CN204692751U - The interim hanging board of steel-structure factory building - Google Patents
The interim hanging board of steel-structure factory building Download PDFInfo
- Publication number
- CN204692751U CN204692751U CN201520411922.1U CN201520411922U CN204692751U CN 204692751 U CN204692751 U CN 204692751U CN 201520411922 U CN201520411922 U CN 201520411922U CN 204692751 U CN204692751 U CN 204692751U
- Authority
- CN
- China
- Prior art keywords
- steel
- hanging
- mainboard
- stiffening plate
- factory building
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
Abstract
The utility model discloses the interim hanging board of a kind of steel-structure factory building, comprise hanging mainboard and stiffening plate, hanging mainboard is provided with the recessed bar groove of mainboard, stiffening plate is provided with stiffening plate groove, and the width of the recessed bar groove of mainboard and stiffening plate groove all matches with the H profile steel at steel-structure factory building top or the flange width of I-steel; Fixing pin axis hole is respectively arranged with and hole clipping is unloaded in hanging in the central position of hanging mainboard bottom; Interim hanging board two is one group, and the boundary dimension of two is completely the same, is connected to the H profile steel at steel-structure factory building top or the both sides, the edge of a wing of I-steel separately; Two interim hanging boards are fixed together by fixing pin axis hole and bearing pin.The utility model is easy to use, with " card ", can take off easily after being finished, and can not leave a trace on original structure to steel-structure factory building, and structure simply, is easily processed, can machining in batch, also can being shaped with steel plate air cutting and making, with doing, there is good use value.
Description
Technical field
The utility model relates to a kind of erecting by overhang, particularly relates to the interim hanging board of a kind of steel-structure factory building.
Background technique:
Along with the progress of China's industrial technology, increasing industrial premises and civil building adopt steel structure as agent structure, need the installation carrying out affiliated facility after main body Construction of Steel Structure completes.For industrial premises, after structure construction completes, also need the installation carrying out the process systems such as a large amount of equipment, pipeline.For thermal power plant construction, after main building has been constructed, a large amount of main and auxiliary equipment and Pipe installing need be carried out.At erection stage, equipment is had bad luck, anabolic process needs to weld interim suspension centre by mill-type construction; Also be first use interim suspension centre to be fixed by pipeline in pipe installation process, then install formal suspension and support.
Now conventional interim suspension centre is the boatswain chair directly welding a steel plate cutting on the steel structure of factory building, then hangs jack or wire rope thereon.Do the possibility that can have damage to workshop steel structure like this, not only the interim suspension centre of welding also needs to cut off after being used to complete, and bothers but also easily injure mother metal.
Model utility content:
Technical problem to be solved in the utility model is: overcome the deficiencies in the prior art, there is provided a kind of steel-structure factory building interim hanging board, the H profile steel at steel-structure factory building top or the both sides, the edge of a wing of I-steel are directly connected to during use, institute's hanging items unloads hole clipping by hanging and wire rope carries out hanging operation, can take off easily after being used to complete, can not leave a trace to raw steel structure workshop.
The technological scheme that the utility model is taked for technical solution problem is:
The interim hanging board of a kind of steel-structure factory building, comprise hanging mainboard and stiffening plate, described hanging mainboard is provided with the recessed bar groove of mainboard, described stiffening plate is provided with stiffening plate groove, the width of the recessed bar groove of described mainboard and stiffening plate groove all matches with the H profile steel at steel-structure factory building top or the flange width of I-steel; The central position of described hanging mainboard bottom is respectively arranged with fixing pin axis hole and hole clipping is unloaded in hanging.
Described interim hanging board two is one group, and the boundary dimension of two is completely the same, supports the use, and is connected to the H profile steel at described steel-structure factory building top or the both sides, the edge of a wing of I-steel separately; Two interim hanging boards are fixed together by fixing pin axis hole and bearing pin.
Shape and the size of the recessed bar groove of described mainboard and stiffening plate groove match; Together with described hanging mainboard is bolted with stiffening plate.
Described stiffening plate is semicircular structure, and its side central position is provided with described stiffening plate groove.
