CN204691152U - Wall installation component - Google Patents

Wall installation component Download PDF

Info

Publication number
CN204691152U
CN204691152U CN201520190702.0U CN201520190702U CN204691152U CN 204691152 U CN204691152 U CN 204691152U CN 201520190702 U CN201520190702 U CN 201520190702U CN 204691152 U CN204691152 U CN 204691152U
Authority
CN
China
Prior art keywords
bolt
wall
rope
anchor
screw bolt
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201520190702.0U
Other languages
Chinese (zh)
Inventor
郭乾坤
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Wenzhou jinzonglu Construction Co. Ltd.
Original Assignee
郭乾坤
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by 郭乾坤 filed Critical 郭乾坤
Priority to CN201520190702.0U priority Critical patent/CN204691152U/en
Application granted granted Critical
Publication of CN204691152U publication Critical patent/CN204691152U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Abstract

The utility model relates to wall installation component, comprises screw bolt, anchor, lining, rope and nut; Screw bolt comprises bolt head and bolt penetration hole; Slidably inserting bolt of restricting is bored a hole; Rope is segmented into rope second end and has rope first end of lid; Second end of restricting extends through bolt penetration hole to wall external surface; During installation, nut connecting thread bolt, makes backboard lean against wall external surface, also makes anchor be close in inside wall surface, and use fixture stationary backplate; Restrict flexible when screw bolt is through porthole, screw bolt is imported porthole and anchor is fixed on wall; Second end of restricting has enough length in the outside of wall, so that make screw bolt and anchor be mounted to precalculated position; Spiro keyhole position is in the anchor surface of anchor; Rope comprises cord grip for helping user to control screw bolt and anchor is mounted to precalculated position.

