CN204690723U - 一种土压力盒侧向固定装置 - Google Patents
一种土压力盒侧向固定装置 Download PDFInfo
- Publication number
- CN204690723U CN204690723U CN201520165002.6U CN201520165002U CN204690723U CN 204690723 U CN204690723 U CN 204690723U CN 201520165002 U CN201520165002 U CN 201520165002U CN 204690723 U CN204690723 U CN 204690723U
- Authority
- CN
- China
- Prior art keywords
- fastening devices
- earth pressure
- expansion link
- pressure cell
- firm banking
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
Landscapes
- Force Measurement Appropriate To Specific Purposes (AREA)
Abstract
本实用新型涉及一种土压力盒侧向固定装置,包括混凝土模板、固定底座、铰接底座、伸缩杆和固定装置;所述固定底座设置于混凝土模板上;所述铰接底座安装在固定底座上,所述伸缩杆的一端铰接安装在铰接底座上,伸缩杆的另一端与固定装置相连。本实用新型结构简单,不需要额外的安装配件,且安装拆卸速度快,不影响后续施工;本实用新型的定位准确,在后续施工过程中不会发生偏移;本实用新型的固定装置将整体土压力盒保护起来,避免在混凝土浇筑过程中水泥浆液凝结在土压力盒表面,影响测量精度。
Description
技术领域
本实用新型属于工程测量、测试技术领域,公开了一种土压力盒侧向固定装置。
背景技术
在工程建设及使用过程中,侧向土压力对建筑结构会产生较大的影响。对于揭露出表面的岩土体,侧向土压力量测仍以土压力盒为主,由于土压力盒位于结构与岩土体之间,操作空间狭窄,在实际安装过程中存在定位、固定困难的问题。目前常用的土压力盒侧向固定方法有焊接法和绑扎法,前者在焊接过程中可能会造成土压力盒的损坏,后者在混凝土浇筑、振捣过程中会引起土压力盒固定位置的改变,且两者都无法起到保护土压力盒的作用,因此两种方法都会对侧向土压力的监测精度产生一定的影响,同时也会影响到结构的正常施工。
实用新型内容
针对现有技术中土压力盒侧向固定所存在的问题,本实用新型提出一种结构简单,使用方便的土压力盒侧向固定装置,能够保证土压力盒紧贴于待测岩土体表面,且起到保护土压力盒的作用。
为实现上述目的,本实用新型采取的技术方案如下:
一种土压力盒侧向固定装置,包括混凝土模板、固定底座、铰接底座、伸缩杆和固定装置;所述固定底座设置于混凝土模板上;所述铰接底座安装在固定底座上,所述伸缩杆的一端铰接安装在铰接底座上,伸缩杆的另一端与固定装置相连。
本实用新型的土压力盒侧向固定装置能够将土压力盒放置在固定装置内,固定底座抵靠在混凝土模板上,通过调节伸缩杆长度,使土压力盒紧贴于测试岩土体表面,结构简单,操作方便,可以解决土压力盒测试侧向土压力埋设过程中定位、固定困难的问题,并对土压力盒起到保护作用。
作为优选,所述固定装置由可相对滑移的内层固定盒和外层固定盒套装组成,所述外层固定盒的侧壁上设有滑槽,所述内层固定盒套装在滑槽内,并可相对外层固定盒移动;所述外层固定盒与伸缩杆相连。
不同量程和型号的土压力盒,其厚度也不相同,因此设置可相对滑移的内层固定盒和外层固定盒来固定不同厚度的土压力盒,因为一般土压力均为圆形结构,因此将内层固定盒设置为不设底面的圆桶状结构,套装在外层固定盒内,可以拉出或缩回到外层固定盒内,通过固定盒的顶压可以将土压力盒固定在预定位置,并保护土压力盒在施工过程中免受破坏。
作为优选,所述铰接底座为“U”形槽结构,所述伸缩杆插入该“U”形槽的槽体中,并通过铰接底座上安装的转轴与铰接底座相铰接。
作为优选,所述伸缩杆为弹簧式伸缩杆,通过扭转弹簧位置可调节伸缩杆的长度。
在实际测量的过程中,为了方便调节弹簧式的伸缩杆与混凝土模板和固定底座的位置,因此设置U形槽铰接的方式,其结构简单,操作方便。
作为优选,所述固定底座通过压力或者粘结剂抵靠在混凝土模板上。
在实际测量的过程中,伸缩杆的位置必须保持水平,可以根据实际情况制作多个角度不同的混凝土模板,以便使伸缩杆保持水平,通过压力抵靠在混凝土模板上进行测量,更换的时候非常方便,必要的时候也可以用粘结剂粘结。
为了体现本实用新型的实用性,本实用新型还提供该土压力侧向固定装置的使用方法,包括如下步骤:
一种利用上述装置生产富硒沼气肥的方法,其特征在于:
(1)清理平整岩土体表面,将土压力盒放置于固定装置内,并将土压力盒的导线引出连接到土压力盒测试仪;
(2)将固定底座抵靠在混凝土模板上,并保持伸缩杆水平。
(3)调节伸缩杆长度,直至土压力盒测试仪读数发生变化时为止。
本实用新型与现有技术相比,主要优点在于:
(1)本实用新型结构简单,不需要额外的安装配件,且安装拆卸速度快,不影响后续施工;
(2)本实用新型的定位准确,在后续施工过程中不会发生偏移;
(3)本实用新型的固定装置将整体土压力盒保护起来,避免在混凝土浇筑过程中水泥浆液凝结在土压力盒表面,影响测量精度;
(4)本实用新型的混凝土模板与固定底座抵靠安装,更换方便;铰接底座安装在固定底座上,伸缩杆相当于与混凝土模板和固定底座铰接设置,方便伸缩杆调节成水平状态。
附图说明
图1为本实用新型立面埋设示意图;
图2为本实用新型平面埋设示意图;
图3为内层固定盒和外层固定盒的安装示意图;
图1、图2和图3中的附图标记说明如下:1-凝土模板、2-固定底座、3-铰接底座、4-伸缩杆、5-固定装置,6-转轴,7-岩体侧壁,51–内层固定盒、52-内层固定盒、53-滑槽。
具体实施方式
下面结合附图对本实用新型的装置作进一步详细说明,不详之处见实用新型内容部分。
一种土压力盒侧向固定装置,包括混凝土模板1、固定底座2、铰接底座3、伸缩杆4和固定装置5;所述固定底座2设置于混凝土模板1上;所述铰接底座3安装在固定底座2上,所述伸缩杆4的一端铰接安装在铰接底座3上,伸缩杆4的另一端与固定装置5相连。
其中,所述固定装置5由可相对滑移的内层固定盒51和外层固定盒52套装组成,所述外层固定盒52的侧壁上设有滑槽53,所述内层固定盒51套装在滑槽53内,并可相对外层固定盒移动;所述外层固定盒52与伸缩杆4相连。
其中,所述铰接底座3为“U”形槽结构,所述伸缩杆4插入该“U”形槽的槽体中,并通过铰接底座3上安装的转轴6与铰接底座3相铰接。
其中,所述伸缩杆4为弹簧式伸缩杆,通过扭转弹簧位置可调节伸缩杆4的长度。
其中,所述固定底座2通过压力或者粘结剂抵靠在混凝土模板1上。
实施例1:
某高速公路黄土隧道工程,要求在初支与二衬之间安装土压力盒,测试隧道衬砌的荷载分布情况。隧道二衬采用C30素混凝土现场浇筑,由于二衬设计中没有配置钢筋,因此土压力盒的固定较为困难,且浇筑混凝土时需振捣密实,土压力盒极易遭到损坏而失效。
根据现场情况,采用一种土压力盒侧向固定装置,参见图1和图2,包括混凝土模板、固定底座、铰接底座、伸缩杆和固定装置;所述固定底座设置于混凝土模板上;所述铰接底座安装在固定底座上,所述伸缩杆的一端铰接安装在铰接底座上,伸缩杆的另一端与固定装置相连。
本实用新型埋设方法包括以下步骤:
(1)清理平整岩土体表面,将土压力盒放置于固定装置内,并将土压力盒的导线引出连接到土压力盒测试仪;
(2)将固定底座抵靠在混凝土模板上,并保持伸缩杆水平。
(3)调节伸缩杆长度,直至土压力盒测试仪读数发生变化时为止。
实施效果:采用本实用新型提供的土压力盒侧向固定装置,能够将土压力盒紧贴于隧道初支表面,在隧道二衬混凝土浇筑过程中不会发生位置偏移,并且还能起到保护土压力盒的作用。隧道二衬施工完成后,土压力盒读数正常,完全满足监测精度要求。
本说明书中所描述的具体实施例仅仅是对本实用新型精神作举例说明。本实用新型所属技术领域的技术人员可以对所描述的具体实施例做各种各样的修改或补充或采用类似的方式替代,但并不会偏离本实用新型的精神或者超越所附权利要求书所定义的范围。
Claims (5)
1.一种土压力盒侧向固定装置,其特征在于:包括混凝土模板(1)、固定底座(2)、铰接底座(3)、伸缩杆(4)和固定装置(5);所述固定底座(2)设置于混凝土模板(1)上;所述铰接底座(3)安装在固定底座(2)上,所述伸缩杆(4)的一端铰接安装在铰接底座(3)上,伸缩杆(4)的另一端与固定装置(5)相连。
2.根据权利要求1所述的土压力盒侧向固定装置,其特征在于:所述固定装置(5)由可相对滑移的内层固定盒(51)和外层固定盒(52)套装组成,所述外层固定盒(52)的侧壁上设有滑槽(53),所述内层固定盒(51)套装在滑槽(53)内,并可相对外层固定盒移动;所述外层固定盒(52)与伸缩杆(4)相连。
3.根据权利要求1所述的土压力盒侧向固定装置,其特征在于:所述铰接底座(3)为“U”形槽结构,所述伸缩杆(4)插入该“U”形槽的槽体中,并通过铰接底座(3)上安装的转轴(6)与铰接底座(3)相铰接。
4.根据权利要求1所述的土压力盒侧向固定装置,其特征在于:所述伸缩杆(4)为弹簧式伸缩杆,通过扭转弹簧位置可调节伸缩杆(4)的长度。