Interim hanging board of the present utility model uses in pairs, and every two is one group, and boundary dimension is identical, is stuck in the both sides, lower flange of structural steel shape, and hanging is unloaded hole clipping and used as hanging weight.
The utility model structure simply, is easily processed, can machining in batch, and also can be shaped with steel plate air cutting makes, and with doing, have good practicability.
The utility model is easy to use, with " card ", can take off easily after being finished, and can not leave a trace on original structure to steel-structure factory building.
Accompanying drawing illustrates:
Fig. 1 is structural representation of the present utility model;
Fig. 2 is the structural representation hanging mainboard in Fig. 1;
Fig. 3 is the structural representation of stiffening plate in Fig. 1;
Fig. 4 is using state reference drawing of the present utility model.
Embodiment:
Below in conjunction with accompanying drawing, the utility model is further explained and explanation;
See Fig. 1, Fig. 2, Fig. 3 and Fig. 4, the interim hanging board of a kind of steel-structure factory building, comprise hanging mainboard 1 and stiffening plate 2, hanging mainboard 1 is provided with the recessed bar groove 3 of mainboard, stiffening plate 2 is provided with stiffening plate groove 6, and the width of the recessed bar groove 3 of mainboard and stiffening plate groove 6 all matches with the H profile steel at steel-structure factory building top or the flange width of I-steel 8; Fixing pin axis hole 4 is respectively arranged with and hole clipping 5 is unloaded in hanging in the central position of hanging mainboard 1 bottom.
Interim hanging board two is one group, and the boundary dimension of two is completely the same, supports the use, and is connected to the H profile steel at described steel-structure factory building top or the both sides, the edge of a wing of I-steel 8 separately; Two interim hanging boards are fixed together by fixing pin axis hole 4 and bearing pin.
Shape and the size of the recessed bar groove 3 of mainboard and stiffening plate groove 6 match; Hanging mainboard 1 and stiffening plate 2 are linked together by bolt 7.
Stiffening plate 2 is semicircular structure, and its side central position is provided with described stiffening plate groove 6.
The utility model is easy to use, with " card ", can take off easily after being finished, and can not leave a trace on original structure to steel-structure factory building, and structure simply, is easily processed, can machining in batch, also can being shaped with steel plate air cutting and making, with doing, there is good use value.
Claims (4)
1. the interim hanging board of steel-structure factory building, it is characterized in that: described interim hanging board comprises hanging mainboard (1) and stiffening plate (2), described hanging mainboard (1) is provided with the recessed bar groove (3) of mainboard, described stiffening plate (2) is provided with stiffening plate groove (6), the width of the recessed bar groove (3) of described mainboard and stiffening plate groove (6) all matches with the H profile steel at steel-structure factory building top or the flange width of I-steel (8); The central position of described hanging mainboard (1) bottom is respectively arranged with fixing pin axis hole (4) and hole clipping (5) is unloaded in hanging.
2. the interim hanging board of steel-structure factory building according to claim 1, it is characterized in that: described interim hanging board two is one group, the boundary dimension of two is completely the same, supports the use, and is connected to the H profile steel at described steel-structure factory building top or the both sides, the edge of a wing of I-steel (8) separately; Two interim hanging boards are fixed together by fixing pin axis hole (4) and bearing pin.
3. the interim hanging board of steel-structure factory building according to claim 2, is characterized in that: shape and the size of the recessed bar groove (3) of described mainboard and stiffening plate groove (6) match; Described hanging mainboard (1) and stiffening plate (2) are linked together by bolt (7).
4. the interim hanging board of steel-structure factory building according to claim 2, is characterized in that: described stiffening plate (2) is semicircular structure, and its side central position is provided with described stiffening plate groove (6).
