CN204690570U - Road repair paster structure - Google Patents

Road repair paster structure Download PDF

Info

Publication number
CN204690570U
CN204690570U CN201520289272.8U CN201520289272U CN204690570U CN 204690570 U CN204690570 U CN 204690570U CN 201520289272 U CN201520289272 U CN 201520289272U CN 204690570 U CN204690570 U CN 204690570U
Authority
CN
China
Prior art keywords
road repair
paster structure
repair paster
oil reservoir
road
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201520289272.8U
Other languages
Chinese (zh)
Inventor
陈怡岳
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Brocade and India technology material Limited by Share Ltd
Original Assignee
Yongzong Enterprise Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Yongzong Enterprise Co Ltd filed Critical Yongzong Enterprise Co Ltd
Priority to CN201520289272.8U priority Critical patent/CN204690570U/en
Application granted granted Critical
Publication of CN204690570U publication Critical patent/CN204690570U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Road Repair (AREA)

Abstract

The utility model relates to a kind of road repair paster structure, this road repair paster structure is made up of asphalt concrete layer, pitch oil reservoir and strippable paper, espespecially be provided with fiber in road repair paster structure, and pitch oil reservoir is located at below asphalt concrete layer, again strippable paper is attached at pitch oil reservoir, allow road repair paster structure can rapid construction whereby, and promote durability and obdurability is not fragile.

