CN204690809U - The ruggedized construction on facility basis on a kind of sand ground that pulls in shore - Google Patents

The ruggedized construction on facility basis on a kind of sand ground that pulls in shore Download PDF

Info

Publication number
CN204690809U
CN204690809U CN201520344972.2U CN201520344972U CN204690809U CN 204690809 U CN204690809 U CN 204690809U CN 201520344972 U CN201520344972 U CN 201520344972U CN 204690809 U CN204690809 U CN 204690809U
Authority
CN
China
Prior art keywords
pile
basis
facility
interlocking
construction
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201520344972.2U
Other languages
Chinese (zh)
Inventor
高沃辉
林镇周
彭孝雄
蔡天机
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Co Ltd Of Energy Source In China Construction Group Guangdong Electric Power Engineering Bureau
Original Assignee
Co Ltd Of Energy Source In China Construction Group Guangdong Electric Power Engineering Bureau
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Co Ltd Of Energy Source In China Construction Group Guangdong Electric Power Engineering Bureau filed Critical Co Ltd Of Energy Source In China Construction Group Guangdong Electric Power Engineering Bureau
Priority to CN201520344972.2U priority Critical patent/CN204690809U/en
Application granted granted Critical
Publication of CN204690809U publication Critical patent/CN204690809U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Foundations (AREA)
  • Revetment (AREA)

Abstract

The utility model discloses the ruggedized construction on facility basis on a kind of sand ground that pulls in shore, comprise construction in the periphery on facility basis, by the fender pile surrounded outside unrestrained position on facility basis, described fender pile is that multiple pile foundation is engaged formation interlocking pile structure each other, has the closed circular arc Guan Liang be connected as a single entity with the pile foundation of all interlocking piles in the construction of the top of fender pile.The fender pile of its interlocking pile structure can hold the ground sandy soil on facility basis inside interlocking pile tightly, stops wave washing away facility basis, avoids emptying of basis, thus ensures basic vertical bearing capacity, maintains the steadiness on basis, reliably prevents toppling of basis.