5.根据权利要求1所述的土压力盒侧向固定装置,其特征在于:所述固定底座(2)通过压力或者粘结剂抵靠在混凝土模板(1)上。
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201520165002.6U CN204690723U (zh) | 2015-03-23 | 2015-03-23 | 一种土压力盒侧向固定装置 |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201520165002.6U CN204690723U (zh) | 2015-03-23 | 2015-03-23 | 一种土压力盒侧向固定装置 |
Publications (1)
Publication Number | Publication Date |
---|---|
CN204690723U true CN204690723U (zh) | 2015-10-07 |
Family
ID=54231032
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201520165002.6U Expired - Fee Related CN204690723U (zh) | 2015-03-23 | 2015-03-23 | 一种土压力盒侧向固定装置 |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN204690723U (zh) |
Cited By (6)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN106052916A (zh) * | 2016-08-08 | 2016-10-26 | 石家庄铁道大学 | 一种用于填方工程的土压力盒埋设装置及方法 |
CN106192967A (zh) * | 2016-08-31 | 2016-12-07 | 中铁建大桥工程局集团第五工程有限公司 | 一种用于在顶管管节中安装固定土压力盒装置及方法 |
CN106323527A (zh) * | 2016-09-27 | 2017-01-11 | 中国科学院武汉岩土力学研究所 | 一种压力盒快速定位固定装置 |
CN108930540A (zh) * | 2017-05-27 | 2018-12-04 | 中冶长天国际工程有限责任公司 | 隧道初支-二衬接触压力测量装置及其埋设方法 |
CN109707448A (zh) * | 2019-02-20 | 2019-05-03 | 西安科技大学 | 一种用于安装土压力盒的辅助设备 |
CN111962575A (zh) * | 2020-09-17 | 2020-11-20 | 湖南联智科技股份有限公司 | 一种监测点布设结构 |
-
2015
- 2015-03-23 CN CN201520165002.6U patent/CN204690723U/zh not_active Expired - Fee Related
Cited By (9)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN106052916A (zh) * | 2016-08-08 | 2016-10-26 | 石家庄铁道大学 | 一种用于填方工程的土压力盒埋设装置及方法 |
CN106052916B (zh) * | 2016-08-08 | 2022-06-24 | 石家庄铁道大学 | 一种用于填方工程的土压力盒埋设装置及方法 |
CN106192967A (zh) * | 2016-08-31 | 2016-12-07 | 中铁建大桥工程局集团第五工程有限公司 | 一种用于在顶管管节中安装固定土压力盒装置及方法 |
CN106323527A (zh) * | 2016-09-27 | 2017-01-11 | 中国科学院武汉岩土力学研究所 | 一种压力盒快速定位固定装置 |
CN108930540A (zh) * | 2017-05-27 | 2018-12-04 | 中冶长天国际工程有限责任公司 | 隧道初支-二衬接触压力测量装置及其埋设方法 |
CN108930540B (zh) * | 2017-05-27 | 2024-02-13 | 中冶长天国际工程有限责任公司 | 隧道初支-二衬接触压力测量装置及其埋设方法 |
CN109707448A (zh) * | 2019-02-20 | 2019-05-03 | 西安科技大学 | 一种用于安装土压力盒的辅助设备 |
CN109707448B (zh) * | 2019-02-20 | 2024-05-28 | 西安科技大学 | 一种用于安装土压力盒的辅助设备 |