Description

Road repair paster structure
Technical field
The utility model relates to a kind of road repair paster structure, this road repair paster structure can rapid attachment on impaired road, reach the effect of repairing fast.
Background technology
Ordinary Rd is all laid with heated asphalt concrete and forms, there is provided smooth, firm road by motor-driven vehicle going, but road is exposed to the sun and rain for a long time, and bear the weight of motor vehicle, heated asphalt concrete easily produces micro-cracks, and as repaired not to the utmost soon, its crack will expand and form hole, hole, dangerous by causing the motor vehicle passed through to produce, and the mode of generally repairing can be divided into:
Heated asphalt concrete, the heated asphalt concrete of breakage is shaved and is removed, again new heated asphalt concrete is laid leveling again, but this kind of mode cost consuming time improves relatively, and shave and cause unnecessary waste except area is greater than original impaired area, and the heated asphalt concrete again laid easily easily causes stacking situation to make road produce rugged problem.
Normal temperature bituminous concrete, be installed in bag, during for carrying out repairing action, first the normal temperature bituminous concrete in bag must be taken out, its uniform spreading is located on damaged road, then carry out compaction actions, repairing work can be completed, but the engaging force of this kind of repairing method normal temperature bituminous concrete and road is low, and cannot for a long time and road fit, easy appearance produces the situation in crack again.
In addition, for effective recycling obsolete material (as tire, plastics and rubber etc.), obsolete material is rubbed into granular environment-friendly materials, and make an addition in existing bituminous concrete and pitch, increase the elasticity of bituminous concrete and pitch, and effectively utilize environment-friendly materials, reduce environmental injury.
Road repair paster is developed in market namely for this reason, by coating asphalt oil reservoir under an asphalt concrete layer, finally strippable paper is made to be affixed on pitch oil reservoir, and existing asphalt concrete layer is made by rubble, pitch, environment-friendly materials etc., strippable paper need only be torn when road repair paster uses, road repair paster can be attached to fast the slight crack place on road surface, but this kind of structure is often because of the oppression of motor vehicle, and the asphalt concrete layer occurred on road repair paster produces breakage.
And in order to improve the disappearance of above-mentioned road repair paster namely in asphalt concrete layer and coal tar interlayer sandwiched one fibrage on market, increase the structural of road repair paster whereby, its toughness can be strengthened by means of fibrage, but its asphalt concrete layer still can produce breakage under Long-Time Service, and the asphalt concrete layer of road repair paster is peeled off, an exposed fiber layer.
In view of this, the design people's active research develops a kind of road repair paster structure, to improving existing disappearance, and increases its practicality.
Utility model content
The purpose of this utility model is to provide one can rapid construction promote durability and the non-damageable road repair paster structure of obdurability.
For achieving the above object, the utility model provides a kind of road repair paster structure, wherein, described road repair paster structure is made up of asphalt concrete layer, pitch oil reservoir and strippable paper, described pitch oil reservoir is located at below described asphalt concrete layer, and described strippable paper is attached at described pitch oil reservoir, is provided with fiber in described road repair paster structure, promote the structural strength of road repair paster structure whereby, and extend the service time of road.
Road repair paster structure as above, wherein, the fiber of described road repair paster structure is located at described asphalt concrete layer and described pitch oil reservoir.
Road repair paster structure as above, wherein, described asphalt concrete layer is located at by the fiber of described road repair paster structure.
Road repair paster structure as above, wherein, described pitch oil reservoir is located at by the fiber of described road repair paster structure.
Feature of the present utility model and advantage as follows:
Of the present utility modelly mainly provide a kind of road repair paster structure, this road repair paster structure is made up of asphalt concrete layer, pitch oil reservoir and strippable paper, espespecially be provided with fiber in road repair paster structure, and pitch oil reservoir is located at below asphalt concrete layer, again strippable paper is attached at pitch oil reservoir, allow road repair paster structure can rapid construction whereby, and promote durability and obdurability is not fragile.
Accompanying drawing explanation
The following drawings is only intended to schematically illustrate the utility model and explain, does not limit scope of the present utility model.Wherein:
Fig. 1 is perspective exploded view of the present utility model.
Fig. 2 is partial cutaway schematic of the present utility model.
Fig. 3 is use schematic diagram of the present utility model.
Fig. 4 is an embodiment generalized section more of the present utility model.
Fig. 5 is another embodiment generalized section of the present utility model.
Drawing reference numeral illustrates:
100 road repair paster structures
10 asphalt concrete layer 11 pitches
12 rubble 13 environment-friendly materials
20 pitch oil reservoir 21 pitches
22 environment-friendly materials
30 strippable papers
40 fibers
50 road 51 cracks
Detailed description of the invention
For the effect making technological means of the present utility model and can reach, can have more complete and clearly disclose, being now described in detail as follows, seeing also the graphic of exposure and figure number:
Refer to shown in Fig. 1, the utility model is relevant a kind of road repair paster structure, this road repair paster structure 100 is by asphalt concrete layer 10, pitch oil reservoir 20 and strippable paper 30 formed, espespecially in road repair paster structure 100, be provided with fiber 40, containing pitch 11 in its asphalt concrete layer 10, rubble 12 and environment-friendly materials 13, and pitch oil reservoir 20 is containing pitch 21 and environment-friendly materials 22, and make pitch oil reservoir 20 be located at below asphalt concrete layer 10, finally again strippable paper 30 is attached at pitch oil reservoir 20, because road repair paster structure 100 can lift structure intensity (as shown in Figure 2) containing fiber 40, and road repair paster structure 100 durability is lengthened, and it is fragile and break to allow road repair paster structure 100 have obdurability.
So, when road 50 road surface produces damaged and crack 51, tear by the strippable paper 30 below road repair paster structure 100 of the present utility model, be affixed on the crack 51 of damage with pitch oil reservoir 20 face, get final product Rapid-Repair crack 51, because of the setting of road repair paster structure 100, vehicle can be born through out-of-date produced pressure, and then prevent the breakage of this road 50 or crack 51 from continuing to expand, the road surface after repairing is allowed to maintain good condition, and road repair paster structure 100 of the present utility model is provided with fiber 40 (as shown in Figure 3), road repair paster structure 100 is not only allowed to strengthen its obdurability and structural, and extend the application life of road repair paster structure 100, improve traffic safety.
The fiber 40 of the utility model road repair paster structure 100 is located at asphalt concrete layer 10 and pitch oil reservoir 20.
As shown in Figure 4, be an embodiment more of the present utility model, asphalt concrete layer 10 is located at by the fiber 40 of this road repair paster structure 100.
As shown in Figure 5, be another embodiment of the present utility model, pitch oil reservoir 20 is located at by the fiber 40 of this road repair paster structure 100.
The fiber 40 of the utility model road repair paster structure 100 can be the materials such as string, mineral fibers, chemical fibre, synthetic fibers.
The foregoing is only the schematic detailed description of the invention of the utility model, and be not used to limit scope of the present utility model.Any those of ordinary skill in the art, equivalent variations done under the prerequisite not departing from design of the present utility model and principle and amendment, all should belong to the scope of the utility model protection.