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201520411922.1U CN204692751U (en) | 2015-06-16 | 2015-06-16 | The interim hanging board of steel-structure factory building |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201520411922.1U CN204692751U (en) | 2015-06-16 | 2015-06-16 | The interim hanging board of steel-structure factory building |
Publications (1)
Publication Number | Publication Date |
---|---|
CN204692751U true CN204692751U (en) | 2015-10-07 |
Family
ID=54233044
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201520411922.1U Expired - Fee Related CN204692751U (en) | 2015-06-16 | 2015-06-16 | The interim hanging board of steel-structure factory building |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN204692751U (en) |
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN106006436A (en) * | 2016-07-01 | 2016-10-12 | 广东省工业设备安装有限公司 | Beam embracing hoisting device |
CN108277993A (en) * | 2018-01-08 | 2018-07-13 | 中国二十冶集团有限公司 | A kind of steel bar truss floor support plate hanging brace device and its assembling production method |
-
2015
- 2015-06-16 CN CN201520411922.1U patent/CN204692751U/en not_active Expired - Fee Related
Cited By (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN106006436A (en) * | 2016-07-01 | 2016-10-12 | 广东省工业设备安装有限公司 | Beam embracing hoisting device |
CN106006436B (en) * | 2016-07-01 | 2019-03-05 | 广东省工业设备安装有限公司 | One kind embracing beam hoisting apparatus |
CN108277993A (en) * | 2018-01-08 | 2018-07-13 | 中国二十冶集团有限公司 | A kind of steel bar truss floor support plate hanging brace device and its assembling production method |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN103669885B (en) | Super-span steel truss sections hoisting | |
CN204692751U (en) | The interim hanging board of steel-structure factory building | |
CN204609266U (en) | A kind of Mobile operating platform for the construction of piping lane comprehensive pipeline | |
CN202924576U (en) | Lifting tool for totally enclosed bus conductor | |
CN106760558A (en) | A kind of suspension type boiler-steam dome aerial aligning method after installing | |
CN204127487U (en) | Pipeline industry mounting support structure | |
CN202754704U (en) | Hoisting device for heating surface module of heat recovery boiler | |
CN205132926U (en) | Special well word hoist of hydroelectric set tail water ell | |
CN205064389U (en) | Air cooling fan crane span structure installation base | |
CN204138202U (en) | Cantilever crane simple and easy hoisting device | |
CN104674951A (en) | Automatic tripping device for hoisting large reinforced concrete prefabricated columns and beams | |
CN204224149U (en) | Steel structure secondary member hoisting device | |
CN204782200U (en) | A adjustable high pressure vacuum circuit breaker support for steel pipe tower | |
CN206299900U (en) | For the shaped steel Two bors d's oeuveres combined bracket that electrical and mechanical comprehensive pipeline is installed | |
CN105544955A (en) | Elevator shaft tool type operation steel platform and manufacturing method thereof | |
CN105438977A (en) | Easily-dismounted portal crane and dismounting method thereof | |
CN202492302U (en) | Tower crane and mounting platform thereof | |
CN204402040U (en) | A kind of moving screw for connecting aluminum alloy wallboard and back cord | |
CN205078927U (en) | Nuclear power station assembled pipeline bracket | |
CN204675645U (en) | The accessory appliances of vertical steel tube lifting in vertical shaft | |
CN204508564U (en) | A kind of high-mobility, multipurpose, wheeled vehicle wind-driven generator seal ring lifting device | |
CN104416352A (en) | Construction method and device for installing and disassembling gantry crane in radial type | |
CN203889913U (en) | Steel beam suspension fixing device with adjusting function | |
CN203878752U (en) | Connecting device for large steel beam and connecting plate | |
CN203945275U (en) | Manually pin clamps |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C14 | Grant of patent or utility model | ||
GR01 | Patent grant | ||
CP03 | Change of name, title or address | ||
CP03 | Change of name, title or address |
Address after: 450001 the 1-11 floor of No. 2, No. 2, No. 30, Changchun Road, hi tech Industrial Development Zone, Zhengzhou, Henan Patentee after: Henan No.1 Thermal Power Construction Co., Ltd. Address before: 450001 Henan Province, Zhengzhou city high tech Development Zone Long Chun road and Holly Street intersection Patentee before: Henan No.1 Thermal Power Construction Co. |
|
CF01 | Termination of patent right due to non-payment of annual fee | ||
CF01 | Termination of patent right due to non-payment of annual fee |
Granted publication date: 20151007 Termination date: 20190616 |