CN111962575A (zh) * | 2020-09-17 | 2020-11-20 | 湖南联智科技股份有限公司 | 一种监测点布设结构 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN204690723U (zh) | 一种土压力盒侧向固定装置 | |
CN103233486B (zh) | 锚拉式挡土墙模型试验装置及试验方法 | |
CN105352884B (zh) | 测试混凝土与煤、岩或砼粘结强度的实验方法和构件 | |
CN205333076U (zh) | 一种地表沉降监测点埋设结构 | |
CN104989411A (zh) | 盾构施工引起的管片周围饱和砂土液化判别装置及方法 | |
Zheng et al. | Centrifuge modeling of the influence of basement excavation on existing tunnels | |
Bonini et al. | State of stress in tunnel lining in squeezing rock conditions | |
Ren-peng et al. | Three-dimensional centrifuge modeling of influence of nearby excavations on existing tunnels and effects of cut-off walls | |
Sienko et al. | Application of distributed optical fibre sensor for strain and temperature monitoring within continuous flight auger columns | |
CN212865883U (zh) | 一种精准基坑的变形监测装置 | |
CN104988884A (zh) | 一种用于面板堆石坝的脱空变形监测装置及安装方法 | |
CN204920938U (zh) | 一种钻孔灌注桩的钻孔检测仪 | |
Volkmann et al. | A contribution to the design of tunnels supported by a pipe roof | |
CN107631676B (zh) | 一种隧道初支与二衬间相对竖向位移的监测方法 | |
CN104060598A (zh) | 一种竖向布置土压力盒的固定装置 | |
CN210529780U (zh) | 一种微型钢管桩与水泥浆界面压力现场测试装置 | |
KR101591802B1 (ko) | 개량형 맨홀구조를 이용한 도로의 시공방법 | |
CN114518292A (zh) | 斜跨坎儿井的高速铁路路基的模型试验装置及试验方法 | |
CN204435892U (zh) | 清水混凝土原浆抹平楼地面隐藏式标高装置 | |
CN108489814B (zh) | 静止侧向土压力系数k0原位测试装置及测试方法 | |
CN207007401U (zh) | 一种用于隧道围岩压力测试的土压力盒固定装置 | |
CN105696635A (zh) | 一种植入受力钢筋的预应力管桩桩身内力测试装置 | |
Bhardwaj et al. | Experimental study on model micropiles under oblique pullout loads | |
Chunshan et al. | Selection of reasonable scheme of entering into a working well in shield construction | |
Gottardi et al. | Monitoring-driven design of a multiphase intervention for the preservation of the Frari bell tower in Venice |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C14 | Grant of patent or utility model | ||
GR01 | Patent grant | ||
CF01 | Termination of patent right due to non-payment of annual fee | ||
CF01 | Termination of patent right due to non-payment of annual fee |