Description

The ruggedized construction on facility basis on a kind of sand ground that pulls in shore
Technical field
The utility model relates to the building on the area, sandy beach on bank such as seashore, riverside and the ruggedized construction of equipment Foundations.
Background technology
For various reasons, the area, sandy beach on seashore and river bank, is often provided with some facility such as building and main equipment, for keeping the stable of these facilities, usually can arrange the pile foundation in buried sandy beach in the bottom of these facilities.But, because pile foundation is embedded in sandy beach, its foundation soil is sandy soil, at bad weathers such as chance typhoons, when there is billow, the pile foundation of these facilities is easily subject to washing away of wave, cause a large amount of sand-like foundation soils in the scour process of billow, following sea can run off, pile foundation is locally emptied, foundation soil is reduced the restraint forces of pile foundation; Simultaneously, in scour process, wave water can infiltrate basis sand-like foundation soil around, and make pile foundation be immersed in water, water is to the buoyancy of pile foundation, thus the effective unit weight of pile foundation is reduced, be equivalent to lighten, cause the resistance to tipping moment of pile foundation to reduce, once resistance to tipping moment is not enough, toppling of facility will be there is, there is great potential safety hazard.
For the problems referred to above, can reinforce the basis of facility on the sand ground that pulls in shore, to avoid toppling of facility.At present, for the underpin technology of the sand ground facility that pulls in shore, mainly contain square technology of just building, caisson technology, put and turn round king's block technology and stacking large geotechnical cloth sand pocket technology etc. four kinds.
Just building square technology, between its square, overall performance is poor, cannot resist the impact of larger wave, in typhoon season, when wave exceedes some strength, is just building square and there is risk of collapsing.
Caisson technology, the construction period is long, and construction cost is high, and inevitably there is gap between caisson, and foundation bottom ground still may be washed in a pan empty by typhoon wave local, still there is above-mentioned risk.
Put and turn round king's block technology, the construction period is long, need configure large-scale overweight machinery when ornaments turn round king's block; After completion, turn round between king's block and there is a large amount of space equally, still there is local and wash in a pan empty risk in typhoon season blower foundation ground, still there is potential safety hazard.
Stack large geotechnical cloth sand pocket technology, poor durability, stormy waves is comparatively large, when flooding sand pocket, sand pocket existed drift risk, still safe not.
Above-mentioned four kinds of reinforcing techniques, all alleviation to a certain degree can only empty the problem of toppling caused, all fail thoroughly to solve the problem, still there is gene basis and empty caused risk of toppling.
Utility model content
The utility model is intended to overcome above-mentioned prior art defect, provide a kind of can thoroughly solve pull in shore that facility basis, sandy beach is emptied, the ruggedized construction on facility basis on the sand ground that pulls in shore of problem of toppling.
The ruggedized construction on facility basis on the sand ground that pulls in shore described in the utility model, comprise construction in the periphery on facility basis, by the fender pile surrounded outside unrestrained position on facility basis, described fender pile is that multiple pile foundation is engaged formation interlocking pile structure each other, has the closed circular arc Guan Liang be connected as a single entity with the pile foundation of all interlocking piles in the construction of the top of fender pile.
The ruggedized construction on facility basis on the sand ground that pulls in shore described in the utility model, periphery, its basis at facility be provided with by enclose towards the outsourcing of wave position, the fender pile of interlocking pile structure that is configured to by multiple pile foundation be engaged each other, the fender pile of interlocking pile structure can stop wave washing away facility basis, and wave can only impact the outside at interlocking pile; Inside interlocking pile, the sandy soil of the basic internal of facility are then held tightly in inside by annular interlocking pile, by the restriction of interlocking pile, sandy soil not only between facility basis and interlocking pile can not run off, and the sandy soil between each pile foundation of basic internal also can not run off, it well can ensure the constant of facility basis vertical bearing capacity, thus maintain the steadiness on basis, reliably avoid toppling of basis, thoroughly solve the problem emptied, topple in facility basis, sandy beach of pulling in shore.In addition, the fender pile of interlocking pile structure can also avoid wave water to enter into foundation soil, basis can not be caused to be soaked, thus can not affect the effective unit weight on basis, thus avoid the reduction of the resistance to tipping moment therefore caused during waviness.In addition, the closed circular arc Guan Liang be connected as a single entity with all interlocking pile pile foundations that interlocking pile structural top is arranged, can make upper end freely interlocking pile structure force way by cantilevered force way be converted into by circular arc Guan Liang retrain approximate simply-support force way, closed circular arc hat beam can form hoop for barrel effect to all pile foundations of interlocking pile structure, make fender pile overall stressed more stable, when identical fender pile structure, its footpath can be less, thus can save material cost.
Accompanying drawing explanation
Fig. 1 is the structural representation of the ruggedized construction on facility basis on the sand ground that pulls in shore described in the utility model.
Detailed description of the invention
As Fig. 1, comprise construction in the periphery on facility basis 1, by the fender pile surrounded outside unrestrained position on facility basis, described fender pile is that multiple pile foundation 21 is engaged formation interlocking pile structure 2 each other, has the closed circular arc be connected as a single entity with the pile foundation of all interlocking piles to be preced with beam 3 in the construction of the top of fender pile.
Described protection dress can 360 degree entirely surround facilities basis, the pile foundation 360 degree of its interlocking pile structure surrounds facility basis entirely, protects reliably to basis.
The pile foundation of the interlocking pile structure of fender pile also can only surround wave position, in the position vacancy that wave cannot arrive, its can when effectively prevent foundation soil run off, basis empty, reduce material cost, as Fig. 1.
Described fender pile is the interlocking pile structure be alternately engaged by plain concrete stake and reinforced concrete pile.