Description

Wall installation component
Technical field
The utility model relates to building field, is specifically related to the wall installation component for building.
Background technology
In correlation technique, multiple different installation component is adopted, such as traditional bolt, screw, screw-shaped joist anchor bar and the wing anchor pole when being fixed by devices such as comprising handrail or hang thin, hollow door, body of wall, ceiling, dry wall, composite plate, gypsum plank, mold glass wall etc.But there is following problem in above-mentioned installation component: its maximum heavy burden is relatively low, does not reach required supporting capacity.
Utility model content
The purpose of this utility model is avoid above-mentioned weak point of the prior art and provide wall installation component.
The purpose of this utility model is achieved through the following technical solutions:
Wall installation component described in the utility model, comprises screw bolt, lining, anchor, rope and nut.
Wall comprises inside wall surface, wall external surface and penetrates the porthole of inside wall surface and wall external surface, and porthole is provided with the bolt hole mated with screw bolt, screw bolt embeds wall by bolt hole.
Screw bolt comprises bolt head and shank of bolt, and described shank of bolt inside is provided with perforation; Perforation through bolt bar is to the inside center duct of bolt outer end, and rope slidably inserts described perforation; Bolt outer end is shape of threads, and the wall external surface that can pass wall mates with nut and is connected.
Lining is arranged at and porthole same position, to block porthole.Lining comprises the bush hole that is positioned at lining central authorities.The size of bush hole and the size coupling of screw bolt, insert screw bolt sliding and be suitable for; The thickness of lining is less than the thickness of wall so that when installing, wall energy moderate compression.Lining is provided with a sloping edge and inserts in porthole to assist operator by lining; The making material of lining is including, but not limited to timber, veneer, polymer, hard rubber, plastics, neoprene, metal or metal honeycomb material etc.
Screw bolt is conventional hex bolts or other bolts, and bolt head can be any shape; The making material of screw bolt is including, but not limited to steel, galvanized steel, stainless steel, copper or aluminium.In present embodiment, screw bolt adopts zinc-plated hex bolts, and its length is 4cm, and diameter is 1cm, and the diameter of bolt penetration hole 20 is 0.5cm.
Rope is provided with rope first end and rope second end of lid, and the size that the size of lid is greater than cord hole is using as handle; Second end of restricting extends through bolt penetration hole to outside wall external surface, and position is now installation site; When being in installation site, nut screwing clamping screw bolt can be used, and then make backboard can lean against on wall external surface, meanwhile, anchor is close in inside wall surface, and use fixture stationary backplate outer.Restrict flexible when screw bolt is through porthole, screw bolt can be imported porthole and anchor is tentatively fixed on wall; When mounted, rope second end is made to have enough length to remain on the outside of wall, so that operator catches and makes screw bolt and anchor be mounted to precalculated position; The minimum diameter of rope depends on used material and mode of occupation, and the intensity of rope is suitable for being fractured into when screw bolt and anchor are mounted to precalculated position; The material of rope is including, but not limited to wire, metal establishment line and polymer etc.
Anchor provides enough intensity to wall installation component, the flexural strength that its length 50 can provide enough for 8cm ~ 25cm to make anchor, and it can be made up of aluminium, steel, plastics or composite material; Present embodiment adopts common steel bar, and length is 20cm, and width is 2cm, and thickness is 0.5cm; Be the hollow wall of 10cm for typical thickness, above-mentioned length, width and height optimum.
Bolt hole can be positioned at any position on the anchor surface of anchor, and anchor surface is elongated plane.
Rope also comprises cord grip, and this cord grip is positioned at rope second end of rope, controls screw bolt and anchor and described screw bolt and anchor are mounted to precalculated position for help user.Cord grip is made up of a becket bridle of restricting, fastening by the securing member being positioned at rope second end.
The beneficial effects of the utility model: this wall installation component service-strong rope is through being fixed on wall by screw bolt and anchor, screw bolt central authorities are provided with the bolt hole that rope can be passed, operator is by being cord grip by knot, by pulling the pull head of rope first end, screw bolt and anchor can be fixed on wall, and then other devices are fixed on wall.Make installation component have very high supporting capacity, it is not only economical and install but also facilitate, and a large amount of has saved manpower and materials, avoids the waste of resource, has ensured again the safety of operator and the safety of building in work progress simultaneously.In addition, the utility model can be used for but is not limited to ceiling wall, hollow timber, frangible wall as on the structure such as plaster wall, slate wall, narrow wall, corrugated steel, aluminium roofing and other hollow walls, therefore has very strong practicality.
Accompanying drawing explanation
Accompanying drawing is utilized to be described further utility model, but the embodiment in accompanying drawing does not form any restriction of the present utility model, for those of ordinary skill in the art, under the prerequisite not paying creative work, other accompanying drawing can also be obtained according to the following drawings.
Fig. 1 is structural representation of the present utility model.
Fig. 2 is the schematic diagram of the bore screw bolt that the utility model uses.
Fig. 3 is the utility model installation process figure.
Reference numeral:
10-wall installation component, 12-screw bolt, 14-anchor, 16-restricts, 18-bolt head,
20-bolt penetration hole, 22-bolt hole, 24-covers, 26-rope rope first end, 28-rope rope second end,
30-porthole, 32-wall, 34-inside wall surface, 36-bolt outer end, 38-wall external surface,
40-nut, 42-backboard, 44-fixture, 46-anchor surface,
54-bolt edge, 56-cord grip, 58-securing member,
64-sloping edge.
Detailed description of the invention
With the following Examples the utility model is further described.
Wall installation component 10 of the present utility model, as shown in Figure 1, for wall 32, comprises screw bolt 12, anchor 14, lining 60, rope 16 and nut 40.
Wall 32 comprises inside wall surface 34, wall external surface 38 and penetrates the porthole 30 of inside wall surface 34 and wall external surface 38, and porthole 30 is provided with the bolt hole 22 mated with screw bolt 12, screw bolt 12 embeds wall 32 by bolt hole 22.
Screw bolt 12 comprises bolt head 18, bolt penetration hole 20 and bolt outer end 36; Bolt penetration hole 20 is the inside center duct being through to bolt outer end 36 from bolt head 18, and rope 16 is inserting bolt perforation 20 slidably; Bolt outer end 36 is shape of threads, and the wall external surface 38 that can pass wall 32 mates with nut and is connected.
Lining 60 is arranged at and porthole 30 same position, to block porthole 30.Lining 60 comprises the bush hole 62 that is positioned at lining 60 central authorities.The size of bush hole 62 and the size coupling of screw bolt 12, insert screw bolt 12 and be suitable for sliding; The thickness of lining 60 is less than the thickness of wall 32 so that when installing, and wall 32 can moderate compression.Lining 60 is provided with a sloping edge 64 and inserts in porthole 30 to assist operator by lining 60; The making material of lining 60 is including, but not limited to timber, veneer, polymer, hard rubber, plastics, neoprene, metal or metal honeycomb material etc.
As shown in Figure 2, screw bolt 12 is conventional hex bolts or other bolts, and bolt head 18 can be any shape; The making material of screw bolt 12 is including, but not limited to steel, galvanized steel, stainless steel, copper or aluminium.In present embodiment, screw bolt 12 adopts zinc-plated hex bolts, and its length is 4cm, and diameter is 1cm, and the diameter of bolt penetration hole 20 is 0.5cm.
Rope 16 is provided with rope first end 26 and rope second end 28 of lid 24, and the size that the size of lid 24 is greater than cord hole 20 is using as handle; Second end 28 of restricting extends through outside bolt penetration hole 20 to wall external surface 38, and position is now installation site; When being in installation site, nut 40 threaded together bolt 12 can be used, and then make backboard 42 can lean against on wall external surface 38, meanwhile, anchor 14 is close in inside wall surface 34, and use fixture 44 stationary backplate 42 outer.Restrict 16 flexible when screw bolt 12 is through porthole 30, screw bolt 12 can be imported porthole 30 and anchor 14 is tentatively fixed on wall 32; When mounted, rope second end 28 is made to have enough length to remain on the outside of wall 32, so that operator catches and makes screw bolt 12 and anchor 14 be mounted to precalculated position; The minimum diameter of rope 16 depends on used material and mode of occupation, and the intensity of rope 16 is suitable for being fractured into when screw bolt 12 and anchor 14 are mounted to precalculated position; The material of rope 16 is including, but not limited to wire, metal establishment line and polymer etc.
Anchor 14 provides enough intensity, the flexural strength that its length 50 can provide enough for 8cm ~ 25cm to make anchor 14 to wall installation component 10, and it can be made up of aluminium, steel, plastics or composite material; Present embodiment adopts common steel bar, and length is 20cm, and width is 2cm, and thickness is 0.5cm; Be the hollow wall of 10cm for typical thickness, above-mentioned length, width and height optimum.
Bolt hole 22 can be positioned at any position on the anchor surface 46 of anchor 14, and anchor surface 46 is elongated plane.
As shown in Figure 3, rope 16 comprises cord grip 56, and this cord grip 56 is positioned at rope second end 28 of rope 16, controls screw bolt 12 and anchor 14 and described screw bolt 12 and anchor 14 are mounted to precalculated position for help user.Cord grip 56 is made up of a becket bridle of rope 16, fastening by the securing member 58 being positioned at rope second end 28.
Finally should be noted that; above embodiment is only in order to illustrate the technical solution of the utility model; but not the restriction to the utility model protection domain; although done to explain to the utility model with reference to preferred embodiment; those of ordinary skill in the art is to be understood that; can modify to the technical solution of the utility model or equivalent replacement, and not depart from essence and the scope of technical solutions of the utility model.