Claims (4)

1. a road repair paster structure, it is characterized in that, described road repair paster structure is made up of asphalt concrete layer, pitch oil reservoir and strippable paper, described pitch oil reservoir is located at below described asphalt concrete layer, described strippable paper is attached at described pitch oil reservoir, is provided with fiber in described road repair paster structure.
2. road repair paster structure according to claim 1, is characterized in that, the fiber of described road repair paster structure is located at described asphalt concrete layer and described pitch oil reservoir.
3. road repair paster structure according to claim 1, is characterized in that, described asphalt concrete layer is located at by the fiber of described road repair paster structure.
4. road repair paster structure according to claim 1, is characterized in that, described pitch oil reservoir is located at by the fiber of described road repair paster structure.
CN201520289272.8U 2015-05-07 2015-05-07 Road repair paster structure Active CN204690570U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201520289272.8U CN204690570U (en) 2015-05-07 2015-05-07 Road repair paster structure

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201520289272.8U CN204690570U (en) 2015-05-07 2015-05-07 Road repair paster structure

Publications (1)

Publication Number Publication Date
CN204690570U true CN204690570U (en) 2015-10-07

Family

ID=54230879

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201520289272.8U Active CN204690570U (en) 2015-05-07 2015-05-07 Road repair paster structure

Country Status (1)

Country Link
CN (1) CN204690570U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN105568834A (en) * 2015-12-10 2016-05-11 交通运输部公路科学研究所 Bituminous pavement pit slot repairing paste and method for repairing bituminous pavement

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN105568834A (en) * 2015-12-10 2016-05-11 交通运输部公路科学研究所 Bituminous pavement pit slot repairing paste and method for repairing bituminous pavement

Similar Documents

Publication Publication Date Title
CN207973957U (en) Impaired bitumen concrete road surface cracks repair structure
KR101323022B1 (en) Method of road repairing by using urethane sealant for repairing broken concrete near expansion joint
US20170167085A1 (en) Patch and method for repairing asphalt pavement
CN204825551U (en) Waterproof crack control bituminous paving structure
CN206143560U (en) Bituminous paving with self -diagnosis and self -repairing function
CN204690570U (en) Road repair paster structure
CN108774962A (en) A kind of road speed-reducing rubber band of impact resistance high abrasion
CN107244113A (en) Temporary pavement pallet device and method a kind of anti-skidding and that prevent buckling deformation
CN203334165U (en) Fiber asphalt spraying device
CN206680897U (en) A kind of high urban track traffic warning sign of protective
CN201620354U (en) Multilayer composite self-adhesive waterproof coiled material
CN108086144A (en) A kind of bridge shrinking cracks jumping prevents construction method
CN203174456U (en) Pavement structure suitable for road runnel
CN201801797U (en) Glass fiber-high polymer anti-crack paste
CN206189306U (en) Public security isolation buffering and restraining device and protective belt
CN204354552U (en) A kind of NEW TYPE OF COMPOSITE high-strength geotextile
CN205295986U (en) Device of repairing roads with multiple use
CN207047694U (en) A kind of environmentally friendly anticollision Bridge guardrail
CN206308575U (en) A kind of efficient color impression concrete road surface
CN215051722U (en) Asphalt concrete pavement structure
CN203393532U (en) Road and pavement structure thereof
CN202416371U (en) Manhole cover for municipal engineering
CN213867169U (en) Noise reduction steel plate structure for temporary pavement protection
CN218911530U (en) Protection device for be used for tunnel open cut tunnel hole top
CN211868829U (en) Take child pitch waterproofing membrane of isolation layer

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
TR01 Transfer of patent right
TR01 Transfer of patent right

Effective date of registration: 20171121

Address after: Chiayi County, Taiwan, China

Patentee after: Yang Zhiyuan

Address before: Chiayi County, Taiwan, China

Patentee before: YONGZONG ENTERPRISE CO., LTD.

TR01 Transfer of patent right
TR01 Transfer of patent right

Effective date of registration: 20180703

Address after: Chiayi County, Taiwan, China

Patentee after: Brocade and India technology material Limited by Share Ltd

Address before: Chiayi County, Taiwan, China

Patentee before: Yang Zhiyuan