Claims (2)

1. the ruggedized construction on facility basis on the sand ground that pulls in shore, it is characterized in that: comprise construction in the periphery on facility basis, by the fender pile surrounded outside unrestrained position on facility basis, described fender pile is that multiple pile foundation is engaged formation interlocking pile structure each other, has the closed circular arc Guan Liang be connected as a single entity with the pile foundation of all interlocking piles in the construction of the top of fender pile.
2. the ruggedized construction on facility basis on the sand ground that pulls in shore according to claim 1, is characterized in that: described fender pile is the interlocking pile structure be alternately engaged by plain concrete stake and reinforced concrete pile.
CN201520344972.2U 2015-05-26 2015-05-26 The ruggedized construction on facility basis on a kind of sand ground that pulls in shore Active CN204690809U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201520344972.2U CN204690809U (en) 2015-05-26 2015-05-26 The ruggedized construction on facility basis on a kind of sand ground that pulls in shore

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201520344972.2U CN204690809U (en) 2015-05-26 2015-05-26 The ruggedized construction on facility basis on a kind of sand ground that pulls in shore

Publications (1)

Publication Number Publication Date
CN204690809U true CN204690809U (en) 2015-10-07

Family

ID=54231118

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201520344972.2U Active CN204690809U (en) 2015-05-26 2015-05-26 The ruggedized construction on facility basis on a kind of sand ground that pulls in shore

Country Status (1)

Country Link
CN (1) CN204690809U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN104831764A (en) * 2015-05-26 2015-08-12 中国能源建设集团广东电力工程局有限公司 Reinforcing structure of facility foundation on sand near beach

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN104831764A (en) * 2015-05-26 2015-08-12 中国能源建设集团广东电力工程局有限公司 Reinforcing structure of facility foundation on sand near beach

Similar Documents

Publication Publication Date Title
CN101666098B (en) Sheet-cell conduit frame prefabricated part pilling structure and dock using same
CN105178245A (en) Large filling bag ecological embankment and revetment building method for river lake channel
JP3230318U (en) Composite foundation structure of single pile for offshore wind power generation
CN102330436B (en) Composite retaining structure and composite retaining method for half geotechnical layer ultradeep round spiral flow tank
CN101838996A (en) Sea gravity type pile foundation combined fan foundation
CN107165177A (en) A kind of side slope supporting construction method
CN102061678A (en) Method for building seaport wharf on soft soil base of coastal beach
CN204690809U (en) The ruggedized construction on facility basis on a kind of sand ground that pulls in shore
CN206157792U (en) Complementary rectification reinforced structure of stake raft
CN202730796U (en) Existing retaining wall rib plate type unloading reinforcing structure
CN211172057U (en) Offshore single-pile foundation with cement mixing pile reinforced foundation
CN210507392U (en) Structural layer formed rapidly in soft foundation field
CN201686963U (en) Riprap slope-type breakwater with supporting frame inside
CN104389290B (en) The anti-bed mud of a kind of wave of the water resistant for Tai Lake plant protection is washed in a pan erosion device
CN206157758U (en) But towage's truss marine wind turbine foundation structure of gravity type combination
CN106677121B (en) Protect the movable permeable spur structure and construction method of Coastal erosion
JP5322068B1 (en) Construction method of submarine
CN104831764A (en) Reinforcing structure of facility foundation on sand near beach
CN205954573U (en) Basalt fiber system unrestrained type hydraulic reclamation island reef bank protection that fixes sand to disappear
CN211773854U (en) Soil retaining structure permeates water with soil nail
CN211498714U (en) Multistage scour protection dyke pond
CN209779617U (en) Pile foundation structure with high-pressure jet grouting pile serving as side slope support pile
RU129948U1 (en) HIGH STRENGTH GABIONS
CN207633320U (en) A kind of protective reinforcing structure of ecology man-made island
CN208563362U (en) The more leg jacket foundation structures of pile foundation gravity type offshore wind turbine height stake

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant