CN207211195U (en) A kind of underground pipe gallery internal drainage device
CN203834642U (en) Floor drain
CN108730637B (en) Seepage-proofing embedded pipe
CN209703856U (en) A kind of roof drain
CN105019941B (en) Composite, water-drain blind pipe can be safeguarded
CN106088265B (en) A kind of anticlogging single standpipe cyclone of preventing water leakage
US10087611B2 (en) Anti-overflow toilet with an internal diverting wall diverting flush water from a secondary drain inlet
CN101886426A (en) Floor drain with built-in water seal
CN208152190U (en) A kind of water supply and sewage work building leakage preventing structure
CN211257029U (en) Device for sealing post-pouring strip piping
JP6705627B2 (en) Siphon drainage system
CN202850531U (en) Pool overflow and emptying structure
JP2018025074A (en) Siphon drainage system
JP2008069543A (en) Siphon drain construction method
CN202187413U (en) Urinal siphon blowing pipe
JP5514481B2 (en) Backflow prevention structure
CN205134453U (en) Deodorant drain pipe
CN205173810U (en) Drain pipe structure for building
CN202302529U (en) Drain pipe fitting
CN203604873U (en) Reduced tee
CN208996167U (en) A kind of integral type H-type connecting tube

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20151014

Termination date: 20200319

CF01 Termination of patent right due to non-payment of annual fee