Claims (3)

1. wall installation component, is characterized in that: porthole is provided with the bolt hole mated with screw bolt, comprises:
Screw bolt; It comprises bolt head and shank of bolt, and the inside of described shank of bolt is provided with the perforation of through bolt bar;
Anchor; It comprises make screw bolt can slide insert bolt hole;
Rope; It is through described perforation; It is provided with rope first end and rope the second end; Described rope first end is provided with lid;
The size of described lid is greater than the size of described perforation;
Described rope second end extends through described perforation forms wall installation component outward installation site to wall external surface;
When described screw bolt is through described porthole, described rope makes shank of bolt import described porthole, and anchor is fixed on the precalculated position of described wall;
Nut; Itself and described screw bolt mate when being connected, and the backboard be positioned between wall external surface and nut leans against wall external surface, and anchor leans against inside wall surface.
2. wall installation component according to claim 1, is characterized in that: also comprise the lining blocking described porthole; Described lining comprises bush hole, the size coupling of its size and screw bolt.
3. wall installation component according to claim 2, is characterized in that: the thickness of described lining is less than the thickness of wall.
CN201520190702.0U 2015-03-31 2015-03-31 Wall installation component Expired - Fee Related CN204691152U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201520190702.0U CN204691152U (en) 2015-03-31 2015-03-31 Wall installation component

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201520190702.0U CN204691152U (en) 2015-03-31 2015-03-31 Wall installation component

Publications (1)

Publication Number Publication Date
CN204691152U true CN204691152U (en) 2015-10-07

Family

ID=54231461

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201520190702.0U Expired - Fee Related CN204691152U (en) 2015-03-31 2015-03-31 Wall installation component

Country Status (1)

Country Link
CN (1) CN204691152U (en)

Cited By (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN105351310A (en) * 2015-12-10 2016-02-24 孙莉新 Mounting and locking column device used for wall-mounting part
CN105757085A (en) * 2016-05-03 2016-07-13 中铁十九局集团电务工程有限公司 Special fitting for fixing bodies on hollow brick wall bodies
CN109306991A (en) * 2018-11-21 2019-02-05 尹苑苑 A kind of unilateral bolt fastener
CN113404752A (en) * 2021-07-07 2021-09-17 上海泰大建筑科技有限公司 Bolt installation method for closed section
CN113883143A (en) * 2021-10-14 2022-01-04 西安鑫垚陶瓷复合材料有限公司 Bolt installation method for near-closed space part

Cited By (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN105351310A (en) * 2015-12-10 2016-02-24 孙莉新 Mounting and locking column device used for wall-mounting part
CN105757085A (en) * 2016-05-03 2016-07-13 中铁十九局集团电务工程有限公司 Special fitting for fixing bodies on hollow brick wall bodies
CN109306991A (en) * 2018-11-21 2019-02-05 尹苑苑 A kind of unilateral bolt fastener
CN113404752A (en) * 2021-07-07 2021-09-17 上海泰大建筑科技有限公司 Bolt installation method for closed section
CN113883143A (en) * 2021-10-14 2022-01-04 西安鑫垚陶瓷复合材料有限公司 Bolt installation method for near-closed space part

Similar Documents

Publication Publication Date Title
CN204691152U (en) Wall installation component
WO2005094469A3 (en) Wall and ceiling fastening system and methods therefor
CN104060732B (en) A kind of hanger on groove of back of stone combination and mounting method
CN204081445U (en) To encorbelment i iron anchor device
CN215978402U (en) Scaffold wall connecting fastener
CN110145133A (en) A kind of assembled one off houses
CN204199520U (en) The syndeton of tiles hanging piece suspended ceiling
CN203222994U (en) Detachable embedded piece for outer wall formwork
CN210232817U (en) Auxiliary tool for mounting ceiling suspender
CN204199490U (en) A kind of hanger on groove of back of stone combination
CN204267873U (en) A kind of trapezoidal bolt card pipe fastening piece
CN207453352U (en) A kind of anchor structure of decorating outer wall of building plate
CN203499017U (en) Wall tie bar pre-embedded positioning device
CN205189402U (en) Back edge connecting device of steel and wood structure of template
CN204492012U (en) A kind of bar connecting device
CN204676756U (en) The fastener of top board furred ceiling
CN204152204U (en) Concrete slab reserving hole structure
CN206352350U (en) A kind of partition wall steel suspension member constructing structure
CN203905365U (en) Bathroom wall stone installation structure for high-rise buildings
CN203821696U (en) Fabricated wallboard adopting steel structure
CN203097291U (en) Reinforcing and counter-pulling device of building construction formwork
CN202900909U (en) Novel eye screw
CN102734298A (en) Multifunctional fastening nail and use method thereof
CN2818884Y (en) Preembedded fixed nail of thermal-insulative board
KR200459900Y1 (en) a sleeve fixing tool of a mold

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
C41 Transfer of patent application or patent right or utility model
CB03 Change of inventor or designer information

Inventor after: Fang Liang

Inventor before: Guo Qiankun

COR Change of bibliographic data
TR01 Transfer of patent right

Effective date of registration: 20160114

Address after: Room 3, building 1801, Southland building, Jinxiu Road, Zhejiang, Wenzhou 325002

Patentee after: Wenzhou jinzonglu Construction Co. Ltd.

Address before: 510006 Panyu District City, Guangzhou Province, the University of Guangdong, West Ring Road, No. 230

Patentee before: Guo Qiankun

CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20151007

Termination date: 20160331

CF01 Termination of patent right due to non-payment of annual fee